Area
The synchronous grid of Continental Europe covers territory of the ENTSO-E Continental Europe regional group and some neighboring countries not involved in the ENTSO-E. The synchronous grid includes part or all of Austria, Belgium, Bosnia and Herzegovina, Bulgaria, Croatia, Czech Republic, Denmark (western part), France, Germany, Greece, Hungary, Italy, Luxembourg, Montenegro, the Netherlands, North Macedonia, Poland, Portugal, Romania, Serbia, Slovakia, Slovenia, Spain, and Switzerland as a members of the ENTSO-E Continental Europe regional group. In addition to the ENTSO-E members, the small west electricity island of Ukraine is synchronized with the grid of Continental Europe. Albania is operating the national grid synchronously with the synchronous grid of Continental Europe. The grids of Morocco, Algeria and Tunisia are synchronized with the European grid through the Gibraltar AC link and form the South West Mediterranean Block, SWMB. In April 2015, the grid of Turkey was synchronized with the European grid. Although synchronous, some countries operate in a near island mode, with low connectivity to other countries. The European Commission considers high connectivity to be beneficial, and has listed several interconnection projects as Projects of Common Interest. However, the national grids must also be upgraded to handle increased power flows if the values of a free energy market are to be realised in the EU.List of electricity interconnection level
Electrical grid#Interconnectors, Electricity interconnection as percentage (EIL = electricity interconnection level) of installed electricity production capacity in 2014; the EU goal of at least 10% for 2020, and 15% for 2030.COM/2015/082 final: "Achieving the 10% electricity interconnection targetInterconnections
Future extension plans
UCTE/ENTSO-E and the corresponding partner TSO companies are planning the following extensions of the grid and synchronous frequency: # UCTE-Ukraine/Moldova, to disconnect only these networks from the IPS/UPS system and synchronously interconnecting them to the synchronized grid of Central Europe # Tunisia-Libya synchronous connection, that would extend the Continental Europe frequency to Libya, Egypt, Jordan, Syria and Lebanon (the latter five countries constitute the South East Mediterranean Block, SEMB of the MedRing, Mediterranean Electricity Ring project. high-voltage direct current, HVDC planned projects: # The EuroAsia Interconnector between the Greek, Cypriot, and Israeli via the world's longest submarine power cable. Separately, there is another option concerning Ukraine and Moldova, and the ENTSO-E Baltic regional group – to disconnect only these networks from the IPS/UPS system and synchronously interconnecting them to the synchronized grid of Central Europe. In early 2021 Ukraine announced that it will be disconnecting from Russia and Belarus by the end of 2023 and integrating into the European grid. Further possibilities are extension to the Nordic regional group, the Turkey-Iraq interconnection, and the DESERTEC concept for interconnection with other countries in the Middle East. In the past Armenia and Turkmenistan networks were part of the Soviet unified system, but currently they are connected to the Iran grid.See also
* SuperSmart Grid – proposal for a wide area synchronous grid combining European, IPS/UPS and Middle East networks * Super grid * European super gridReferences
{{ReflistExternal links