Ave Beer Remix
   HOME

TheInfoList



OR:

''Alta Velocidad Española'' (''AVE'') is a service of
high-speed rail High-speed rail (HSR) is a type of rail system that runs significantly faster than traditional rail, using an integrated system of specialised rolling stock and dedicated tracks. While there is no single standard that applies worldwide, lines ...
in Spain operated by Renfe, the Spanish national railway company, at speeds of up to . As of December 2021, the Spanish high-speed rail network, on part of which the AVE service runs, is the longest HSR network in Europe with and the second longest in the world, after China's. AVE trains run on a network of high-speed rail track owned and managed by ADIF (''Administrador de Infraestructuras Ferroviarias''), where other high speed (, Alvia, Avlo) and mid-speed ( Altaria) services also operate. The first line was opened in 1992, connecting the cities of Madrid, Córdoba and Seville. Unlike the rest of the Iberian broad gauge network, the AVE uses
standard gauge A standard-gauge railway is a railway with a track gauge of . The standard gauge is also called Stephenson gauge (after George Stephenson), International gauge, UIC gauge, uniform gauge, normal gauge and European gauge in Europe, and SGR in Ea ...
. This permits direct connections to outside Spain through the link to the French network at the Perthus Tunnel. AVE trains are operated by Renfe, but private companies may be able to operate trains in the future using other brands, in accordance with European Union legislation. Some TGV-derived trains used to run on the broad-gauge network at slower speeds, but these were branded separately as
Euromed Euromed may refer to: * Euromed (train) * Barcelona Euro-Mediterranean Conference * Euro-Mediterranean Parliamentary Assembly See also * EU Med Group {{Disambig ...
until new rolling stock was commissioned for these services. Renfe is the dominant high-speed rail operator in Spain, but private companies Ouigo España and Iryo compete on the Madrid–Barcelona route. French TGV services run from the border to Barcelona. translates to "Spanish High Speed", but the initials are also a play on the word , meaning "bird".


History


New rail link to Andalusia

Towards the end of the 1980s a new line was planned to join the Castilian Meseta with Andalusia without passing through the
Despeñaperros Natural Park Despeñaperros (literally, ''liff wheredogs plunge'') is a gorge or canyon carved out by the Despeñaperros river. It is located in the municipality of Santa Elena in the northern portion of the province of Jaén, Spain. The area was declar ...
. After considering various options it was decided that a standard-gauge line, allowing for Spain's first high-speed rail link, would be built. The project was named NAFA (''Nuevo Acceso Ferroviario a Andalucía'', New Rail Link to Andalusia) and was meant to help revitalise the stagnant southern Spanish economy. The line was inaugurated on 14 April 1992 to coincide with Expo 92 being held in Seville. Seven days later on 21 April 1992 commercial service began with six daily services stopping at Madrid, Seville, Córdoba, Puertollano and
Ciudad Real Ciudad Real (, ; en, "Royal City") is a municipality of Spain located in the autonomous community of Castile–La Mancha, capital of the province of Ciudad Real. It is the 5th most populated municipality in the region. History It was founde ...
. In October 1992 Renfe began the AVE Lanzadera (Shuttle) service between Madrid and Puertollano and Ciudad Real. It has been suggested that the PSOE government chose the French
Alstom Alstom SA is a French multinational rolling stock manufacturer operating worldwide in rail transport markets, active in the fields of passenger transportation, signalling, and locomotives, with products including the AGV, TGV, Eurostar, Avelia ...
bid over the
Siemens Siemens AG ( ) is a German multinational conglomerate corporation and the largest industrial manufacturing company in Europe headquartered in Munich with branch offices abroad. The principal divisions of the corporation are ''Industry'', '' ...
and Talgo bids for political rather than technical reasons, rewarding the French government for its assistance in capturing ETA activists who took " sanctuary" across the border in southern France. Seville's hosting of the 1992 World's Fair prompted the choice of that city for the inaugural AVE line, with its being the home town of then Spanish prime minister Felipe González also playing some role. Seville is the artistic, cultural, and financial capital of southern Spain and the fourth largest city in Spain, after Madrid, Barcelona and Valencia, with a population of over 700,000 and a metropolitan area of almost 1.5 million people. It is also the capital of Andalusia, Spain's most populous autonomous community (region). In January 1993 the ''Talgo 200 Madrid–Málaga'' service began, using AVE lines as far as Córdoba and then the Córdoba–Málaga Spanish-gauge conventional track to reach
Málaga Málaga (, ) is a municipality of Spain, capital of the Province of Málaga, in the autonomous community of Andalusia. With a population of 578,460 in 2020, it is the second-most populous city in Andalusia after Seville and the sixth most pop ...
. On 23 April that year, the AVE set a new top speed of on a test run. Later in 1993 the mixed-method services ''Talgo 200 Madrid–Cádiz'' and ''Talgo 200 Madrid–Huelva'' began. In 1994 AVE trains on the Madrid–Seville line began to run at 300 km/h, cutting journey times by at least 40 minutes and covering the 471 km in hours, though it is unlikely that much of a saving came from the increase in maximum speed, because only a small section of the line near Los Yébenes has the alignments for 300 km/h operation. The maximum permitted speed is 270 km/h between Atocha station and Brazatortas, save for the approaches to the intermediate stations (Atocha, Ciudad Real and Puertollano). Beyond Brazatortas, the line is only authorised for 250 km/h operation, which drops to 215 km/h in the Sierra Morena mountains and 90 km/h around Córdoba station. It is more likely that time savings occurred as a result of there being fewer intermediate stops. Although in 1999 Renfe began a mixed-service ''Talgo 200 Madrid–Algeciras'' route, this was, along with the other mixed services, transferred to ''Grandes Líneas Renfe'' (Renfe's Spanish gauge long-distance brand) following changes to plans for high-speed rail in Spain. The last segment of the Madrid–Málaga high-speed rail line was completed on 24 December 2007 when the new high speed railway section between the cities of Córdoba and Málaga was inaugurated. It is a standard gauge railway line of 155 km in length and is designed for speeds of 300 km/h (186 mph). It has compatibility with neighbouring countries' railway systems as well. In October 2015 an extension of the Madrid-Seville high-speed rail line to Cádiz was completed after 14 years of works and put in service by Alvia trains for speeds up to 200 km/h. In 2019 the Antequera–Granada high-speed rail line opened.


AVANT – Media Distancia

In 1992, a new high-speed medium distance service (''AV Media Distancia'' operating under the AVE Lanzadera brand) began between Madrid, Ciudad Real and Puertollano, using spare class 100 trains. In November 2003 a new service began between Seville and Córdoba using new class 104 trains, reducing journey times between the two cities to 40 minutes. In 2005 the brand was renamed RENFE Avant, and all services started to use class 104 trains, leaving class 100 for AVE services. The construction of a stretch of high-speed line from Madrid to
Toledo Toledo most commonly refers to: * Toledo, Spain, a city in Spain * Province of Toledo, Spain * Toledo, Ohio, a city in the United States Toledo may also refer to: Places Belize * Toledo District * Toledo Settlement Bolivia * Toledo, Orur ...
allowed the inauguration of a medium distance service in November 2005. The journey time between the two cities is now less than 30 minutes. The high-speed link combined with high property prices in Madrid has encouraged many Madrid commuters to settle in
Ciudad Real Ciudad Real (, ; en, "Royal City") is a municipality of Spain located in the autonomous community of Castile–La Mancha, capital of the province of Ciudad Real. It is the 5th most populated municipality in the region. History It was founde ...
, the first stop on the Madrid–Seville line. There has, however, been controversy over the construction of this line as the change to standard-gauge track meant that towns such as Getafe, Aranjuez and
Algodor Algodor is a small settlement between Toledo and Aranjuez, Spain. The locality is within the municipal limits of Aranjuez and is in the Community of Madrid. It has a population of 14, but in its heyday in the 1920s there were more inhabitants a ...
, which now have no commercial services, lost their direct services to Toledo. Furthermore, since Toledo is now connected by standard-gauge track it is impossible for other passenger or goods trains to reach it that have not come from other high-speed lines. Further Avant services have been launched with the expansion of the AVE lines to Valladolid, Barcelona, Málaga and
Galicia Galicia may refer to: Geographic regions * Galicia (Spain), a region and autonomous community of northwestern Spain ** Gallaecia, a Roman province ** The post-Roman Kingdom of the Suebi, also called the Kingdom of Gallaecia ** The medieval King ...
. See below for details of all Avant services. In the Valladolid line, new class 114 trains are used. Both Avant class 104 and class 114 trains are Pendolino designs, without tilting capacity: - Avant class 104 trains are based in ETR 480 - Avant class 114 trains are based in
ETR 600 The New Pendolino is a class of high-speed tilting trains built by Alstom Ferroviaria (Fiat Ferroviaria) for Trenitalia and Cisalpino. It is derived from a model developed for the Chinese operator Changchun Railway Company, and subsequently deve ...


