Wellington railway station
   HOME

TheInfoList



OR:

Wellington railway station, or Wellington Central station, is the main railway station serving
Wellington Wellington ( mi, Te Whanganui-a-Tara or ) is the capital city of New Zealand. It is located at the south-western tip of the North Island, between Cook Strait and the Remutaka Range. Wellington is the second-largest city in New Zealand by metr ...
,
New Zealand New Zealand ( mi, Aotearoa ) is an island country in the southwestern Pacific Ocean. It consists of two main landmasses—the North Island () and the South Island ()—and over 700 smaller islands. It is the sixth-largest island count ...
, and is the southern terminus of the
North Island Main Trunk The North Island Main Trunk (NIMT) is the main railway line in the North Island of New Zealand, connecting the capital city Wellington with the country's largest city, Auckland. The line is long, built to the New Zealand rail gauge of and se ...
,
Wairarapa Line The Wairarapa Line is a secondary railway line in the south-east of the North Island of New Zealand. The line runs for , connects the capital city Wellington with the Palmerston North - Gisborne Line at Woodville, via Lower Hutt, Upper Hutt ...
and Johnsonville Line. The station opened in June 1937, replacing the two previous Wellington termini, Lambton and Thorndon.


History


Development

The capital's first Wellington railway station was a group of small buildings at Pipitea Point built in 1874 on earthquake-raised harbour floor for a temporary terminus of the railway line to the Hutt Valley. A series of reclamations allowed the line to reach well down Featherston Street and in 1880 a new Wellington railway station was, as it turned out, temporarily placed near the goods station for the new Railway Wharf. Traffic at the wharf quickly grew beyond expectations. The 1880 building was pulled north on rollers in 1885 to a less congested site on Featherston Street opposite the junction of Mulgrave Street and Sydney Street now Kate Sheppard Place. The third site named Wellington railway station was only the passenger terminus for the Hutt and Wairarapa lines. After the Government took control of the Manawatu line in December 1908, the Wellington railway station was renamed Wellington Lambton station and the Manawatu station which became the terminus for the
North Island Main Trunk The North Island Main Trunk (NIMT) is the main railway line in the North Island of New Zealand, connecting the capital city Wellington with the country's largest city, Auckland. The line is long, built to the New Zealand rail gauge of and se ...
was named Wellington Thorndon station. The Thorndon station had been opened in September 1885 by the private
Wellington and Manawatu Railway Company The Wellington and Manawatu Railway Company (WMR or W&MR) was a private railway company that built, owned and operated the Wellington-Manawatu railway line between Thorndon in Wellington, the capital of New Zealand, and Longburn, near Palmers ...
. The Government bought the line from its shareholders in 1908 to incorporate the Manawatu line into their system. Once both stations were in government control, public pressure began to build for a single terminal. In 1908, a joint reclamation scheme was drawn up by the Railways Department and the
Wellington Harbour Board (Strong but true) , predecessor = , merged = , successor = , formation = , founder = , founding_location = , dissolved = , merger = , type ...
and in 1912 a new railway station was proposed, to supersede the Lambton and Thorndon stations. The government decided on a co-ordinated development that included a new station building, and after agreement in 1922 between the Railways Department and the Wellington Harbour Board, the reclamation of about 68 acres (27 hectares) incorporating a new double-track line, train marshalling areas, goods yards and sheds and using fill from the Tawa Flat Deviation. The Thorndon reclamation began in 1923 and was on track to be completed by 1932, which allowing the government in 1929 to confirm in 1929 that Bunny Street would be the location of a new station, so removing the inconvenience of two separate stations. In 1929, W. Gray Young, an architect known for his neo-Georgian styles, of Wellington architectural firm of Gray Young, Morton & Young, was selected (without a design competition) to design the new station, over the Auckland firm of Gummer & Ford, which had designed Auckland railway station. Gray Young, Morton and Young was formed in 1923 and consisted of William Gray Young, Hubert Morton and Gray Young's brother Jack. The firm had recently finished large commissions for Victoria University, designing the Stout Building (1930) and Weir House (1930), and later the Kirk Building (1938). The need to review building techniques after the Napier earthquake and the impact of the Depression on finances delayed the government formally committing to the project until June 1933.


