Valley Metro Rail
   HOME

TheInfoList



OR:

Valley Metro Rail is a
light rail Light rail (or light rail transit, abbreviated to LRT) is a form of passenger urban rail transit that uses rolling stock derived from tram technology National Conference of the Transportation Research Board while also having some features from ...
system serving the
Phoenix metropolitan area The Phoenix metropolitan area, also known as the Valley of the Sun, the Salt River Valley, metro Phoenix, or The Valley, is the largest metropolitan statistical area in the Southwestern United States, with its largest principal city being the c ...
in
Arizona Arizona is a U.S. state, state in the Southwestern United States, Southwestern region of the United States, sharing the Four Corners region of the western United States with Colorado, New Mexico, and Utah. It also borders Nevada to the nort ...
, USA. The network, which is part of the Valley Metro public transit system, began operations on December 27, 2008. In , the system had a ridership of , or about per weekday as of . In the years since it opened in 2008, the system has undergone six expansions (including the
infill station An infill station (sometimes in-fill station) is a train station built on an existing passenger rail, rapid transit, or light rail line to address demand in a location between existing stations. Such stations take advantage of existing train ser ...
at 50th Street/Washington and the Valley Metro Streetcar), with two more scheduled. Extensions are underway into West Phoenix to the Arizona State Capitol and onwards to Desert Sky Mall, both of which were expanded due to obtaining funding under the Proposition 104 sales tax increase.


Current system


Lines

In Valley Metro terminology, common with most other metro systems, a ''line'' is a named service, defined by a route and set of stations served by trains on that route. (The word does not refer to a physical rail corridor, as it does in New York City Subway nomenclature.)


History


Background

Numerous plans preceded the implementation of light rail. The Phoenix Street Railway provided streetcar service from 1887 to 1948. Historic vehicles may be seen at the Phoenix Trolley Museum, with Car #116 celebrating her 80th birthday on December 25, 2008, just days before the opening of modern rail service. In 1989, the ValTrans elevated rail proposal was turned down by voters in a referendum due to cost and feasibility concerns. Subsequent initiatives during the 1990s failed over similar reasons. Valley Metro was created by the Transit 2000 Regional Transportation Plan (RTP), also called the ''Transit 2000 plan'', which involved a half-cent sales tax, and was approved by Phoenix voters in 2000. Transit 2000 aimed at improving the local bus service (considered unacceptably inadequate compared to other major US cities) and adding new bus rapid transit routes. It used the route placing and color designations from the 1989 ValTrans plan. The plan also called for a new light rail line to be built throughout the
Phoenix Metropolitan area The Phoenix metropolitan area, also known as the Valley of the Sun, the Salt River Valley, metro Phoenix, or The Valley, is the largest metropolitan statistical area in the Southwestern United States, with its largest principal city being the c ...
, resuming rail transit service that was absent since the 1940s. Additional funding for the new rail line was secured in 2004 when residents approved Proposition 400, extending the half-cent countywide sales tax.


Initial light-rail segment

Construction on the new light rail line began in March 2005. The expected construction cost for the line was $1.4 billion, or $70 million per mile."FAQs and Fast Facts" (pdf)
– ''ValleyMetro.org''.
The line's initial segment consisted of 28 stations running between Phoenix and Mesa. In March 2008, cracks in the system's rails were discovered. The cause of the cracks was determined to be improper use of
plasma cutting Plasma cutting is a process that cuts through electrically conductive materials by means of an accelerated jet of hot plasma. Typical materials cut with a plasma torch include steel, stainless steel, aluminum, brass and copper, although other ...
torches by contractors. The affected track was repaired by May for $600,000 with still no word on which parties will be held financially responsible. The last of the concrete and rail for the system was installed in the end of April, with the CEO declaring the system to be on time and on budget. The line celebrated its grand opening on December 27, 2008, with official ribbon-cutting ceremonies and community celebrations throughout Phoenix, Tempe, and Mesa. The event was produced by Arizona's Entertainment Solutions, Inc. and was attended by thousands of local residents who waited as long as an hour or more to ride the vehicles. The stations have been designed to complement their immediate surroundings. Station platform areas are approximately wide by long. As of early 2014, income has exceeded Metro's stated goal with 44.6% farebox recovery, partially due to the light rail ridership far exceeding original projections. The light rail has also led to rapid urban development in downtown Phoenix and Tempe, generating additional revenue through taxes. Valley Metro had its busiest month in April 2017, with a total passenger count of 1,514,456 and an average weekday ridership of 52,910. On the weekend of March 31, 2017, through April 2, 2017, the light rail system saw 275,615 passengers board the train due to several large events including Final Four Fan Fest, March Madness Music Festival,
Arizona Diamondbacks The Arizona Diamondbacks are an American professional baseball team based in Phoenix, Arizona. The Diamondbacks compete in Major League Baseball (MLB) as a member club of the National League (NL) West Division. The franchise was established ...
home opener, Phoenix Pride Festival,
Phoenix Suns The Phoenix Suns are an American professional basketball team based in Phoenix, Arizona. The Suns compete in the National Basketball Association (NBA) as a member of the Pacific Division (NBA), Pacific Division of the Western Conference (NBA), We ...
game, and Tempe Festival of the Arts. That Sunday, April 2, 2017, they saw 80,210 passengers board the train due to those large events.


