Kanpur Monorail
   HOME

TheInfoList



OR:

The Kanpur Monorail was a proposed
monorail A monorail (from "mono", meaning "one", and " rail") is a railway in which the track consists of a single rail or a beam. Colloquially, the term "monorail" is often used to describe any form of elevated rail or people mover. More accurat ...
system for the city of Kanpur.


Lines

There are three lines proposed in phase I are as follows: *From Panki Sector 18 to
Shuklaganj Shuklaganj (officially Gangaghat) is situated in Unnao district, but it is also considered as a suburb of Kanpur, Uttar Pradesh, located on the banks of holy river Ganges about 5 km from Kanpur on the SH 58 to Unnao.The population was ...
via Govind Puri - Jarib Chauki - Central - Ghantaghar 8 Point - Shuklaganj. Length of this line would be 24.5 km *From Chobepur to Maharajpur via IIT Kanpur - Kalyanpur - Rawatpur - Kanpur Anwarganj -
Kanpur Central Kanpur Central (formerly known as Cawnpore North Barracks, station code: CNB) is a central and junction railway station in the city of Kanpur and is one of the five central Indian railway stations. It is third busiest in country after Howrah ...
. Length of this line would be 28.5 km *From
Kanpur Zoo Kanpur Zoological Park or Allen Forest Zoo (Hindi: कानपुर चिड़ियाघर / कानपुर प्राणी उद्यान), also called the Kanpur Zoo is a zoo in Kanpur, a large city in Northern India. It i ...
to
Kanpur Cantonment Kanpur Cantonment (popularly referred to as Kanpur Cantt) is a military cantonment in Kanpur, Uttar Pradesh, India. The Kanpur Cantonment was established in the year 1811 and is situated on the right bank of river Ganges and is bound by Kanpu ...
via Old Kanpur -
Civil Lines Civil Lines (archaically White Town) are the residential neighbourhoods developed during the British Raj for its senior civilian officers like Divisional commissioner and District magistrate. These townships were built all over the Indian subconti ...
- Wazid Pur. Length of this line would be 16.0 km Total length of Phase I would be 63.0 km.


Other lines

Other lines which are being proposed in addition to Phase I are: *From Daheli Sujanpur to
Govind Nagar Govind Nagar is a southern neighbourhood of Kanpur named after Govind Vallabh Pant as he inaugurated this locality. It was the largest Vidhan Sabha constituency in Asia until Kidwai Nagar Vidhan Sabha constituency was formed. It is surrounded ...
. *From J K Temple to Kidwai Nagar via Kamla Club -
Govindpuri Govindpuri is a colony in South East Delhi. It is recreated on top of an old graveyard and is surrounded by Kalkaji, Chittaranjan Park, and Tughlakabad. The Violet Line of the Delhi Metro The Delhi Metro is a mass rapid transit (MRT) ...
. *From Gangotri Township to Sahara City via
Green Park Stadium Green Park Stadium is an international standards cricket stadium of Kanpur, India. Its seating capacity is 32,000 seats. It is the home ground of Uttar Pradesh cricket team. This arena is an International Test match venue. Green Park is under ...
- Rave 3 - Old Kanpur - New Kanpur City


Status

Feasibility study has been completed for Phase I corridors. Work was predicted to start after 2016. As of 2021 no work has commenced. In 2016 the State Government approved the rail based
Kanpur Metro The Kanpur Metro is a mass rapid transit (MRT) system in Kanpur, Uttar Pradesh, India. The metro is owned and operated by the Uttar Pradesh Metro Rail Corporation (UPMRC). The feasibility study for the project was done by RITES in June 2015. ...
, which began construction in 2021. It is not clear if the metro corridors will replace the monorail plans.


References

Proposed monorails in India Transport in Kanpur Proposed infrastructure in Uttar Pradesh {{Asia-metro-stub