Madrid–Barcelona

The Madrid– ZaragozaBarcelona line was inaugurated on 20 February 2008, after parts of the line had operated since 2003 (Madrid–Zaragoza–Lleida) and 2006 (Lleida–Tarragona). This line is currently one of the world's fastest long-distance trains in commercial operation, with non-stop trains covering the between the two cities in just 2 hours 30 minutes, and those calling at all stations in 3 hours 10 minutes. The line includes a spur railway that branches off at Zaragoza towards Huesca in north
Aragon Aragon ( , ; Spanish and an, Aragón ; ca, Aragó ) is an autonomous community in Spain, coextensive with the medieval Kingdom of Aragon. In northeastern Spain, the Aragonese autonomous community comprises three provinces (from north to sou ...
. The Madrid-Huesca high-speed rail line was inaugurated in 2005. The line currently terminates at
Barcelona Sants railway station Barcelona Sants is the main railway station in Barcelona, owned by Adif, the railway infrastructure agency of Spain. It has become the most important transport hub of the city - being the centre of Rodalies de Catalunya including Barcelona sub ...
, but a new station is under construction at La Sagrera on the northern edge of the city. The Sants–La Sagrera tunnel links the Barcelona Sants station in Barcelona with the future Sagrera station through the Eixample district. The tunnel passes under and along the streets of
Provença Provence (, , , , ; oc, Provença or ''Prouvènço'' , ) is a geographical region and historical province of southeastern France, which extends from the left bank of the lower Rhône to the west to the Italian border to the east; it is bor ...
and
Mallorca Mallorca, or Majorca, is the largest island in the Balearic Islands, which are part of Spain and located in the Mediterranean. The capital of the island, Palma, is also the capital of the autonomous community of the Balearic Islands. The Bal ...
, while uses a short part under Diagonal avenue to link between these two streets. In the ''Carrer de Mallorca'' street, the tunnel passes directly in front of Gaudí's masterpiece, the basilica of the Sagrada Família, and in the ''Carrer de Provença'' street, near another Gaudí's architectural work, the Casa Milà. In a long campaign against this route, the ''Board of the Sagrada Família'' and other parties argued that the tunnel would damage the church, whose construction is still in progress. In this discussion about different possible routes, the one now built is also called the ''Provença tunnel'' because part of its route passes under the street of the same name. The tunnel boring machine ''Barcino'' passed the Sagrada Família in October 2010, and reached its final destination a few months later. In March 2012, railway equipment was installed, with a special elastic isolation of the rails in order to dampen vibrations at the sections passing close to Gaudí's architectural works, using the Edilon system. Rail traffic was planned to start in 2012, initially without stops at the La Sagrera station, which was expected to be completed in 2016. Map of the tunnel route and details if the railway equipment in the tunnel in a PDF in ''El Periodico''
/ref> The Sants–La Sagrera tunnel was finally inaugurated on 8 January 2013 along with the Perpignan–Barcelona high-speed rail line while commercial services via the tunnel towards France begun on the following day. However, works on the Sagrera station suspended in early 2014 due to a corruption scandal involving one of the companies carrying out the works. Construction works at the station were finally resumed in 2018 and the new AVE station is now expected to open in 2023.


Northern corridors

The first installment of a
high-speed rail High-speed rail (HSR) is a type of rail system that runs significantly faster than traditional rail, using an integrated system of specialised rolling stock and dedicated tracks. While there is no single standard that applies worldwide, lines ...
corridor in the north and north-west of Spain was the 179.6 km section Madrid– SegoviaValladolid which was put in operation on 22 December 2007. It includes a tunnel of at Guadarrama, which is the fourth longest train tunnel in Europe. The extension of the line with the 162.7 km section ValladolidVenta de BañosLeon was inaugurated on 29 September 2015. Valladolid will become the hub for all AVE lines connecting the north and north-west of Spain with the rest of the country. On 24 April 2010, it was announced a 55 km high-speed spur would leave the Madrid–Valladolid route at Segovia and continue to
Ávila Ávila (, , ) is a city of Spain located in the autonomous community of Castile and León. It is the capital and most populated municipality of the Province of Ávila. It lies on the right bank of the Adaja river. Located more than 1,130 m abov ...
. Initial plans were expected to be complete by the end of 2010 but as of 2020 this line remains unfinished. On 21 July 2022 a new 86.5 km section between Venta de Baños and Burgos was inaugurated after 13 years of works at an investment cost of 759 million euros and introduced a new AVE Madrid-Burgos service that cuts the journey time between the two cities down to just over an hour and a half. This section is the first expansion of the high-speed network to the north-northeast towards the Spanish region of the
Basque Country Basque Country may refer to: * Basque Country (autonomous community), as used in Spain ( es, País Vasco, link=no), also called , an Autonomous communities of Spain, autonomous community of Spain (shown in pink on the map) * French Basque Country o ...
and the future Basque high-speed railway line (Basque Y). It includes 2 tunnels and 12
viaduct A viaduct is a specific type of bridge that consists of a series of arches, piers or columns supporting a long elevated railway or road. Typically a viaduct connects two points of roughly equal elevation, allowing direct overpass across a wide v ...
s, the longest of them passes over Pisuerga river and
Autovía A-62 The Autovía A-62 (also known as ''Autovía de Castilla'') is a Spanish autovía which starts in Burgos and runs through the community of Castile and León, via the cities of Palencia, Valladolid and Salamanca, before ending at the Portuguese bor ...
highway. In the north-west of Spain the Madrid–Galicia high-speed rail line completed on 21 December 2021 after 20 years of works when the OlmedoZamoraSantiago de Compostela section was finished. This line is connected to the Madrid–Leon line at Olmedo south of Valladolid. Construction on the 87.1 km northernmost part of this section between the cities of
Ourense Ourense (; es, Orense ) is a city and capital of the province of Ourense, located in the Autonomous communities of Spain, autonomous community of Galicia (Spain), Galicia, northwestern Spain. It is on the Camino Sanabrés path of the Way of St ...
and Santiago de Compostela began late 2004 and this part was inaugurated in December 2011. The 107 km southern section, between Olmedo (130 km north of Madrid on the Madrid–Leon line) and Zamora entered revenue service on 17 December 2015 by Alvia trains. The 110 km new built section in the middle between Zamora and Otero de Sanabria near the town of
Puebla de Sanabria Puebla de Sanabria (; ) is a small town located in the north-western part of the province of Zamora in Spain, between the rivers Tera and Castro. It is the economic and political centre of the ''comarca'' of Sanabria. History Well known as ...
was put in service on 26 October 2020, while the 119.4 km last remaining part between Puebla de Sanabria and Ourense which crosses some of Spain's most remote and fragile nature areas, was completed in end 2021. Up to that date the entire line was served by Alvia S-730 (''Patito'', max speed ) trains. This line is connected in the region of
Galicia Galicia may refer to: Geographic regions * Galicia (Spain), a region and autonomous community of northwestern Spain ** Gallaecia, a Roman province ** The post-Roman Kingdom of the Suebi, also called the Kingdom of Gallaecia ** The medieval King ...
with the 156 km Atlantic Axis high-speed rail line that connects the cities of Vigo and A Coruña via Santiago de Compostela. The Atlantic Axis was inaugurated in April 2015 while the section A Coruña–Santiago de Compostela opened in 2009 and was electrified in 2011. The new railway shortened the distance between the two cities by 22 km, from 178 km to 156 km, and cut the travel time from around 3 hours on the old railway down to 1 hour and 20 minutes on the new one. 37 tunnels totalling 59 km and 34 bridges totalling 15 km form part of the rebuilt railway.


Eastern corridors

The Madrid–Levante network connects Madrid with the Mediterranean coast of the Levante Region (Eastern Spain). The Madrid– CuencaValencia line was officially finished on Friday, 10 December 2010, with commercial trips starting on Saturday 18 December 2010. Non-stop trains between Madrid and Valencia cover the in 1 hour 38 minutes. The Madrid– Albacete
Alicante Alicante ( ca-valencia, Alacant) is a city and municipality in the Valencian Community, Spain. It is the capital of the province of Alicante and a historic Mediterranean port. The population of the city was 337,482 , the second-largest in th ...
line was inaugurated on 17 June 2013. Trains cover the distance between Madrid and Alicante in 2 hour 12 minutes. On 22 January 2018 the extension section of the line to Castellón was inaugurated introducing a new AVE service Madrid-Castellón which cut the journey time between the two cities by further 30 minutes to total 2 hours and 25 minutes. The first stretch of the AVE service from Madrid to Murcia was inaugurated on 1 February 2021, linking Monforte del Cid, Elche and Orihuela, while the continuation up to Murcia is expected to be operational in 2021, and work is being prepared to extend the line to Cartagena. When fully operational the Madrid–Levante network will total 955 km of high-speed rail connecting Madrid, Cuenca, Albacete, Valencia, Alicante, Elche, Castellón, Murcia and Cartagena.


