Özgüneş Railway Station
   HOME

TheInfoList



OR:

Özgüneş railway station () is a railway station in
Ankara Ankara is the capital city of Turkey and List of national capitals by area, the largest capital by area in the world. Located in the Central Anatolia Region, central part of Anatolia, the city has a population of 5,290,822 in its urban center ( ...
,
Turkey Turkey, officially the Republic of Türkiye, is a country mainly located in Anatolia in West Asia, with a relatively small part called East Thrace in Southeast Europe. It borders the Black Sea to the north; Georgia (country), Georgia, Armen ...
, currently being rebuilt. The station was a stop on the
Ankara suburban Ankara is the capital city of Turkey and List of national capitals by area, the largest capital by area in the world. Located in the Central Anatolia Region, central part of Anatolia, the city has a population of 5,290,822 in its urban center ( ...
from 1972 to 2016 when it was closed and demolished shortly after, in order to rebuild and expand the railway. Construction of the new station began in 2017 and is expected to open on 12 April 2018. Özgüneş station was originally built in 1970 by the
Turkish State Railways The State Railways of the Republic of Turkey (), abbreviated as TCDD, is a government-owned national railway company responsible for the ownership and maintenance of railways in Turkey, as well as the planning and construction of new lines. TCDD ...
, when the railway from Ankara to Sincan was
double-tracked Double tracking or doubling is an audio recording technique in which a performer sings or plays along with their own prerecorded performance, usually to produce a stronger or bigger sound than can be obtained with a single voice or instrument. ...
. It entered service in 1972, when electric commuter service began on the line. The new station consists of an
island platform An island platform (also center platform (American English) or centre platform (British English)) is a station layout arrangement where a single platform is positioned between two tracks within a railway station, tram stop or transitway inte ...
serving two tracks, within a five-track railway. South of the platform are two tracks for mainline and YHT high-speed trains, while the track north of the platform is a bi-directional track for freight trains and equipment moves.


References

{{reflist, refs= {{cite web, url=http://evdenhaberler.com/baskentray-ne-zaman-acilacak-2018/ , title=Başkentray ne zaman açılacak? , website=evdenhaberler.com , language=Turkish , date=9 March 2018 , access-date=27 March 2018 {{cite web, url=http://www.trainsofturkey.com/pmwiki.php/History/TCDD , title=TCDD History , website=trainsofturkey.com , access-date=27 March 2018


External links


TCDD TaşımacılıkEGO Genel Müdürlüğü
Railway stations in Ankara Province Railway stations in Turkey opened in 1972 Railway stations in Turkey closed in 2016