SSCV ''Sleipnir'' is a
semi-submersible Semi-submersible may refer to a self-propelled vessel, such as: *Heavy-lift ship, which partially submerge to allow their cargo (another ship) to float into place for transport *Narco-submarine, some of which remained partially on the surface *S ...
crane vessel A crane vessel, crane ship, crane barge, or floating crane is a ship with a crane specialized in lifting heavy loads, typically exceeding for modern ships. The largest crane vessels are used for offshore construction. The cranes are fitted to c ...
(SSCV) owned and operated by the Netherlands-based
Heerema Marine Contractors Heerema Marine Contractors (HMC) is a contractor headquartered in the Netherlands most notable for operation of three of the largest crane vessels in the offshore industry. History Heerema Marine Contractors was formed in 1948 by Pieter Schelte ...
. It was ordered in 2015 and built in
Singapore Singapore, officially the Republic of Singapore, is an island country and city-state in Southeast Asia. The country's territory comprises one main island, 63 satellite islands and islets, and one outlying islet. It is about one degree ...
by
Sembcorp Marine Seatrium Limited provides innovative engineering solutions to the global offshore, marine and energy industries. Headquartered in Singapore, the Group has over 60 years of track record in the design and construction of rigs, floaters, offshore p ...
. It was named for
Sleipnir In Norse mythology, Sleipnir (Old Norse: "slippy"Orchard (1997:151). or "the slipper"Kermode (1904:6).) is an eight-legged horse ridden by Odin. Sleipnir is attested in the ''Poetic Edda'', compiled in the 13th century from earlier traditional ...
, the eight-legged horse ridden by
Odin Odin (; from ) is a widely revered god in Norse mythology and Germanic paganism. Most surviving information on Odin comes from Norse mythology, but he figures prominently in the recorded history of Northern Europe. This includes the Roman Em ...
in
Norse mythology Norse, Nordic, or Scandinavian mythology, is the body of myths belonging to the North Germanic peoples, stemming from Old Norse religion and continuing after the Christianization of Scandinavia as the Nordic folklore of the modern period. The ...
. The vessel is equipped with two revolving cranes built by Huisman Equipment B.V., each with a capacity of ; the main cranes can be operated in tandem to jointly lift . After its completion in 2019, SSCV ''Sleipnir'' succeeded Heerema's earlier as the largest crane vessel in the world.


Design

The vessel is essentially a large platform supported by eight columns (four on each side), with one pontoon per side. Typical SSCVs use larger columns under the cranes to provide support, which can lead to severe pitching in rough seas; SSCV ''Sleipnir'' uses columns that are symmetrical fore and aft for calmer motions under higher sea states. The columns are rounded to reduce wave interactions, and the pontoons are streamlined to reduce drag. The ship's ballast tanks and LNG storage are contained within the eight columns. Each column is tall and has a staircase connecting the deck with the pontoon below.


Cranes

The two large port and starboard tub-mounted cranes are provided by Huisman; overall boom length is . The slewing system, which allows the cranes to rotate in their tub, uses the world's largest bearings at in diameter. Conventional tub-mounted cranes ride on bogies or wheels, while the Huisman 10,000t cranes use the bearing directly. Prior to the cranes for ''Sleipnir'', the largest bearings Huisman had used for tub-mounted cranes were only in diameter. The crane house is secured to the foundation using 1,100 bolts in diameter, each weighing more than , and held in place by nuts. Each luffing frame weighs , and each boom weighs . The large port and starboard cranes were fabricated at Huisman's factory in Xiamen, China, and shipped in pieces to Singapore; the BigRoll
RoRo Roll-on/roll-off (RORO or ro-ro) ships are cargo ships designed to carry wheeled cargo, such as cars, motorcycles, trucks, semi-trailer trucks, buses, trailers, and railroad cars, that are driven on and off the ship on their own wheels or usi ...
ships ''Baffin'' (now BigLift Baffin) and ''Beaufort'' were used to ferry the crane houses, luffing frames, winch frames and booms along with other large pieces in 2018. Using the main hoist, each crane is capable of lifting a maximum of at a radius between ; lifting capacity drops to at a radius of up to , and at radius; the maximum operating radius using the main hoist is . Objects can be lifted and lowered using the main hoist from below the waterline to above it when SSCV ''Sleipnir'' is operating at its maximum draft. The main hoists were tested to 110% of rated load using the modified barge H-408 during sea trials in June 2019. These cranes each use approximately of braided wire rope, thick. These two large cranes are also equipped with an auxiliary hoist capable of lifting at a radius between . Using the auxiliary hoist, objects can be lifted and lowered from below the waterline to above it when SSCV ''Sleipnir'' is operating at its maximum draft. The main cranes are also equipped with a third (whip) hoist. The whip hoist is capable of lifting at a radius between from below the waterline to above it at maximum draft. ''Sleipnir'' is equipped with a third, auxiliary, crane at the opposite end of the ship, near the berths. The auxiliary crane is capable of lifting (or lowering) at a radius up to down to below the waterline; capacity reduces to at radius and at radius. Huisman provided the auxiliary crane as well.