International connection with France

A milestone for the AVE network was reached in December 2013 when it was connected to the rest of Europe via France. The connecting link was the construction of the Barcelona–Figueres section of the Perpignan–Barcelona high-speed line, an extension of the Madrid–Barcelona line, completed in January 2013 at a cost of €3.7 billion. The international Perpignan–Figueres section of the line opened in December 2010 and includes the new Perthus Tunnel under the Pyrenees. The high-speed Barcelona-Figueres section (from Barcelona to the French border) was officially inaugurated in January 2013. The journey from the centre of Barcelona to the centre of Girona takes now 37 minutes (compared to the previous 90 minutes), and to Figueres in 53 minutes (instead of two hours). Girona and Figueres are now 14 minutes from each other. The Perpignan (France)-Figueres section opened in 2010. One lacking high-speed section on the French side, between
Montpellier Montpellier (, , ; oc, Montpelhièr ) is a city in southern France near the Mediterranean Sea. One of the largest urban centres in the region of Occitania (administrative region), Occitania, Montpellier is the prefecture of the Departments of ...
and
Nîmes Nîmes ( , ; oc, Nimes ; Latin: ''Nemausus'') is the prefecture of the Gard department in the Occitanie region of Southern France. Located between the Mediterranean Sea and Cévennes, the commune of Nîmes has an estimated population of 148,5 ...
, opened in July 2018, allowing almost continuous high-speed travel from the French high-speed network to the Spanish one. The French government, on the other hand, recently announced indefinite delays to the Montpellier-Perpignan high speed section that was originally planned for 2020.


Madrid interconnector

On 24 April 2010, tunnelling started on the 7.3 km route connecting the 2 main stations in Madrid,
Madrid Atocha Madrid Atocha ( es, Estación de Madrid Atocha), also named Madrid Puerta de Atocha–Almudena Grandes, is the first major railway station in Madrid. It is the largest station serving commuter trains ( ''Cercanías''), regional trains from the s ...
and
Madrid Chamartín Madrid ( , ) is the capital and most populous city of Spain. The city has almost 3.4 million inhabitants and a metropolitan area population of approximately 6.7 million. It is the second-largest city in the European Union (EU), an ...
. Electrification works for the line along with line duplication works in the section between Atocha and Torrejón de Velasco started in 2017 and these works were expected to be completed in early 2018 and the line was hoped to open for commercial service for AVE trains within the same year. A later announcement postponed the opening for the second half of 2020. However, delays in the schedule due to the COVID-19 pandemic postponed it further. In November 2021, the inauguration of the interconnector was projected to the first trimester of 2022. Test runs were being conducted in early February 2022, and the line was expected to be ready for permit application in early March. The tunnel finally opened on July 1, 2022. Before this all trains going towards Valladolid left from Chamartín and trains going to Seville,
Málaga Málaga (, ) is a municipality of Spain, capital of the Province of Málaga, in the autonomous community of Andalusia. With a population of 578,460 in 2020, it is the second-most populous city in Andalusia after Seville and the sixth most pop ...
, Valencia,
Alicante Alicante ( ca-valencia, Alacant) is a city and municipality in the Valencian Community, Spain. It is the capital of the province of Alicante and a historic Mediterranean port. The population of the city was 337,482 , the second-largest in th ...
and Barcelona left from Atocha station. Also, there is a single daily service in each direction running along the Barcelona–Seville, Barcelona–Málaga, and Barcelona-Granada routes, which uses the high-speed bypass around Madrid to avoid reversing the direction of train in Atocha station. The tunnel now allows services serving northern cities to travel non-stop or with a stop through Madrid and onward to southern cities (or vice versa), without the driver having to change ends or bypass Madrid, a valuable source of passengers. Previously someone wanting to travel from Valladolid to Alicante, for instance, had to travel from Valladolid Campo Grande station to Madrid Chamartín station before taking a Cercanías service to Atocha; then finally taking an onward train to Alicante.


Incidents and accidents

* Santiago de Compostela derailment * Euromed 2002 accident


Operational services

The Spanish high-speed network is used, among others, by the following services: * international: ** Barcelona–Lyon via Girona, Figueres, Perpignan, Narbonne, Béziers, Montpellier, Nîmes, and Valence. ** Barcelona–Paris via Girona, Figueres, Perpignan, Narbonne, Béziers, Agde, Sète, Montpellier, Nîmes, and Valence. ** Barcelona–Toulouse via Girona, Figueres, Perpignan, and Carcassonne. ** Madrid–Barcelona–Marseille via Zaragoza, Tarragona, Barcelona, Girona, Figueres, Perpignan, Narbonne, Béziers, Montpellier, Nîmes, Avignon, and Aix-en-Provence * : ** Barcelona–Granada via Tarragona, Lleida, Zaragoza, Córdoba, Puente Genil-Herrera and Antequera. ** Barcelona–Seville via Tarragona, Lleida, Zaragoza, Ciudad Real, Puertollano, and Córdoba. ** Madrid–Alicante via Cuenca, Albacete, and Villena. ** Madrid–Barcelona via Zaragoza, Lleida, and Tarragona. ** Madrid–Burgos via Valladolid. ** Madrid–Castellón via Cuenca and Valencia. ** Madrid–Granada via Ciudad Real, Puertollano, Córdoba, Puente Genil-Herrera, Antequera and Loja. ** Madrid–Huesca via Guadalajara, Calatayud, Zaragoza, and Tardienta. ** Madrid–León via Valladolid and Palencia. ** Madrid–Málaga via Córdoba, Puente Genil-Herrera, and Antequera. ** Madrid–Orihuela via Cuenca, Albacete, and Elche. ** Madrid–Ourense via Zamora. ** Madrid–Seville via Ciudad Real, Puertollano, and Córdoba. ** Madrid–Valencia via Cuenca and Requena-Utiel. ** Málaga–Barcelona via Antequera, Puente Genil-Herrera, Córdoba, Zaragoza, and Tarragona. ** Valencia–Seville via Cuenca, Ciudad Real, Puertollano, and Córdoba. ** Valencia–Burgos via Madrid Chamartín. * (mid distance): ** A Coruña–Santiago de Compostela–Ourense. ** Barcelona−Girona−Figueres. ** Barcelona–Tarragona–Lleida. ** Barcelona–Tortosa via Camp de Tarragona, Cambrils and L'Hospitalet de l'Infant. ** Calatayud–Zaragoza. ** Madrid–Ciudad Real–Puertollano. ** Madrid–Segovia–Valladolid. ** Madrid–Toledo. ** Málaga–Córdoba–Seville via Antequera and Puente Genil-Herrera. ** Málaga–Granada via Loja. ** Ourense–Santiago de Compostela–A Coruña. ** Valencia–Requena Utiel. * (mixed high-speed/conventional): ** Alicante–Santander, via Villena, Albacete, Cuenca, Madrid, Segovia, Valladolid, Palencia and Torrelavega. ** Barcelona–A Coruña, via Lleida, Zaragoza, Pamplona, Vitoria-Gasteiz, Burgos, León, Ponferrada, Ourense and Santiago de Compostela. ** Barcelona–Bilbao, via Camp Tarragona, Lleida, Zaragoza, Tudela, Castejon, Calahorra, Logroño, Haro and Miranda De Ebro. ** Barcelona–San Sebastian, via Camp Tarragona, Lleida, Zaragoza, Tudela, Castejon, Tafalla, Pamplona, Altsasu and Zumarraga. ** Barcelona–Salamanca, via Camp Tarragona, Lleida, Zaragoza, Tudela, Castejon, Tafalla, Pamplona, Vitoria-Gasteiz, Miranda de Ebro, Burgos, Valladolid and Medina del Campo. ** Barcelona–Vigo, via Lleida, Zaragoza, Pamplona, Vitoria-Gasteiz, Burgos, León, Ponferrada and Ourense, with connection services to Gijón in León and to A Coruña in Monforte de Lemos. ** Gijón–Oropesa Del Mar, via Oviedo, Mieres Del Camín, La Pola, León, Palencia, Valladolid, Segovia, Madrid, Cuenca, Requena Utiel, Valencia, Sagunt, Castellón and Benicàssim. ** Gijón–Alicante, via Oviedo, Mieres Del Camín, La Pola, León, Palencia, Valladolid, Segovia, Madrid, Cuenca, Albacete and Villena. ** Madrid–A Coruña, via Zamora, Ourense and Santiago de Compostela. ** Madrid–Badajoz, via Leganés, Torrijos, Talavera De La Reina, Oropesa, Navalmoral De La Mata, Monfragüe-plasencia, Cáceres and Mérida. ** Madrid–Bilbao, via Segovia, Valladolid, Burgos and Miranda de Ebro. ** Madrid–Cádiz, via Ciudad Real, Puertollano, Córdoba, Sevilla and Jerez de la Frontera. ** Madrid–Ferrol, via Segovia, Medina del Campo, Zamora, Sanabria, A Gudiña, Ourense, Santiago de Compostela, A Coruña, Betanzos and Pontedeume. ** Madrid–Gijón, via Valladolid, Palencia, León and Oviedo. ** Madrid–Huelva, via Cordoba and La Palma Del Condado. ** Madrid–Irun, via Segovia, Valladolid, Burgos, Miranda de Ebro, Vitoria-Gasteiz, Zumarraga, Tolosa and San Sebastián. ** Madrid–Logroño, via Guadalajara, Calatayud, Tudela and Calahorra ** Madrid–Lugo, via Segovia, Medina del Campo, Zamora, Sanabria, A Gudiña, Ourense, Monforte De Lemos and Sarria. ** Madrid–Cartagena, via Albacete, Hellin, Cieza, Murcia, Balsicas-mar Menor and Torre-pacheco. ** Madrid–Pamplona, via Guadalajara, Calatayud, Tudela and Tafalla. ** Madrid–Pontevedra, via Zamora, Sanabria, A Gudiña, Ourense, Santiago de Compostela and Vilagarcia De Arousa. ** Madrid–Salamanca, via Segovia and Medina del Campo. ** Madrid–Santander, via Valladolid, Palencia, Aguilar De Campoo, Reinosa and Torrelavega. ** Madrid–Santiago de Compostela, via Zamora, Sanabria, A Gudiña and Ourense. ** Madrid–Vigo, via Segovia, Medina del Campo, Zamora, Sanabria, A Gudiña, Ourense and Pontevedra. The central hub of the AVE system is Madrid's Puerta de Atocha, except for the Madrid–León, Madrid–Burgos, Madrid–Galicia and Madrid–Alicante lines, that terminate at
Chamartín station Chamartín may refer to: * Chamartín, Ávila, a municipality in the province of Ávila, Castile and León. *Chamartín (Madrid), an administrative district. *Estadio Chamartín, a former multi-use stadium in Madrid, Spain. *Madrid Chamartín railwa ...
.


