Ave Very
   HOME

TheInfoList



OR:

''Alta Velocidad Española'' (''AVE'') is a service of high-speed rail in
Spain , image_flag = Bandera de España.svg , image_coat = Escudo de España (mazonado).svg , national_motto = ''Plus ultra'' (Latin)(English: "Further Beyond") , national_anthem = (English: "Royal March") , i ...
operated by Renfe, the Spanish national railway company, at speeds of up to . As of December 2021, the Spanish high-speed rail network, on part of which the AVE service runs, is the longest HSR network in Europe with and the second longest in the world, after China's. AVE trains run on a network of high-speed rail track owned and managed by ADIF (''Administrador de Infraestructuras Ferroviarias''), where other high speed (,
Alvia Alvia is a high-speed train service in Spain used by Renfe Operadora for long-distance service with a top speed of . The trains have the ability to use both Iberian gauge and standard gauge, which allows them to travel on the recently constructed ...
,
Avlo Avlo (, short for Alta Velocidad Low ''Cost'' literally ''"No Frills High Speed"'' ) is the name of the Spanish low-cost high-speed rail service, at the start between of the cities of Madrid, Zaragoza and Barcelona, by the national rail company ...
) and mid-speed ( Altaria) services also operate. The first line was opened in 1992, connecting the cities of
Madrid Madrid ( , ) is the capital and most populous city of Spain. The city has almost 3.4 million inhabitants and a Madrid metropolitan area, metropolitan area population of approximately 6.7 million. It is the Largest cities of the Europ ...
, Córdoba and
Seville Seville (; es, Sevilla, ) is the capital and largest city of the Spanish autonomous community of Andalusia and the province of Seville. It is situated on the lower reaches of the River Guadalquivir, in the southwest of the Iberian Peninsula ...
. Unlike the rest of the Iberian broad gauge network, the AVE uses standard gauge. This permits direct connections to outside Spain through the link to the French network at the
Perthus Tunnel The Perthus Tunnel is a twin-bore railway tunnel between France and Spain under the Eastern Pyrenees, built as part of the high-speed railway line LGV Perpignan-Figueres, Perpignan-Figueres. It has made possible the implementation of direct high-s ...
. AVE trains are operated by Renfe, but private companies may be able to operate trains in the future using other brands, in accordance with
European Union legislation A directive is a legal act of the European Union that requires member states to achieve a particular result without dictating the means of achieving that result. Directives first have to be enacted into national law by member states before the ...
. Some TGV-derived trains used to run on the broad-gauge network at slower speeds, but these were branded separately as Euromed until new rolling stock was commissioned for these services. Renfe is the dominant high-speed rail operator in Spain, but private companies
Ouigo España Ouigo España is an open-access operator, that operates high-speed services between Madrid and Barcelona in Spain. It is a subsidiary of SNCF, the French national railway company, and uses its trademark Ouigo. History The company was founded o ...
and
Iryo Iryo is a brand of Intermodalidad de Levante S.A., a private high-speed rail operator in Spain. The company is jointly owned by Trenitalia, Air Nostrum, and the infrastructure investment fund Globalvia. Trains began operating on the Madrid–Bar ...
compete on the Madrid–Barcelona route. French
TGV The TGV (french: Train à Grande Vitesse, "high-speed train"; previously french: TurboTrain à Grande Vitesse, label=none) is France's intercity high-speed rail service, operated by SNCF. SNCF worked on a high-speed rail network from 1966 to 19 ...
services run from the border to Barcelona. translates to "Spanish High Speed", but the initials are also a play on the word , meaning "bird".


History


New rail link to Andalusia

Towards the end of the 1980s a new line was planned to join the Castilian Meseta with
Andalusia Andalusia (, ; es, Andalucía ) is the southernmost autonomous community in Peninsular Spain. It is the most populous and the second-largest autonomous community in the country. It is officially recognised as a "historical nationality". The t ...
without passing through the Despeñaperros Natural Park. After considering various options it was decided that a standard-gauge line, allowing for Spain's first high-speed rail link, would be built. The project was named NAFA (''Nuevo Acceso Ferroviario a Andalucía'', New Rail Link to Andalusia) and was meant to help revitalise the stagnant southern Spanish economy. The line was inaugurated on 14 April 1992 to coincide with Expo 92 being held in Seville. Seven days later on 21 April 1992 commercial service began with six daily services stopping at
Madrid Madrid ( , ) is the capital and most populous city of Spain. The city has almost 3.4 million inhabitants and a Madrid metropolitan area, metropolitan area population of approximately 6.7 million. It is the Largest cities of the Europ ...
,
Seville Seville (; es, Sevilla, ) is the capital and largest city of the Spanish autonomous community of Andalusia and the province of Seville. It is situated on the lower reaches of the River Guadalquivir, in the southwest of the Iberian Peninsula ...
, Córdoba,
Puertollano Puertollano () is a municipality of Spain located in the province of Ciudad Real, Castile-La Mancha. The city has a population of 47,035 (2019). Contrasting to the largely rural character of the region, Puertollano stands out for the importance o ...
and Ciudad Real. In October 1992 Renfe began the AVE Lanzadera (Shuttle) service between Madrid and Puertollano and Ciudad Real. It has been suggested that the
PSOE The Spanish Socialist Workers' Party ( es, Partido Socialista Obrero Español ; PSOE ) is a social-democraticThe PSOE is described as a social-democratic party by numerous sources: * * * * political party in Spain. The PSOE has been in gov ...
government chose the French Alstom bid over the Siemens and
Talgo Talgo (officially Patentes Talgo, SAU) is a Spanish manufacturer of intercity, standard, and high-speed passenger trains. Corporate history TALGO, an abbreviation of Tren Articulado Ligero Goicoechea Oriol (English: ''Lightweight articulated tr ...
bids for political rather than technical reasons, rewarding the French government for its assistance in capturing
ETA Eta (uppercase , lowercase ; grc, ἦτα ''ē̂ta'' or ell, ήτα ''ita'' ) is the seventh letter of the Greek alphabet, representing the close front unrounded vowel . Originally denoting the voiceless glottal fricative in most dialects, ...
activists who took "
sanctuary A sanctuary, in its original meaning, is a sacred place, such as a shrine. By the use of such places as a haven, by extension the term has come to be used for any place of safety. This secondary use can be categorized into human sanctuary, a sa ...
" across the border in southern France. Seville's hosting of the 1992 World's Fair prompted the choice of that city for the inaugural AVE line, with its being the home town of then Spanish prime minister
Felipe González Felipe González Márquez (; born 5 March 1942) is a Spanish lawyer, professor, and politician, who was the Secretary-General of the Spanish Socialist Workers' Party (PSOE) from 1974 to 1997, and the 3rd Prime Minister of Spain since the ...
also playing some role. Seville is the artistic, cultural, and financial capital of southern Spain and the fourth largest city in Spain, after Madrid,
Barcelona Barcelona ( , , ) is a city on the coast of northeastern Spain. It is the capital and largest city of the autonomous community of Catalonia, as well as the second most populous municipality of Spain. With a population of 1.6 million within ci ...
and
Valencia Valencia ( va, València) is the capital of the autonomous community of Valencia and the third-most populated municipality in Spain, with 791,413 inhabitants. It is also the capital of the province of the same name. The wider urban area al ...
, with a population of over 700,000 and a metropolitan area of almost 1.5 million people. It is also the capital of Andalusia, Spain's most populous
autonomous community eu, autonomia erkidegoa ca, comunitat autònoma gl, comunidade autónoma oc, comunautat autonòma an, comunidat autonoma ast, comunidá autónoma , alt_name = , map = , category = Autonomous administra ...
(region). In January 1993 the ''Talgo 200 Madrid–Málaga'' service began, using AVE lines as far as Córdoba and then the Córdoba–Málaga Spanish-gauge conventional track to reach Málaga. On 23 April that year, the AVE set a new top speed of on a test run. Later in 1993 the mixed-method services ''Talgo 200 Madrid–Cádiz'' and ''Talgo 200 Madrid–Huelva'' began. In 1994 AVE trains on the Madrid–Seville line began to run at 300 km/h, cutting journey times by at least 40 minutes and covering the 471 km in hours, though it is unlikely that much of a saving came from the increase in maximum speed, because only a small section of the line near Los Yébenes has the alignments for 300 km/h operation. The maximum permitted speed is 270 km/h between Atocha station and Brazatortas, save for the approaches to the intermediate stations (Atocha, Ciudad Real and Puertollano). Beyond Brazatortas, the line is only authorised for 250 km/h operation, which drops to 215 km/h in the Sierra Morena mountains and 90 km/h around Córdoba station. It is more likely that time savings occurred as a result of there being fewer intermediate stops. Although in 1999 Renfe began a mixed-service ''Talgo 200 Madrid–Algeciras'' route, this was, along with the other mixed services, transferred to ''Grandes Líneas Renfe'' (Renfe's Spanish gauge long-distance brand) following changes to plans for high-speed rail in Spain. The last segment of the
Madrid–Málaga high-speed rail line The Madrid–Málaga high-speed rail line is a standard gauge High-speed rail line of in length that links the city of Madrid with the city of Málaga in Spain. The line was inaugurated on 24 December 2007. At the time the service opened, Re ...
was completed on 24 December 2007 when the new high speed railway section between the cities of Córdoba and Málaga was inaugurated. It is a standard gauge railway line of 155 km in length and is designed for speeds of 300 km/h (186 mph). It has compatibility with neighbouring countries' railway systems as well. In October 2015 an extension of the Madrid-Seville high-speed rail line to
Cádiz Cádiz (, , ) is a city and port in southwestern Spain. It is the capital of the Province of Cádiz, one of eight that make up the autonomous community of Andalusia. Cádiz, one of the oldest continuously inhabited cities in Western Europe, ...
was completed after 14 years of works and put in service by
Alvia Alvia is a high-speed train service in Spain used by Renfe Operadora for long-distance service with a top speed of . The trains have the ability to use both Iberian gauge and standard gauge, which allows them to travel on the recently constructed ...
trains for speeds up to 200 km/h. In 2019 the
Antequera–Granada high-speed rail line The Antequera–Granada high-speed rail line opened in 2019, linking the Spanish city of Granada to the AVE network via a branch from the existing Madrid–Málaga high-speed rail line at Antequera. Background The line from Antequera to Granad ...
opened.