Design

As the planned location was on
reclaimed Land reclamation, usually known as reclamation, and also known as land fill (not to be confused with a waste landfill), is the process of creating new land from oceans, seas, riverbeds or lake beds. The land reclaimed is known as reclamati ...
land, test piles were driven in 1928 to test the quality of soil. On the basis of the test results the decision was made to use Vibro cast-in-place piles to support the structure. The building was the first major New Zealand structure to incorporate a significant measure of earthquake resistance. Gray Young was paid a 4% fee based on the originally estimated cost of £470,000. This cost rose to £483,000 once the quantity surveying firm of Maltby & Sommerville compiled a detailed quantity schedule, for which they were paid 1% of the estimated cost. Because of the impact of the Depression on Government finances it was decided to reduce the cost by eliminating a mailroom and a section of the West wing along Featherston Street and by transferring the £28,000 cost of the platforms and verandahs to a separate budget. As a result, the official estimated cost of the station was reduced to £350,000. To encourage employment of workers out of work due to the Depression the project received a subsidy of £34,000 (10% of the estimated cost) from the Employment Board. The building is a U-shaped structure with the longest leg 105.5 metres 46 feetlong and 23.5 metres 7 feethigh. Because of delays in importing the specialized boring equipment needed to install the cast-in-place piles called for in the original design, the decision was made to use 1615 15 x 15 inch and 16 x 16 inch reinforced concrete piles. These were driven by a steam-powered hammer. On top of the piles a five- and six-storey steel-framed structure was built. The steel was encased in reinforced concrete and 1.75 million bricks. 21,000 cubic yards of aggregate from the Hutt River with cement from Whangarei were mixed on site to create the concrete. The bricks used for the outer cladding were of a special design, with slots to accommodate vertical corrosion–resistant steel rods that reinforced the brickwork and bound it to the structural members. 1500 tons of decorative Hanmer and Whāngarei granite and marble were used to clad the interior and the entranceway. 2500 gallons of paint were used. The roof was clad in Marseille tiles. The main entrance is on the south side via a colonnade of eight 13-metre- 2-foothigh Doric columns opening into a large booking hall decorated with delicately mottled dados extending to a high vaulted ceiling. The glazed-roof concourse contained waiting rooms and toilets, a large dining room, a barber shop, book and fruit stalls and a first aid room. There was a nursery on the top floor to allow parents to leave their children while they shopped or waited for their train. When completed the station was New Zealand's largest building, partly covering 0.6 hectares and with a combined floor area of two hectares. It was designed to accommodate the 675 staff of the Railways Department head office and the Wellington district office, which until then had been accommodated in 11 leased buildings throughout the city. The platforms, designed to accommodate up to 12 carriages, are made of concrete covered with a sealed surface under verandahs held up by railway irons. Platform 9 was designed to be a roadway without rails for the terminus for certain services provided by
New Zealand Railways Road Services The New Zealand Railways Road Services (NZRRS) was a branch of the New Zealand Railways Department and later the New Zealand Railways Corporation. It operated long-distance, tourist and suburban bus services and freight trucking and parcel serv ...
. A park was created in the forecourt with lawns and paths of paving stones with brick edging arranged in a herringbone pattern.


Construction

The construction tender closed on 25 September 1933, extended by two weeks in an attempt to encourage local manufacturers to offer locally manufactured materials. Twelve tenders were received, with Fletcher Building the lowest at £339,000. The next lowest was £350,000 from J T Julian & Son, who had constructed a significant part of the Auckland railway station. Fletchers was awarded what was believed to be the largest single-building contract let in New Zealand up to that time, to which a performance bond of £3000 was applied. Fletchers appointed 26-year-old Joe Craig to manage his first major project. His prior experience had been on the construction of Chateau Tongariro, Massey College and earthquake reconstruction in Hastings. His management skills, supported by a large team of experienced foremen and a close working relationship with the architect, ensured that construction progressed very smoothly on a project that was very profitable for Fletchers. Work commenced on site in January 1934 with a workforce of 12, which built up to 161 in January 1936. Fletchers reduced the cost of the construction steel to £70,000 from an estimated £85,000 by directly importing it rather than purchasing it from local steel merchants, and had it fabricated on site by Wm Cable Ltd. Progress was rapid, with 1500 of the piles driven by the time the foundation stone was laid on 17 December 1934 by the Duke of Gloucester, an occasion witnessed by an estimated 5000 people. The contract was expanded to include the construction of an electric substation (commenced 1936) at a cost of £2022 and a locomotive maintenance workshop (commenced 1936) along the Thorndon Quay side of the railway yard. This cost £37,406 and is still in use. In August 1938, to accommodate increasing staff numbers, work commenced on the construction of the section of the Featherston Street Wing removed from the original design to reduce its cost. This was undertaken as a separate project at a cost of £59,662. A two-storey brick building with a mansard roof containing a social hall and a garage was built in 1937 facing Waterloo Quay to the north of the East wing, at a cost of £15,000. The garage was on the ground floor with the social hall occupying part of the ground floor and the entire first storey. The garage also incorporated rooms for the chauffeur to the Railways Departments General Manager.


