Saint-Étienne–Lyon Railway
   HOME

TheInfoList



OR:

The Saint-Étienne to Lyon line is a railway linking
Saint-Étienne Saint-Étienne (; Franco-Provençal: ''Sant-Etiève''), also written St. Etienne, is a city and the prefecture of the Loire département, in eastern-central France, in the Massif Central, southwest of Lyon, in the Auvergne-Rhône-Alpes regi ...
to
Lyon Lyon (Franco-Provençal: ''Liyon'') is a city in France. It is located at the confluence of the rivers Rhône and Saône, to the northwest of the French Alps, southeast of Paris, north of Marseille, southwest of Geneva, Switzerland, north ...
. The line was built between 1828 and 1833 by Camille Seguin and Marc Seguin at a cost of 14,500,000  FRF.Structurae
/ref>


History


Construction

Construction began in September 1826. Marc Seguin was chief engineer, chief of estates, maintenance and rolling stock at the same time. Despite all the natural obstacles he encountered, Seguin drew up the plans for line, 56 km in length, with a slow descent towards
Lyon Lyon (Franco-Provençal: ''Liyon'') is a city in France. It is located at the confluence of the rivers Rhône and Saône, to the northwest of the French Alps, southeast of Paris, north of Marseille, southwest of Geneva, Switzerland, north ...
. The first part of the line, between
Saint-Étienne Saint-Étienne (; Franco-Provençal: ''Sant-Etiève''), also written St. Etienne, is a city and the prefecture of the Loire département, in eastern-central France, in the Massif Central, southwest of Lyon, in the Auvergne-Rhône-Alpes regi ...
and Rive-de-Gier was laid at a constant descent of 1.2 to 1.4%. The following section, running along the Gier valley down to Givors, on the
Rhône The Rhône ( , ; Occitan language, Occitan: ''Ròse''; Franco-Provençal, Arpitan: ''Rôno'') is a major river in France and Switzerland, rising in the Alps and flowing west and south through Lake Geneva and Southeastern France before dischargi ...
, was less inclined, with a slope of 0.65%. The last section of the line, to
Lyon Lyon (Franco-Provençal: ''Liyon'') is a city in France. It is located at the confluence of the rivers Rhône and Saône, to the northwest of the French Alps, southeast of Paris, north of Marseille, southwest of Geneva, Switzerland, north ...
, was built virtually level.


Technical data

To avoid difficulties in acquiring land, with no laws concerning compulsory purchase at the time, Seguin built several bridges and tunnels. Between 1827 and 1830 he dug the first tunnel from Couzon to Rive de Gier, with a length of 977 m, a second tunnel, only 400 m long, was dug in 1831 in Lyon. A third tunnel, 1.5 km in length, was dug under Terrenoire. Instead of
cast iron Cast iron is a class of iron–carbon alloys with a carbon content of more than 2% and silicon content around 1–3%. Its usefulness derives from its relatively low melting temperature. The alloying elements determine the form in which its car ...
laid on stone sleepers as was then the practice in mines, Seguin decided to use
iron Iron is a chemical element; it has symbol Fe () and atomic number 26. It is a metal that belongs to the first transition series and group 8 of the periodic table. It is, by mass, the most common element on Earth, forming much of Earth's o ...
rails on wooden sleepers.


Route

The railway followed the path of the
Janon The Janon is a small river that rises in Mont Pilat in the Massif Central of France near to Saint-Étienne. It runs for through mostly built-up country to join the Gier (river), Gier at Saint-Chamond, Loire, Saint-Chamond. The valley of the Janon ...
from Terrenoire (now part of Saint-Étienne) to Saint-Chamond, and then the Gier to the Rhone. Between Rive-de-Gier and Givors on the Rhone, the railway paralleled the Givors canal. The population was hostile to the railway which threatened many trades. Trains were derailed and wagons set on fire. In 1835 the proletarian poet Guillaume Roquille published his
Franco-Provençal language Franco-Provençal (also Francoprovençal, Patois or Arpitan) is a Gallo-Romance language that originated and is spoken in eastern France, western Switzerland, and northwestern Italy. Franco-Provençal has several distinct dialects and is s ...
collection ''Ballon d'essai d'un jeune poète forézien'' (Trial balloon of a young Forézien poet) violently attacked the arrival of the railway, which would ruin the canal on which his father worked as a porter. The line was at first meant to traverse Givors and cross the
Rhône The Rhône ( , ; Occitan language, Occitan: ''Ròse''; Franco-Provençal, Arpitan: ''Rôno'') is a major river in France and Switzerland, rising in the Alps and flowing west and south through Lake Geneva and Southeastern France before dischargi ...
to finish its course on the left bank. However the inhabitants of Givors protested in such large numbers that it was decided to build the line on the right bank. The work lasted five years between 1827 and 1832. The first portion to be opened was between Givors and Rive-de-Gier which opened on 28 June 1830. A transfer between ships and trains was enabled by the construction of a ''water station'' at Givors. It became the largest harbour on the
Rhône The Rhône ( , ; Occitan language, Occitan: ''Ròse''; Franco-Provençal, Arpitan: ''Rôno'') is a major river in France and Switzerland, rising in the Alps and flowing west and south through Lake Geneva and Southeastern France before dischargi ...
and an active industrial city.


Traction

During the first few months of operation, horses were used to provide the tractive power. Where the line descended the horses were carried in a truck for the 22 km descent and then hauled the train for the remainder of journey. For the journey up, one horse was used to haul 5 or six empty wagons. The trains were pulled at 3 or 4 km/h but ran down hill at a speed of 24 to 28 km/h. For comfort, the Seguin company had placed drapes on the seats and used leather straps to open and close the windows. The first were cut out by passengers and made into clothes and the straps were used as belts!


Opening sections

From early 1831, the locomotive Seguin hauled twenty-four to twenty-eight empty wagons between Givors and Rive-de-Gier or seven full wagons. On 3 April 1832, the section up to Lyon was used for freight transport with a few passengers being accepted, who sat on straw in the wagons. The last section, to
Saint-Étienne Saint-Étienne (; Franco-Provençal: ''Sant-Etiève''), also written St. Etienne, is a city and the prefecture of the Loire département, in eastern-central France, in the Massif Central, southwest of Lyon, in the Auvergne-Rhône-Alpes regi ...
, was opened on 1 October 1832 for passenger use only, freight being accepted a few months later. On 4 April 1833 the line was opened in its entirety.


Rolling stock

In 1836, the company possessed 12 locomotives, 135 wagons and transported its passengers from end to end in six hours. Accidents were a regular occurrence as people would sometimes walk along the railway line. From 1844, the use of horse traction was terminated and the entire journey was done in only 2 and a half hours.


Outstanding structures

*Old tunnel of Couzon-Rive-de-Gier, built 1830, closed 1856 *New tunnel of Couzon-Rive-de-Gier, built 1856 *Pont de La Mulatière, bridge built in 1914 *Mulatière Bridge, built 1830 *Tunnel de Terrenoire, built 1829


References

Notes Citations Sources * * *


External links

*
Line history
on art-et-histoire *
Line history
on culturerail {{DEFAULTSORT:Saint-Etienne-Lyon railway Transport in Saint-Étienne Rail transport in Lyon Railway lines in Auvergne-Rhône-Alpes Closed railway lines in France