AVANT – Media Distancia

In 1992, a new high-speed medium distance service (''AV Media Distancia'' operating under the AVE Lanzadera brand) began between Madrid, Ciudad Real and Puertollano, using spare class 100 trains. In November 2003 a new service began between Seville and Córdoba using new class 104 trains, reducing journey times between the two cities to 40 minutes. In 2005 the brand was renamed RENFE Avant, and all services started to use class 104 trains, leaving class 100 for AVE services. The construction of a stretch of high-speed line from Madrid to Toledo allowed the inauguration of a medium distance service in November 2005. The journey time between the two cities is now less than 30 minutes. The high-speed link combined with high property prices in Madrid has encouraged many Madrid commuters to settle in Ciudad Real, the first stop on the Madrid–Seville line. There has, however, been controversy over the construction of this line as the change to standard-gauge track meant that towns such as
Getafe Getafe () is a municipality and a city in Spain belonging to the Community of Madrid. , it has a population of 180,747, the region's sixth most populated municipality. Getafe is located 13 km south of Madrid's city centre, within a flat ar ...
,
Aranjuez Aranjuez () is a city and municipality of Spain, part of the Community of Madrid. Located in the southern end of the region, the main urban nucleus lies on the left bank of Tagus, a bit upstream the discharge of the Jarama. , the municipality h ...
and Algodor, which now have no commercial services, lost their direct services to Toledo. Furthermore, since Toledo is now connected by standard-gauge track it is impossible for other passenger or goods trains to reach it that have not come from other high-speed lines. Further Avant services have been launched with the expansion of the AVE lines to
Valladolid Valladolid () is a municipality in Spain and the primary seat of government and de facto capital of the autonomous community of Castile and León. It is also the capital of the province of the same name. It has a population around 300,000 peop ...
,
Barcelona Barcelona ( , , ) is a city on the coast of northeastern Spain. It is the capital and largest city of the autonomous community of Catalonia, as well as the second most populous municipality of Spain. With a population of 1.6 million within ci ...
, Málaga and Galicia. See below for details of all Avant services. In the Valladolid line, new class 114 trains are used. Both Avant class 104 and class 114 trains are
Pendolino Pendolino (from Italian ''pendolo'' "pendulum", and ''-ino,'' a diminutive suffix) is an Italian family of tilting trains used in Italy, Spain, Germany, Poland, Portugal, Slovenia, Finland, Russia, the Czech Republic, Slovakia, the UK, the US, ...
designs, without tilting capacity: - Avant class 104 trains are based in
ETR 480 The ETR 480 is a tilting Electric Multiple Unit built by Fiat Ferroviaria (now Alstom Ferroviaria) since 1993, It is also known as Pendolino. It was developed from the first new-generation Pendolino, the ETR 460. The main difference between ETR ...
- Avant class 114 trains are based in ETR 600


Madrid–Barcelona

The Madrid–
Zaragoza Zaragoza, also known in English as Saragossa,''Encyclopædia Britannica'"Zaragoza (conventional Saragossa)" is the capital city of the Zaragoza Province and of the autonomous community of Aragon, Spain. It lies by the Ebro river and its tributari ...
Barcelona Barcelona ( , , ) is a city on the coast of northeastern Spain. It is the capital and largest city of the autonomous community of Catalonia, as well as the second most populous municipality of Spain. With a population of 1.6 million within ci ...
line was inaugurated on 20 February 2008, after parts of the line had operated since 2003 (Madrid–Zaragoza–Lleida) and 2006 (Lleida–Tarragona). This line is currently one of the world's fastest long-distance trains in commercial operation, with non-stop trains covering the between the two cities in just 2 hours 30 minutes, and those calling at all stations in 3 hours 10 minutes. The line includes a spur railway that branches off at Zaragoza towards
Huesca Huesca (; an, Uesca) is a city in north-eastern Spain, within the autonomous community of Aragon. It is also the capital of the Spanish province of the same name and of the comarca of Hoya de Huesca. In 2009 it had a population of 52,059, almo ...
in north Aragon. The Madrid-Huesca high-speed rail line was inaugurated in 2005. The line currently terminates at Barcelona Sants railway station, but a new station is under construction at
La Sagrera La Sagrera is a neighborhood of Barcelona. Geography La Sagrera is bordered to the north by Sant Andreu del Palomar and to the east by the neighborhood of La Verneda; included by the south end is the zone named Navas, and to the west the C ...
on the northern edge of the city. The Sants–La Sagrera tunnel links the Barcelona Sants station in Barcelona with the future Sagrera station through the
Eixample The Eixample (; ) is a district of Barcelona between the old city ( Ciutat Vella) and what were once surrounding small towns ( Sants, Gràcia, Sant Andreu, etc.), constructed in the 19th and early 20th centuries. Its population was 262,000 ...
district. The tunnel passes under and along the streets of Provença and Mallorca, while uses a short part under
Diagonal In geometry, a diagonal is a line segment joining two vertices of a polygon or polyhedron, when those vertices are not on the same edge. Informally, any sloping line is called diagonal. The word ''diagonal'' derives from the ancient Greek δ ...
avenue to link between these two streets. In the ''Carrer de Mallorca'' street, the tunnel passes directly in front of Gaudí's masterpiece, the basilica of the
Sagrada Família The Basílica i Temple Expiatori de la Sagrada Família, shortened as the Sagrada Família, is an unfinished church in the Eixample district of Barcelona, Catalonia, Spain. It is the largest unfinished Catholic church in the world. Designed by ...
, and in the ''Carrer de Provença'' street, near another Gaudí's architectural work, the
Casa Milà Casa Milà (, ), popularly known as ''La Pedrera'' (, ; "the stone quarry") in reference to its unconventional rough-hewn appearance, is a '' Modernista'' building in Barcelona, Catalonia, Spain. It was the last private residence designed by arc ...
. In a long campaign against this route, the ''Board of the Sagrada Família'' and other parties argued that the tunnel would damage the church, whose construction is still in progress. In this discussion about different possible routes, the one now built is also called the ''Provença tunnel'' because part of its route passes under the street of the same name. The
tunnel boring machine A tunnel boring machine (TBM), also known as a "mole", is a machine used to excavate tunnels with a circular cross section through a variety of soil and rock strata. They may also be used for microtunneling. They can be designed to bore thro ...
''Barcino'' passed the Sagrada Família in October 2010, and reached its final destination a few months later. In March 2012, railway equipment was installed, with a special elastic isolation of the rails in order to dampen vibrations at the sections passing close to Gaudí's architectural works, using the Edilon system. Rail traffic was planned to start in 2012, initially without stops at the La Sagrera station, which was expected to be completed in 2016. Map of the tunnel route and details if the railway equipment in the tunnel in a PDF in ''El Periodico''
/ref> The Sants–La Sagrera tunnel was finally inaugurated on 8 January 2013 along with the
Perpignan–Barcelona high-speed rail line The Perpignan–Barcelona high-speed line is an international high-speed rail line between France and Spain. The line consists of a railway, of which 24.6 km are in France and 150.8 km are in Spain. It crosses the French–Spanish bord ...
while commercial services via the tunnel towards France begun on the following day. However, works on the Sagrera station suspended in early 2014 due to a corruption scandal involving one of the companies carrying out the works. Construction works at the station were finally resumed in 2018 and the new AVE station is now expected to open in 2023.