Central Mesa Extension

The Central Mesa Extension extended rail service from the line's original eastern terminus at Sycamore/Main Street to Mesa Drive/Main Street. It added four new stations in the median of Main Street at Alma School Road, Country Club Drive, Center Street, and Mesa Drive, bringing rail service directly to Downtown Mesa. In March 2012, Valley Metro selected a design-build joint venture between
Kiewit Corporation Kiewit Corporation is an American construction company based in Omaha, Nebraska founded in 1884. In 2021, it was ranked 243rd on the Fortune 500. Privately held, it is one of the largest construction and engineering organizations in North America ...
and Mass. Electric to construct the extension. Construction began in July 2012 and passenger service started on August 22, 2015. Mesa held a summit in early 2012 to have urban developers give their ideas on how to revitalize downtown. The extension cost $200 million, paid for from a combination of Proposition 400 sales tax revenues, federal air quality, and New Starts grants. It is estimated to have added 5,000 daily riders.


Northwest Extension Phase I

In 2016, the system was extended north from the previous western terminus at along the median of 19th Avenue to a new terminus and
park and ride A park and ride, also known as incentive parking or a commuter lot, is a parking lot with public transport connections that allows commuters and other people heading to city centres to leave their vehicles and transfer to a bus, Rail transport, r ...
at in Phoenix. The extension features of track, three additional stations, and before opening was predicted to serve 5,000 riders per day in its first full year of operation. As an original part of the Transit 2000 plan, this extension was originally scheduled to open by 2012. However, due to lower-than-expected sales tax revenues and uncertainty regarding the availability of federal funds to support the project, the opening date was delayed. Initially, it was pushed back to 2014, and then it was rescheduled again by 9 years, to the fiscal year 2023, by the Phoenix City Council in June 2009. In July 2012, a vote was held to reschedule this extension to open in 2016. Under this plan, the city of Phoenix advanced $60 million of local funds to Valley Metro Rail, who would then fund the remaining cost of the project (approximately $267 million) with both Transit 2000 and Proposition 400 funds, thereby allowing work on the project to begin. The design-build contract was awarded to a joint venture of Sundt and Stacy and Witbeck, for the extension. Construction began in January 2013, with a celebration to mark the laying of the first track section being held in July 2014. Construction work continued until December 2015, when it was announced that testing along the new stretch would begin. The extension opened on March 19, 2016.


50th Street infill station

The 50th Street infill station project added a new station to the existing alignment at 50th Street and Washington, the first and only
infill station An infill station (sometimes in-fill station) is a train station built on an existing passenger rail, rapid transit, or light rail line to address demand in a location between existing stations. Such stations take advantage of existing train ser ...
added in the Valley Metro Rail system. The project aimed to enable better connectivity with nearby businesses, and recent commercial and residential development projects in the area. The project, funded entirely by the city of Phoenix, began construction in June 2017. Although all Valley Metro stations are ADA accessible, the new station had more accessible features including wider platforms and gentle entrance slopes. The station opened on April 25, 2019.