Wellington railway yard

The Wellington railway yard incorporates marshalling and storage tracks and buildings and a Multiple Unit Depot (MUD) for servicing EMUs. A rail line under the overhead stadium walkway goes to the container terminal and other freight facilities on the Port wharves, with a level crossing on Aotea Quay. The principal Wellington signal box known as the "A Box" is near the overhead stadium walkway with a commanding view of the station platforms and main lines entering the station. In 2021/2022 additional crossovers and connections to the station approaches will provide extra capacity and resilience ($4.5 million) and the signal interlocking may be replaced with a computer based system ($8 million). A second lead track is to be provided to the train storage yards to facilitate faster platform clearance (2020; $5.9 million). When a derailed goods wagon near the Interisland terminal damaged both tracks through the yard out of Wellington on 3 July 2019 commuter service to the Hutt Valley and Kapiti lines were seriously disrupted for two days. The closed Kaiwharawhara railway station is to be developed as an emergency Wellington terminal.


Wellington railway station

The station was opened on 19 June 1937 by the Governor-General of New Zealand, Viscount Galway. Lambton closed on 19 June 1937 and Thorndon on 8 June 1937. In 1982, the
New Zealand Railways Corporation New Zealand Railways Corporation (NZRC) is the state-owned enterprise that owns the land beneath KiwiRail's railway network on behalf of the Crown. The Corporation has existed under a number of guises since 1982, when the old New Zealand Railway ...
replaced the Railways Department. The application of a more commercial attitude to the running of the organization resulted in a large reduction in staff employed at the Wellington railway station. Due to the reduction of railway staff numbers in the 1980s, large parts of the building became underutilised. In 1988, the Railways-run bookstall and cafeteria were closed with subsequently the barber's shop and men's toilets being converted into 'Trax Bar and Cafe', while the women's waiting rooms were converted into toilet blocks. The original dining hall and kitchen were converted to office space. At about this time platforms 2 to 7 were shortened at the concourse end to provide increased space for waiting passengers. Large concrete planter boxes were installed at the end of the tracks to assist in stopping runaway trains. As part of the creation of the WestpacTrust Stadium (completed November 1999) on surplus railway land to the north of the station, an elevated walkway from Thorndon Quay to the stadium was installed with access via ramps from platforms 3/4, 5/6 and 7/8. To facilitate this work, the canopies of platforms 7/8 and 9 were shortened to the same length as platforms 3/4 and 5/6. In 1991, as a result of a major restructuring of the New Zealand Railways Corporation, ownership of the land and buildings was retained by the Railways Corporation while a new organisation known as New Zealand Rail Limited took over rail operations including freight distribution, commuter and long-distance passenger services and the Interisland ferry service. Both organisations retained offices in the building. In 1993, New Zealand Rail Limited was sold to a private business consortium, which became
Tranz Rail Tranz Rail, formally Tranz Rail Holdings Limited (New Zealand Rail Limited until 1995), was the main rail operator in New Zealand from 1991 until it was purchased by Toll Holdings in 2003. History The New Zealand railway network was initially ...
Holdings Limited in 1995. In 2000, Tranz Rail moved to its head office to Auckland but retained space for operational management of the railway network. In 2004, Tranz Rail was sold and renamed
Toll NZ Toll Domestic Forwarding (TDF) is a division of the Toll Group specialising in freight forwarding by road, rail and sea within and between Australia and New Zealand. Toll is Australia’s largest mover of freight. Toll New Zealand is New ...
Ltd, which then sold the track and infrastructure back to the Railways Corporation. Between August 2003 and October 2008, the building was refurbished at a cost of NZ$14.6 million to house part of Victoria University in the West wing and Toll NZ (now
KiwiRail KiwiRail Holdings Limited is a New Zealand state-owned enterprise responsible for rail operations in New Zealand, and operates inter-island ferries. Trading as KiwiRail and headquartered in Wellington, New Zealand, KiwiRail is the largest rail ...
) in the East wing. This work included a seismic upgrade, restoration and refurbishment, and installing three new lifts and dedicated access in the south-west corner to the university wing from the concourse. The architect was Athfield Architects with construction undertaken by
Fletcher Construction The Fletcher Construction Company Limited is a New Zealand construction company and a subsidiary of Fletcher Building. Together with Higgins Contractors Ltd it makes up the Construction division of Fletcher Building. Fletcher Construction is wid ...
. As part of this reorganization of the building, the 24-hour train control centre was relocated from the western wing to the eastern side of the southern part of the building. On 4 December 2006, the
New World The term ''New World'' is often used to mean the majority of Earth's Western Hemisphere, specifically the Americas."America." ''The Oxford Companion to the English Language'' (). McArthur, Tom, ed., 1992. New York: Oxford University Press, p. ...
Railway Metro supermarket opened on the ground floor. This coincided with the closure of the Railway Kiosk and the American Hotdog vendor. In 2010, the former social hall was converted into 660 square metres of boutique office space. The station was registered on 25 September 1986 as a Category I Historic Place. In August 2018, the proposed sale of the building by KiwiRail was stopped by
Winston Peters Winston Raymond Peters (born 11 April 1945) is a New Zealand politician serving as the leader of New Zealand First since its foundation in 1993. Peters served as the 13th deputy prime minister of New Zealand from 1996 to 1998 and 2017 to 2020, ...
the Minister of State-Owned Enterprises as "premature". The building requires earthquake strengthening (cost $62 million), and the anticipated sale price of $80 million had already been included in KiwiRail's budget. The Port Nicholson Block Settlement Trust decided not to purchase the building in 2016.