Power

Power for the ship is provided by 12
MAN A man is an adult male human. Before adulthood, a male child or adolescent is referred to as a boy. Like most other male mammals, a man's genome usually inherits an X chromosome from the mother and a Y chromosome from the f ...
8L51/60DF inline eight-cylinder
four-stroke engine A four-stroke (also four-cycle) engine is an internal combustion (IC) engine in which the piston completes four separate strokes while turning the crankshaft. A stroke refers to the full travel of the piston along the cylinder, in either directi ...
s equipped with selective catalytic reduction (SCR) to achieve IMO Tier III emissions. "DF" denotes dual-fuel, which means the engines can operate on either low-sulfur Marine Gas Oil (MGO) or
liquefied natural gas Liquefied natural gas (LNG) is natural gas (predominantly methane, CH4, with some mixture of ethane, C2H6) that has been cooled to liquid form for ease and safety of non-pressurized storage or transport. It takes up about 1/600th the volume o ...
(LNG). They are grouped into four engine rooms, with three engines per room. Each engine has a maximum continuous output of at 500 RPM (rising to at 514 RPM), with an overall size (L×W×H) of , weighing . The fuel capacity is of LNG, which allows ''Sleipnir'' to cross the Atlantic or remain on station for one month. Heerema intends to use primarily LNG fuel, except where terminals lack the infrastructure to provide LNG bunkers. SCR will be used with MGO to reduce emissions.


Propulsion

The ship is propelled by a total of eight
Wärtsilä Wärtsilä Oyj Abp (), trading internationally as Wärtsilä Corporation, is a Finnish corporation, Finnish company which manufactures and services power sources and other equipment in the Marine propulsion, marine and energy markets. The core ...
azimuth thruster An azimuth thruster is a configuration of marine propellers placed in pods that can be rotated to any horizontal angle (azimuth), making a rudder redundant. These give ships better maneuverability than a fixed propeller and rudder system. Type ...
s, arranged with four at the forward end and four at the stern; each thruster has an output of 5.5 MW. The four forward thrusters are retractable, designated WST-65RU; aft thrusters are designated WST-65U and are not retractable. All eight thrusters are underwater mountable, meaning the ship does not need to be drydocked to replace a thruster unit. For SSCV ''Sleipnir'', the forward thrusters are retractable to increase overall efficiency and protect them from damage in shallow waters; a rack-and-pinion system is used to retract the thrusters with a cycle time of 10 minutes. The WST-65U has a propeller in diameter driven by a propeller shaft tilted at 8° from horizontal to reduce the interaction with the hull and associated hydrodynamic losses. During sea trials, SSCV ''Sleipnir'' reached a speed of . Cruising speed is rated at . The cruise speed is achieved using only the aft thrusters.


Stationkeeping

A 12-point mooring system using Stevpris Mk-6 anchors, each weighing , and of wire rope is used to hold the ship's position during lifting operations. The
dynamic positioning Dynamic positioning (DP) is a computer-controlled system to automatically maintain a vessel's position and heading by using its own propellers and thrusters. Position reference sensors, combined with wind sensors, motion sensors and gyrocompas ...
system was able to hold the ship's position to within a area during simulated operations for sea trials.


Accommodations

The total deck area available for cargo is , measuring (L×W) with a capacity of . In addition, there is a circular helipad near the berths, measuring in diameter, capable of holding , which is designed for an AgustaWestland EH101 or
Sikorsky S-92 The Sikorsky S-92 is an American twin-engine medium-lift helicopter built by Sikorsky Aircraft for the civil and military helicopter markets. The S-92 was developed from the Sikorsky S-70 helicopter and has similar parts such as flight control ...
. The berthing area is designed to accommodate 400 people in 5 executive, 45 single, and 175 double cabins. The dining hall can hold 200 people. SSCV ''Sleipnir'' is equipped with nine Harding FF1200 freefall lifeboat systems, including
davit Boat suspended from Welin Quadrant davits; the boat is mechanically 'swung out' Gravity multi-pivot on Scandinavia'' file:Bossoir a gravité.jpg, Gravity Roller Davit file:Davits-starbrd.png, Gravity multi-pivot davit holding rescue vessel on ...
s; each lifeboat has a capacity of 70.