Trains

Currently, there are several series of high-speed trains that run the AVE service: * S/100, manufactured by
Alstom Alstom SA is a French multinational rolling stock manufacturer operating worldwide in rail transport markets, active in the fields of passenger transportation, signalling, and locomotives, with products including the AGV, TGV, Eurostar, Avelia ...
* S/102, manufactured by Talgo and Bombardier * S/103, manufactured by Siemens, marketed globally under the brand Siemens Velaro * S/112, manufactured by Talgo and Bombardier There are also other series of trains that are considered high-speed, but do not run under the AVE name. They run under the brand Alvia and Avant, and are variable gauge trains. They can run on high-speed lines at a maximum of , and can also change between standard- and Iberian-gauge lines without stopping. The trains that are operated under the Alvia and Avant brand are: * Avant S-104, manufactured by Alstom and CAF * Avant S-114, manufactured by Alstom and CAF * Avant S-121, manufactured by CAF and Alstom * Alvia S-120, manufactured by CAF and Alstom * Alvia S-130, manufactured by Talgo and Bombardier * Alvia S-730, manufactured by Talgo and Bombardier File:AVE in spain.jpg, A
Talgo 350 Talgo (officially Patentes Talgo, SAU) is a Spanish manufacturer of intercity, standard, and high-speed passenger trains. Corporate history TALGO, an abbreviation of Tren Articulado Ligero Goicoechea Oriol (English: ''Lightweight articulated tra ...
train (Renfe Class 102) at Madrid Atocha station. File:Talgo 350.jpg, AVE train Talgo 350 (Renfe Class 102) File:AVE a Lleida.jpg,
Talgo 350 Talgo (officially Patentes Talgo, SAU) is a Spanish manufacturer of intercity, standard, and high-speed passenger trains. Corporate history TALGO, an abbreviation of Tren Articulado Ligero Goicoechea Oriol (English: ''Lightweight articulated tra ...
train (Renfe Class 102) at Lleida Pirineus station File:Renfe clase 100.JPG, AVE "Alstom"(Renfe Class 100) trainset at Córdoba. File:RENFE AVE Velaro 2013.jpg, A RENFE AVE S/103 (Siemens Velaro E) at Figueres Vilafant railway station in 2013.


Lines in operation

Currently there are five corridors with twelve main lines in operation, and two spur lines connecting the cities of
Toledo Toledo most commonly refers to: * Toledo, Spain, a city in Spain * Province of Toledo, Spain * Toledo, Ohio, a city in the United States Toledo may also refer to: Places Belize * Toledo District * Toledo Settlement Bolivia * Toledo, Orur ...
with the Madrid–Seville main line and Huesca with the Madrid–Barcelona main line.


North-western corridor


Madrid–Galicia

The Madrid–Galicia high-speed rail line connects the city of Madrid with the region of
Galicia Galicia may refer to: Geographic regions * Galicia (Spain), a region and autonomous community of northwestern Spain ** Gallaecia, a Roman province ** The post-Roman Kingdom of the Suebi, also called the Kingdom of Gallaecia ** The medieval King ...
and the Atlantic Axis high-speed rail line in the North West of Spain via Segovia, Zamora,
Puebla de Sanabria Puebla de Sanabria (; ) is a small town located in the north-western part of the province of Zamora in Spain, between the rivers Tera and Castro. It is the economic and political centre of the ''comarca'' of Sanabria. History Well known as ...
,
Ourense Ourense (; es, Orense ) is a city and capital of the province of Ourense, located in the Autonomous communities of Spain, autonomous community of Galicia (Spain), Galicia, northwestern Spain. It is on the Camino Sanabrés path of the Way of St ...
and Santiago de Compostela. The line includes a new 424 km long high-speed railway section that starts at Olmedo 130 km to the north of Madrid on the Madrid–Leon high-speed rail line and ends at Santiago de Compostela. It was put in AVE service on 21 December 2021. AVE trains run between Madrid and
Ourense Ourense (; es, Orense ) is a city and capital of the province of Ourense, located in the Autonomous communities of Spain, autonomous community of Galicia (Spain), Galicia, northwestern Spain. It is on the Camino Sanabrés path of the Way of St ...
with a maximum operating speed of 300 km/h and cover the distance in 2h 15min, whilst Alvia services in the line on class
130 130 may refer to: *130 (number) *AD 130 Year 130 ( CXXX) was a common year starting on Saturday (link will display the full calendar) of the Julian calendar. At the time, it was known as the Year of the Consulship of Catullinus and Aper (or, l ...
and 730 gauge-changing trains with a commercial speed of 250km/h, connect Madrid to Santiago de Compostela, Pontevedra, Vigo,
Lugo Lugo (, ; la, Lucus Augusti) is a city in northwestern Spain in the autonomous communities of Spain, autonomous community of Galicia (Spain), Galicia. It is the capital of the Lugo (province), province of Lugo. The municipality had a population ...
, La Coruña and
Ferrol Ferrol may refer to: Places * Ferrol (comarca), a coastal region in A Coruña, Galicia, Spain * Ferrol, Spain, industrial city and naval station in Galicia, Spain ** Racing de Ferrol, an association football club * Ferrol, Romblon, municipality in ...
. Meanwhile certification is ongoing for the first gauge-changing Talgo AVRIL trains to operate at 330km/h in order journey times to be further reduced by 20 minutes between Madrid and Galicia. Part of the line up to Medina del Campo is also used for the Alvia Madrid– Salamanca service.


The Atlantic Axis

The Atlantic Axis high-speed railway line is connecting the two main cities of Vigo and A Coruña (Corunna) via Santiago de Compostela in the northwestern Spanish region of
Galicia Galicia may refer to: Geographic regions * Galicia (Spain), a region and autonomous community of northwestern Spain ** Gallaecia, a Roman province ** The post-Roman Kingdom of the Suebi, also called the Kingdom of Gallaecia ** The medieval King ...
. The railway, 155.6 km in length, is an upgrade of the former non electrified single railway line between the town of
Ferrol Ferrol may refer to: Places * Ferrol (comarca), a coastal region in A Coruña, Galicia, Spain * Ferrol, Spain, industrial city and naval station in Galicia, Spain ** Racing de Ferrol, an association football club * Ferrol, Romblon, municipality in ...
and the Portuguese border for the part between A Coruña and Vigo, into a double electrified high-speed line. The new rebuilt railway permits mixed use traffic with a maximum design speed of 250 km/h for passenger trains. The line is served by Alvia S-121 or S-730 (max speed ) train-sets for the routes between A Coruña and Vigo and between A Coruña and
Ourense Ourense (; es, Orense ) is a city and capital of the province of Ourense, located in the Autonomous communities of Spain, autonomous community of Galicia (Spain), Galicia, northwestern Spain. It is on the Camino Sanabrés path of the Way of St ...
and by Alvia S-730 (''Patito'', max speed ) train-sets connecting Galicia with other Spanish regions. The line is connected at Santiago de Compostela with the Madrid–Galicia high-speed rail line.


