Overview
The ET was the largest element of the Space Shuttle, and when loaded, it was also the heaviest. It consisted of three major components: * the forward liquid oxygen (LOX) tank * an unpressurized intertank that contains most of the electrical components * the aft liquidVersions
Over the years, NASA worked to reduce the weight of the ET to increase overall efficiency. The weight reduced from the ET resulted in an almost equal increase of the cargo-carrying capability of the Space Shuttle.Orange color
The external tank's orange color is from the sprayed foam insulation, no longer painted white, after the first two missions, saving six hundred pounds. The first two, used for STS-1 and STS-2, were painted white to protect the tanks from ultraviolet light during the extended time that the shuttle spends on the launch pad prior to launch. Because this did not turn out to be a problem, Martin Marietta (now part of Lockheed Martin) reduced weight by leaving the rust-colored spray-on insulation unpainted beginning with STS-3, saving approximately .National Aeronautics and Space AdministratioStandard Weight Tank
The original ET is informally known as the Standard Weight Tank (SWT) and was fabricated from 2219 aluminum alloy, a high-strength aluminum-copper alloy used for many aerospace applications. After STS-4, several hundred pounds were eliminated by deleting the anti-geyser line. This line paralleled the oxygen feed line, providing a circulation path for liquid oxygen. This reduces accumulation of gaseous oxygen in the feed line during prelaunch tanking (loading of the LOX). After propellant loading data from ground tests and the first few Space Shuttle missions were assessed, the anti-geyser line was removed for subsequent missions. The total length and diameter of the ET remain unchanged. The last SWT, flown on STS-7, weighed approximately inert.Lightweight Tank
Beginning with the STS-6 mission, a lightweight ET (LWT), was introduced. This tank was used for the majority of the Shuttle flights, and was last used during the launch of the ill-fated STS-107 mission. Although tanks vary slightly in weight, each weighed approximately inert. The weight reduction from the SWT was accomplished by eliminating portions of stringers (structural stiffeners running the length of the hydrogen tank), using fewer stiffener rings and by modifying major frames in the hydrogen tank. Also, significant portions of the tank were milled differently so as to reduce thickness, and the weight of the ET's aft solid rocket booster attachments was reduced by using a stronger, yet lighter and less expensive titanium alloy.Super Lightweight Tank
The Super Lightweight Tank (SLWT) was first flown in 1998 on STS-91 and was used for all subsequent missions with two exceptions ( STS-99 and STS-107).Technical specifications
SLWT specifications *Length: *Diameter: *Empty weight: *Gross liftoff weight: LOX tank *Length: *Diameter: *Volume (at 22Contractor
The contractor for the external tank was Lockheed Martin (previously Martin Marietta), New Orleans, Louisiana. The tank was manufactured at the Michoud Assembly Facility,Components
The ET has three primary structures: an LOX tank, an intertank, and an LH2 tank. Both tanks are constructed of aluminium alloy skins with support or stability frames as required. The intertank aluminium structure utilizes skin stringers with stabilizing frames. The primary aluminium materials used for all three structures are 2195 and 2090 alloys. AL 2195 is an Al-Li alloy designed by Lockheed Martin and Reynolds for storage of cryogenics (and used for the SLW version of the ET - earlier versions used Al 2219Super Lightweight External TankLiquid oxygen tank
The LOX tank is located at the top of the ET and has an ogive shape to reduce aerodynamic drag and aerothermodynamic heating. The ogive nose section is capped by a flat removable cover plate and a nose cone. The nose cone consists of a removable conical assembly that serves as an aerodynamic fairing for the propulsion and electrical system components. The foremost element of the nose cone functions as a cast aluminium lightning rod. The LOX tank volume is at and ( cryogenic). The tank feeds into a diameter feed line that conveys the liquid oxygen through the intertank, then outside the ET to the aft right-hand ET/orbiter disconnect umbilical. The diameter feed line permits liquid oxygen to flow at approximately with the RS-25s operating at 104% or permits a maximum flow of . All loads except aerodynamic loads are transferred from the LOX tank at a bolted, flange-joint interface with the intertank. The LOX tank also includes an internal slosh baffle and a vortex baffle to dampen fluid slosh. The vortex baffle is mounted over the LOX feed outlet to reduce fluid swirl resulting from slosh and to prevent entrapment of gases in the delivered LOX.Intertank
The intertank is the ET structural connection between the LOX and LH2 tanks. Its primary functions are to receive and distribute all thrust loads from the SRBs and transfer loads between the tanks. The two SRB forward attach fittings are located 180° apart on the intertank structure. A beam is extended across the intertank structure and is mechanically fastened to the attach fittings. When the SRBs are firing, the beam will flex due to high stress loads. These loads will be transferred to the fittings. Adjoining the SRB attach fittings is a major ring frame. The loads are transferred from the fittings to the major ring frame which then distributes the tangential loads to the intertank skin. Two panels of the intertank skin, called the thrust panels, distribute the concentrated axial SRB thrust loads to the LOX and LH2 tanks and to adjacent intertank skin panels. These adjacent panels are made up of six stringer-stiffened panels. The intertank also functions as a protective compartment for housing the operational instrumentation.Liquid hydrogen tank