Northern corridors

The first installment of a high-speed rail corridor in the north and north-west of Spain was the 179.6 km section Madrid–
Segovia Segovia ( , , ) is a city in the autonomous community of Castile and León, Spain. It is the capital and most populated municipality of the Province of Segovia. Segovia is in the Inner Plateau ('' Meseta central''), near the northern slopes of t ...
Valladolid Valladolid () is a municipality in Spain and the primary seat of government and de facto capital of the autonomous community of Castile and León. It is also the capital of the province of the same name. It has a population around 300,000 peop ...
which was put in operation on 22 December 2007. It includes a tunnel of at
Guadarrama Guadarrama is a town and municipality in the Cuenca del Guadarrama comarca, in the Community of Madrid, Spain. Its population is 13,032 (winter, according to a 2006 census); the population swells to approximately 60,000 in summer. Its name co ...
, which is the fourth longest train tunnel in Europe. The extension of the line with the 162.7 km section
Valladolid Valladolid () is a municipality in Spain and the primary seat of government and de facto capital of the autonomous community of Castile and León. It is also the capital of the province of the same name. It has a population around 300,000 peop ...
Venta de Baños Venta de Baños is a small town and municipality of about 6,400 inhabitants located in the Cerrato district of the province of Palencia, part of the autonomous community of Castile and León in central Spain. It lies some 10 km south of the ...
Leon Leon, Léon (French) or León (Spanish) may refer to: Places Europe * León, Spain, capital city of the Province of León * Province of León, Spain * Kingdom of León, an independent state in the Iberian Peninsula from 910 to 1230 and again f ...
was inaugurated on 29 September 2015. Valladolid will become the hub for all AVE lines connecting the north and north-west of Spain with the rest of the country. On 24 April 2010, it was announced a 55 km high-speed spur would leave the Madrid–Valladolid route at Segovia and continue to
Ávila Ávila (, , ) is a city of Spain located in the autonomous community of Castile and León. It is the capital and most populated municipality of the Province of Ávila. It lies on the right bank of the Adaja river. Located more than 1,130 m abov ...
. Initial plans were expected to be complete by the end of 2010 but as of 2020 this line remains unfinished. On 21 July 2022 a new 86.5 km section between Venta de Baños and
Burgos Burgos () is a city in Spain located in the autonomous community of Castile and León. It is the capital and most populated municipality of the province of Burgos. Burgos is situated in the north of the Iberian Peninsula, on the confluence of ...
was inaugurated after 13 years of works at an investment cost of 759 million euros and introduced a new AVE Madrid-Burgos service that cuts the journey time between the two cities down to just over an hour and a half. This section is the first expansion of the high-speed network to the north-northeast towards the Spanish region of the Basque Country and the future Basque high-speed railway line (Basque Y). It includes 2 tunnels and 12 viaducts, the longest of them passes over
Pisuerga river The Pisuerga is a river in northern Spain, the Duero's second largest tributary. It rises in the Cantabrian Mountains in the province of Palencia, autonomous region of Castile and León. Its traditional source is called Fuente Cobre, but it has ...
and Autovía A-62 highway. In the north-west of Spain the
Madrid–Galicia high-speed rail line The Madrid–Galicia high-speed rail line is a high-speed railway line in Spain that links the city of Madrid with the region of Galicia via the cities of Olmedo, Zamora, Ourense and Santiago de Compostela. The line also connects the Atlant ...
completed on 21 December 2021 after 20 years of works when the OlmedoZamora
Santiago de Compostela Santiago de Compostela is the capital of the autonomous community of Galicia, in northwestern Spain. The city has its origin in the shrine of Saint James the Great, now the Cathedral of Santiago de Compostela, as the destination of the Way of S ...
section was finished. This line is connected to the Madrid–Leon line at Olmedo south of
Valladolid Valladolid () is a municipality in Spain and the primary seat of government and de facto capital of the autonomous community of Castile and León. It is also the capital of the province of the same name. It has a population around 300,000 peop ...
. Construction on the 87.1 km northernmost part of this section between the cities of Ourense and
Santiago de Compostela Santiago de Compostela is the capital of the autonomous community of Galicia, in northwestern Spain. The city has its origin in the shrine of Saint James the Great, now the Cathedral of Santiago de Compostela, as the destination of the Way of S ...
began late 2004 and this part was inaugurated in December 2011. The 107 km southern section, between Olmedo (130 km north of Madrid on the Madrid–Leon line) and Zamora entered revenue service on 17 December 2015 by
Alvia Alvia is a high-speed train service in Spain used by Renfe Operadora for long-distance service with a top speed of . The trains have the ability to use both Iberian gauge and standard gauge, which allows them to travel on the recently constructed ...
trains. The 110 km new built section in the middle between Zamora and Otero de Sanabria near the town of
Puebla de Sanabria Puebla de Sanabria (; ) is a small town located in the north-western part of the province of Zamora in Spain, between the rivers Tera and Castro. It is the economic and political centre of the ''comarca'' of Sanabria. History Well known as ...
was put in service on 26 October 2020, while the 119.4 km last remaining part between Puebla de Sanabria and Ourense which crosses some of Spain's most remote and fragile nature areas, was completed in end 2021. Up to that date the entire line was served by
Alvia Alvia is a high-speed train service in Spain used by Renfe Operadora for long-distance service with a top speed of . The trains have the ability to use both Iberian gauge and standard gauge, which allows them to travel on the recently constructed ...
S-730 (''Patito'', max speed ) trains. This line is connected in the region of Galicia with the 156 km
Atlantic Axis high-speed rail line The Atlantic Axis high-speed rail line, also called Atlantic Corridor high-speed rail line, is a high-speed railway line that links A Coruña, Santiago de Compostela, Pontevedra and Vigo in Spain. The Atlantic Axis was inaugurated in April 2015. ...
that connects the cities of
Vigo Vigo ( , , , ) is a city and municipality in the province of Pontevedra, within the autonomous community of Galicia, Spain. Located in the northwest of the Iberian Peninsula, it sits on the southern shore of an inlet of the Atlantic Ocean, the ...
and
A Coruña A Coruña (; es, La Coruña ; historical English: Corunna or The Groyne) is a city and municipality of Galicia, Spain. A Coruña is the most populated city in Galicia and the second most populated municipality in the autonomous community and s ...
via Santiago de Compostela. The Atlantic Axis was inaugurated in April 2015 while the section A Coruña–Santiago de Compostela opened in 2009 and was electrified in 2011. The new railway shortened the distance between the two cities by 22 km, from 178 km to 156 km, and cut the travel time from around 3 hours on the old railway down to 1 hour and 20 minutes on the new one. 37 tunnels totalling 59 km and 34 bridges totalling 15 km form part of the rebuilt railway.


Eastern corridors

The Madrid–Levante network connects Madrid with the Mediterranean coast of the Levante Region (Eastern Spain). The Madrid– Cuenca
Valencia Valencia ( va, València) is the capital of the autonomous community of Valencia and the third-most populated municipality in Spain, with 791,413 inhabitants. It is also the capital of the province of the same name. The wider urban area al ...
line was officially finished on Friday, 10 December 2010, with commercial trips starting on Saturday 18 December 2010. Non-stop trains between Madrid and Valencia cover the in 1 hour 38 minutes. The Madrid–
Albacete Albacete (, also , ; ar, ﭐَلبَسِيط, Al-Basīṭ) is a city and municipality in the Spanish autonomous community of Castilla–La Mancha, and capital of the province of Albacete. Lying in the south-east of the Iberian Peninsula, the ...
Alicante Alicante ( ca-valencia, Alacant) is a city and municipality in the Valencian Community, Spain. It is the capital of the province of Alicante and a historic Mediterranean port. The population of the city was 337,482 , the second-largest in t ...
line was inaugurated on 17 June 2013. Trains cover the distance between Madrid and Alicante in 2 hour 12 minutes. On 22 January 2018 the extension section of the line to Castellón was inaugurated introducing a new AVE service Madrid-Castellón which cut the journey time between the two cities by further 30 minutes to total 2 hours and 25 minutes. The first stretch of the AVE service from Madrid to Murcia was inaugurated on 1 February 2021, linking Monforte del Cid, Elche and Orihuela, while the continuation up to Murcia is expected to be operational in 2021, and work is being prepared to extend the line to Cartagena. When fully operational the Madrid–Levante network will total 955 km of high-speed rail connecting Madrid, Cuenca, Albacete, Valencia, Alicante,
Elche Elche ( ca-valencia, Elx) is a city and municipality of Spain, belonging to the province of Alicante, in the Valencian Community. According to 2014 data, Elche has a population of 228,647 inhabitants,Murcia Murcia (, , ) is a city in south-eastern Spain, the capital and most populous city of the autonomous community of the Region of Murcia, and the seventh largest city in the country. It has a population of 460,349 inhabitants in 2021 (about one ...
and Cartagena.


International connection with France

A milestone for the AVE network was reached in December 2013 when it was connected to the rest of Europe via France. The connecting link was the construction of the Barcelona–Figueres section of the Perpignan–Barcelona high-speed line, an extension of the Madrid–Barcelona line, completed in January 2013 at a cost of €3.7 billion. The international Perpignan–Figueres section of the line opened in December 2010 and includes the new
Perthus Tunnel The Perthus Tunnel is a twin-bore railway tunnel between France and Spain under the Eastern Pyrenees, built as part of the high-speed railway line LGV Perpignan-Figueres, Perpignan-Figueres. It has made possible the implementation of direct high-s ...
under the
Pyrenees The Pyrenees (; es, Pirineos ; french: Pyrénées ; ca, Pirineu ; eu, Pirinioak ; oc, Pirenèus ; an, Pirineus) is a mountain range straddling the border of France and Spain. It extends nearly from its union with the Cantabrian Mountains to ...
. The high-speed Barcelona-Figueres section (from Barcelona to the French border) was officially inaugurated in January 2013. The journey from the centre of
Barcelona Barcelona ( , , ) is a city on the coast of northeastern Spain. It is the capital and largest city of the autonomous community of Catalonia, as well as the second most populous municipality of Spain. With a population of 1.6 million within ci ...
to the centre of
Girona Girona (officially and in Catalan , Spanish: ''Gerona'' ) is a city in northern Catalonia, Spain, at the confluence of the Ter, Onyar, Galligants, and Güell rivers. The city had an official population of 103,369 in 2020. Girona is the capital ...
takes now 37 minutes (compared to the previous 90 minutes), and to Figueres in 53 minutes (instead of two hours). Girona and Figueres are now 14 minutes from each other. The Perpignan (France)-Figueres section opened in 2010. One lacking high-speed section on the French side, between Montpellier and Nîmes, opened in July 2018, allowing almost continuous high-speed travel from the French high-speed network to the Spanish one. The French government, on the other hand, recently announced indefinite delays to the Montpellier-Perpignan high speed section that was originally planned for 2020.


Madrid interconnector

On 24 April 2010, tunnelling started on the 7.3 km route connecting the 2 main stations in Madrid, Madrid Atocha and Madrid Chamartín. Electrification works for the line along with line duplication works in the section between Atocha and Torrejón de Velasco started in 2017 and these works were expected to be completed in early 2018 and the line was hoped to open for commercial service for AVE trains within the same year. A later announcement postponed the opening for the second half of 2020. However, delays in the schedule due to the
COVID-19 pandemic The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identi ...
postponed it further. In November 2021, the inauguration of the interconnector was projected to the first trimester of 2022. Test runs were being conducted in early February 2022, and the line was expected to be ready for permit application in early March. The tunnel finally opened on July 1, 2022. Before this all trains going towards
Valladolid Valladolid () is a municipality in Spain and the primary seat of government and de facto capital of the autonomous community of Castile and León. It is also the capital of the province of the same name. It has a population around 300,000 peop ...
left from Chamartín and trains going to
Seville Seville (; es, Sevilla, ) is the capital and largest city of the Spanish autonomous community of Andalusia and the province of Seville. It is situated on the lower reaches of the River Guadalquivir, in the southwest of the Iberian Peninsula ...
, Málaga,
Valencia Valencia ( va, València) is the capital of the autonomous community of Valencia and the third-most populated municipality in Spain, with 791,413 inhabitants. It is also the capital of the province of the same name. The wider urban area al ...
,
Alicante Alicante ( ca-valencia, Alacant) is a city and municipality in the Valencian Community, Spain. It is the capital of the province of Alicante and a historic Mediterranean port. The population of the city was 337,482 , the second-largest in t ...
and
Barcelona Barcelona ( , , ) is a city on the coast of northeastern Spain. It is the capital and largest city of the autonomous community of Catalonia, as well as the second most populous municipality of Spain. With a population of 1.6 million within ci ...
left from Atocha station. Also, there is a single daily service in each direction running along the Barcelona–Seville, Barcelona–Málaga, and Barcelona-Granada routes, which uses the high-speed bypass around
Madrid Madrid ( , ) is the capital and most populous city of Spain. The city has almost 3.4 million inhabitants and a Madrid metropolitan area, metropolitan area population of approximately 6.7 million. It is the Largest cities of the Europ ...
to avoid reversing the direction of train in Atocha station. The tunnel now allows services serving northern cities to travel non-stop or with a stop through Madrid and onward to southern cities (or vice versa), without the driver having to change ends or bypass Madrid, a valuable source of passengers. Previously someone wanting to travel from Valladolid to Alicante, for instance, had to travel from Valladolid Campo Grande station to Madrid Chamartín station before taking a
Cercanías The commuter rail systems of Spain's major metropolitan areas are called ''Cercanías'' () in most of Spain, ''Rodalia'' () in the Valencian Community, ''Aldiriak'' () in the Basque Country and ''Rodalies'' () in Catalonia. There are twelve ''Ce ...
service to Atocha; then finally taking an onward train to Alicante.