North corridor


Madrid–León

The Madrid–Leon high-speed rail line connects Madrid with León passing the cities of Segovia, Valladolid and Palencia. The line supports the longest railway tunnel in Spain at 28 km in length and is served by up to two S-102 (''Pato'', max speed ) trains per day with the fastest schedule lasting 2 hours and 6 minutes. Other trainsets used on the Madrid–Leon line include S-120 (max speed ) and S-130 (''Patito'', max speed ) for the Alvia services.


Madrid–Burgos

The Madrid–Burgos high-speed rail line connects Madrid with Burgos. The line shares a common section with the Madrid–Leon high-speed rail line up to Venta de Baños and then includes a 86.5 km long spur line up to the city of Burgos. S-112 trains are used for the AVE Madrid–Burgos service and cover the distance in 1 hour and 33 minutes by making one stop in the city of Valladolid. By January 2023 a new AVE service between Burgos and Valencia is planned to connect the two cities in 3 hour and 30 minutes.


North-eastern corridor


Madrid–Barcelona

Madrid–Barcelona high-speed railway line connects Madrid with Barcelona in the north east of Spain passing through the cities of
Guadalajara Guadalajara ( , ) is a metropolis in western Mexico and the capital of the list of states of Mexico, state of Jalisco. According to the 2020 census, the city has a population of 1,385,629 people, making it the 7th largest city by population in Me ...
, Calatayud, Zaragoza (Saragossa),
Lleida Lleida (, ; Spanish: Lérida ) is a city in the west of Catalonia, Spain. It is the capital city of the province of Lleida. Geographically, it is located in the Catalan Central Depression. It is also the capital city of the Segrià comarca, as ...
(Lérida) and Tarragona where the future Tarragona–Valencia high-speed railway line will connect. The line has a length of 621 km and a travel time of two and a half hours for the direct trains using the route avoiding entering Zaragoza (Saragossa) and Lleida (Lérida). The line is served by S-103 (max speed ) trains. Seventeen trains run now every day between 6:00 and 21:00 hrs. Direct trains Barcelona–Seville and Barcelona–Malaga that do not make a stop in Madrid are also scheduled combining the Madrid–Barcelona line with one of the southern corridor's existing lines. S-112 (''Pato'', max speed ) trains are used for these services and cover these distances in less than 6 hours.


Barcelona–Perpignan (France)

The international high-speed section across the border,
Perpignan Perpignan (, , ; ca, Perpinyà ; es, Perpiñán ; it, Perpignano ) is the prefecture of the Pyrénées-Orientales department in southern France, in the heart of the plain of Roussillon, at the foot of the Pyrenees a few kilometres from the ...
Figueres (44.4 km), of the Perpignan–Barcelona high-speed rail line opened in December 2010. Since then, French TGV trains operate from Paris. The Spanish high-speed section Barcelona–Figueres opened on 7 January 2013. Nine Spanish services initially serviced the line, with 8 being a through service to Madrid, which also connected with two French TGV services from Paris. Previously French TGV services connected Paris and Barcelona by means of a shuttle train on the standard Barcelona–Figueres line. Direct Barcelona- Paris, Madrid- Marseille, Barcelona- Lyon and Barcelona- Toulouse high-speed trains between France and Spain started on 15 December 2013.


Madrid–Huesca

The Zaragoza–Huesca section branches off from the Madrid–Barcelona line at Zaragoza and connects with the city of Huesca and serves the connection train station for regional trains in the town of
Tardienta Tardienta is a municipality located in Huesca Province, Aragon, Spain. According to the 2004 census (INE INE, Ine or ine may refer to: Institutions * Institut für Nukleare Entsorgung, a German nuclear research center * Instituto Nacional de ...
. The line first put in operation in 2005 and is served by up to two S-102 (''Pato'', max speed ) trains per day with the fastest train journey between the two cities lasting 2 hours and 5 minutes.


Eastern corridor


Madrid–Castellón

The Madrid–Castellón line connects the city of Castellón with the city of Madrid passing through the cities of Cuenca, Requena-Utiel and Valencia. The section It is serviced by S-112 (''Pato'', max speed ) trains, assembled by the Talgo-Bombardier consortium. Direct trains to Valencia cover the 391 km in 98 minutes while thirty trains run every day between 05:00 and 21:00, fifteen in each direction. For the service Madrid–Castellón AVE trains cover the distance in 2 hours and 25 minutes and 4 trains per day are scheduled, two in each direction. The line is part of the Madrid–Levante network (see below). Direct trains Valencia–Seville that do not make a stop in Madrid are also scheduled combining the existing lines of Madrid–Castellón and Madrid-Seville. S-102 (''Pato'', max speed ) trains are used for this service and cover the whole distance in 3 hours and 50 minutes.


Madrid–Alicante

A 350 km/h line branches off from the Madrid–Castellón Line and connects the city of
Alicante Alicante ( ca-valencia, Alacant) is a city and municipality in the Valencian Community, Spain. It is the capital of the province of Alicante and a historic Mediterranean port. The population of the city was 337,482 , the second-largest in th ...
with the city of Madrid passing through the cities of Cuenca, Albacete and Villena. It is part of the Madrid–Levante HSR network and is serviced by S-112 (''Pato'', max speed ) trains that cover the distance in up to 2 hours and 12 minutes. Direct trains Toledo–Albacete were also scheduled in the past, combining four of the existing lines, but this service was eventually terminated due to low demand.


Madrid–Orihuela

Branching out from the Madrid–Alicante Line at
Monforte del Cid Monforte del Cid is a village in the province of Alicante and autonomous community of Valencia, Spain , image_flag = Bandera de España.svg , image_coat = Escudo de España (mazonado).svg , national_motto = ''P ...
to extend the network towards Murcia, the first AVE service to Orihuela was inaugurated on 1 February 2021. The branch links Albacete, Elche and Orihuela, while the continuation to Murcia is expected to be operational in 2022. Work is being prepared to extend the line to Cartagena. The AVE Madrid–Elche–Orihuela daily service takes 2 hours and 22 minutes for the fastest journey. Some trains are arriving to Alicante and then reversing to Orihuela.


South corridor


Madrid–Seville

The Madrid–Seville high-speed railway line connects Madrid with Seville in the south of Spain, passing through the cities of
Ciudad Real Ciudad Real (, ; en, "Royal City") is a municipality of Spain located in the autonomous community of Castile–La Mancha, capital of the province of Ciudad Real. It is the 5th most populated municipality in the region. History It was founde ...
, Puertollano and Córdoba, where the Madrid–Málaga high-speed rail line branches off towards
Málaga Málaga (, ) is a municipality of Spain, capital of the Province of Málaga, in the autonomous community of Andalusia. With a population of 578,460 in 2020, it is the second-most populous city in Andalusia after Seville and the sixth most pop ...
just outside
Los Mochos LOS, or Los, or LoS may refer to: Science and technology * Length of stay, the duration of a single episode of hospitalisation * Level of service, a measure used by traffic engineers * Level of significance, a measure of statistical significance ...
near Almodóvar del Río. The route travels across the plains of Castile, travelling through the Sierra Morena mountains just before reaching Córdoba, before going onward towards Seville through the largely flat land surrounding the Guadalquivir river. The Madrid–Seville line was the first dedicated passenger high-speed rail line to be built in Spain and was completed in time for Seville's Expo 92. With a length of 472 km, the fastest train journey between the two cities takes 2 hours and 20 minutes. The line is served by S-100 (max speed ) trains. The extension section of the Madrid-Seville high-speed rail line to Cádiz is served by Alvia trains that connect the city of Cádiz to Madrid and reach speeds up to 200 km/h in this section.


Madrid–Málaga

The Madrid–Málaga high-speed rail line connects the city of
Málaga Málaga (, ) is a municipality of Spain, capital of the Province of Málaga, in the autonomous community of Andalusia. With a population of 578,460 in 2020, it is the second-most populous city in Andalusia after Seville and the sixth most pop ...
with the city of Madrid. The line shares a common section with the Madrid–Seville high-speed rail line up to the city of Córdoba and then includes a 155 km long spur line up to the city of Málaga. It is served by S-102 (''Pato'', max speed ) and S-103 (max speed ) trains and the fastest train journey between the two cities takes 2 hours and 20 minutes. Apart from the traffic to and from the city of Málaga, the line also handles the traffic to the cities of
Granada Granada (,, DIN 31635, DIN: ; grc, Ἐλιβύργη, Elibýrgē; la, Illiberis or . ) is the capital city of the province of Granada, in the autonomous communities of Spain, autonomous community of Andalusia, Spain. Granada is located at the fo ...
and Algeciras. In the future, the line will also support the traffic between Madrid and the
Costa del Sol The Costa del Sol (literally "Coast of the Sun" or "Sun Coast") is a region in the south of Spain in the autonomous community of Andalusia, comprising the coastal towns and communities along the coastline of the Province of Málaga and the easte ...
high-speed rail line.