World War I Roll of Honour

In the office entrance to the station, a roll of honour lists 450 members of the New Zealand Railways Department who lost their lives in
World War I World War I (28 July 1914 11 November 1918), often abbreviated as WWI, was one of the deadliest global conflicts in history. Belligerents included much of Europe, the Russian Empire, the United States, and the Ottoman Empire, with fightin ...
.
Transcript of the names with links to their records on the Auckland War Memorial Museum's Cenotaph database
) As many as 5,000 of the department's permanent staff, out of a 1914 workforce of 14,000, enlisted during the war, and many casual workers also served. The roll was unveiled by Prime Minister
William Massey William Ferguson Massey (26 March 1856 – 10 May 1925), commonly known as Bill Massey, was a politician who served as the 19th prime minister of New Zealand from May 1912 to May 1925. He was the founding leader of the Reform Party, New Zea ...
in the Railways Department's head office in Featherston St on 30 April 1922. It originally listed 446 names, including two out of alphabetical order at the end, presumably late additions. Four names were added later, including those of three men who died after the war. When the station opened in 1937, the memorial was moved along the road to its present location.


Filming location

Wellington railway station featured prominently in the 1981 film ''
Goodbye Pork Pie ''Goodbye Pork Pie'' is a 1981 New Zealand comedy film directed by Geoff Murphy, co-produced by Murphy and Nigel Hutchinson, and written by Geoff Murphy and Ian Mune. The film was New Zealand's first large-scale local hit. One book described ...
'', in which the protagonists drive a Mini through the station concourse in order to escape pursuing police officers. The station was used in a 2009 TV advert in the
United Kingdom The United Kingdom of Great Britain and Northern Ireland, commonly known as the United Kingdom (UK) or Britain, is a country in Europe, off the north-western coast of the European mainland, continental mainland. It comprises England, Scotlan ...
for train ticketing company TheTrainLine, where a large flock of sheep use the facilities. In May 2014, the station foyer was used by celebrity chef
Nigella Lawson Nigella Lucy Lawson (born 6 January 1960) is an English food writer and television cook. She attended Godolphin and Latymer School, London. After graduating from the University of Oxford, where she was a member of Lady Margaret Hall, Lawson st ...
to film a commercial for Whittaker's a local chocolate manufacturing firm.


