East Float
   HOME

TheInfoList



OR:

The Great Float is a body of water on the Wirral Peninsula, England, formed from the natural tidal inlet, the Wallasey Pool. It is split into two large docks, East Float and West Float, both part of the Birkenhead Docks complex. The docks run approximately inland from the River Mersey, dividing the towns of Birkenhead and
Wallasey Wallasey () is a town within the Metropolitan Borough of Wirral, in Merseyside, England; until 1974, it was part of the historic county of Cheshire. It is situated at the mouth of the River Mersey, at the north-eastern corner of the Wirral Pe ...
. The Great Float consists of of water and more than of quays.


History

Unlike in Liverpool, where the docks were built along the coastline of the River Mersey, Birkenhead Docks were designed as an inland system by enclosing the tidal inlet of Wallasey Pool. The construction of a cofferdam enabled
land reclamation Land reclamation, usually known as reclamation, and also known as land fill (not to be confused with a waste landfill), is the process of creating new land from oceans, seas, riverbeds or lake beds. The land reclaimed is known as reclamati ...
and excavations to take place. After the establishment of the Great Low Water Basin, Morpeth Dock and
Egerton Dock Egerton Dock is a dock at Birkenhead, in England. The dock is situated between East Float and Morpeth Dock, within Birkenhead's dock system. History The dock was the second named as Egerton Dock along the Mersey, the first being the forerunne ...
, the Great Float was formed between 1851 and 1860 from most of what remained of Wallasey Pool. The plans for its construction were originally shown in 1844 in the ''Liverpool Standard'' newspaper. Designed by
James Meadows Rendel James is a common English language surname and given name: *James (name), the typically masculine first name James * James (surname), various people with the last name James James or James City may also refer to: People * King James (disambiguat ...
, protégé of Thomas Telford, the scheme was managed by the Birkenhead Dock Company until a financial crisis in 1847. The docks were taken over by the Liverpool Corporation in 1855. By 1858, the rights to dock ownership and revenues were transferred to the Mersey Docks and Harbour Board, based in Liverpool. Graving docks were built in 1864 and 1877, on the south side of West Float. Established in 1853, Thomas Brassey's
Canada Works Thomas Brassey (7 November 18058 December 1870) was an English civil engineering contractor and manufacturer of building materials who was responsible for building much of the world's railways in the 19th century. By 1847, he had built about o ...
was built to the east of the Great Float. The entrance to the Great Float was originally through the Great Low Water Basin, which was enclosed in 1877 as Wallasey Dock. After this date, access from the river was provided via
Alfred Dock Alfred Dock is a dock at Birkenhead, Merseyside, England. The dock covers an area of and provides access to the Great Float from the River Mersey. History In 1856, J. B. Hartley produced plans for alternative river access to the Great Flo ...
and Morpeth Dock. The ''
Resurgam ''Resurgam'' (Latin: ''"I shall rise again"'') is the name given to an early Victorian submarine and its prototype, designed and built in Britain by Reverend George Garrett. She was intended as a weapon to penetrate the chain netting placed ...
'', one of the first
submarines A submarine (or sub) is a watercraft capable of independent operation underwater. It differs from a submersible, which has more limited underwater capability. The term is also sometimes used historically or colloquially to refer to remotely o ...
, was tested in the Great Float in 1879. In the early 20th century, Birkenhead Docks became an important flour milling centre, with numerous companies, including Joseph Rank Ltd and
Spillers Spillers Ltd was a British company that owned flour milling operations, operated bakeries and also sold pet food and equine feeds. History The business originated in 1829 from the establishment of a flour mill in Bridgwater, Somerset, by Joel Sp ...
, located on the Great Float's quaysides. In the 1990s, long after the industry had gone into decline, most of these buildings were demolished. Two large warehouses remain, which have now been converted into residential apartments. The Great Float was the site of the
Warship Preservation Trust The Warship Preservation Trust was based in Birkenhead, Wirral, England and hosted Europe's largest collection of preserved warships. The collection was brought to Birkenhead in 2002 and was moored in the West Float of the Birkenhead docks com ...
's exhibits from 2002 until its closure in February 2006.
LCT 7074 HM LCT 7074 is the last surviving Landing Craft, Tank (LCT) in the UK. LCT 7074 is an amphibious assault ship for landing tanks, other vehicles and troops on beachheads. Built in 1944 by Hawthorn Leslie and Company, Hebburn, the Mark 3 LCT 707 ...
''Landfall'' is the last remaining tank landing craft which had served during
D-Day The Normandy landings were the landing operations and associated airborne operations on Tuesday, 6 June 1944 of the Allied invasion of Normandy in Operation Overlord during World War II. Codenamed Operation Neptune and often referred to as D ...
. The landing craft was one of the Warship Preservation Trust exhibits and had sunk in East Float following the liquidation of the trust in 2006. The craft was refloated on 16 October 2014.


Docks

The following docks were originally accessible from the Great Float: In addition, three graving docks existed in the Great Float for ship repairs. Bidston No.3 Dock remains in use as part of the facilities of Cammell Laird Shiprepairers and Shipbuilders Ltd. The other graving docks were filled in during the 1980s.


