Pasažieru Vilciens
   HOME

TheInfoList



OR:

AS Pasažieru vilciens, operating as Vivi, is the sole passenger railway operator in
Latvia Latvia, officially the Republic of Latvia, is a country in the Baltic region of Northern Europe. It is one of the three Baltic states, along with Estonia to the north and Lithuania to the south. It borders Russia to the east and Belarus to t ...
, operating both
electric Electricity is the set of physical phenomena associated with the presence and motion of matter possessing an electric charge. Electricity is related to magnetism, both being part of the phenomenon of electromagnetism, as described by Maxwel ...
and diesel trains on various lines throughout the country. Officially named '' AS "Pasažieru vilciens"'' (', abbreviated: PV), the company was founded in November 2001. It is fully owned by the Latvian state, with the
Ministry of Transport A ministry of transport or transportation is a ministry responsible for transportation within a country. It usually is administered by the ''minister for transport''. The term is also sometimes applied to the departments or other government a ...
acting as shareholder.


History

Pasažieru vilciens was established in 2001 through the merger of two separate companies, ''Elektrovilciens'' ("Electric Train") and ''PPU Dīzeļvilciens'' ("Diesel Train"), which were subsidiaries of the state-owned Latvijas Dzelzceļš (Latvian Railways, LDz). The company was created to separate domestic passenger services from other functions managed by LDz. Initially, Pasažieru vilciens was a 100% subsidiary of Latvijas Dzelzceļš, but in October 2008, it became an independent
state-owned company A state-owned enterprise (SOE) is a business entity created or owned by a national or local government, either through an executive order or legislation. SOEs aim to generate profit for the government, prevent private sector monopolies, provide goo ...
. As of 2017, Pasažieru vilciens employed 1,075 people. The company currently operates ten routes, four electric and six diesel, with its main operating base in the capital city,
Riga Riga ( ) is the capital, Primate city, primate, and List of cities and towns in Latvia, largest city of Latvia. Home to 591,882 inhabitants (as of 2025), the city accounts for a third of Latvia's total population. The population of Riga Planni ...
. In 2019, it carried 18.6 million passengers. On November 29, 2023, Pasažieru vilciens launched a rebranding initiative, adopting the new name Vivi (from the Latvian phrase ''vienā vilcienā'', meaning "on one train" and "in one draw (of breath)") and a yellow-grey colour scheme. This change coincided with the introduction of new Škoda Vagonka electric trains to operation. The full rebranding process is set to be completed by the end of 2024, although the company's legal name, AS Pasažieru vilciens, will be retained.


Routes

Vivi operates the passenger transports in the following electric train routes: * Rīga – Carnikava – Saulkrasti – Skulte * Rīga – Dubulti – Sloka – Ķemeri – Tukums 1 – Tukums 2 * Rīga – Jelgava * Rīga – Ogre – Lielvārde – Aizkraukle and in the following diesel train routes: *Rīga – Jelgava – Dobele – Liepāja *Rīga – Krustpils – Līvāni – Daugavpils – Krāslava – Indra *Rīga – Krustpils – Rēzekne – Zilupe *Rīga – Pļaviņas – Madona – Gulbene *Rīga – Sigulda – Cēsis – Valmiera – Valga the following routes have ended service in recent years *Rīga – Ērgļi (2007) *Rīga – Reņģe (2010) *Rīga – Ventspils (2010) A 1
Euro The euro (currency symbol, symbol: euro sign, €; ISO 4217, currency code: EUR) is the official currency of 20 of the Member state of the European Union, member states of the European Union. This group of states is officially known as the ...
fee must be paid if a train ticket is purchased from the conductor while on the train, provided that the station from which the ticket is being bought is open at the time.