Incidents and accidents

*
Santiago de Compostela derailment The Santiago de Compostela derailment occurred on 24 July 2013, when an Alvia high-speed train traveling from Madrid to Ferrol, in the north-west of Spain, derailed at high speed on a bend about outside of the railway station at Santiago de ...
* Euromed (train)#2002 accident, Euromed 2002 accident


Operational services

The Spanish high-speed network is used, among others, by the following services: * international: ** Barcelona–Lyon via Girona, Figueres, Perpignan, Narbonne, Béziers, Montpellier, Nîmes, and Valence. ** Barcelona–Paris via Girona, Figueres, Perpignan, Narbonne, Béziers, Agde, Sète, Montpellier, Nîmes, and Valence. ** Barcelona–Toulouse via Girona, Figueres, Perpignan, and Carcassonne. ** Madrid–Barcelona–Marseille via Zaragoza, Tarragona, Barcelona, Girona, Figueres, Perpignan, Narbonne, Béziers, Montpellier, Nîmes, Avignon, and Aix-en-Provence * : ** Barcelona–Granada via Tarragona, Lleida, Zaragoza, Córdoba, Puente Genil-Herrera and Antequera. ** Barcelona–Seville via Tarragona, Lleida, Zaragoza, Ciudad Real, Puertollano, and Córdoba. ** Madrid–Alicante via Cuenca, Albacete, and Villena. ** Madrid–Barcelona via Zaragoza, Lleida, and Tarragona. ** Madrid–Burgos via Valladolid. ** Madrid–Castellón via Cuenca and Valencia. ** Madrid–Granada via Ciudad Real, Puertollano, Córdoba, Puente Genil-Herrera, Antequera and Loja. ** Madrid–Huesca via Guadalajara, Calatayud, Zaragoza, and Tardienta. ** Madrid–León via Valladolid and Palencia. ** Madrid–Málaga via Córdoba, Puente Genil-Herrera, and Antequera. ** Madrid–Orihuela via Cuenca, Albacete, and Elche. ** Madrid–Ourense via Zamora. ** Madrid–Seville via Ciudad Real, Puertollano, and Córdoba. ** Madrid–Valencia via Cuenca and Requena-Utiel. ** Málaga–Barcelona via Antequera, Puente Genil-Herrera, Córdoba, Zaragoza, and Tarragona. ** Valencia–Seville via Cuenca, Ciudad Real, Puertollano, and Córdoba. ** Valencia–Burgos via Madrid Chamartín. * (mid distance): ** A Coruña–Santiago de Compostela–Ourense. ** Barcelona−Girona−Figueres. ** Barcelona–Tarragona–Lleida. ** Barcelona–Tortosa via Camp de Tarragona, Cambrils and L'Hospitalet de l'Infant. ** Calatayud–Zaragoza. ** Madrid–Ciudad Real–Puertollano. ** Madrid–Segovia–Valladolid. ** Madrid–Toledo. ** Málaga–Córdoba–Seville via Antequera and Puente Genil-Herrera. ** Málaga–Granada via Loja. ** Ourense–Santiago de Compostela–A Coruña. ** Valencia–Requena Utiel. * (mixed high-speed/conventional): ** Alicante–Santander, via Villena, Albacete, Cuenca, Madrid, Segovia, Valladolid, Palencia and Torrelavega. ** Barcelona–A Coruña, via Lleida, Zaragoza, Pamplona, Vitoria-Gasteiz, Burgos, León, Ponferrada, Ourense and Santiago de Compostela. ** Barcelona–Bilbao, via Camp Tarragona, Lleida, Zaragoza, Tudela, Castejon, Calahorra, Logroño, Haro and Miranda De Ebro. ** Barcelona–San Sebastian, via Camp Tarragona, Lleida, Zaragoza, Tudela, Castejon, Tafalla, Pamplona, Altsasu and Zumarraga. ** Barcelona–Salamanca, via Camp Tarragona, Lleida, Zaragoza, Tudela, Castejon, Tafalla, Pamplona, Vitoria-Gasteiz, Miranda de Ebro, Burgos, Valladolid and Medina del Campo. ** Barcelona–Vigo, via Lleida, Zaragoza, Pamplona, Vitoria-Gasteiz, Burgos, León, Ponferrada and Ourense, with connection services to Gijón in León and to A Coruña in Monforte de Lemos. ** Gijón–Oropesa Del Mar, via Oviedo, Mieres Del Camín, La Pola, León, Palencia, Valladolid, Segovia, Madrid, Cuenca, Requena Utiel, Valencia, Sagunt, Castellón and Benicàssim. ** Gijón–Alicante, via Oviedo, Mieres Del Camín, La Pola, León, Palencia, Valladolid, Segovia, Madrid, Cuenca, Albacete and Villena. ** Madrid–A Coruña, via Zamora, Ourense and Santiago de Compostela. ** Madrid–Badajoz, via Leganés, Torrijos, Talavera De La Reina, Oropesa, Navalmoral De La Mata, Monfragüe-plasencia, Cáceres and Mérida. ** Madrid–Bilbao, via Segovia, Valladolid, Burgos and Miranda de Ebro. ** Madrid–Cádiz, via Ciudad Real, Puertollano, Córdoba, Sevilla and Jerez de la Frontera. ** Madrid–Ferrol, via Segovia, Medina del Campo, Zamora, Sanabria, A Gudiña, Ourense, Santiago de Compostela, A Coruña, Betanzos and Pontedeume. ** Madrid–Gijón, via Valladolid, Palencia, León and Oviedo. ** Madrid–Huelva, via Cordoba and La Palma Del Condado. ** Madrid–Irun, via Segovia, Valladolid, Burgos, Miranda de Ebro, Vitoria-Gasteiz, Zumarraga, Tolosa and San Sebastián. ** Madrid–Logroño, via Guadalajara, Calatayud, Tudela and Calahorra ** Madrid–Lugo, via Segovia, Medina del Campo, Zamora, Sanabria, A Gudiña, Ourense, Monforte De Lemos and Sarria. ** Madrid–Cartagena, via Albacete, Hellin, Cieza, Murcia, Balsicas-mar Menor and Torre-pacheco. ** Madrid–Pamplona, via Guadalajara, Calatayud, Tudela and Tafalla. ** Madrid–Pontevedra, via Zamora, Sanabria, A Gudiña, Ourense, Santiago de Compostela and Vilagarcia De Arousa. ** Madrid–Salamanca, via Segovia and Medina del Campo. ** Madrid–Santander, via Valladolid, Palencia, Aguilar De Campoo, Reinosa and Torrelavega. ** Madrid–Santiago de Compostela, via Zamora, Sanabria, A Gudiña and Ourense. ** Madrid–Vigo, via Segovia, Medina del Campo, Zamora, Sanabria, A Gudiña, Ourense and Pontevedra. The central hub of the AVE system is Madrid's Madrid Atocha railway station, Puerta de Atocha, except for the Madrid–León high-speed rail line, Madrid–León, Madrid–Burgos, Madrid–Galicia high-speed rail line, Madrid–Galicia and Madrid–Alicante lines, that terminate at Madrid Chamartín railway station, Chamartín station.


Trains

Currently, there are several series of high-speed trains that run the AVE service: *AVE Class 100, S/100, manufactured by Alstom *AVE Class 102, S/102, manufactured by
Talgo Talgo (officially Patentes Talgo, SAU) is a Spanish manufacturer of intercity, standard, and high-speed passenger trains. Corporate history TALGO, an abbreviation of Tren Articulado Ligero Goicoechea Oriol (English: ''Lightweight articulated tr ...
and Bombardier Transportation, Bombardier *AVE Class 103, S/103, manufactured by Siemens, marketed globally under the brand Siemens Velaro *AVE Class 112, S/112, manufactured by Talgo and Bombardier There are also other series of trains that are considered high-speed, but do not run under the AVE name. They run under the brand
Alvia Alvia is a high-speed train service in Spain used by Renfe Operadora for long-distance service with a top speed of . The trains have the ability to use both Iberian gauge and standard gauge, which allows them to travel on the recently constructed ...
and #AVANT, Avant, and are variable gauge trains. They can run on high-speed lines at a maximum of , and can also change between standard- and Iberian-gauge lines without stopping. The trains that are operated under the Alvia and Avant brand are: *:es:Serie 104 de Renfe, Avant S-104, manufactured by Alstom and Construcciones y Auxiliar de Ferrocarriles, CAF *:es:Serie 114 de Renfe, Avant S-114, manufactured by Alstom and Construcciones y Auxiliar de Ferrocarriles, CAF *RENFE Class 120 / 121, Avant S-121, manufactured by Construcciones y Auxiliar de Ferrocarriles, CAF and Alstom *RENFE Class 120 / 121, Alvia S-120, manufactured by Construcciones y Auxiliar de Ferrocarriles, CAF and Alstom *RENFE Class 130, Alvia S-130, manufactured by Talgo and Bombardier *RENFE Class 730, Alvia S-730, manufactured by Talgo and Bombardier File:AVE in spain.jpg, A Talgo, Talgo 350 train (Renfe Class 102) at Atocha railway station, Madrid Atocha station. File:Talgo 350.jpg, AVE train Talgo 350 (Renfe Class 102) File:AVE a Lleida.jpg, Talgo, Talgo 350 train (Renfe Class 102) at Lleida Pirineus station File:Renfe clase 100.JPG, AVE "Alstom"(Renfe Class 100) trainset at Córdoba. File:RENFE AVE Velaro 2013.jpg, A RENFE AVE S/103 (Siemens Velaro E) at Figueres Vilafant railway station in 2013.


Lines in operation

Currently there are five corridors with twelve main lines in operation, and two spur lines connecting the cities of Toledo with the Madrid–Seville main line and
Huesca Huesca (; an, Uesca) is a city in north-eastern Spain, within the autonomous community of Aragon. It is also the capital of the Spanish province of the same name and of the comarca of Hoya de Huesca. In 2009 it had a population of 52,059, almo ...
with the Madrid–Barcelona main line.