Gilbert Road Extension

An extension further eastward, past the terminus at Mesa Drive/Main Street to Gilbert Road/Main Street, began construction in October 2016, and began operating on May 18, 2019. The line, budgeted at approximately $184 million, travels in the median of Main Street and has one intermediate stop at Stapley Drive. The design-build contract for this project was awarded to Sundt/Stacy and Witbeck, with Jacobs Engineering providing design services for the project. Service to the new stations started on May 18, 2019.


Streetcar

S Line Streetcar consists of 14 stations, running from Dorsey Lane west on Apache Boulevard, then north on Mill Avenue. From there, it loops around Downtown Tempe along Mill and Ash avenues. The route continues along Rio Salado Parkway to Marina Heights, with a possible extension to Mesa to connect with the
Chicago Cubs The Chicago Cubs are an American professional baseball team based in Chicago. The Cubs compete in Major League Baseball (MLB) as a member club of the National League (baseball), National League (NL) National League Central, Central Division. Th ...
’ new spring training facility, as well as Tempe Marketplace. Service began on May 20, 2022.


Northwest Extension Phase II

Upon completion of Northwest Phase I, the focus shifted to Phase II of the project. This extension continues west on Dunlap Avenue before turning to head north along 25th Avenue. From there, the system heads west on Mountain View Road, before crossing
Interstate 17 Interstate 17 (I-17) is a north–south Interstate Highway located entirely within the US state of Arizona. I-17's southern terminus lies in Phoenix, at I-10/US 60 and its northern terminus is in Flagstaff, at I-40. Most of I-17 is kn ...
and terminating on the east side of the Metrocenter shopping mall. The extension includes three new stations, one in the vicinity of 25th Avenue and Dunlap, another adjacent to the Rose Mofford Sports Complex, and a relocated transit center (Thelda Williams Transit Center) on the east side of Metrocenter Mall. The extension was originally planned to open in 2026, but it was accelerated to 2024 after the Phoenix City Council passed the Proposition 104 sales tax increase in 2015. In October 2017, the project had entered the
environmental assessment Environmental impact assessment (EIA) is the assessment of the environmental consequences of a plan, policy, program, or actual projects prior to the decision to move forward with the proposed action. In this context, the term "environmental imp ...
(EA) phase. The construction contract was awarded to
Kiewit Kiewit () is a Belgium, Belgian parish and village within the northernmost extension of the Flemish region, Flemish municipality of Hasselt. It also borders on the municipality of Zonhoven to the north and Genk to the east, with Kuringen, another ...
-McCarthy in July 2020 and was scheduled to break ground that Fall. Service began on January 27, 2024.


Proposition 105 and South Extension

Like the Northwest Extension, the funding from Proposition 104 moved the timeline of the light rail extension to
South Phoenix South Phoenix is a region of Phoenix, Arizona. By one definition it encompasses an area south of the Salt River, north of Baseline Road, east of 51 Avenue, and west of 48 Street. History The first land purchase recorded in South Phoenix occur ...
up by a decade. Outreach to the residents and business owners of South Phoenix became strained when the extension called for the reduction of lanes from four to two along Central Avenue. In February 2019, opponents were able to gather enough signatures to require the city to hold a referendum on future light rail expansion. The referendum to stop light rail expansion, known as Proposition 105, failed to pass in a special election on August 27, 2019. Construction on the South Central extension began in October 2019, Service began on June 7, 2025. The extension introduced a new two-line system with the A Line and the B Line. The A Line runs from the Downtown Phoenix Hub to Gilbert Road/Main Street. The B Line runs from Metro Parkway to Baseline/Central Avenue.


South Central Extension

The South Central Extension runs from Downtown Phoenix, south along Central Avenue to Baseline Road, adding and eight stations, while connecting with two park and ride locations. Additionally, this project will form a light rail hub in Downtown Phoenix, between Central and First avenues to the west and east, and Washington and Jefferson streets to the north and south. Also included are new tracks for turn-around/staging purposes at both Third Avenue and Fifth Street for enhanced flexibility during peak service. Trains along the segment are planned to operate as a new line, originating at Baseline Road and running to the Downtown Hub before taking over parts of the existing light rail system and continuing north to the terminus at Metro Parkway. Service began on June 7, 2025. The extension introduced a new two-line system with the A Line and the B Line. The A Line runs from the Downtown Phoenix Hub to Gilbert Road/Main Street. The B Line runs from Metro Parkway to Baseline/Central Avenue.