Stations

The main stations on the Vivi network are: * Aizkraukle *
Carnikava Carnikava ( Livonian: ''Sarnikau'', , ''Zarnikau''), previously Sānkaule, is a village and the center of the Carnikava Parish of Ādaži Municipality in the Vidzeme region of Latvia. It's located 25 km north from Riga at the mouth of the ...
*
Cēsis Cēsis (; (, , , ) is a town in Latvia located in the northern part of the Central Vidzeme Upland. Cēsis is on the Gauja River valley, and is built on a series of ridges above the river, overlooking the woods below. Cēsis was selected to b ...
*
Daugavpils Daugavpils (see also other names) is a state city in southeastern Latvia, located on the banks of the Daugava River, from which the city derives its name. The parts of the city to the north of the river belong to the historical Latvian region ...
* Dobele * Dubulti *
Jelgava Jelgava () is a state city in central Latvia. It is located about southwest of Riga. It is the largest town in the Semigallia region of Latvia. Jelgava was the capital of the united Duchy of Courland and Semigallia (1578–1795) and was the ad ...
* Krustpils *
Ķemeri Ķemeri resort (originally ''Ķemeres'', also known as ''Kemmern'') is a part of Jūrmala in Latvia, 44 km from Riga. From 1928 to 1959, Ķemeri was a separate town, famous for healing mud baths and luxurious hotels. Approximately 2,200 in ...
* Lielvārde *
Liepāja Liepāja () (formerly: Libau) is a Administrative divisions of Latvia, state city in western Latvia, located on the Baltic Sea. It is the largest city in the Courland region and the third-largest in the country after Riga and Daugavpils. It is an ...
*
Līvāni Līvāni ( ; ; ) is a town (population approx. 10,000) in Līvāni Municipality in the Latgale region of eastern Latvia. It is situated at the junction of the Dubna River (Daugava basin), Dubna and Daugava River, Daugava rivers, approximately 170 ...
*
Madona Madona (; ) is a town with town rights in the Vidzeme region of Latvia and is the center of the Madona municipality. History The surrounding area of Madona had been populated in earlier times, which is confirmed by discoveries of old buria ...
*
Ogre An ogre (feminine: ogress) is a legendary monster depicted as a large, hideous, man-like being that eats ordinary human beings, especially infants and children. Ogres frequently feature in mythology, folklore, and fiction throughout the world ...
*
Pļaviņas Pļaviņas (; ) is a town in Aizkraukle Municipality in Latvia. The town is located on the Daugava river. The population in 2020 was 2,974. Latvian law defines the town of Pļaviņas as belonging partly to the Vidzeme region and partly to Latgale ...
*
Rēzekne Rēzekne (, ''Rēzne'' or ''Rēzekne'' , ) is a state city in the Rēzekne River valley in the Latgale region of eastern Latvia. It is called ''The Heart of Latgale'' (Latvian ''Latgales sirds'', Latgalian ''Latgolys sirds''). Built on seven ...
*
Rīga Riga ( ) is the capital, Primate city, primate, and List of cities and towns in Latvia, largest city of Latvia. Home to 591,882 inhabitants (as of 2025), the city accounts for a third of Latvia's total population. The population of Riga Planni ...
*
Saulkrasti Saulkrasti (; ) (literally ''Sun shores'' in Latvian) is a town in Saulkrasti Municipality in the Vidzeme region of Latvia, on the east coast of the Gulf of Riga. It is the administrative centre of Saulkrasti Municipality. Made up of a number o ...
*
Sigulda Sigulda (; ; Polish Zygwold) is a town in the Vidzeme region of Latvia, from the capital city Riga. Overview Sigulda is on a picturesque stretch of the primeval Gauja river valley. Because of the reddish Devonian sandstone which forms steep r ...
* Skulte * Sloka * Torņakalns *
Tukums Tukums (; ; ) is a town in Latvia and serves as the administrative center of Tukums Municipality. It is located in the eastern part of the historical region of Courland, and with more than 16,000 inhabitants Tukums is the 13th largest settlem ...
* Valga (
Estonia Estonia, officially the Republic of Estonia, is a country in Northern Europe. It is bordered to the north by the Gulf of Finland across from Finland, to the west by the Baltic Sea across from Sweden, to the south by Latvia, and to the east by Ru ...
) *
Valmiera Valmiera () is the second largest city of the historical Vidzeme region, Latvia, with a total area of . As of 2002, Valmiera had a population of 27,323, and in 2020, it was at 24,879. It is a Administrative divisions of Latvia, state city, and ...
* Vecāķi * Zemitāni * Zilupe


