HOME
*





Yabog Pipeline
The Yabog (Yacimientos-Bolivian Gulf) pipeline is a natural gas pipeline. It is long and connects Río Grande in Santa Cruz de la Sierra, Bolivia, with Campo Duran in Salta Province, Argentina. The pipeline was commissioned in 1972. History A contract concerning the Yabog pipeline between the Government of Bolivia and oil companies YPFB and Gulf Oil was signed in August 1968. Financing for the project was provided by the World Bank and US private firms. Construction began in 1970, and the pipeline began operating in 1972. Technical features The diameter of the pipeline is and the annual capacity is 2.19 billion cubic meters. The Bolivian section is operated by Transredes, a subsidiary of YPFB, and the Argentinian section is operated by Transportadora de Gas del Norte, a subsidiary of Gasinvest S.A. See also * Gasoducto del Noreste Argentino * Cruz del Sur pipeline * GasAndes Pipeline * Paraná–Uruguaiana pipeline * Natural gas in Bolivia Natural gas in Boliv ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Bolivia
, image_flag = Bandera de Bolivia (Estado).svg , flag_alt = Horizontal tricolor (red, yellow, and green from top to bottom) with the coat of arms of Bolivia in the center , flag_alt2 = 7 × 7 square patchwork with the (top left to bottom right) diagonals forming colored stripes (green, blue, purple, red, orange, yellow, white, green, blue, purple, red, orange, yellow, from top right to bottom left) , other_symbol = , other_symbol_type = Dual flag: , image_coat = Escudo de Bolivia.svg , national_anthem = " National Anthem of Bolivia" , image_map = BOL orthographic.svg , map_width = 220px , alt_map = , image_map2 = , alt_map2 = , map_caption = , capital = La Paz Sucre , largest_city = , official_languages = Spanish , languages_type = Co-official languages , languages ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

OECD
The Organisation for Economic Co-operation and Development (OECD; french: Organisation de coopération et de développement économiques, ''OCDE'') is an intergovernmental organisation with 38 member countries, founded in 1961 to stimulate economic progress and world trade. It is a forum whose member countries describe themselves as committed to democracy and the market economy, providing a platform to compare policy experiences, seek answers to common problems, identify good practices, and coordinate domestic and international policies of its members. The majority of OECD members are high-income economies with a very high Human Development Index (HDI), and are regarded as developed countries. Their collective population is 1.38 billion. , the OECD member countries collectively comprised 62.2% of global nominal GDP (US$49.6 trillion) and 42.8% of global GDP ( Int$54.2 trillion) at purchasing power parity. The OECD is an official United Nations observer. In April 1948, ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Natural Gas Pipelines In Argentina
Nature, in the broadest sense, is the physics, physical world or universe. "Nature" can refer to the phenomenon, phenomena of the physical world, and also to life in general. The study of nature is a large, if not the only, part of science. Although humans are part of nature, human activity is often understood as a separate category from other natural phenomena. The word ''nature'' is borrowed from the Old French ''nature'' and is derived from the Latin word ''natura'', or "essential qualities, innate disposition", and in ancient times, literally meant "birth". In ancient philosophy, ''natura'' is mostly used as the Latin translation of the Greek word ''physis'' (φύσις), which originally related to the intrinsic characteristics of plants, animals, and other features of the world to develop of their own accord. The concept of nature as a whole, the physical universe, is one of several expansions of the original notion; it began with certain core applications of the word ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Energy Infrastructure Completed In 1972
In physics, energy (from Ancient Greek: ἐνέργεια, ''enérgeia'', “activity”) is the quantitative property that is transferred to a body or to a physical system, recognizable in the performance of work and in the form of heat and light. Energy is a conserved quantity—the law of conservation of energy states that energy can be converted in form, but not created or destroyed. The unit of measurement for energy in the International System of Units (SI) is the joule (J). Common forms of energy include the kinetic energy of a moving object, the potential energy stored by an object (for instance due to its position in a field), the elastic energy stored in a solid object, chemical energy associated with chemical reactions, the radiant energy carried by electromagnetic radiation, and the internal energy contained within a thermodynamic system. All living organisms constantly take in and release energy. Due to mass–energy equivalence, any object that has mass when ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Natural Gas In Bolivia
Natural gas in Bolivia is one of the nation's main energy sources and export products. Bolivia's proved natural gas reserves are estimated to be 10.7 (TCF) (31 December 2017 est.).. Most of these reserves are located in the eastern region of the country. The major export pipelines in Bolivia transport the gas to Argentina and Brazil. In 1994 the natural gas sector was privatized, and it was subsequently re-nationalized in 2006 by president Evo Morales after popular protests during the 2005 Bolivian gas conflict. Historical background "Bolivia's economic history reveals a pattern of a single-commodity focus",http://lcweb2.loc.gov/frd/cs/botoc.html Library of Congress. Country Studies. Bolivia diversification has only occasionally being the case, due to political and geographical problems. Currently, the situation is no different, and the commodity of the day is natural gas. Natural gas first became significant in Bolivia only relatively recently, after vast discoveries of fields in ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


Paraná–Uruguaiana Pipeline
Paraná-Uruguaiana pipeline (also: ''Transportadora de Gas del Mercosur'') is a natural gas pipeline from Aldea Brasilera, Paraná in Argentina to Uruguaiana in Brazil. History The pipeline was constructed by Techint. Construction started in August 1999 and the pipeline became operational in July 2000. It was inaugurated by presidents of Brazil and Argentina, Fernando Henrique Cardoso and Fernando de la Rúa on 18 August 2000 at Paso de los Libres. Technical description The pipeline length is , of which is laid in Brazil. It has diameter of and it has a capacity of 5.5 billion cubic meter of natural gas per year. The pipeline cost US$250 million. The pipeline supplies natural gas to a 600-MW power plant in Uruguaiana. There is a plan to extend the pipeline from Uruguaiana to Porto Alegre. Operator The Argentine section is operated by Transportadora de Gas de Mercosur. This is a joint venture of Techint, Total S.A., Petronas, Compañia General de Com ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