Quays


East Float


West Float


Bridges

Three road bridges cross the Great Float: A red girdered bascule bridge at Tower Road connects the Seacombe district of Wallasey with Birkenhead. Known as the Four Bridges, as originally four movable bridges existed along Tower Road: two between the Great Float and Alfred Dock, one between the Great Float and Wallasey Dock and one between the Great Float and Egerton Dock. When originally built, all four were hydraulic swing bridge types. In the 1930s most were replaced by bascule bridges. Joining the southern end of the Poulton district of Wallasey with the north end of Birkenhead, Duke Street bridge is also a
bascule Bascule may refer to: * Bascule bridge, a moveable bridge with a counterweight that continuously balances the span in providing clearance for boat traffic * Bascule (horse), the arc a horse's body takes as it goes over a jump * Bascule light, a sma ...
(see-saw) bridge but with painted green girders. Originally, it was also a swing bridge. Furthest upstream is the Penny Bridge, which crosses the head of the pool to connect Poulton with
Bidston Bidston is a village, a parish and a suburb of Birkenhead, on the Wirral Peninsula, in the modern county of Merseyside. The area is a mixture of the well-preserved Bidston Village, Bidston Hill, a modern housing estate, and the Bidston Moss nat ...
in Birkenhead. Replacing an earlier wooden bridge of 1843, the name derives from the 1896 one
penny A penny is a coin ( pennies) or a unit of currency (pl. pence) in various countries. Borrowed from the Carolingian denarius (hence its former abbreviation d.), it is usually the smallest denomination within a currency system. Presently, it is t ...
toll to cross in one direction. The bridge was replaced again in 1926 and provided access to
Bidston Dock Bidston Dock was a Dock (maritime), dock at Birkenhead, in England. It was situated to the west of the Great Float, between Bidston and Poulton, Merseyside, Poulton. History A proposal for the construction of the dock on most of what remained ...
. The bridge was replaced by a new swing bridge in 1996 but since the dock itself has been filled in the mechanism has fallen into disrepair through lack of use and the bridge is now effectively a static structure. 2017 should have seen both of the bridges on Tower Road replaced. The south bridge will be replaced with a modern, flat-deck fixed concrete slab whilst the north bridge will be replaced with a lifting bridge powered by hydraulic rams. Work was expected to be completed by November 2017 but, due to complications, the bridge was not reopened until 28 June 2018.


Central Hydraulic Tower and Engine House

Jesse Hartley, who was responsible for many of Liverpool's maritime structures – including the
Albert Dock Albert Dock may refer to: *Albert Dock, Hull, in Kingston upon Hull, England *Royal Albert Dock, Liverpool, a dock and warehouse system in Liverpool, England *Royal Albert Dock, London The Royal Albert Dock is one of three docks in the Royal ...
, designed the Central Hydraulic Tower and Engine House (the tower is an
accumulator tower A hydraulic accumulator is a pressure storage reservoir in which an incompressible hydraulic fluid is held under pressure that is applied by an external source of mechanical energy. The external source can be an engine, a spring, a raised weight, ...
). Providing power for the movement of lock gates and bridges at Birkenhead Docks, it was completed in 1863. The design of the building was based on the
Palazzo Vecchio The Palazzo Vecchio ( "Old Palace") is the City hall, town hall of Florence, Italy. It overlooks the Piazza della Signoria, which holds a copy of Michelangelo's ''David (Michelangelo), David'' statue, and the gallery of statues in the adjacent ...
in the Piazza Della Signoria, Florence, Italy. The tower and building sustained considerable damage from bombing during the Second World War and was repaired in a functional, rather than architectural style. The large
lantern A lantern is an often portable source of lighting, typically featuring a protective enclosure for the light sourcehistorically usually a candle or a wick in oil, and often a battery-powered light in modern timesto make it easier to carry and h ...
at the top of the tower was not replaced. The building is now disused and in a dilapidated condition. In March 2008, a planning application was submitted for a £12 million restoration and redevelopment of the building by
Peel Holdings The Peel Group is a British infrastructure and property investment business, based in Manchester. In 2022, its Peel Land and Property estate extends to of buildings, and over of land and water. Peel retains minority stakes in its former ports ...
to be converted into a bar and restaurant. A ninety-two bed hotel complex was planned to be constructed immediately adjacent to it. These plans never came to fruition and in September 2015 it was announced that the tower would become part of a £30 million advanced manufacturing and engineering skills centre. Known as the 'Hydraulic Tower and Generator Project', owners Peel intend to create 90,000 square feet of space for offices and workspaces for small to medium fast-growing businesses. In March 2021, it was announced that the building would be brought back in to use as The Maritime Knowledge Hub and will be a national base for marine engineering research and development and survival training as well as providing business accelerator space for the maritime sector. The project will cost £23m.


Wirral Waters

Peel Holdings announced on 6 September 2006 the Wirral Waters project. This would allow for a £4.5bn of investment in the regeneration of the dockland area. This equates with an investment of over £14,000 for each of the 320,000 population of Wirral. At the East Float and Vittoria Dock, the development would include several 50-storey skyscrapers, of new office space and for new residential apartments. A retail and leisure quarter at the former Bidston Dock site would encompass another of space. The whole project is estimated to create over 27,000 permanent new jobs, aside from the employment required for construction and other peripheral employment. The Wirral Waters Baseline Study of July 2008 has been endorsed by
Wirral Borough Council Wirral Metropolitan Borough Council, or simply Wirral Council, is the local authority of the Metropolitan Borough of Wirral in Merseyside, England. It is a metropolitan district council, one of five in Merseyside and one of 36 in the metropolit ...
. In February 2009 the first stage of the planning application for the first major mixed use development masterplan/quarter was submitted. The development would be expected to take up to 30 years.


References


Sources

* * * * * *


Further reading

*


External links

*
Aerial photo

Wirral Waters official site


{{Birkenhead docks Birkenhead docks Maritime Transport in Merseyside