Operations


Route description

, the Valley Metro Rail system consists of two lines serving 50 stations on about 38 miles of tracks within the cities of Phoenix, Tempe, and Mesa. The A Line starts at the Downtown Phoenix Hub. Eastbound service runs on First Avenue south before turning east on Jefferson Street; likewise, westbound one-way service starts at 26th Street on Washington Street before turning north on Central Avenue.Both tracks rejoin east of 24th Street on Washington Street. Continuing east on Washington, the rail line passes Phoenix Sky Harbor Airport, which is connected by the PHX Sky Train at 44th Street/Washington, and then turns southeast towards Tempe. After Center Parkway/Washington station, the line leaves the median of Washington Street and runs south on a bridge that crosses Tempe Town Lake, parallel to the
Union Pacific Railroad The Union Pacific Railroad is a Railroad classes, Class I freight-hauling railroad that operates 8,300 locomotives over routes in 23 U.S. states west of Chicago and New Orleans. Union Pacific is the second largest railroad in the United Stat ...
. It then turns east along Mill Avenue and connects to the Valley Metro Streetcar at Mill Avenue/3rd St before proceeding via its own right-of-way near
Arizona State University Arizona State University (Arizona State or ASU) is a public university, public research university in Tempe, Arizona, United States. Founded in 1885 as Territorial Normal School by the 13th Arizona Territorial Legislature, the university is o ...
. Going southward, it joins Apache Boulevard headed eastward, which becomes Main Street in Mesa. The light rail line ends at an intersection with Gilbert Road at Gilbert Road/Main Street station. The B Line starts in Phoenix on the east side of the former Metrocenter shopping mall at the Metro Parkway station. The rail line runs east on an elevated viaduct, crossing over Interstate 17. After the crossing, the line's alignment parallels Mountain View Road before turning south on 25th Street. The line runs south on 25th Street, crossing the Arizona Canal and passing by the Rose Mofford Sports Complex. It continues until it reaches Dunlap Avenue where it swerves east on Dunlap, before turning south again on 19th Avenue for . After three stops, it turns eastward again on Camelback Road for , then turns south onto Central Avenue where it continues into
Downtown Phoenix Downtown Phoenix is the central business district (CBD) of the City of Phoenix, Arizona, United States. It is in the heart of the Phoenix metropolitan area or Valley of the Sun. Phoenix, being the county seat of Maricopa County, Arizona, ...
. At Roosevelt Street, the line splits into one-way segments until Lincoln Street. Both track rejoins at Hadley Street. The rail line continues south under the Interstate 17 then Salt River bridge. The light rail line ends at an intersection with Baseline Road at Baseline/Central Avenue station station. With the opening of the South Central Extension on June 7, 2025, the system has split into two lines: the A Line and B Line. The A Line runs east to west, from the eastern terminus at Gilbert Road/Main Street to the Downtown Phoenix Hub in Downtown Phoenix (which serve as the transfer point between the two lines), while the B Line runs north to south from the Metro Parkway station to Baseline/Central Avenue station. Trains mostly operate on city streets in a " center reservation", similar to the Red Line of the
METRORail METRORail is the light rail system in Houston, Texas (United States). In , the system had a ridership of , or about per weekday as of . METRORail ranks as the second most-traveled light rail system in the Southern United States and the List ...
light rail system in
Houston Houston ( ) is the List of cities in Texas by population, most populous city in the U.S. state of Texas and in the Southern United States. Located in Southeast Texas near Galveston Bay and the Gulf of Mexico, it is the county seat, seat of ...
and the surface sections of the
MBTA subway The Massachusetts Bay Transportation Authority (MBTA) operates rapid transit (heavy rail), light rail, and bus rapid transit services in the Boston metropolitan area, collectively referred to as the rapid transit, subway, the T system, or simp ...
's Green Line in
Boston Boston is the capital and most populous city in the Commonwealth (U.S. state), Commonwealth of Massachusetts in the United States. The city serves as the cultural and Financial centre, financial center of New England, a region of the Northeas ...
. Some parts of the line, such as the bridge over Tempe Town Lake, have no contact with other traffic.


