Çanta Wind Farm
Çanta Wind Farm is a 2014 wind power plant consisting of 19 wind turbines with a total installed capacity of 47.5  MW. The wind farm is in Çanta in the Silivri district of Istanbul Province, northwestern Turkey. The wind farm was initially projected by Bora Wind Energy Company in 2011. After Boydak Energy Company took over Bora Co., construction began in 2012. The farm went into production in May 2014 with six turbines, each with a capacity to generate 2.5  MW. By the end of June 2014, eight more turbines were in service, increasing the total installed capacity to 35 MW. Location The wind farm is located on a -high hill northwest of Çanta town, just east of the provincial border between TekirdaÄŸ and Istanbul. It is at a distance of to Çorlu, to Silivri and to Istanbul. Technical details Maximum power output of each of the 19 turbines supplied by Nordex in Germany is 2.5  MW, and the total annual energy production is about 151  GWh. The turbines of ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


Çanta, Silivri
Çanta (Turkish language, Turkish, 'bag') is a settlement in the municipality and district of Silivri, Istanbul Province, Istanbul Province, Turkey. It consists of two neighbourhoods: Çanta Balaban and Çanta Sancaktepe. Its population is 10,201 (2022). Çanta was an independent municipality until it was merged into the municipality of Silivri in 2008.Kanun No. 5747
Resmî Gazete, 22 March 2008. It is on the European side of the city. It is accessible from the state road State road D.100 (Turkey), D.100 that runs from Istanbul to Edirne.


Population


See also

* Çanta Wind Farm


References

{{DEFAULTSORT:Canta, Silivri Neighbourhoods of Silivri ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  



MORE