Madrid–Toledo

The
Madrid–Toledo high-speed rail line The LAV Madrid-Toledo is a Spanish high-speed rail line that connects the cities of Madrid and Toledo, a distance of approximately . The service was inaugurated in 2005. Route The route shares the first with the Madrid–Seville high-speed ...
branches off from the Seville and Málaga routes around the depot at La Sagra. The Avant service between the two cities offers journey times of half an hour on trains with a maximum speed of 250 km/h.


Madrid–Granada

The 122.8 km Antequera–Granada high-speed rail line is a part of the under construction ''Andalusian Transverse Axis high-speed rail line''. The three times per day AVE service between
Madrid Atocha Madrid Atocha ( es, Estación de Madrid Atocha), also named Madrid Puerta de Atocha–Almudena Grandes, is the first major railway station in Madrid. It is the largest station serving commuter trains ( ''Cercanías''), regional trains from the s ...
and Granada covers the distance of 568 km in 3 h 5 min. The daily AVE train between Granada and Barcelona Sants connects the two cities in 6 h 25 min. S-102 and S-112 (''Pato'', max speed ) trains are used for these services and all trains call at Córdoba, offering a journey time of 90 min from Granada. The total cost of building the line was €1.4 billion.


Madrid interconnector

A new interconnecting tunnel between
Madrid Atocha Madrid Atocha ( es, Estación de Madrid Atocha), also named Madrid Puerta de Atocha–Almudena Grandes, is the first major railway station in Madrid. It is the largest station serving commuter trains ( ''Cercanías''), regional trains from the s ...
and
Madrid Chamartín Madrid ( , ) is the capital and most populous city of Spain. The city has almost 3.4 million inhabitants and a metropolitan area population of approximately 6.7 million. It is the second-largest city in the European Union (EU), an ...
stations opened to service in July 2022. The AVE Madrid–Alicante service having Madrid Chamartín station as a terminal station and the Burgos-Valencia service are using the Madrid interconection tunnel. Alvia services connecting Gijón to
Alicante Alicante ( ca-valencia, Alacant) is a city and municipality in the Valencian Community, Spain. It is the capital of the province of Alicante and a historic Mediterranean port. The population of the city was 337,482 , the second-largest in th ...
, Santander to Alicante and Gijón to Oropesa Del Mar via Valencia, are also using the Madrid interconection tunnel and are calling at Madrid Chamartín station. The Madrid–Badajoz Alvia service uses this tunnel too, starting at Madrid Chamartín and making a stop at Madrid Atocha.


Lines under construction

Currently there are six corridors with ten lines under construction.


North corridor


León–Gijón

* León
Oviedo Oviedo (; ast, Uviéu ) is the capital city of the Principality of Asturias in northern Spain and the administrative and commercial centre of the region. It is also the name of the municipality that contains the city. Oviedo is located ap ...
Gijón Madrid–Asturias high-speed railway is the line connecting Madrid to the region of Asturias in the north of Spain. The new under construction section branches off the Valladolid–Vitoria high-speed section at Venta de Baños: 205 km north of Madrid and then reaches the cities of
Oviedo Oviedo (; ast, Uviéu ) is the capital city of the Principality of Asturias in northern Spain and the administrative and commercial centre of the region. It is also the name of the municipality that contains the city. Oviedo is located ap ...
and Gijón via Palencia and León. This section includes the 24,7 km long Pajares Base Tunnel (''Variante de Pajares'') which runs under a very mountainous area between the Province of León and the Principality of Asturias. Construction started in 2009 (except variante de pajares which started 2003) and reached León in September 2015. In September 2021 the first test runs started through Pajares Base Tunnel in the railway between
La Robla La Robla is a municipality located in the province of León, Castile and León, Spain. According to the 2020 census (INE), the municipality has a population of 3,752 inhabitants. The area around La Robla was once an important mining community. Th ...
and Campomanes. The line is expected to put in service by May 2023.


Burgos–Vitoria

* BurgosMiranda de EbroVitoria-Gasteiz The extension of the Madrid–Valladolid section towards the Basque Country began construction in 2009. This railway line will run parallel to the long existing railway line. Originally it was to be used as a mixed-use high-speed railway line, but it has since been changed to a passenger-dedicated railway line, leaving the existing railway line for freight trains. The line was forecast to open the ValladolidBurgos part around 2013 and the Burgos– Vitoria-Gasteiz part in 2014 or 2015. However, due to delays the line is not expected to open before 2023, although the Valladolid–Burgos section entered full revenue service in July 2022. At
Vitoria Vitoria or Vitória may refer to : People * Francisco de Vitoria (c. 1483–1546), a Spanish Renaissance theologian * Alberto Vitoria (1956–2010), Spanish footballer * Rui Vitória (born 1970), Portuguese retired footballer * Steven Vitória (b ...
it will be connected to the Basque high-speed railway line ( Basque Y), thus reaching the French border. Once opened, the travel time between Valladolid and
Vitoria Vitoria or Vitória may refer to : People * Francisco de Vitoria (c. 1483–1546), a Spanish Renaissance theologian * Alberto Vitoria (1956–2010), Spanish footballer * Rui Vitória (born 1970), Portuguese retired footballer * Steven Vitória (b ...
will be around an hour.


Basque Y

* BilbaoVitoria-GasteizSan SebastianFrench border The Basque high-speed railway line (Basque Y) will connect the three Basque capitals, Vitoria-Gasteiz, Bilbao and
San Sebastián San Sebastian, officially known as Donostia–San Sebastián (names in both local languages: ''Donostia'' () and ''San Sebastián'' ()) is a city and Municipalities of Spain, municipality located in the Basque Country (autonomous community), B ...
. Construction began in October 2006 and the line was forecast to open in 2016. However, due to delays in construction, the line is expected to put in service in 2023 according to the new estimations. The three Basque capitals will be further connected with Madrid via Valladolid, and with the French border via Irun and
Bayonne Bayonne (; eu, Baiona ; oc, label= Gascon, Baiona ; es, Bayona) is a city in Southwestern France near the Spanish border. It is a commune and one of two subprefectures in the Pyrénées-Atlantiques department, in the Nouvelle-Aquitaine re ...
.


Madrid-Santander

* MadridSegoviaValladolidPalencia
Villaprovedo Villaprovedo is a municipality located in the province of Palencia, Castile and León, Spain , image_flag = Bandera de España.svg , image_coat = Escudo de España (mazonado).svg , national_motto = ''Plus ultra ...
ReinosaSantander A new high-speed line is planned to branch off from the current Madrid–Leon high-speed rail line at Palencia and as a part of the north corridor will connect the region of Cantabria to the high-speed rail network with direct connection to Madrid. According to the plans the city of Santander will be connected via
Villaprovedo Villaprovedo is a municipality located in the province of Palencia, Castile and León, Spain , image_flag = Bandera de España.svg , image_coat = Escudo de España (mazonado).svg , national_motto = ''Plus ultra ...
and Reinosa. An agreement for completing the line by the end of 2015 was signed on 11 August 2010 including the agreement to call tenders for the section between Palencia and Villaprovedo before the end of March 2011 and for the Villaprovedo – Reinosa section before the end of 2012. However construction works in the line started in November 2021 for the section between Palencia and Osorno, while the section between Osorno and Reinosa is planned to be projected in 2022 and to start construction in 2023.


Eastern corridor


Alicante–Cartagena

*
Alicante Alicante ( ca-valencia, Alacant) is a city and municipality in the Valencian Community, Spain. It is the capital of the province of Alicante and a historic Mediterranean port. The population of the city was 337,482 , the second-largest in th ...
MurciaCartagena This is an under construction section, part of the Madrid–Levante network of high-speed railways connecting the capital with the Mediterranean coast. Consisting of of railways with an estimated cost of 12.5 billion euros, it is the most expensive high-speed railway project in Spain. The network will consist of both dedicated passenger high-speed railways designed for trains running above and high-speed railways shared with freight trains. The network is to be opened in stages, starting with the MadridValencia/ Albacete section, which was opened in December 2010, followed by Albacete–
Alicante Alicante ( ca-valencia, Alacant) is a city and municipality in the Valencian Community, Spain. It is the capital of the province of Alicante and a historic Mediterranean port. The population of the city was 337,482 , the second-largest in th ...
in June 2013, Valencia– Castellón in January 2018,
Monforte del Cid Monforte del Cid is a village in the province of Alicante and autonomous community of Valencia, Spain , image_flag = Bandera de España.svg , image_coat = Escudo de España (mazonado).svg , national_motto = ''P ...
Orihuela in February 2021 while reaching the city of Murcia is expected to follow by 2022 with a branch line to Cartagena. The section linking Valencia with Alicante in the Mediterranean Corridor is expected to open in 2022.