North-western corridor


Madrid–Galicia

The
Madrid–Galicia high-speed rail line The Madrid–Galicia high-speed rail line is a high-speed railway line in Spain that links the city of Madrid with the region of Galicia via the cities of Olmedo, Zamora, Ourense and Santiago de Compostela. The line also connects the Atlant ...
connects the city of
Madrid Madrid ( , ) is the capital and most populous city of Spain. The city has almost 3.4 million inhabitants and a Madrid metropolitan area, metropolitan area population of approximately 6.7 million. It is the Largest cities of the Europ ...
with the region of Galicia and the
Atlantic Axis high-speed rail line The Atlantic Axis high-speed rail line, also called Atlantic Corridor high-speed rail line, is a high-speed railway line that links A Coruña, Santiago de Compostela, Pontevedra and Vigo in Spain. The Atlantic Axis was inaugurated in April 2015. ...
in the North West of Spain via
Segovia Segovia ( , , ) is a city in the autonomous community of Castile and León, Spain. It is the capital and most populated municipality of the Province of Segovia. Segovia is in the Inner Plateau ('' Meseta central''), near the northern slopes of t ...
, Zamora,
Puebla de Sanabria Puebla de Sanabria (; ) is a small town located in the north-western part of the province of Zamora in Spain, between the rivers Tera and Castro. It is the economic and political centre of the ''comarca'' of Sanabria. History Well known as ...
, Ourense and
Santiago de Compostela Santiago de Compostela is the capital of the autonomous community of Galicia, in northwestern Spain. The city has its origin in the shrine of Saint James the Great, now the Cathedral of Santiago de Compostela, as the destination of the Way of S ...
. The line includes a new 424 km long high-speed railway section that starts at Olmedo, Spain, Olmedo 130 km to the north of Madrid on the Madrid–Leon high-speed rail line and ends at Santiago de Compostela. It was put in AVE service on 21 December 2021. AVE trains run between
Madrid Madrid ( , ) is the capital and most populous city of Spain. The city has almost 3.4 million inhabitants and a Madrid metropolitan area, metropolitan area population of approximately 6.7 million. It is the Largest cities of the Europ ...
and Ourense with a maximum operating speed of 300 km/h and cover the distance in 2h 15min, whilst
Alvia Alvia is a high-speed train service in Spain used by Renfe Operadora for long-distance service with a top speed of . The trains have the ability to use both Iberian gauge and standard gauge, which allows them to travel on the recently constructed ...
services in the line on class RENFE Class 130, 130 and 730 gauge-changing trains with a commercial speed of 250km/h, connect Madrid to
Santiago de Compostela Santiago de Compostela is the capital of the autonomous community of Galicia, in northwestern Spain. The city has its origin in the shrine of Saint James the Great, now the Cathedral of Santiago de Compostela, as the destination of the Way of S ...
, Pontevedra,
Vigo Vigo ( , , , ) is a city and municipality in the province of Pontevedra, within the autonomous community of Galicia, Spain. Located in the northwest of the Iberian Peninsula, it sits on the southern shore of an inlet of the Atlantic Ocean, the ...
, Lugo, La Coruña and Ferrol, Spain, Ferrol. Meanwhile certification is ongoing for the first gauge-changing Talgo AVRIL trains to operate at 330km/h in order journey times to be further reduced by 20 minutes between Madrid and Galicia. Part of the line up to Medina del Campo is also used for the Alvia Madrid–Salamanca service.


The Atlantic Axis

The Atlantic Axis high-speed rail line, Atlantic Axis high-speed railway line is connecting the two main cities of
Vigo Vigo ( , , , ) is a city and municipality in the province of Pontevedra, within the autonomous community of Galicia, Spain. Located in the northwest of the Iberian Peninsula, it sits on the southern shore of an inlet of the Atlantic Ocean, the ...
and
A Coruña A Coruña (; es, La Coruña ; historical English: Corunna or The Groyne) is a city and municipality of Galicia, Spain. A Coruña is the most populated city in Galicia and the second most populated municipality in the autonomous community and s ...
(Corunna) via
Santiago de Compostela Santiago de Compostela is the capital of the autonomous community of Galicia, in northwestern Spain. The city has its origin in the shrine of Saint James the Great, now the Cathedral of Santiago de Compostela, as the destination of the Way of S ...
in the northwestern Spanish region of Galicia. The railway, 155.6 km in length, is an upgrade of the former non electrified single railway line between the town of Ferrol, Galicia, Ferrol and the Portuguese border for the part between A Coruña and Vigo, into a double electrified high-speed line. The new rebuilt railway permits mixed use traffic with a maximum design speed of 250 km/h for passenger trains. The line is served by S/120, Alvia S-121 or S-730 (max speed ) train-sets for the routes between A Coruña and Vigo and between A Coruña and Ourense and by
Alvia Alvia is a high-speed train service in Spain used by Renfe Operadora for long-distance service with a top speed of . The trains have the ability to use both Iberian gauge and standard gauge, which allows them to travel on the recently constructed ...
S-730 (''Patito'', max speed ) train-sets connecting Galicia with other Spanish regions. The line is connected at Santiago de Compostela with the
Madrid–Galicia high-speed rail line The Madrid–Galicia high-speed rail line is a high-speed railway line in Spain that links the city of Madrid with the region of Galicia via the cities of Olmedo, Zamora, Ourense and Santiago de Compostela. The line also connects the Atlant ...
.


North corridor


Madrid–León

The Madrid–Leon high-speed rail line connects Madrid with León, Spain, León passing the cities of
Segovia Segovia ( , , ) is a city in the autonomous community of Castile and León, Spain. It is the capital and most populated municipality of the Province of Segovia. Segovia is in the Inner Plateau ('' Meseta central''), near the northern slopes of t ...
,
Valladolid Valladolid () is a municipality in Spain and the primary seat of government and de facto capital of the autonomous community of Castile and León. It is also the capital of the province of the same name. It has a population around 300,000 peop ...
and Palencia. The line supports the longest railway tunnel in Spain at 28 km in length and is served by up to two AVE Class 102, S-102 (''Pato'', max speed ) trains per day with the fastest schedule lasting 2 hours and 6 minutes. Other trainsets used on the Madrid–Leon line include RENFE Class 120, S-120 (max speed ) and RENFE Class 130, S-130 (''Patito'', max speed ) for the
Alvia Alvia is a high-speed train service in Spain used by Renfe Operadora for long-distance service with a top speed of . The trains have the ability to use both Iberian gauge and standard gauge, which allows them to travel on the recently constructed ...
services.


Madrid–Burgos

The Madrid–Burgos high-speed rail line connects Madrid with
Burgos Burgos () is a city in Spain located in the autonomous community of Castile and León. It is the capital and most populated municipality of the province of Burgos. Burgos is situated in the north of the Iberian Peninsula, on the confluence of ...
. The line shares a common section with the Madrid–Leon high-speed rail line up to
Venta de Baños Venta de Baños is a small town and municipality of about 6,400 inhabitants located in the Cerrato district of the province of Palencia, part of the autonomous community of Castile and León in central Spain. It lies some 10 km south of the ...
and then includes a 86.5 km long spur line up to the city of Burgos. AVE Class 112, S-112 trains are used for the AVE Madrid–Burgos service and cover the distance in 1 hour and 33 minutes by making one stop in the city of
Valladolid Valladolid () is a municipality in Spain and the primary seat of government and de facto capital of the autonomous community of Castile and León. It is also the capital of the province of the same name. It has a population around 300,000 peop ...
. By January 2023 a new AVE service between Burgos and Valencia is planned to connect the two cities in 3 hour and 30 minutes.


North-eastern corridor


Madrid–Barcelona

Madrid–Barcelona high-speed rail line, Madrid–Barcelona high-speed railway line connects Madrid with Barcelona in the north east of Spain passing through the cities of Guadalajara, Calatayud,
Zaragoza Zaragoza, also known in English as Saragossa,''Encyclopædia Britannica'"Zaragoza (conventional Saragossa)" is the capital city of the Zaragoza Province and of the autonomous community of Aragon, Spain. It lies by the Ebro river and its tributari ...
(Saragossa), Lleida (Lérida) and Tarragona where the future Tarragona–Valencia high-speed railway line will connect. The line has a length of 621 km and a travel time of two and a half hours for the direct trains using the route avoiding entering Zaragoza (Saragossa) and Lleida (Lérida). The line is served by AVE Class 103, S-103 (max speed ) trains. Seventeen trains run now every day between 6:00 and 21:00 hrs. Direct trains Barcelona–Seville and Barcelona–Malaga that do not make a stop in Madrid are also scheduled combining the Madrid–Barcelona line with one of the southern corridor's existing lines. AVE Class 112, S-112 (''Pato'', max speed ) trains are used for these services and cover these distances in less than 6 hours.


Barcelona–Perpignan (France)

The international high-speed section across the border, Perpignan–Figueres (44.4 km), of the
Perpignan–Barcelona high-speed rail line The Perpignan–Barcelona high-speed line is an international high-speed rail line between France and Spain. The line consists of a railway, of which 24.6 km are in France and 150.8 km are in Spain. It crosses the French–Spanish bord ...
opened in December 2010. Since then, French TGV trains operate from Paris. The Spanish high-speed section Barcelona–Figueres opened on 7 January 2013. Nine Spanish services initially serviced the line, with 8 being a through service to Madrid, which also connected with two French TGV services from Paris. Previously French TGV services connected Paris and Barcelona by means of a shuttle train on the standard Barcelona–Figueres line. Direct Barcelona-Paris, Madrid-Marseille, Barcelona-Lyon and Barcelona-Toulouse high-speed trains between France and Spain started on 15 December 2013.


Madrid–Huesca

The Zaragoza–Huesca section branches off from the Madrid–Barcelona line at Zaragoza and connects with the city of
Huesca Huesca (; an, Uesca) is a city in north-eastern Spain, within the autonomous community of Aragon. It is also the capital of the Spanish province of the same name and of the comarca of Hoya de Huesca. In 2009 it had a population of 52,059, almo ...
and serves the connection train station for regional trains in the town of Tardienta. The line first put in operation in 2005 and is served by up to two AVE Class 102, S-102 (''Pato'', max speed ) trains per day with the fastest train journey between the two cities lasting 2 hours and 5 minutes.


