Topic summary
FBTR

Extracted from the Wikipedia article Fast Breeder Test Reactor.
History
The FBTR has rarely operated at its designed capacity and had to be shut down between 1987 and 1989 due to technical problems. From 1989 to 1992, the reactor operated at 1 MW. In 1993, the reactor's power level was raised to 10.5 MW. In September 2002, fuel burn-up in the FBTR for the first time reached the 100,000 megawatt-days per metric ton uranium (MWd/MTU) mark. This is considered an important milestone in breeder reactor technology. On 7 March 2022 it attained the design power level of 40 MWt.