Rocketry
A countdown is a carefully devised set of procedures ending with the ignition of a rocket's engine. Depending on the type of vehicle used, countdowns can start from 72 to 96 hours before launch time. During countdown: * Aerospace personnel bring the rocket vehicle to the launch site and load it with payload and propellants; * Launch-center computers communicate with sensors in the rocket, which monitor important systems on the launch vehicle and payload; * Launch personnel monitor the weather and wait for the launch window; * Security personnel prevent unauthorized persons from entering the "keep-out" area. The procedures for each launch are written carefully. For the Space Shuttle, a five-volume set, Shuttle Countdown (KSC S0007), often referred to as "S0007", was used. Rosie Carver, a technical writer for United Launch Alliance, has created at least 15,000 procedures for more than 300 missions since the Solar Maximum Mission, which launched Feb. 14, 1980. These documents are living documents, which reflect new issues and solutions as they develop. Each mission requires approximately 100 procedure books. Proceeding with the countdown depends on several factors, such as the proper launch window, weather that permits a safe launch, and the rocket and payload working properly. The launch weather guidelines involving the Space Shuttle and expendable rockets are similar in many areas, but a distinction is made for the individual characteristics of each. The criteria are broadly conservative and assure avoidance of possibly adverse conditions. They are reviewed for each launch. For the Space Shuttle, weather "outlooks" provided by the U. S. Air Force Range Weather Operations Facility at Cape Canaveral began at Launch minus 5 days in coordination with the NOAA National Weather Service Spaceflight Meteorology Group at the Johnson Space Center in Houston. These included weather trends and their possible effects on launch day. A formal prelaunch weather briefing was held on Launch minus 1 day, which was a specific weather briefing for all areas of Space Shuttle launch operations. The launch window is a precise time during which aerospace personnel launch a rocket so the payload can reach the proper orbital destination.Angelo 2003: 144 A hold is the suspension of the normal countdown process. This can be done to investigate a technical process that has gone wrong, or because of marginal weather at the launch pad. Some holds are planned: they are done so the launch-support computers can run automatic checks on the rocket. Under some circumstances, a countdown may be recycled to an earlier time. When that happens, launch personnel begin following the countdown checklist from the earlier point. During communications for a countdown, the launch team uses acronyms to keep channels open as much as possible. All Firing Room console positions are assigned unique 'call signs' that are used by the team for quick and positive identification of who is talking. For example, dialogue heard during the launch of a Delta II rocket carrying the Kepler Space Telescope on March 8, 2009, included:Time: T minus 3 minutes.In the context of a rocket launch, the "L minus Time" is the physical time before launch, e.g. "L minus 3 minutes and 40 seconds". "T minus Time" is a system to mark points at which actions necessary for the launch are planned - this time stops and starts as various hold points are entered, and so doesn't show the actual time to launch. The last ten seconds are usually counted down aloud "Ten seconds to liftoff. Nine, eight, seven, six, five, four, three, two, one." After a launch, most countdown clocks begin to show
Launch Control (LC): , third stage arm permit to close.
OSM: Closed.
LC: , third stage S&A armed.
SSC: Armed.
LC: Prop 1, vehicle fuel tank press open.
Prop 1: Open.
LC: Fuel umbilical purge to open.
Prop 1: Open.
LC: SSC, vent 1 heater control exit.
SSC: Exit.
LC: SSC, vent 2 heater control exit.
SSC: Exit.
LC: NSC reports spacecraft is go.
Mission Director: Kepler spacecraft is go.
LC: SSC - FTS bat one and two heater controls heaters off.
SSC: Off.
LC: Prop 1, pressurized first stage LOX tanks to relief.
Prop 1: Pressurized.
LC: Prop 2, top first stage LOX to 100 percent levels.
Prop 2: Up and down, 100 percent.
Time: Ninety seconds.
LC: SSC, hydraulic external power to on.
SSC: External.
Time: Eighty seconds.
LC: RCO, report range go for launch.
Range Control Officer (RCO): Range go for launch.
Mission Director: LC (Viera), you're go for launch.
LC: Roger.
NASA Channel, 8 March 2009, 10:40 Eastern Standard Time
Film
At the start of films, a countdown sequence is printed on the head leader, and is used to synchronize film reel changeovers (switching between reels of film). In film (but not television) the 'Academy Leader' countdown first used in 1930 is in units of feet rather than time units; it starts at 11 and ends at 3 where it cuts to black for the last few feet. In 1959, SMPTE leader was created and measures seconds, not feet. It starts at 8 and cuts to black on the first frame of 2, which is accompanied by a 'pop.' This leader eventually displaced the older Academy and was the only leader used by the end of the optical (film) projection era.New Year's Eve
In manySee also
* Count off * Minutes to Midnight * TimerReferences
External links
{{commons category, Countdowns