The LH2 tank is the bottom portion of the ET. The tank is constructed of four cylindrical barrel sections, a forward dome, and an aft dome. The barrel sections are joined together by five major ring frames. These ring frames receive and distribute loads. The forward dome-to-barrel frame distributes the loads applied through the intertank structure and is also the flange for attaching the LH2 tank to the intertank. The aft major ring receives orbiter-induced loads from the aft orbiter support struts and SRB-induced loads from the aft SRB support struts. The remaining three ring frames distribute orbiter thrust loads and LOX feedline support loads. Loads from the frames are then distributed through the barrel skin panels. The LH2 tank has a volume of at and (cryogenic).Thermal protection system
The ET thermal protection system consists primarily of spray-on foam insulation (SOFI), plus preformed foam pieces and premolded ablator materials. The system also includes the use of phenolic thermal insulators to preclude air liquefaction. Thermal isolators are required for liquid hydrogen tank attachments to preclude the liquefaction of air on exposed metal, and to reduce heat flow into the liquid hydrogen. While the warmer liquid oxygen results in fewer thermal requirements, the aluminum of the liquid oxygen tank forward areas require protection from aeroheating. Meanwhile, insulation on the aft surfaces prevents liquified air from pooling in the intertank. The middle cylinder of the oxygen tank, and the propellant lines, could withstand the expected depths of frost accumulation condensed from humidity, but the orbiter could not take the damage from ice breaking free. The thermal protection system weighs . Development of the ETs thermal protection system was problematic. Anomalies in foam application were so frequent that they were treated as variances, not safety incidents. NASA had difficulty preventing fragments of foam from detaching during flight for the entire history of the program: * STS-1 ''Hardware
Vents and relief valves
Each propellant tank has a vent and relief valve at its forward end. This dual-function valve can be opened by ground support equipment for the vent function during prelaunch and can open during flight when the ullage (empty space) pressure of the liquid hydrogen tank reaches or the ullage pressure of the liquid oxygen tank reaches . On early flights, the liquid oxygen tank contained a separate, pyrotechnically operated, propulsive tumble vent valve at its forward end. At separation, the liquid oxygen tumble vent valve was opened, providing impulse to assist in the separation maneuver and more positive control of the entry aerodynamics of the ET. The last flight with the tumble valve active was STS-36. Each of the two aft external tank umbilical plates mate with a corresponding plate on the orbiter. The plates help maintain alignment among the umbilicals. Physical strength at the umbilical plates is provided by bolting corresponding umbilical plates together. When the orbiter GPCs command external tank separation, the bolts are severed by pyrotechnic devices. The ET has five propellant umbilical valves that interface with orbiter umbilicals: two for the liquid oxygen tank and three for the liquid hydrogen tank. One of the liquid oxygen tank umbilical valves is for liquid oxygen, the other for gaseous oxygen. The liquid hydrogen tank umbilical has two valves for liquid and one for gas. The intermediate-diameter liquid hydrogen umbilical is a recirculation umbilical used only during the liquid hydrogen chill-down sequence during prelaunch. As the ET is filled, excess gaseous hydrogen is vented through umbilical connections over a large diameter pipe on an arm extended from the fixed service structure. The connection for this pipe between the ET and service structure is made at the ground umbilical carrier plate (GUCP). Sensors are also installed at the GUCP to measure hydrogen levels. Countdowns of STS-80, STS-119, STS-127 and STS-133 have been halted and resulted in several week delays in the later cases due to hydrogen leaks at this connection. This requires complete draining of the tanks and removal of all hydrogen via helium gas purge, a 20-hour process, before technicians can inspect and repair problems. A cap mounted to the swing-arm on the fixed service structure covers the oxygen tank vent on top of the ET during the countdown and is retracted about two minutes before lift-off. The cap siphons off oxygen vapor that threatens to form large ice accumulations on the ET, thus protecting the orbiter's thermal protection system during launch.Sensors
Range safety system
Earlier tanks incorporated a range safety system to disperse tank propellants if necessary. It included a battery power source, a receiver/decoder, antennas and ordnance. Starting with STS-79 this system was disabled, and was completely removed for STS-88 and all subsequent flights.Notes
Future use
In 1990, it was suggested that the external tank be used as a lunar habitat or as an orbital station. These proposals did not come to fruition.As basis for Ares in Constellation
With the retirement of the Space Shuttle in 2011,NASA launch scheduleProposed for DIRECT
The DIRECT project, a proposed alternative shuttle-derived vehicle, would have used a modified, standard diameter, external tank with three RS-25 engines, with two standard SRBM, as a Crew Launch Vehicle. The same vehicle, with one extra RS-25, and an EDS upper stage, would have served as the Cargo Launch Vehicle. It was planned to save $16 billion, eliminate NASA job losses, and reduce the post-shuttle, manned spaceflight gap from five plus years to two or less.Core stage of Space Launch System
The Space Launch System (SLS) is a US super heavy-lift expendable launch vehicle, which is under construction for Artemis 1 as of 2020. The core stage of the rocket is in diameter and mount a Main Propulsion System (MPS) incorporating four RS-25 engines. The core stage is structurally similar to the Space Shuttle external tank, and initial flights will use modified RS-25D engines left over from the Space Shuttle program. Later flights will switch to a cheaper version of the engine not intended for reuse.Unflown hardware
See also
* Space Launch System (a super heavy-lift launch vehicle under construction) * DIRECT (a proposed heavy launch system) * MPTA-ET (external tank test for STS) * List of reentering space debris * List of heaviest spacecraftReferences
Further reading
External links