Eastern corridor


Madrid–Castellón

The Madrid–Castellón line connects the city of Castellón with the city of Madrid passing through the cities of Cuenca, Requena-Utiel and
Valencia Valencia ( va, València) is the capital of the autonomous community of Valencia and the third-most populated municipality in Spain, with 791,413 inhabitants. It is also the capital of the province of the same name. The wider urban area al ...
. The section It is serviced by AVE Class 112, S-112 (''Pato'', max speed ) trains, assembled by the Talgo-Bombardier consortium. Direct trains to Valencia cover the 391 km in 98 minutes while thirty trains run every day between 05:00 and 21:00, fifteen in each direction. For the service Madrid–Castellón AVE trains cover the distance in 2 hours and 25 minutes and 4 trains per day are scheduled, two in each direction. The line is part of the Madrid–Levante high-speed rail network, Madrid–Levante network (see below). Direct trains Valencia–Seville that do not make a stop in Madrid are also scheduled combining the existing lines of Madrid–Castellón and Madrid-Seville. AVE Class 102, S-102 (''Pato'', max speed ) trains are used for this service and cover the whole distance in 3 hours and 50 minutes.


Madrid–Alicante

A 350 km/h line branches off from the Madrid–Castellón Line and connects the city of
Alicante Alicante ( ca-valencia, Alacant) is a city and municipality in the Valencian Community, Spain. It is the capital of the province of Alicante and a historic Mediterranean port. The population of the city was 337,482 , the second-largest in t ...
with the city of Madrid passing through the cities of Cuenca,
Albacete Albacete (, also , ; ar, ﭐَلبَسِيط, Al-Basīṭ) is a city and municipality in the Spanish autonomous community of Castilla–La Mancha, and capital of the province of Albacete. Lying in the south-east of the Iberian Peninsula, the ...
and Villena. It is part of the Madrid–Levante high-speed rail network, Madrid–Levante HSR network and is serviced by AVE Class 112, S-112 (''Pato'', max speed ) trains that cover the distance in up to 2 hours and 12 minutes. Direct trains Toledo–Albacete were also scheduled in the past, combining four of the existing lines, but this service was eventually terminated due to low demand.


Madrid–Orihuela

Branching out from the Madrid–Alicante Line at Monforte del Cid to extend the network towards
Murcia Murcia (, , ) is a city in south-eastern Spain, the capital and most populous city of the autonomous community of the Region of Murcia, and the seventh largest city in the country. It has a population of 460,349 inhabitants in 2021 (about one ...
, the first AVE service to Orihuela was inaugurated on 1 February 2021. The branch links
Albacete Albacete (, also , ; ar, ﭐَلبَسِيط, Al-Basīṭ) is a city and municipality in the Spanish autonomous community of Castilla–La Mancha, and capital of the province of Albacete. Lying in the south-east of the Iberian Peninsula, the ...
,
Elche Elche ( ca-valencia, Elx) is a city and municipality of Spain, belonging to the province of Alicante, in the Valencian Community. According to 2014 data, Elche has a population of 228,647 inhabitants, Some trains are arriving to Alicante and then reversing to Orihuela.


South corridor


Madrid–Seville

The Madrid–Seville high-speed rail line, Madrid–Seville high-speed railway line connects
Madrid Madrid ( , ) is the capital and most populous city of Spain. The city has almost 3.4 million inhabitants and a Madrid metropolitan area, metropolitan area population of approximately 6.7 million. It is the Largest cities of the Europ ...
with
Seville Seville (; es, Sevilla, ) is the capital and largest city of the Spanish autonomous community of Andalusia and the province of Seville. It is situated on the lower reaches of the River Guadalquivir, in the southwest of the Iberian Peninsula ...
in the south of Spain, passing through the cities of Ciudad Real,
Puertollano Puertollano () is a municipality of Spain located in the province of Ciudad Real, Castile-La Mancha. The city has a population of 47,035 (2019). Contrasting to the largely rural character of the region, Puertollano stands out for the importance o ...
and Córdoba, Spain, Córdoba, where the
Madrid–Málaga high-speed rail line The Madrid–Málaga high-speed rail line is a standard gauge High-speed rail line of in length that links the city of Madrid with the city of Málaga in Spain. The line was inaugurated on 24 December 2007. At the time the service opened, Re ...
branches off towards Málaga just outside Los Mochos near Almodóvar del Río. The route travels across the plains of Castile (historical region), Castile, travelling through the Sierra Morena mountains just before reaching Córdoba, before going onward towards Seville through the largely flat land surrounding the Guadalquivir river. The Madrid–Seville line was the first dedicated passenger high-speed rail line to be built in Spain and was completed in time for Seville's Expo 92. With a length of 472 km, the fastest train journey between the two cities takes 2 hours and 20 minutes. The line is served by AVE Class 100, S-100 (max speed ) trains. The extension section of the Madrid-Seville high-speed rail line to
Cádiz Cádiz (, , ) is a city and port in southwestern Spain. It is the capital of the Province of Cádiz, one of eight that make up the autonomous community of Andalusia. Cádiz, one of the oldest continuously inhabited cities in Western Europe, ...
is served by
Alvia Alvia is a high-speed train service in Spain used by Renfe Operadora for long-distance service with a top speed of . The trains have the ability to use both Iberian gauge and standard gauge, which allows them to travel on the recently constructed ...
trains that connect the city of Cádiz to Madrid and reach speeds up to 200 km/h in this section.


Madrid–Málaga

The
Madrid–Málaga high-speed rail line The Madrid–Málaga high-speed rail line is a standard gauge High-speed rail line of in length that links the city of Madrid with the city of Málaga in Spain. The line was inaugurated on 24 December 2007. At the time the service opened, Re ...
connects the city of Málaga with the city of Madrid. The line shares a common section with the Madrid–Seville high-speed rail line up to the city of Córdoba and then includes a 155 km long spur line up to the city of Málaga. It is served by AVE Class 102, S-102 (''Pato'', max speed ) and AVE Class 103, S-103 (max speed ) trains and the fastest train journey between the two cities takes 2 hours and 20 minutes. Apart from the traffic to and from the city of Málaga, the line also handles the traffic to the cities of Granada and Algeciras. In the future, the line will also support the traffic between Madrid and the Costa del Sol high-speed rail line.


Madrid–Toledo

The Madrid-Toledo high-speed rail line, Madrid–Toledo high-speed rail line branches off from the Seville and Málaga routes around the depot at La Sagra. The #AVANT, Avant service between the two cities offers journey times of half an hour on trains with a maximum speed of 250 km/h.


Madrid–Granada

The 122.8 km
Antequera–Granada high-speed rail line The Antequera–Granada high-speed rail line opened in 2019, linking the Spanish city of Granada to the AVE network via a branch from the existing Madrid–Málaga high-speed rail line at Antequera. Background The line from Antequera to Granad ...
is a part of the under construction ''Andalusian Transverse Axis high-speed rail line''. The three times per day AVE service between Madrid Atocha and Granada covers the distance of 568 km in 3 h 5 min. The daily AVE train between Granada and Barcelona Sants railway station, Barcelona Sants connects the two cities in 6 h 25 min. AVE Class 102, S-102 and AVE Class 112, S-112 (''Pato'', max speed ) trains are used for these services and all trains call at Córdoba railway station, Córdoba, offering a journey time of 90 min from Granada. The total cost of building the line was €1.4 billion.


Madrid interconnector

A new interconnecting tunnel between Madrid Atocha and Madrid Chamartín stations opened to service in July 2022. The AVE Madrid–Alicante service having Madrid Chamartín station as a terminal station and the Burgos-Valencia service are using the Madrid interconection tunnel.
Alvia Alvia is a high-speed train service in Spain used by Renfe Operadora for long-distance service with a top speed of . The trains have the ability to use both Iberian gauge and standard gauge, which allows them to travel on the recently constructed ...
services connecting Gijón to
Alicante Alicante ( ca-valencia, Alacant) is a city and municipality in the Valencian Community, Spain. It is the capital of the province of Alicante and a historic Mediterranean port. The population of the city was 337,482 , the second-largest in t ...
, Santander, Spain, Santander to Alicante and Gijón to Oropesa Del Mar via
Valencia Valencia ( va, València) is the capital of the autonomous community of Valencia and the third-most populated municipality in Spain, with 791,413 inhabitants. It is also the capital of the province of the same name. The wider urban area al ...
, are also using the Madrid interconection tunnel and are calling at Madrid Chamartín station. The Madrid–Badajoz Alvia service uses this tunnel too, starting at Madrid Chamartín and making a stop at Madrid Atocha.


Lines under construction

Currently there are six corridors with ten lines under construction.


North corridor


León–Gijón

* León, Spain, León–Oviedo–Gijón Madrid–Asturias high-speed railway is the line connecting Madrid to the region of Asturias in the north of Spain. The new under construction section branches off the Valladolid–Vitoria high-speed section at
Venta de Baños Venta de Baños is a small town and municipality of about 6,400 inhabitants located in the Cerrato district of the province of Palencia, part of the autonomous community of Castile and León in central Spain. It lies some 10 km south of the ...
: 205 km north of Madrid and then reaches the cities of Oviedo and Gijón via Palencia and León, Spain, León. This section includes the 24,7 km long Pajares Base Tunnel (''Variante de Pajares'') which runs under a very mountainous area between the Province of León and the Principality of Asturias. Construction started in 2009 (except variante de pajares which started 2003) and reached León in September 2015. In September 2021 the first test runs started through Pajares Base Tunnel in the railway between La Robla and Campomanes. The line is expected to put in service by May 2023.


Burgos–Vitoria

*
Burgos Burgos () is a city in Spain located in the autonomous community of Castile and León. It is the capital and most populated municipality of the province of Burgos. Burgos is situated in the north of the Iberian Peninsula, on the confluence of ...
–Miranda de Ebro–Vitoria-Gasteiz The extension of the Madrid–Valladolid section towards the Basque Country began construction in 2009. This railway line will run parallel to the long existing railway line. Originally it was to be used as a mixed-use high-speed railway line, but it has since been changed to a passenger-dedicated railway line, leaving the existing railway line for freight trains. The line was forecast to open the
Valladolid Valladolid () is a municipality in Spain and the primary seat of government and de facto capital of the autonomous community of Castile and León. It is also the capital of the province of the same name. It has a population around 300,000 peop ...
Burgos Burgos () is a city in Spain located in the autonomous community of Castile and León. It is the capital and most populated municipality of the province of Burgos. Burgos is situated in the north of the Iberian Peninsula, on the confluence of ...
part around 2013 and the Burgos–Vitoria-Gasteiz part in 2014 or 2015. However, due to delays the line is not expected to open before 2023, although the Valladolid–Burgos section entered full revenue service in July 2022. At Vitoria-Gasteiz, Vitoria it will be connected to the Basque high-speed railway line (Basque Y), thus reaching the French border. Once opened, the travel time between
Valladolid Valladolid () is a municipality in Spain and the primary seat of government and de facto capital of the autonomous community of Castile and León. It is also the capital of the province of the same name. It has a population around 300,000 peop ...
and Vitoria-Gasteiz, Vitoria will be around an hour.