History

Although the concept of a crane vessel larger than SSCV ''Thialf'' was studied as early as 2008, market conditions precluded formal design work until 2011. Heerema developed the concept internally from 2011 to 2012, determining the optimum vessel type and capabilities. GVA Consultants completed preliminary conceptual studies for a new crane vessel for Heerema in March 2013, and were awarded a basic design contract in February 2014. Heerema intended for the new crane vessel to provide lifting capacities in the segment between the largest SSCVs (such as and , capable of lifting using deck-mounted revolving cranes) and floatover lifters (such as , capable of with significantly less flexibility). One month later, in March 2014, Heerema signed a letter of intent with Huisman to supply the world's largest offshore cranes; the cranes were to be equipped on the new crane vessel, designated NSCV, for New Semi-submersible Crane Vessel, in lieu of a name. In March 2015, Heerema Offshore Services B.V. signed a letter of intent with Jurong Shipyard Pte Ltd to build NSCV in
Singapore Singapore, officially the Republic of Singapore, is an island country and city-state in Southeast Asia. The country's territory comprises one main island, 63 satellite islands and islets, and one outlying islet. It is about one degree ...
; Jurong's parent
Sembcorp Marine Seatrium Limited provides innovative engineering solutions to the global offshore, marine and energy industries. Headquartered in Singapore, the Group has over 60 years of track record in the design and construction of rigs, floaters, offshore p ...
announced the contract, worth US$1 billion, had been awarded on July 15, 2015. NSCV was planned to be built at Phase II of Sembcorp's Tuas Boulevard Yard, in an offshore dock measuring , and was scheduled for delivery at the end of 2018. The drydock construction was a unique factor in Sembcorp's favor when Heerema was evaluating bids for construction. The first steel was cut for the cranes, which were being built in China, in July 2015. Heerema announced the NSCV would be named ''Sleipnir'', for Odin's eight-legged horse, on December 18, 2015. The two main port and starboard cranes were installed by August 2018. The vessel was christened SSCV ''Sleipnir'' by Mrs. Maha Hatfield on May 24, 2019, and embarked on sea trials and crane load tests afterwards. Sea trials were completed in late June 2019.


Operations

Heerema booked its first contracts for SSCV ''Sleipnir'' in 2017, two years before it was completed. During the ship's maiden voyage from Singapore to Spain via the
Cape of Good Hope The Cape of Good Hope ( ) is a rocky headland on the Atlantic Ocean, Atlantic coast of the Cape Peninsula in South Africa. A List of common misconceptions#Geography, common misconception is that the Cape of Good Hope is the southern tip of Afri ...
, it set a world record for the largest LNG bunkering operation on July 10, when of LNG were transferred to it off the coast of
Sumatra Sumatra () is one of the Sunda Islands of western Indonesia. It is the largest island that is fully within Indonesian territory, as well as the list of islands by area, sixth-largest island in the world at 482,286.55 km2 (182,812 mi. ...
from ''Coral Fraseri'', chartered by Titan LNG from Anthony Veder. ''Coral Fraseri'' was scheduled to refuel ''Sleipnir'' in Spain, prior to it passing into the Mediterranean Sea. ''Sleipnir'' completed a record lift of for the topsides of the Leviathan project for
Noble Energy Noble Energy, Inc. was a company engaged in hydrocarbon exploration headquartered in Houston, Texas. In October 2020, the company was acquired by Chevron Corporation. The company was known as Noble Affiliates, Inc. until 2002. As of December ...
, in September 2019. ''Sleipnir'' is next contracted to install the production and living quarters platforms of the Tyra Future project for Maersk Oil. The existing Tyra platforms will be picked by ''Sleipnir'' and loaded on barges for recycling. Other future contracts include Brae Bravo (jacket and topsides removal) and Hollandse Kust Zuid Alpha (HVAC platform installation).


References


External links


Heerema's ''Sleipnir'' page

Actual position, status, weather and other updates from SSCV Sleipnir
* * {{DEFAULTSORT:Sleipnir, SSCV Ships built in Singapore Ships of the Netherlands Crane vessels Semi-submersibles 2019 ships