Hours and frequency

Full rail service (serving all stops between Metro Parkway and Gilbert Road/Main Street) begins Monday through Friday at approximately 4:30 a.m., while Saturday and Sunday service begins at approximately 4:50 a.m. Full rail service ends at approximately 11 p.m. daily. Since a complete light rail trip takes about 110 minutes from end to end, full rail service does not run earlier or later than those times. Instead, in the early morning and late night hours, limited rail service operates service from to Gilbert Road/Main Street and from to Metro Parkway. This limited service extends the line's operating hours to as early as 3:30 a.m. and as late as 1 a.m. Throughout the day, trains run every 12 minutes on weekdays and Saturdays, and every 20 minutes on Sundays. All trains run every 20 minutes from 8 p.m. until the end of service.


Rolling stock

, Valley Metro Rail operates a fleet of 50
Kinki Sharyo is a Japanese manufacturer of railroad vehicles based in Osaka. It is an affiliate company of Kintetsu Corporation. In business since 1920 as Tanaka Rolling Stock Works, and renamed The Kinki Sharyo Co., Ltd in 1945, they produce rolling stock f ...
Low Floor Light Rail Vehicles (LRVs), which were built exclusive to VMR. Each vehicle has a seated capacity of 66. Due to the desert climate of the Phoenix area the units were designed with more insulation and solar reflective windows as well as larger air conditioner units. The vehicles are accessible with space for four wheelchairs and four bicycles, per vehicle with addition to a hydraulic leveling system to remove potential vertical gap, to ease loading. Up to three vehicles may operate together in a single train set but are typically in sets of two. The vehicles have a maximum speed of . The LF-LRVs are also equipped with energy absorbent bumpers to reduce the effects of road vehicle collision, measures warranted due to the light rail mostly running in the center of streets.In 2017, Valley Metro contracted Brookville Equipment Corporation and
Siemens Mobility Siemens Mobility GmbH is a division of Siemens. With its global headquarters in Munich, Siemens Mobility has four core business units: Mobility Management, dedicated to rail technology and intelligent traffic systems, Railway Electrification, ...
for six and eleven light rail vehicles, respectively, with the Brookville fleet planned to be used for the Valley Metro Streetcar. The first Siemens car arrived in March 2020 and the first Brookville car for Tempe in March 2021.


Fares

Valley Metro Rail shares its fare system with the Valley Metro Bus system but uses a
proof-of-payment Proof-of-payment (POP) or proof-of-fare (POF) is an honor-based fare collection system used on many public transportation systems. Instead of checking each passenger as they enter a fare control zone, passengers are required to carry a paper ...
system to allow for simplified boarding and platform access. Fares on Valley Metro Rail contribute to fare capping. A reloadable Copper Card can be purchased from ticket vending machines at the entrance to all stations, or purchased in the Valley Metro App, but must be validated or scanned before boarding the train. Copper Cards can also be purchased at select retailers. Fare inspections are conducted throughout the system at random to ensure compliance. , the system has a fare-compliance rate of 94%.


Future extensions and improvements


Current and priority projects

The following Valley Metro Rail projects have been given high priority by Valley Metro.


Capitol Extension (2028)

The Capitol Extension extends the A Line from the Downtown Phoenix Hub in
Downtown Phoenix Downtown Phoenix is the central business district (CBD) of the City of Phoenix, Arizona, United States. It is in the heart of the Phoenix metropolitan area or Valley of the Sun. Phoenix, being the county seat of Maricopa County, Arizona, ...
west to 15th Avenue, adding and two stations. environmental assessment work is underway. In March 2024, Valley Metro selected Jacobs Engineering for principal civil design and PGH Wong Engineering for principal system design. In May 2024, the project entered the
environmental assessment Environmental impact assessment (EIA) is the assessment of the environmental consequences of a plan, policy, program, or actual projects prior to the decision to move forward with the proposed action. In this context, the term "environmental imp ...
(EA) phase.


