HOME

TheInfoList



OR:

Fahrettin Altay is an underground station of the
İzmir Metro The İzmir Metro () is a Medium-capacity rail system, light metro system serving the city of İzmir, Turkey. The current system, consisting of M1 (İzmir Metro), one line, starts from Narlıdere Kaymakamlık station in the southwestern portion of ...
's only operating line, the M1. Located under Fahrettin Altay square, the station has two
side platforms A side platform (also known as a marginal platform or a single-face platform) is a railway platform, platform positioned to the side of one or more railway tracks or guideways at a railway station, tram stop, or bus rapid transit, transitway. A st ...
servicing two tracks. The station was opened on 26 July 2014, after 9 years of delayed construction. The station was a terminal station from 2014 to 2024, until line extended to Narlıdere. The station offers connections to regional buses to
ÇeÅŸme ÇeÅŸme, officially the ÇeÅŸme Municipality, is a municipality and Districts of Turkey, district of İzmir Province, Turkey. Its area is 285 km2, and its population is 48,924 (2022). It sits at Turkey's westernmost end, on a promontory on t ...
, Urla,
Seferihisar Seferihisar is a municipality and district of İzmir Province, Turkey. Its area is 375 km2, and its population is 60,914 (2024). Seferihisar district area borders on other İzmir districts of Urla to the west and Menderes to the east, and t ...
and
Karaburun Karaburun (, Achirlí) is a municipality and Districts of Turkey, district of İzmir Province, in western Turkey. Its area is 421 km2, and its population is 12,200 (2022). The district area roughly corresponds to the peninsula of the same nam ...
, which depart from a terminal within walking distance to Fahrettin Altay square.


History

Construction of the six station expansion of the subway line, west from Üçyol, began in 2005 with completion expected by April 2007. The contract was awarded in March and groundbreaking began on 5 July. However, due to disagreements between the İzmir Metropolitan Municipality and the company contracted with building the line, construction halted on 14 February 2006 and the contract was cancelled in November. A new contract was awarded on 23 January 2007, with completion expected 31 October 2008. However the company could not reach the deadline and the contract was cancelled on 13 August 2009. The İzmir Municipality finished the remaining works, albeit at a slow pace, and completed the extension, opening Fahrettin Altay station on 26 July 2014.


Connections

ESHOT Elektrik Su Havagazı Otobüs Troleybüs () or ESHOT is a bus service operating in the İzmir. ESHOT, along with İZULAŞ are the two main bus transit services in İzmir. Buses serve all districts, however, denser network presence attained in the ...
operates city bus service on Fahrettin Altay Square.


Station Layout


References

{{İzmir Metro stations (Navbox) İzmir Metro stations Karabağlar District Konak District Railway stations in Turkey opened in 2014