Rolling stock

The current rolling stock consists of both modern Škoda 16Ev electric trains and elderly
Soviet The Union of Soviet Socialist Republics. (USSR), commonly known as the Soviet Union, was a List of former transcontinental countries#Since 1700, transcontinental country that spanned much of Eurasia from 1922 until Dissolution of the Soviet ...
-period diesel trains built locally by
Rīgas Vagonbūves Rūpnīca Rīgas Vagonbūves Rūpnīca (RVR) was a Latvian rail and tram vehicle manufacturer, most notable for its multiple unit trains and tram vehicles used throughout the Soviet Union and its successor states. It has been insolvent and non-operat ...
(RVR). Previously, electric trains made by RVR were used, which were gradually refurbished since the early 2000s. In 2016 PV received 19 extensively modernized DR1A DMU train wagons from DMU vilcieni in cooperation with RVR, Daugavpils Lokomotīvju Remonta Rūpnīca and Zasulauks depot. However, LSM reported in October 2016 that the refurbished wagons soon experienced quality issues. The livery of the RVR electric trains and some diesel trains is yellow and blue, while some refurbished DMUs are in red and white. Since 2023, the new Škoda EMUs and a part of the DMUs have been painted in signal yellow, anthracite gray and dark gray.


Future upgrades


Electric trains

The first project for the procurement of new trains was announced in 2010 and 2011. In 2012 PV ordered 34 three-car
electric multiple unit An electric multiple unit or EMU is a multiple-unit train consisting of self-propelled carriages using electricity as the motive power. An EMU requires no separate locomotive, as electric traction motors are incorporated within one or a number o ...
trains and seven three-car diesel multiple unit trains from CAF to be built on the Civity platform, with plans to manufacture them in cooperation with RVR. Later that year the contract was halted due to irregularities and an appeal from Stadler with the
European Commission The European Commission (EC) is the primary Executive (government), executive arm of the European Union (EU). It operates as a cabinet government, with a number of European Commissioner, members of the Commission (directorial system, informall ...
, an initial financial supporter of the project, and a new procurement organized. A hire/purchase contract for 25
Stadler FLIRT Stadler FLIRT (, ) is a passenger multiple unit trainset made by Stadler Rail of Switzerland. The baseline design of FLIRT is an electric multiple unit Articulated car, articulated trainset that can come in units of two to twelve cars with two t ...
EMU The emu (; ''Dromaius novaehollandiae'') is a species of flightless bird endemism, endemic to Australia, where it is the Tallest extant birds, tallest native bird. It is the only extant taxon, extant member of the genus ''Dromaius'' and the ...
s was likewise cancelled in July 2014 after an appeal from the other participant,
Hyundai Rotem Hyundai Rotem Company, often referred to as Hyundai Rotem (), is a South Korean manufacturer of railway rolling stock, railway signalling, defense products and plant equipment. It is a member of Hyundai Motor Group and has presence in more than ...
, and another tender organized. In December 2015, four contenders – Talgo, CAF, Stadler Polska and Škoda Vagonka – continued participation in the second stage of the train procurement project. The contract includes the delivery of 32 electric trains with a capacity of 450 each, from 2020 to 2023, maintenance equipment, spare parts for five years and staff training. Talgo's VitTal was announced as the provisional winner of the €225.3 million contract in November 2018 although Škoda rejected the methodology used to assess price competitiveness. Škoda and CAF filed a successful appeal of the results of the procurement