I-10 West Extension (2030)

The I-10 West Extension will run from 15th Avenue west to
Interstate 17 Interstate 17 (I-17) is a north–south Interstate Highway located entirely within the US state of Arizona. I-17's southern terminus lies in Phoenix, at I-10/US 60 and its northern terminus is in Flagstaff, at I-40. Most of I-17 is kn ...
before turning north to the interchange of
Interstate 10 Interstate 10 (I-10) is the southernmost transcontinental highway in the Interstate Highway System of the United States. It is the fourth-longest Interstate in the country at , following I-90, I-80, and I-40. It was part of the origina ...
and I-17 (" The Stack"). Then the line will turn west and continue down I-10 in the median past 43rd Avenue. It will then go over the westbound lanes of I-10 to continue alongside the highway to Desert Sky Mall, adding and 8 stations to connect the West Valley and ease congestion on Interstate 10. The line will transfer over I-10 from the median to the shoulder at 47th Avenue, which will connect with I-10 around 51st Avenue with an elevated station. In fall 2021, the Phoenix City Council approved extending the project corridor to the Desert Sky Transit Center, adjacent to the Desert Sky Mall. In May 2024, the project entered the preliminary engineering (PE) phase.


West Phoenix

Starting in 2013, Valley Metro along with the cities of Glendale and Phoenix approved a project to study the potential extension of light rail, bus rapid transit or
streetcar A tram (also known as a streetcar or trolley in Canada and the United States) is an urban rail transit in which vehicles, whether individual railcars or multiple-unit trains, run on tramway tracks on urban public streets; some include s ...
to Glendale. Initially, three different route options were proposed, all heading west from the current light rail system and featuring a shared terminus in the Downtown Glendale area. Options included travel directly across Glendale Avenue, as well as routes that travel along Camelback Road and a combination of 43rd and 51st avenues, before entering the shared downtown terminus area. In February 2016, a community working group recommend a route for this project, this route travels along Camelback Road until 43rd Avenue, at which point light rail would travel north along 43rd Avenue until Glendale Avenue, from there it would continue west until it reaches 56th Avenue, where the route is likely to shift approximately north to Glenn Drive, where it will continue to the downtown terminus. Light rail was selected as the preferred type of transit for the route, as opposed to bus rapid transit or streetcar. On October 17, 2017, Glendale City Council directed staff against moving forward on a route into downtown Glendale, effectively killing the plans for the Glendale portion of the extension. At the beginning of 2019, Phoenix City Council voted to delay the remaining Phoenix portion of the project indefinitely. Starting in 2022, Valley Metro opened talks again about the West Phoenix Extension. The West Phoenix Extension will run from 91st Avenue and Thomas Road to 75th Avenue and Thomas then turn north to Indian School Road and connect to the Indian School Road and Central Avenue station. As of 2023 the project is in the locally preferred alternative adoption process. The West Phoenix Extension will also connect with the I-10 West Extension on 79th Avenue and Thomas Road and the Phoenix BRT on 35th Avenue and Indian School Road. On May 30, 2024, Phoenix City Council approved the project.


Other

, an extension was planned to occur to
Arizona State University Arizona State University (Arizona State or ASU) is a public university, public research university in Tempe, Arizona, United States. Founded in 1885 as Territorial Normal School by the 13th Arizona Territorial Legislature, the university is o ...
's West campus in 2044. Extensions of light rail in Tempe, Mesa, and Chandler were also being studied. A previous study into a Northeast light rail corridor has been suspended indefinitely, with Phoenix City Council directing funds towards street maintenance instead.


See also

* PHX Sky Train * Phoenix Public Transportation * Valley Metro Streetcar * Light rail in North America *
List of tram and light rail transit systems The following is a list of cities that have current tram/streetcar (including heritage trams/heritage streetcars), or light rail systems as part of their regular public transit systems. In other words, this list only includes systems which ...
* List of rail transit systems in the United States


References

Informational notes Citations


External links

*
Article on Valley Metro Rail and preemptive urban revitalization

Slideshow of photos on light rail construction and progress – from azcentral.com

A BRIEF HISTORY OF PUBLIC TRANSPORTATION IN METRO PHOENIX

South Phoenix light rail on fast track, to come a decade early

Allhands: No, transit STILL doesn't go there , Phoenix
{{USLightRail Arizona railroads Electric railways in Arizona 2008 establishments in Arizona Railway lines opened in 2008 750 V DC railway electrification Rail transportation in Phoenix, Arizona Transportation in Tempe, Arizona Transportation in Mesa, Arizona