Oosterscheldedam Storm Rens Jacobs
   HOME

TheInfoList



OR:

The Oosterscheldekering ( English: Eastern Scheldt storm surge barrier), between the islands Schouwen-Duiveland and
Noord-Beveland Noord-Beveland (; "North Beveland") is a municipality and region in the southwestern Netherlands and a former island, now part of the Walcheren-Zuid-Beveland-Noord-Beveland peninsula. Noord-Beveland is enclosed by the Oosterschelde estuary to the ...
, is the largest of the Delta Works, a series of dams and storm surge barriers, designed to protect the
Netherlands ) , anthem = ( en, "William of Nassau") , image_map = , map_caption = , subdivision_type = Sovereign state , subdivision_name = Kingdom of the Netherlands , established_title = Before independence , established_date = Spanish Netherl ...
from flooding from the North Sea. The construction of the Delta Works was a response to the widespread damage and loss of life in the
North Sea flood of 1953 The 1953 North Sea flood was a major flood caused by a heavy storm surge that struck the Netherlands, north-west Belgium, England and Scotland. Most sea defences facing the surge were overwhelmed, causing extensive flooding. The storm and flo ...
.


Surge barrier

The longest dam in the Delta Works, the nine-kilometre-long Oosterscheldekering (''kering'' meaning barrier) was initially designed, and partly built, as a closed dam, but after public protests, huge
sluice Sluice ( ) is a word for a channel controlled at its head by a movable gate which is called a sluice gate. A sluice gate is traditionally a wood or metal barrier sliding in grooves that are set in the sides of the waterway and can be considered ...
-gate-type doors were installed in the remaining four kilometres. These doors are normally open, but can be closed under adverse weather conditions. In this way, the saltwater marine life behind the dam is preserved and fishing can continue, while the land behind the dam is safe from the water. On 4 October 1986, Queen Beatrix officially opened the dam for use by saying the well-known words: "''De stormvloedkering is gesloten. De Deltawerken zijn voltooid. Zeeland is veilig.''" (The flood barrier is closed. The Delta Works are completed. Zeeland is safe.) At the artificial island Neeltje-Jans, at one end of the barrier, a plaque is installed with the words: "''Hier gaan over het tij, de maan, de wind en wij''" ("Here the tide is ruled by the moon, the wind and us").


Construction

The Oosterscheldekering was the most difficult to build and most expensive part of the Delta works. Work on the dam took more than a decade. It was constructed by a consortium of contractors comprising
Ballast Nedam Ballast Nedam is a Dutch-based construction and engineering company headquartered in Nieuwegein. The company resulted from a merger between Amsterdamse Ballast Maatschappij and Nederlandse Aannemingsmaatschappij. History As the name might sug ...
,
Boskalis Westminster Royal Boskalis Westminster N.V. is a Dutch dredging and heavylift company that provides services relating to the construction and maintenance of Maritime transport, maritime infrastructure internationally. The company has one of the world's larges ...
, Baggermaatschappij Breejenhout, Hollandse Aanneming Maatschappij, Hollandse Beton Maatschappij, Van Oord-Utrecht, Stevin Baggeren, Stevin Beton en Waterbouw, Adriaan Volker Baggermaatschappij, Adriaan Volker Beton en Waterbouw and Aannemerscombinatie Zinkwerken. Construction started in April 1976 and was completed in June 1986. The road over the dam was ready for use in November 1987. The road was opened by the former queen,
Princess Juliana Juliana (; Juliana Louise Emma Marie Wilhelmina; 30 April 1909 – 20 March 2004) was Queen of the Netherlands from 1948 until her abdication in 1980. Juliana was the only child of Queen Wilhelmina and Prince Henry of Mecklenburg-Schwerin. ...
on 5 November 1987, exactly 457 years after the St Felix Day's flood of 1530, which had washed away a large chunk of Zeeland, upstream of the new barrier's position. To facilitate the building, an artificial island, Neeltje-Jans, was created in the middle of the estuary. When the construction was finished, the island was rebuilt to be used as education centre for visitors and as a base for maintenance works. The dam is based on 65 concrete pillars with 62 steel doors, each 42 metres wide. The parts were constructed in a
dry dock A dry dock (sometimes drydock or dry-dock) is a narrow basin or vessel that can be flooded to allow a load to be floated in, then drained to allow that load to come to rest on a dry platform. Dry docks are used for the construction, maintenance, ...
. The area was flooded and a small fleet of special construction ships lifted the pillars and placed them in their final positions. Each pillar is between 35 and 38.75 metres high and weighs 18000
tonne The tonne ( or ; symbol: t) is a unit of mass equal to 1000  kilograms. It is a non-SI unit accepted for use with SI. It is also referred to as a metric ton to distinguish it from the non-metric units of the short ton ( United State ...
s. The dam is designed to last more than 200 years. The Oosterscheldekering is sometimes referred to as the eighth Wonder of the World. It has been declared one of the modern
Seven Wonders of the World Various lists of the Wonders of the World have been compiled from antiquity to the present day, in order to catalogue the world's most spectacular natural features and human-built structures. The Seven Wonders of the Ancient World is the o ...
by the
American Society of Civil Engineers American(s) may refer to: * American, something of, from, or related to the United States of America, commonly known as the "United States" or "America" ** Americans, citizens and nationals of the United States of America ** American ancestry, pe ...
.


Construction fleet

Four ships were custom designed and built for this project: * ''Mytilus'', a ship equipped with various ground working tools, such as needles to make the seabed denser and more stable. * ''Cardium'', a ship to transport and lay a special foil carpet on the seabed for the pillars to rest on. * ''Ostrea'', a ship capable of lifting a
concrete Concrete is a composite material composed of fine and coarse aggregate bonded together with a fluid cement (cement paste) that hardens (cures) over time. Concrete is the second-most-used substance in the world after water, and is the most wi ...
pillar from the dry dock and placing it accurately on a special foil on the seabed. The ship is 85 metres long and has a portal 50 metres high. The ship can only lift 10,000 tonnes, but as a large part of the pillar is underwater, it is not necessary for the ship to be able to lift the full 18,000 tonnes. This ship is considered the flagship of the construction fleet, mainly because of its larger size and power in comparison to the other ships. * ''Macoma'', a ship that works closely with the Ostrea, cleaning the foil assisting in placing the pillars accurately in their final position. The ships are named after various types of
shellfish Shellfish is a colloquial and fisheries term for exoskeleton-bearing aquatic invertebrates used as food, including various species of molluscs, crustaceans, and echinoderms. Although most kinds of shellfish are harvested from saltwater envir ...
.


Operation

The dam is manually operated but if human control fails, an electronic security system acts as a backup. A Dutch law regulates the conditions under which the dam is allowed to close. The water levels must be at least three meters above regular sea level before the doors can be completely shut. Each sluice gate is closed once a month for testing. Emergency procedures are tested on pre-scheduled dates. Once the test is passed, the shutters are quickly opened again to create a minimum amount of effect on tidal movements and the local marine ecosystem. It takes approximately one hour to close a door. The cost of operation is €17 million per year. The full dam has been closed twenty-eight times since 1986, due to water levels exceeding or being predicted to exceed the three metres. The last time was on January 31 2022, because of Storm Corrie.


Further reading

*


External links

*
Satellite view from Google Maps

DeltaWorks.org
– DeltaWorks.Org about Oosterscheldekering. Includes text, photos, video and virtual tour. {{Authority control Buildings and structures in Schouwen-Duiveland Dams completed in 1986 Dams in the Netherlands Delta Works Flood barriers Noord-Beveland Tourist attractions in Zeeland