South corridor


Seville–Antequera

* Transversal Rail Axis ('' Eje Ferroviario transversal de Andalucía''), the Andalusian high-speed rail line connecting Huelva, Seville, Granada and Almería. Part of the line is financed and built by the Andalusian government. The southern Andalusian transverse high-speed railway line is a 503.7-kilometre railway running between the cities of Huelva and Almería, passing the cities of Seville and Granada. The line is designed for speeds up to 250 kilometres per hour, except for the 130-kilometre Antequera–Granada and the 103-kilometre Seville–Huelva parts of the line, which are designed for speeds in excess of 300 kilometres per hour. A connection between Huelva and the Portuguese border is being studied. When finished the journey between Huelva and Almería in the new line is estimated to last 3 hours and 35 minutes. The first section of the line between Antequera–Granada high-speed rail line was put in service on 26 June 2019 connecting the city of Granada to the rest of the high speed network via a branch from the Madrid–Málaga high-speed rail line. The section between Seville and Antequera is currently under construction and completion is expected in the following years.


Madrid–Jaén

* MadridAlcázar de San JuanJaén This high-speed railway line will be part passenger-dedicated high-speed railway (Madrid–Alcázar de San Juan) and part shared with freight trains (Alcázar de San Juan–Jaén). The first 99 km of the line will use the already existing Madrid-Seville high-speed railway line. From there, a 67.5 km branch line will be constructed towards Alcázar de San Juan. From Alcázar de San Juan the existing railway line will be upgraded to allow passenger trains to run up to 250 km/h; a new double-tracked route through the
Despeñaperros Despeñaperros (literally, ''
liff where Liff or LIFF may refer to: People with the family name * Biff Liff (1919-2015), Tony Award-winning American Broadway manager and producer. * Vincent Liff (1915-2003), American film director from West Hartford, Connecticut. Other * Liff, Angus, vi ...
dogs plunge'') is a Canyon, gorge or canyon carved out by the Despeñaperros river. It is located in the Municipalities of Spain, municipality of Santa Elena, Jaén, Santa Elena in the northern portion o ...
mountain range will be built to replace the existing single-tracked route. This part of the high-speed railway also forms part of the Madrid–Algeciras freight corridor. An extension of the line to Granada is being investigated; however, the complicated terrain between Jaén and Granada might make it uneconomical.


Mediterranean corridor


Tarragona–Almería

* TarragonaValencian Community
Murcia Region The Region of Murcia (, ; es, Región de Murcia ), is an autonomous community of Spain located in the southeastern part of the Iberian Peninsula, on the Mediterranean coast. The region is in area and had a population of 1,511,251 as at the st ...
Almería The section linking Tarragona to Almería via Valencia and Murcia is expected to be completed by 2023 when the currently under construction 184 km Murcia–Almería high-speed rail line will be finished. Its first 46,5 km new built cut-off part between
Camp de Tarragona Camp de Tarragona () is a natural and historical region of Catalonia, Spain. It includes a central plain, surrounded by the Serralada Prelitoral mountain chain on the west and in the north, with the Mediterranean sand beaches of the Costa Daur ...
and Vandellòs started commercial services on 13 January 2020. A new dual-gauge high speed rail track on the 72 km part between Valencia and Castellón inaugurated in January 2018. The section between Vandellòs and Castellón is an upgraded line of the old Iberian-gauge Valencia−Sant Vicenç de Calders railway currently used by the
Euromed Euromed may refer to: * Euromed (train) * Barcelona Euro-Mediterranean Conference * Euro-Mediterranean Parliamentary Assembly See also * EU Med Group {{Disambig ...
service in speeds up to 220 km/h that covers distance of 400 km between the cities of Barcelona and Valencia in 2 hours and 35 minutes. With a new line, it will take about 1 hour and 45 minutes on high speed trains to cover the same distance. However, this part is not under construction yet for a new standard-gauge high speed line. The section linking Valencia with
Alicante Alicante ( ca-valencia, Alacant) is a city and municipality in the Valencian Community, Spain. It is the capital of the province of Alicante and a historic Mediterranean port. The population of the city was 337,482 , the second-largest in th ...
is expected to be completed by the year 2022. The 52 km part between Torrent outside Valencia and Xàtiva, which is under construction since October 2002, is expected to be completed by end 2020 and it is designed for speeds up to 350 km/h. Modernization works in the 40 km remaining part between Xàtiva and La Encina Hub for maximum speed of 260 km/h including conversion to standard-gauge high speed line are expected to be completed by end 2022. The final section between Almería and Algeciras, passing through
Málaga Málaga (, ) is a municipality of Spain, capital of the Province of Málaga, in the autonomous community of Andalusia. With a population of 578,460 in 2020, it is the second-most populous city in Andalusia after Seville and the sixth most pop ...
, will be built at a later point of time and an alternative and longer route looks likely.


South-western corridor


Madrid–Extremadura

* Madrid
Toledo Toledo most commonly refers to: * Toledo, Spain, a city in Spain * Province of Toledo, Spain * Toledo, Ohio, a city in the United States Toledo may also refer to: Places Belize * Toledo District * Toledo Settlement Bolivia * Toledo, Orur ...
Talavera de la ReinaPlasenciaCáceresMéridaBadajoz This line was initially planned as Lisbon–Madrid high-speed rail line in order to connect the two peninsular capitals, Madrid and
Lisbon Lisbon (; pt, Lisboa ) is the capital and largest city of Portugal, with an estimated population of 544,851 within its administrative limits in an area of 100.05 km2. Grande Lisboa, Lisbon's urban area extends beyond the city's administr ...
in 2 hours and 45 minutes. This line had been a key issue in bilateral summits in recent years and was about to link Spain's high-speed rail network with the planned High-speed rail in Portugal, a project announced by the Portuguese government in February 2009. Construction on the Spanish side began in late 2008 on a segment between the cities of Badajoz and Mérida. Both Spanish and Portuguese track were to be completed around 2013, later the Portuguese government brought forward its plans from 2015 but the Portuguese froze works in June 2011 and eventually cancelled the project in March 2012. In 2016 the European Union's European Regional Development Fund, gave Spain €205.1m towards the €312.1m needed for the track between Navalmoral de la Mata and
Mérida, Spain Mérida () is a city and municipality of Spain, part of the Province of Badajoz, and capital of the autonomous community of Extremadura. Located in the western-central part of the Iberian Peninsula at 217 metres above sea level, the city is crosse ...
. The section on the Spanish side between Madrid and Badajoz is expected to be completed in 2023. With a length of 439 km on the Spanish side, of which 48 km are part of the already built Madrid–Seville high-speed rail line, the original plan was to connect cities like Talavera de la Reina, Navalmoral de la Mata, Plasencia, Cáceres, Mérida and Badajoz to Madrid. The Almonte River Viaduct was completed in May 2016 to carry this line. It is a concrete arch bridge with a span of 384 meters (1,260 feet), ranking among the longest in the world of this type of bridge. For the section between Madrid and Oropesa a new Informative Study was awarded by the Ministry of Public Works in February 2018 in order to propose alternative routes with lower environmental impact than those in the initial study from 2008. In November 2020 the new study was approved by the Ministry of Transport and in the revised proposal the city of
Toledo Toledo most commonly refers to: * Toledo, Spain, a city in Spain * Province of Toledo, Spain * Toledo, Ohio, a city in the United States Toledo may also refer to: Places Belize * Toledo District * Toledo Settlement Bolivia * Toledo, Orur ...
was added in the route by the use of the existing high speed section between Madrid and Toledo. The new introduced 127 km section with budget of €1.3 billion starts from Toledo and passes through the cities of Talavera de la Reina and Oropesa until it reaches the border of the
Province of Toledo Toledo is a province of central Spain, in the western part of the autonomous community of Castile–La Mancha. It is bordered by the provinces of Madrid, Cuenca, Ciudad Real, Badajoz, Cáceres, and Ávila. Its capital is the city of Toledo. ...
with new stations planned in all those three cities. The section between Plasencia and Mérida was originally planned to put in service by end 2021. However, the first part given to service was the entire 150km section between Plasencia and Badajoz that was inaugurated on 18 July 2022 at an investment cost of €1.7 billion. It is a double Iberian gauge line that is due to be changed to standard gauge in the future. The total budget for the Madrid–Extremadura line is €3.7 billion.