in December, while Stadler expressed disappointment at the results. After reviewing the results of the contest under instructions from the government's procurement watchdog agency, the Procurement Monitoring Bureau (PMB), PV announced on February 15, 2019 that the offer from Škoda worth €241.88 million has been selected as the new winner, based on revised electricity consumption cost estimates. Talgo announced in a press release the same day that they will contest the decision. On May 21, 2019, PV announced that after the second revision of the submitted bids, Škoda was again confirmed as the winner, however, the decision could yet again be contested. The offer of Talgo was mentioned as to have had a lower price per unit, but the maintenance costs of Škoda trains were found to be lower with the total cost lower as well. Minister of Transport Tālis Linkaits commented on this that due to potential issues regarding the implication of Škoda Transportation A.S., a subsidiary of Škoda Transportation Group and a sister company of Škoda Vagonka, in recent corruption scandals concerning the Rīgas Satiksme public transport company, a failure to wrap up the procurement by the end of the year might have led to the dissolution of PV. The PMB turned down the final complaint by Talgo on July 4, giving PV the go-ahead to sign a contract with Škoda Vagonka. In a statement, the PV predicted that they would receive the first trains in late 2021, with the last ones being shipped in late 2023. The contract between PV and Škoda Vagonka a.s. was finally signed on 30 July 2019. Under the agreement, all 32 EMU trains were to be delivered by 2023 or 140 weeks after the contract takes effect. Each 109-meter-long four-car train with a top speed of 160 
km/h The kilometre per hour ( SI symbol: km/h; non-SI abbreviations: kph, kmph, km/hr) is a unit of speed, expressing the number of kilometres travelled in one hour. History Although the metre was formally defined in 1799, the term "kilometres per h ...
would accommodate 436 seated and 450 standing passengers. The trains are expected to operate services from
Riga Riga ( ) is the capital, Primate city, primate, and List of cities and towns in Latvia, largest city of Latvia. Home to 591,882 inhabitants (as of 2025), the city accounts for a third of Latvia's total population. The population of Riga Planni ...
to Aizkraukle,
Tukums Tukums (; ; ) is a town in Latvia and serves as the administrative center of Tukums Municipality. It is located in the eastern part of the historical region of Courland, and with more than 16,000 inhabitants Tukums is the 13th largest settlem ...
,
Jelgava Jelgava () is a state city in central Latvia. It is located about southwest of Riga. It is the largest town in the Semigallia region of Latvia. Jelgava was the capital of the united Duchy of Courland and Semigallia (1578–1795) and was the ad ...
and Skulte, as well as the inter-urban routes from and to Krustpils,
Daugavpils Daugavpils (see also other names) is a state city in southeastern Latvia, located on the banks of the Daugava River, from which the city derives its name. The parts of the city to the north of the river belong to the historical Latvian region ...
and
Rēzekne Rēzekne (, ''Rēzne'' or ''Rēzekne'' , ) is a state city in the Rēzekne River valley in the Latgale region of eastern Latvia. It is called ''The Heart of Latgale'' (Latvian ''Latgales sirds'', Latgalian ''Latgolys sirds''). Built on seven ...
which are expected to be modernized and electrified at 25 kV 50 Hz for completion by the end of 2023. In February 2020, a new signal yellow, anthracite gray and dark gray livery design created by Teika Design Studio for the future trains was unveiled by PV. Due to