Basque Y

* Bilbao–Vitoria-Gasteiz–Donostia-San Sebastián, San Sebastian–France, French border The Basque high-speed railway line (Basque Y) will connect the three Basque capitals, Vitoria-Gasteiz, Bilbao and San Sebastián. Construction began in October 2006 and the line was forecast to open in 2016. However, due to delays in construction, the line is expected to put in service in 2023 according to the new estimations. The three Basque capitals will be further connected with Madrid via Valladolid, and with the French border via Irun and Bayonne.


Madrid-Santander

*
Madrid Madrid ( , ) is the capital and most populous city of Spain. The city has almost 3.4 million inhabitants and a Madrid metropolitan area, metropolitan area population of approximately 6.7 million. It is the Largest cities of the Europ ...
Segovia Segovia ( , , ) is a city in the autonomous community of Castile and León, Spain. It is the capital and most populated municipality of the Province of Segovia. Segovia is in the Inner Plateau ('' Meseta central''), near the northern slopes of t ...
Valladolid Valladolid () is a municipality in Spain and the primary seat of government and de facto capital of the autonomous community of Castile and León. It is also the capital of the province of the same name. It has a population around 300,000 peop ...
–Palencia–Villaprovedo–Reinosa–Santander, Spain, Santander A new high-speed line is planned to branch off from the current Madrid–Leon high-speed rail line at Palencia and as a part of the north corridor will connect the region of Cantabria to the high-speed rail network with direct connection to Madrid. According to the plans the city of Santander, Spain, Santander will be connected via Villaprovedo and Reinosa. An agreement for completing the line by the end of 2015 was signed on 11 August 2010 including the agreement to call tenders for the section between Palencia and Villaprovedo before the end of March 2011 and for the Villaprovedo – Reinosa section before the end of 2012. However construction works in the line started in November 2021 for the section between Palencia and Osorno la Mayor, Osorno, while the section between Osorno and Reinosa is planned to be projected in 2022 and to start construction in 2023.


Eastern corridor


Alicante–Cartagena

*
Alicante Alicante ( ca-valencia, Alacant) is a city and municipality in the Valencian Community, Spain. It is the capital of the province of Alicante and a historic Mediterranean port. The population of the city was 337,482 , the second-largest in t ...
Murcia Murcia (, , ) is a city in south-eastern Spain, the capital and most populous city of the autonomous community of the Region of Murcia, and the seventh largest city in the country. It has a population of 460,349 inhabitants in 2021 (about one ...
Cartagena This is an under construction section, part of the Madrid–Levante high-speed rail line, Madrid–Levante network of high-speed railways connecting the capital with the Mediterranean coast. Consisting of of railways with an estimated cost of 12.5 billion euros, it is the most expensive high-speed railway project in Spain. The network will consist of both dedicated passenger high-speed railways designed for trains running above and high-speed railways shared with freight trains. The network is to be opened in stages, starting with the
Madrid Madrid ( , ) is the capital and most populous city of Spain. The city has almost 3.4 million inhabitants and a Madrid metropolitan area, metropolitan area population of approximately 6.7 million. It is the Largest cities of the Europ ...
Valencia Valencia ( va, València) is the capital of the autonomous community of Valencia and the third-most populated municipality in Spain, with 791,413 inhabitants. It is also the capital of the province of the same name. The wider urban area al ...
/
Albacete Albacete (, also , ; ar, ﭐَلبَسِيط, Al-Basīṭ) is a city and municipality in the Spanish autonomous community of Castilla–La Mancha, and capital of the province of Albacete. Lying in the south-east of the Iberian Peninsula, the ...
section, which was opened in December 2010, followed by Albacete–
Alicante Alicante ( ca-valencia, Alacant) is a city and municipality in the Valencian Community, Spain. It is the capital of the province of Alicante and a historic Mediterranean port. The population of the city was 337,482 , the second-largest in t ...
in June 2013, Valencia– Castellón in January 2018, Monforte del Cid–Orihuela in February 2021 while reaching the city of
Murcia Murcia (, , ) is a city in south-eastern Spain, the capital and most populous city of the autonomous community of the Region of Murcia, and the seventh largest city in the country. It has a population of 460,349 inhabitants in 2021 (about one ...
is expected to follow by 2022 with a branch line to Cartagena. The section linking Valencia with Alicante in the Mediterranean Corridor is expected to open in 2022.


South corridor


Seville–Antequera

* Transversal Rail Axis ('':es:Eje ferroviario transversal de Andalucía, Eje Ferroviario transversal de Andalucía''), the Andalusian high-speed rail line connecting Huelva, Seville, Granada and Almería. Part of the line is financed and built by the Andalusian government. The southern
Andalusia Andalusia (, ; es, Andalucía ) is the southernmost autonomous community in Peninsular Spain. It is the most populous and the second-largest autonomous community in the country. It is officially recognised as a "historical nationality". The t ...
n transverse high-speed railway line is a 503.7-kilometre railway running between the cities of Huelva and Almería, passing the cities of Seville and Granada. The line is designed for speeds up to 250 kilometres per hour, except for the 130-kilometre Antequera–Granada and the 103-kilometre Seville–Huelva parts of the line, which are designed for speeds in excess of 300 kilometres per hour. A connection between Huelva and the Portuguese border is being studied. When finished the journey between Huelva and Almería in the new line is estimated to last 3 hours and 35 minutes. The first section of the line between
Antequera–Granada high-speed rail line The Antequera–Granada high-speed rail line opened in 2019, linking the Spanish city of Granada to the AVE network via a branch from the existing Madrid–Málaga high-speed rail line at Antequera. Background The line from Antequera to Granad ...
was put in service on 26 June 2019 connecting the city of Granada to the rest of the high speed network via a branch from the
Madrid–Málaga high-speed rail line The Madrid–Málaga high-speed rail line is a standard gauge High-speed rail line of in length that links the city of Madrid with the city of Málaga in Spain. The line was inaugurated on 24 December 2007. At the time the service opened, Re ...
. The section between
Seville Seville (; es, Sevilla, ) is the capital and largest city of the Spanish autonomous community of Andalusia and the province of Seville. It is situated on the lower reaches of the River Guadalquivir, in the southwest of the Iberian Peninsula ...
and Antequera is currently under construction and completion is expected in the following years.


Madrid–Jaén

*
Madrid Madrid ( , ) is the capital and most populous city of Spain. The city has almost 3.4 million inhabitants and a Madrid metropolitan area, metropolitan area population of approximately 6.7 million. It is the Largest cities of the Europ ...
–Alcázar de San Juan–Jaén, Spain, Jaén This high-speed railway line will be part passenger-dedicated high-speed railway (Madrid–Alcázar de San Juan) and part shared with freight trains (Alcázar de San Juan–Jaén). The first 99 km of the line will use the already existing Madrid-Seville high-speed railway line. From there, a 67.5 km branch line will be constructed towards Alcázar de San Juan. From Alcázar de San Juan the existing railway line will be upgraded to allow passenger trains to run up to 250 km/h; a new double-tracked route through the Despeñaperros mountain range will be built to replace the existing single-tracked route. This part of the high-speed railway also forms part of the Madrid–Algeciras freight corridor. An extension of the line to Granada is being investigated; however, the complicated terrain between Jaén, Spain, Jaén and Granada might make it uneconomical.


Mediterranean corridor


Tarragona–Almería

* Tarragona–Valencian Community–Murcia Region–Almería The section linking Tarragona to Almería via
Valencia Valencia ( va, València) is the capital of the autonomous community of Valencia and the third-most populated municipality in Spain, with 791,413 inhabitants. It is also the capital of the province of the same name. The wider urban area al ...
and
Murcia Murcia (, , ) is a city in south-eastern Spain, the capital and most populous city of the autonomous community of the Region of Murcia, and the seventh largest city in the country. It has a population of 460,349 inhabitants in 2021 (about one ...
is expected to be completed by 2023 when the currently under construction 184 km Murcia–Almería high-speed rail line will be finished. Its first 46,5 km new built cut-off part between Camp de Tarragona and Vandellòs i l'Hospitalet de l'Infant, Vandellòs started commercial services on 13 January 2020. A new dual-gauge high speed rail track on the 72 km part between Valencia and Castellón inaugurated in January 2018. The section between Vandellòs and Castellón is an upgraded line of the old Iberian-gauge railways, Iberian-gauge Valencia−Sant Vicenç de Calders railway currently used by the Euromed service in speeds up to 220 km/h that covers distance of 400 km between the cities of Barcelona and Valencia in 2 hours and 35 minutes. With a new line, it will take about 1 hour and 45 minutes on high speed trains to cover the same distance. However, this part is not under construction yet for a new Standard-gauge railway, standard-gauge high speed line. The section linking Valencia with
Alicante Alicante ( ca-valencia, Alacant) is a city and municipality in the Valencian Community, Spain. It is the capital of the province of Alicante and a historic Mediterranean port. The population of the city was 337,482 , the second-largest in t ...
is expected to be completed by the year 2022. The 52 km part between Torrent outside Valencia and Xàtiva, which is under construction since October 2002, is expected to be completed by end 2020 and it is designed for speeds up to 350 km/h. Modernization works in the 40 km remaining part between Xàtiva and La Encina Hub for maximum speed of 260 km/h including conversion to standard-gauge high speed line are expected to be completed by end 2022. The final section between Almería and Algeciras, passing through Málaga, will be built at a later point of time and an alternative and longer route looks likely.