Two Seas corridor


Zaragoza–Pamplona

* ZaragozaCastejonPamplona A high-speed track between Zaragoza (
Aragon Aragon ( , ; Spanish and an, Aragón ; ca, Aragó ) is an autonomous community in Spain, coextensive with the medieval Kingdom of Aragon. In northeastern Spain, the Aragonese autonomous community comprises three provinces (from north to sou ...
) and Pamplona (
Navarre Navarre (; es, Navarra ; eu, Nafarroa ), officially the Chartered Community of Navarre ( es, Comunidad Foral de Navarra, links=no ; eu, Nafarroako Foru Komunitatea, links=no ), is a foral autonomous community and province in northern Spain, ...
) is currently under development as a part of the Two Seas (Cantabrian-Mediterranean) corridor. The section between Castejon and Pamplona (both in Navarre) with a total length of 75.5 kilometers is under construction with some sub-sections already completed. The line is expected to be completed by 2023.


Lines planned

In the short term, other connections to the LGV are planned. After the connection to France at
La Jonquera La Jonquera () is a municipality in the ''comarca'' of l'Alt Empordà, in Catalonia, Spain. It is situated next to the border with Northern Catalonia, nowadays France, opposite the municipality of Le Perthus. History The area has always been an ...
in Catalonia, another connection is proposed at Irun in the
Basque Country Basque Country may refer to: * Basque Country (autonomous community), as used in Spain ( es, País Vasco, link=no), also called , an Autonomous communities of Spain, autonomous community of Spain (shown in pink on the map) * French Basque Country o ...
. Other new lines are under consideration, including a line connecting Soria to the Madrid–Barcelona line at Calatayud. Finally, the Madrid–Barcelona line currently terminates in Barcelona's Estació de Sants, but a new station is under construction at La Sagrera on the northern edge of the city. In the long term, the Spanish government has an ambitious plan to make of high-speed railway operational, with all provincial capitals at most only 4 hours from Madrid, and hours from Barcelona. According to the Strategic Plan for railway infrastructures developed by the Spanish ''Ministerio de Fomento'' (Ministry of Public Works), called PEIT, and published in 2005, a second expansion program is planned to start when the last lines of the first program still under construction begin operation. This plan initially had a ten-year scope, ending in 2020, and its ambition was to make the network reach by the end of that year. However, this program has been now postponed to indefinite time frame since the first expansion program is still on going. When both programs will be completed, the Spanish high-speed network will be the most extensive network in Europe, with several operational links with France and Portugal, and this is the most ambitious high-speed rail plan in the European Union.


Connection with Barajas Airport

In May 2021 the Spanish Ministry of Transport, Mobility and Urban Agenda announced its plans to connect Madrid's Adolfo Suárez Madrid–Barajas Airport with the AVE network. According to the plans this is going to be realized in two phases. In the first short-term phase, AVE trains will reach the airport by sharing a line with the Cercanías trains until
Chamartín station Chamartín may refer to: * Chamartín, Ávila, a municipality in the province of Ávila, Castile and León. *Chamartín (Madrid), an administrative district. *Estadio Chamartín, a former multi-use stadium in Madrid, Spain. *Madrid Chamartín railwa ...
. Tendering for these works is planned to start within 2022. In long-term during the second phase, a dedicated high-speed line will be constructed to connect the airport.


Cantabrian Sea corridor

*
Galicia Galicia may refer to: Geographic regions * Galicia (Spain), a region and autonomous community of northwestern Spain ** Gallaecia, a Roman province ** The post-Roman Kingdom of the Suebi, also called the Kingdom of Gallaecia ** The medieval King ...
AsturiasCantabria
Basque Country Basque Country may refer to: * Basque Country (autonomous community), as used in Spain ( es, País Vasco, link=no), also called , an Autonomous communities of Spain, autonomous community of Spain (shown in pink on the map) * French Basque Country o ...
French border The 430 km high-speed line will connect
Ferrol Ferrol may refer to: Places * Ferrol (comarca), a coastal region in A Coruña, Galicia, Spain * Ferrol, Spain, industrial city and naval station in Galicia, Spain ** Racing de Ferrol, an association football club * Ferrol, Romblon, municipality in ...
in
Galicia Galicia may refer to: Geographic regions * Galicia (Spain), a region and autonomous community of northwestern Spain ** Gallaecia, a Roman province ** The post-Roman Kingdom of the Suebi, also called the Kingdom of Gallaecia ** The medieval King ...
with Bilbao in the
Basque Country Basque Country may refer to: * Basque Country (autonomous community), as used in Spain ( es, País Vasco, link=no), also called , an Autonomous communities of Spain, autonomous community of Spain (shown in pink on the map) * French Basque Country o ...
passing through the regions of Asturias and Cantabria along the Cantabrian Sea coast in the north Spain. The line will be further connected to the Atlantic Axis high-speed rail line on the west, the Basque Y high-speed railway line on the east and the north corridor (future Madrid-Gijón high-speed railway line) in Asturias region. The travel time between El Ferrol and Bilbao in the new line is estimated to last 1 hour and 48 minutes. The line is not yet projected but it is planned to be completed before 2024.


Two seas corridor

* Valencian Community
Aragon Aragon ( , ; Spanish and an, Aragón ; ca, Aragó ) is an autonomous community in Spain, coextensive with the medieval Kingdom of Aragon. In northeastern Spain, the Aragonese autonomous community comprises three provinces (from north to sou ...
La Rioja
Navarre Navarre (; es, Navarra ; eu, Nafarroa ), officially the Chartered Community of Navarre ( es, Comunidad Foral de Navarra, links=no ; eu, Nafarroako Foru Komunitatea, links=no ), is a foral autonomous community and province in northern Spain, ...
Basque Country Basque Country may refer to: * Basque Country (autonomous community), as used in Spain ( es, País Vasco, link=no), also called , an Autonomous communities of Spain, autonomous community of Spain (shown in pink on the map) * French Basque Country o ...
French border The line will connect the Valencian Community with the
Basque Country Basque Country may refer to: * Basque Country (autonomous community), as used in Spain ( es, País Vasco, link=no), also called , an Autonomous communities of Spain, autonomous community of Spain (shown in pink on the map) * French Basque Country o ...
region and the French border passing through the regions of
Aragon Aragon ( , ; Spanish and an, Aragón ; ca, Aragó ) is an autonomous community in Spain, coextensive with the medieval Kingdom of Aragon. In northeastern Spain, the Aragonese autonomous community comprises three provinces (from north to sou ...
,
Navarre Navarre (; es, Navarra ; eu, Nafarroa ), officially the Chartered Community of Navarre ( es, Comunidad Foral de Navarra, links=no ; eu, Nafarroako Foru Komunitatea, links=no ), is a foral autonomous community and province in northern Spain, ...
and La Rioja, with further connection to the TGV network via Irun towards Bordeaux and Paris. The line will include two connections between the region of Aragon and the Basque Country, one via Pamplona in Navarre towards the French border and one via Logroño in La Rioja towards Bilbao. Connected cities will include Valencia, Teruel, Zaragoza, Pamplona, Logroño, Vitoria-Gasteiz,
San Sebastián San Sebastian, officially known as Donostia–San Sebastián (names in both local languages: ''Donostia'' () and ''San Sebastián'' ()) is a city and Municipalities of Spain, municipality located in the Basque Country (autonomous community), B ...
and Bilbao with possible further connection to Santander. The travel time between Valencia and Bilbao in the new high-speed line will be decreased from 9 hours down to roughly 4 hours. Some sections between the regions of Aragon, Navarre and La Rioja are projected, while the section between Castejon and Pamplona is currently under construction. The Ministry of Development has not set a target date to complete the Cantabrian-Mediterranean corridor yet.


Central-Pyrenees corridor

* ZaragozaHuescaFrench borderToulouse A new high-capacity rail connecting Spain with France on international standard gauge track is considered via a 40 km tunnel through the central Pyrenees mountains. The line, also called Trans-Pyrenean Central Corridor ( Travesía Central de los Pirineos) or TCP project, will serve both passenger high-speed trains as well as large freight trains and will connect directly Zaragoza to Toulouse via Huesca a distance of 355 km in length. Ten possible alternatives are being considered for crossing the mountains, all of them including tunnels at low altitude and other possible stops include Tarbes or Pau. There is currently no clear provision on its construction.


Passenger usage

The still-growing network transported a record 21.3 million passengers in 2018. Though the network length is extensive, it lags in ridership behind comparable high-speed rail systems in Japan, France, Germany, China, Taiwan, and Korea.


See also


Other high-speed rail services

* Intercity-Express * TGV * Eurostar and Thalys * YHT * Le Frecce * Shinkansen


Rail infrastructure in Spain and Europe

* Rail transport in Spain * High-speed rail in Europe * Train categories in Europe


Notes


References


External links


AVE (Renfe)
{{DEFAULTSORT:AVE AVE high-speed trains Renfe High-speed rail in Spain