2022 Russian invasion of Ukraine On 24 February 2022, , starting the largest and deadliest war in Europe since World War II, in a major escalation of the Russo-Ukrainian War, conflict between the two countries which began in 2014. The fighting has caused hundreds of thou ...
, the end date of full delivery was postponed till at least end of 2023, since originally it was planned to deliver all trains to Latvia on tracks through Ukraine and Belarus, due to the same track gauge. The first four-car train was delivered in June 2022 in parts by road through Poland and Lithuania and was used for testing purposes in the coming months. Each train was designed for 436 passengers. While initially it was said that the new trains would enter service in January 2023, cited problems like production delays caused by the Russian invasion of Ukraine and the
COVID-19 pandemic The COVID-19 pandemic (also known as the coronavirus pandemic and COVID pandemic), caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2), began with an disease outbreak, outbreak of COVID-19 in Wuhan, China, in December ...
, and a long certification process still in progress, repeatedly pushed this back to 'no earlier' than November. By June 2023, 14 electric trains had been assembled in Latvia, with nine more left to go until the end of the year. The final deliveries were planned for the first half of 2024. The first regular journey of the new model took place on December 15, 2023, on the route
Riga Riga ( ) is the capital, Primate city, primate, and List of cities and towns in Latvia, largest city of Latvia. Home to 591,882 inhabitants (as of 2025), the city accounts for a third of Latvia's total population. The population of Riga Planni ...
Dubulti. Trains heading for Aizkraukle, Tukums and Skulte followed, concluding with the Jelgava route on December 16. In January 2024, five of the newly delivered trains stopped running after several technical problems. On January 2, the train on the Saulkrasti–Rīga route stopped at Garciems station after the train's
pantograph A pantograph (, from their original use for copying writing) is a Linkage (mechanical), mechanical linkage connected in a manner based on parallelograms so that the movement of one pen, in tracing an image, produces identical movements in a se ...
went down and the cabin heating stopped working. After several other repeated incidents with the new trains, Transport Minister Kaspars Briškens and Vivi demanded explanations from Škoda Vagonka about the defects and on January 5 informed passengers about the possibility to request compensation in case of canceled trains. On January 25, 2024, the members of the company's board announced their resignations, as they claimed that 'solving the crisis caused by the new electric trains is beyond the board's functions and scope'. Later, the Ministry of Transport announced that a temporary council had been appointed in its place. However, on January 26, the Minister of Transport announced that it considered to return the sets of the new trains back to the manufacturer as defects and to ask the government for money for the overhaul of the old trains. Ultimately, these plans were not approved, with Škoda receiving fines. For the 2024/25 winter season, Vivi announced that it had improved staff training and set up a 24-hour operational technical support service in cooperation with Škoda. A reserve fleet of 13 old trains was preserved to be used for emergencies. No major breakdowns were reported during the winter. In March 2024, the deadline for the delivery of all new trains was extended to the end of the summer of 2024. By the end of September, all of the 32 trains had been delivered, with Škoda incurring penalties for the delay. PV/Vivi were criticized by some as having no bicycle racks on the new trains - the first train received a bicycle rack in January 2025, with a plan to equip the rest by May.