South-western corridor


Madrid–Extremadura

*
Madrid Madrid ( , ) is the capital and most populous city of Spain. The city has almost 3.4 million inhabitants and a Madrid metropolitan area, metropolitan area population of approximately 6.7 million. It is the Largest cities of the Europ ...
Toledo–Talavera de la Reina–Plasencia–Cáceres, Spain, Cáceres–Mérida, Spain, Mérida–Badajoz This line was initially planned as Lisbon–Madrid high-speed rail line in order to connect the two peninsular capitals, Madrid and Lisbon in 2 hours and 45 minutes. This line had been a key issue in bilateral summits in recent years and was about to link Spain's high-speed rail network with the planned High-speed rail in Portugal, a project announced by the Portuguese government in February 2009. Construction on the Spanish side began in late 2008 on a segment between the cities of Badajoz and Mérida, Spain, Mérida. Both Spanish and Portuguese track were to be completed around 2013, later the Portuguese government brought forward its plans from 2015 but the Portuguese froze works in June 2011 and eventually cancelled the project in March 2012. In 2016 the European Union's European Regional Development Fund, gave Spain €205.1m towards the €312.1m needed for the track between Navalmoral de la Mata and Mérida, Spain. The section on the Spanish side between Madrid and Badajoz is expected to be completed in 2023. With a length of 439 km on the Spanish side, of which 48 km are part of the already built Madrid–Seville high-speed rail line, the original plan was to connect cities like Talavera de la Reina, Navalmoral de la Mata, Plasencia, Cáceres, Spain, Cáceres, Mérida, Spain, Mérida and Badajoz to Madrid. The Almonte River Viaduct was completed in May 2016 to carry this line. It is a concrete arch bridge with a span of 384 meters (1,260 feet), ranking among the longest in the world of this type of bridge. For the section between Madrid and Oropesa, Spain, Oropesa a new Informative Study was awarded by the Ministry of Public Works in February 2018 in order to propose alternative routes with lower environmental impact than those in the initial study from 2008. In November 2020 the new study was approved by the Ministry of Transport and in the revised proposal the city of Toledo was added in the route by the use of the existing Madrid–Toledo high-speed rail line, high speed section between Madrid and Toledo. The new introduced 127 km section with budget of €1.3 billion starts from Toledo and passes through the cities of Talavera de la Reina and Oropesa until it reaches the border of the Province of Toledo with new stations planned in all those three cities. The section between Plasencia and Mérida was originally planned to put in service by end 2021. However, the first part given to service was the entire 150km section between Plasencia and Badajoz that was inaugurated on 18 July 2022 at an investment cost of €1.7 billion. It is a double Iberian gauge line that is due to be changed to standard gauge in the future. The total budget for the Madrid–Extremadura line is €3.7 billion.


Two Seas corridor


Zaragoza–Pamplona

*
Zaragoza Zaragoza, also known in English as Saragossa,''Encyclopædia Britannica'"Zaragoza (conventional Saragossa)" is the capital city of the Zaragoza Province and of the autonomous community of Aragon, Spain. It lies by the Ebro river and its tributari ...
–Castejón, Navarre, Castejon–Pamplona A high-speed track between Zaragoza ( Aragon) and Pamplona (Navarre) is currently under development as a part of the Two Seas (Cantabrian-Mediterranean) corridor. The section between Castejon and Pamplona (both in Navarre) with a total length of 75.5 kilometers is under construction with some sub-sections already completed. The line is expected to be completed by 2023.


Lines planned

In the short term, other connections to the LGV are planned. After the connection to France at La Jonquera in Catalonia, another connection is proposed at Irun in the Basque Country. Other new lines are under consideration, including a line connecting Soria to the Madrid–Barcelona line at Calatayud. Finally, the Madrid–Barcelona line currently terminates in Barcelona's Estació de Sants, but a new station is under construction at
La Sagrera La Sagrera is a neighborhood of Barcelona. Geography La Sagrera is bordered to the north by Sant Andreu del Palomar and to the east by the neighborhood of La Verneda; included by the south end is the zone named Navas, and to the west the C ...
on the northern edge of the city. In the long term, the Spanish government has an ambitious plan to make of high-speed railway operational, with all provincial capitals at most only 4 hours from Madrid, and hours from Barcelona. According to the Strategic Plan for railway infrastructures developed by the Spanish ''Ministerio de Fomento'' (Ministry of Public Works), called PEIT, and published in 2005, a second expansion program is planned to start when the last lines of the first program still under construction begin operation. This plan initially had a ten-year scope, ending in 2020, and its ambition was to make the network reach by the end of that year. However, this program has been now postponed to indefinite time frame since the first expansion program is still on going. When both programs will be completed, the Spanish high-speed network will be the most extensive network in Europe, with several operational links with France and Portugal, and this is the most ambitious high-speed rail plan in the European Union.


Connection with Barajas Airport

In May 2021 the Spanish Ministry of Transport, Mobility and Urban Agenda announced its plans to connect Madrid's Adolfo Suárez Madrid–Barajas Airport with the AVE network. According to the plans this is going to be realized in two phases. In the first short-term phase, AVE trains will reach the airport by sharing a line with the
Cercanías The commuter rail systems of Spain's major metropolitan areas are called ''Cercanías'' () in most of Spain, ''Rodalia'' () in the Valencian Community, ''Aldiriak'' () in the Basque Country and ''Rodalies'' () in Catalonia. There are twelve ''Ce ...
trains until Madrid Chamartín railway station, Chamartín station. Tendering for these works is planned to start within 2022. In long-term during the second phase, a dedicated high-speed line will be constructed to connect the airport.


Cantabrian Sea corridor

* Galicia–Asturias–Cantabria– Basque Country–France, French border The 430 km high-speed line will connect Ferrol, Galicia, Ferrol in Galicia with Bilbao in the Basque Country passing through the regions of Asturias and Cantabria along the Cantabrian Sea coast in the north Spain. The line will be further connected to the
Atlantic Axis high-speed rail line The Atlantic Axis high-speed rail line, also called Atlantic Corridor high-speed rail line, is a high-speed railway line that links A Coruña, Santiago de Compostela, Pontevedra and Vigo in Spain. The Atlantic Axis was inaugurated in April 2015. ...
on the west, the Basque Y high-speed railway line on the east and the north corridor (future Madrid-Gijón high-speed railway line) in Asturias region. The travel time between El Ferrol and Bilbao in the new line is estimated to last 1 hour and 48 minutes. The line is not yet projected but it is planned to be completed before 2024.


Two seas corridor

* Valencian Community– Aragon–La Rioja (Spain), La Rioja–Navarre– Basque Country–France, French border The line will connect the Valencian Community with the Basque Country region and the French border passing through the regions of Aragon, Navarre and La Rioja (Spain), La Rioja, with further connection to the
TGV The TGV (french: Train à Grande Vitesse, "high-speed train"; previously french: TurboTrain à Grande Vitesse, label=none) is France's intercity high-speed rail service, operated by SNCF. SNCF worked on a high-speed rail network from 1966 to 19 ...
network via Irun towards Bordeaux and Paris. The line will include two connections between the region of Aragon and the Basque Country, one via Pamplona in Navarre towards the French border and one via Logroño in La Rioja towards Bilbao. Connected cities will include
Valencia Valencia ( va, València) is the capital of the autonomous community of Valencia and the third-most populated municipality in Spain, with 791,413 inhabitants. It is also the capital of the province of the same name. The wider urban area al ...
, Teruel,
Zaragoza Zaragoza, also known in English as Saragossa,''Encyclopædia Britannica'"Zaragoza (conventional Saragossa)" is the capital city of the Zaragoza Province and of the autonomous community of Aragon, Spain. It lies by the Ebro river and its tributari ...
, Pamplona, Logroño, Vitoria-Gasteiz, San Sebastián and Bilbao with possible further connection to Santander, Spain, Santander. The travel time between Valencia and Bilbao in the new high-speed line will be decreased from 9 hours down to roughly 4 hours. Some sections between the regions of Aragon, Navarre and La Rioja are projected, while the section between Castejón, Navarre, Castejon and Pamplona is currently under construction. The Ministry of Development has not set a target date to complete the Cantabrian-Mediterranean corridor yet.


Central-Pyrenees corridor

*
Zaragoza Zaragoza, also known in English as Saragossa,''Encyclopædia Britannica'"Zaragoza (conventional Saragossa)" is the capital city of the Zaragoza Province and of the autonomous community of Aragon, Spain. It lies by the Ebro river and its tributari ...
Huesca Huesca (; an, Uesca) is a city in north-eastern Spain, within the autonomous community of Aragon. It is also the capital of the Spanish province of the same name and of the comarca of Hoya de Huesca. In 2009 it had a population of 52,059, almo ...
–France, French border–Toulouse A new high-capacity rail connecting Spain with France on international standard gauge track is considered via a 40 km tunnel through the central Pyrenees , Pyrenees mountains. The line, also called Trans-Pyrenean Central Corridor (:es:Travesía central del Pirineo, Travesía Central de los Pirineos) or TCP project, will serve both passenger high-speed trains as well as large freight trains and will connect directly
Zaragoza Zaragoza, also known in English as Saragossa,''Encyclopædia Britannica'"Zaragoza (conventional Saragossa)" is the capital city of the Zaragoza Province and of the autonomous community of Aragon, Spain. It lies by the Ebro river and its tributari ...
to Toulouse via
Huesca Huesca (; an, Uesca) is a city in north-eastern Spain, within the autonomous community of Aragon. It is also the capital of the Spanish province of the same name and of the comarca of Hoya de Huesca. In 2009 it had a population of 52,059, almo ...
a distance of 355 km in length. Ten possible alternatives are being considered for crossing the mountains, all of them including tunnels at low altitude and other possible stops include Tarbes or Pau, Pyrénées-Atlantiques, Pau. There is currently no clear provision on its construction.


Passenger usage

The still-growing network transported a record 21.3 million passengers in 2018. Though the network length is extensive, it lags in ridership behind comparable high-speed rail systems in Japan, France, Germany, China, Taiwan, and Korea.


See also


Other high-speed rail services

* Intercity-Express *
TGV The TGV (french: Train à Grande Vitesse, "high-speed train"; previously french: TurboTrain à Grande Vitesse, label=none) is France's intercity high-speed rail service, operated by SNCF. SNCF worked on a high-speed rail network from 1966 to 19 ...
* Eurostar and Thalys * YHT * Le Frecce * Shinkansen


Rail infrastructure in Spain and Europe

* Rail transport in Spain * High-speed rail in Europe * Train categories in Europe


Notes


References


External links


AVE (Renfe)
{{DEFAULTSORT:AVE AVE high-speed trains Renfe High-speed rail in Spain