GasAndes Pipeline
The GasAndes Pipeline is a long natural gas pipeline from La Mora, Mendoza in Argentina to San Bernardo on the outskirts of Santiago, Chile. History In 1991, Argentina and Chile concluded the Gas Interconnection Protocol. For the implementation of this protocol several pipeline projects were proposed. The GasAndes Pipeline project was proposed by the consortium of NOVA Corporation of Canada, Chilean companies Gasco and Gener, and Argentine companies Compañía General de Combustibles and Techint Compañía Ténica Internacional. The feasibility study of the pipeline was concluded in 1994. The pipeline was commissioned in 1997. Technical features The diameter of the pipeline is and the annual capacity is 3.3 billion cubic meter. It is supplied mainly from the Neuquén gas fields. Total investments of the project was US$1.46 billion. See also * Gasoducto del Noreste Argentino * Cruz del Sur pipeline * Yabog pipeline The Yabog (Yacimientos-Bolivian Gulf) pipelin ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


Cruz Del Sur Pipeline
Cruz del Sur pipeline is a natural gas pipeline linking Buenos Aires in Argentina with Colonia del Sacramento and Montevideo in Uruguay. History Construction of the pipeline started in March 2001. The pipeline was completed in November 2002 and it was inaugurated by the presidents of Uruguay and Argentina, Jorge Batlle Ibáñez and Eduardo Duhalde on 29 November 2002 in Montevideo. Technical description The pipeline is long and it has capacity of 1.8 billion cubic meters of natural gas per year. It cost US$150 millions. The offshore section between Punta Lara (Argentina) and Santa Ana (Uruguay) across of the River Plate, is long. It has a diameter of and a maximum pressure of . The Uruguayan section is long and has a maximum pressure of . The pipeline is supplied from the gas fields in the Neuquén Basin. Operator It operated by Gasoducto Cruz del Sur S.A. and owned by consortium of BG Group (40%), Pan American Energy (30%), ANCAP (20%) and Wintershall D ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  




Gasoducto Del Noreste Argentino
Gasoducto del Noreste Argentino (also known as the Argentine Northwest Gas Pipeline and GNEA pipeline) is a proposed long natural gas pipeline to transport natural gas from Bolivia to Argentina. History The pipeline project was announced in 2003. The agreement between Bolivia and Argentina to build the pipeline was signed on 26 March 2007. Technical features The length of the pipeline is and the capacity will be 10 billion cubic meter (bcm) of natural gas per annum. Construction The pipeline would be built by Techint. The construction is expected to start in July 2008. Pipes for the pipeline would be provided by Siat or Tubacero. The pipeline is expected to be commissioned by January 2010 and it is expected to cost US$1.8 billion. See also * Cruz del Sur pipeline * GasAndes Pipeline * Paraná–Uruguaiana pipeline * Yabog pipeline The Yabog (Yacimientos-Bolivian Gulf) pipeline is a natural gas pipeline. It is long and connects Río Grande in Santa Cruz ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

International Energy Agency
The International Energy Agency (IEA) is a Paris-based autonomous intergovernmental organisation, established in 1974, that provides policy recommendations, analysis and data on the entire global energy sector, with a recent focus on curbing carbon emissions and reaching global climate targets, including the Paris Agreement. The 31 member countries and 11 association countries of the IEA represent 75% of global energy demand. The IEA was set up under the framework of the Organisation for Economic Co-operation and Development (OECD) in the aftermath of the 1973 oil crisis to respond to physical disruptions in global oil supplies, provide data and statistics about the global oil market and energy sector, promote energy savings and conservation, and establish international technical collaboration on innovation and research. Since its founding, the IEA has also coordinated use of the oil reserves that its members are required to hold. In subsequent decades, the IEA's role expanded t ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Argentina
Argentina (), officially the Argentine Republic ( es, link=no, República Argentina), is a country in the southern half of South America. Argentina covers an area of , making it the second-largest country in South America after Brazil, the fourth-largest country in the Americas, and the eighth-largest country in the world. It shares the bulk of the Southern Cone with Chile to the west, and is also bordered by Bolivia and Paraguay to the north, Brazil to the northeast, Uruguay and the South Atlantic Ocean to the east, and the Drake Passage to the south. Argentina is a federal state subdivided into twenty-three provinces, and one autonomous city, which is the federal capital and largest city of the nation, Buenos Aires. The provinces and the capital have their own constitutions, but exist under a federal system. Argentina claims sovereignty over the Falkland Islands, South Georgia and the South Sandwich Islands, and a part of Antarctica. The earliest recorded human prese ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

World Bank
The World Bank is an international financial institution that provides loans and grants to the governments of low- and middle-income countries for the purpose of pursuing capital projects. The World Bank is the collective name for the International Bank for Reconstruction and Development (IBRD) and International Development Association (IDA), two of five international organizations owned by the World Bank Group. It was established along with the International Monetary Fund at the 1944 Bretton Woods Conference. After a slow start, its first loan was to France in 1947. In the 1970s, it focused on loans to developing world countries, shifting away from that mission in the 1980s. For the last 30 years, it has included NGOs and environmental groups in its loan portfolio. Its loan strategy is influenced by the Sustainable Development Goals as well as environmental and social safeguards. , the World Bank is run by a president and 25 executive directors, as well as 29 various vice ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]