Diesel and battery trains

In May 2020, PV announced that it would procure 8 new diesel trains to replace existing DMUs with Russian-made engines due to the addition of the manufacturers to the United States sanctions list. Five bidders applied, with three advancing to the second round in July - CAF, Pesa Bydgoszcz and Stadler Polska. PV said it planned to sign a contract by December 31. However, this did not materialise, in part due to uncertainties concerning available funding and with the Ministry of Transport switching its focus on acquiring battery-powered trains (BEMU) by 2026, citing such upsides as a lesser impact on the environment and less noise. The ministry announced plans to order feasibility study for evaluating the technological and economic aspects of the intended purchase in the second half of 2021. The ministry added that the BEMUs would be mainly used in Riga and the Riga region. A tender for 9 BEMU trains (with an option to purchase seven additional ones if funding is available) was announced on 13 April 2022 by the Road Transport Administration, which predicted that new units for a new Bolderāja – Riga –
Sigulda Sigulda (; ; Polish Zygwold) is a town in the Vidzeme region of Latvia, from the capital city Riga. Overview Sigulda is on a picturesque stretch of the primeval Gauja river valley. Because of the reddish Devonian sandstone which forms steep r ...
line would be delivered by the end of 2026. Each train would have a capacity of 200–240 seats and the overall cost was predicted at €75-76 million, and every unit should be able to cover a distance 100 km with a single charge. The submission deadline for the first round was June, with the second round scheduled for autumn of 2022. Three bids were submitted by CAF,
Škoda Transportation Škoda Transportation Akciová společnost, a.s. is a Czech Republic, Czech manufacturer of vehicles for public transport, including Tram, trams, Electric multiple unit, electric multiple units, and Bus, buses. The company was formerly a divisio ...
/Škoda Vagonka and Stadler Polska, with all advancing to the next round. However, in May 2023 it was reported by
Delfi Delfi (occasionally capitalized as DELFI) is a news website in Estonia, Latvia, and Lithuania providing daily news, ranging from gardening to politics. It ranks as one of the most popular websites among Baltic users. Delfi operates in the re ...
that the second round is delayed due to protracted documentation works. In September, the outgoing Minister of Transport Jānis Vitenbergs told LTV1 ''Panorāma'' news that 'everything has been prepared for the start of a tender and it just needs to be announced'. The Latvian Autotransport Directorate then announced it planned to start the tender 'in the near time'. All three bidders were later found compliant and invited to submit their bids for the second round until March 2024. In April, Škoda was declared as the winner of the second round, as Stadler were found to have faulty documentation and CAF didn't submit a bid. January 2024 began with news that the government supported the initiative of the Ministry of Transport to purchase rolling stock of at least two new battery electric trains until December 31, 2029 for use on the Riga-Dobele line. It was also announced that the previous tender with the end goal of 2026 was still ongoing, and that these first BEMUs would start service on the Riga- Bolderāja and Riga-Sigulda routes.
Public Broadcasting of Latvia Public Service Media of Latvia ( – LSM) is a publicly funded radio and television organization operated by both of Latvia's public broadcasters – Latvijas Televīzija, Latvian Television and Latvijas Radio, Radio Latvia. LSM provides news, a ...
also reported that there were concerns about the durabilty of train batteries during winter in the face of issues experienced by the new electric trains in early 2024. In May 2024, PV purchased a used diesel locomotive from Estonia. Ultimately, the BEMU project stalled amid rising costs connected to the construction of the Rail Baltica project, and in September 2024 the Ministry of Transport proposed redirecting EU funding away from the battery BEMU project into the construction of the new Riga Central and Riga Airport stations. Amid other reasons specified for cancellation were the high costs and time needed to adjust infrastructure for the use of BEMUs, especially outside the Riga region, and having only one procurement finalist. The decision required approval from the Cabinet of Ministers and the
European Commission The European Commission (EC) is the primary Executive (government), executive arm of the European Union (EU). It operates as a cabinet government, with a number of European Commissioner, members of the Commission (directorial system, informall ...
. The government ultimately approved the plan to reallocate 74€ million from the Emission-Free Rail Infrastructure Development Project to Rail Baltica in February 2025, suspending the project.


See also

*
Latvian Railways Latvijas dzelzceļš (', abbr. LDz) is the state-owned company responsible for managing public railway infrastructure in Latvia. It is fully owned by the Government of Latvia, Latvian government, with 100% of its shares held by the state. The com ...
*
Elron (rail transit) AS Eesti Liinirongid, operating as Elron, is a government-owned passenger train operator in Estonia. Prior to 2014, the company operated exclusively the electrified commuter rail system in Harjumaa, and was known until October 2013 as ''Elektri ...
- Estonian passenger rail operator * LTG Link - Lithuanian passenger rail operator


References


External links

*
AS "Pasažieru vilciens" train routes and zonal tariffs


{{DEFAULTSORT:Pasazieru vilciens Railway companies of Latvia Companies based in Riga Railway companies established in 2001 Latvian companies established in 2001