Airspace development

In 1972, NZR proposed developing the airspace above the station's platforms. The proposed development included four buildings built north of the current station over the platforms and part of the marshaling yards. The development would include a 200-bed hotel, tavern, car-parking, shopping facilities and a revolving restaurant. NZR made an application to Wellington City Council for consent to begin the project in 1977. The plan was revised in 1986 in a joint-venture between
Mainzeal Mainzeal Property and Construction Ltd was one of the leading New Zealand property and construction companies until being placed into receivership on 6 February 2013 and then being placed into liquidation on 28 February 2013. According to its web ...
and the Railways Corporation under the "Gateway Development." The development included seven tower blocks, a hotel, retail and recreational facilities.


Head Office and occupants

The Railways Head office had been combined in an ornate three-story brick building at 75 Featherston Street in 1903. The foundation stone was laid by the Duke of Cornwall (later King George V) on 21 June 1901. One of the first Wellington buildings reinforced against earthquakes, the style was Classical Baroque and Jacobean; ornamented in white Oamaru stone with carved cornicles and balustrades and roofed with Marsiette tiles. In 1937 it became the Defence Department headquarters but the decorative features, high roof and lighting turrets were removed, and it was demolished in 1982. The new station building was also designed to house the head office of the
New Zealand Railways Department The New Zealand Railways Department, NZR or NZGR (New Zealand Government Railways) and often known as the "Railways", was a government department charged with owning and maintaining New Zealand's railway infrastructure and operating the railway ...
. The building now houses the Wellington office of its successor, the
New Zealand Railways Corporation New Zealand Railways Corporation (NZRC) is the state-owned enterprise that owns the land beneath KiwiRail's railway network on behalf of the Crown. The Corporation has existed under a number of guises since 1982, when the old New Zealand Railway ...
in the east wing of the building. The
Victoria University of Wellington Victoria University of Wellington ( mi, Te Herenga Waka) is a university in Wellington, New Zealand. It was established in 1897 by Act of Parliament, and was a constituent college of the University of New Zealand. The university is well kno ...
occupies the west wing. The ground floor has always provided services for long-distance travellers and local passengers including a restaurant, cafes, a bar, a shoe repair shop, and a drycleaners. The
New World The term ''New World'' is often used to mean the majority of Earth's Western Hemisphere, specifically the Americas."America." ''The Oxford Companion to the English Language'' (). McArthur, Tom, ed., 1992. New York: Oxford University Press, p. ...
Railway Metro supermarket has occupied part of the ground floor since 2006.


Services

The station copes with large daily passenger numbers with very little alteration having proved necessary. In its first year, 7,600 passengers made 15,200 trips on 140 trains daily. In the 1960s it was estimated that over 42,000 people used the station each day. Today, 29,000 passengers make 44,000 trips on 390 trains, excluding long-distance services. Work from 2019 as part of the Wellington Metro upgrade improved the station approaches, and new foundations were built for 80 masts for the traction overhead as steel masts are to replace wooden masts.


Rail

Two companies operate train services from Wellington.
Transdev Transdev, formerly Veolia Transdev, is a French-based international private-sector company which operates public transport. It has operations in 17 countries and territories as of November 2020. History The group was formed by the merger of ...
operates the Wellington suburban rail network on behalf of the Greater Wellington Regional Council. This includes the electrified lines serving the Wellington and Kapiti urban areas, plus the
Wairarapa Connection The Wairarapa Connection is a New Zealand interurban commuter rail service along the Wairarapa Line between Masterton, the largest town in the Wairarapa, and Wellington. It is operated by Wellington suburban operator Transdev (with KiwiRai ...
service to Masterton via the Hutt Valley and the Remutaka Tunnel. At off-peak, 8–10 trains per hour leave Wellington, broken down they are: *2 tph Johnsonville Line services to Johnsonville *3 tph
Kapiti Line Metlink's Kapiti Line is the electrified southern portion of the North Island Main Trunk railway between New Zealand's capital city, Wellington, and Waikanae on the Kapiti Coast, operated by Transdev Wellington on behalf of Greater Wellington R ...
services to Waikanae (2tph on weekends) *3 tph Hutt Valley Line services to
Upper Hutt Upper Hutt ( mi, Te Awa Kairangi ki Uta) is a city in the Wellington Region of New Zealand and one of the four cities that constitute the Wellington metropolitan area. Geography The Upper Hutt city centre lies approximately 26 km north-e ...
(2tph on weekends) *1 tph Melling Line to Melling (weekdays only) *5
Wairarapa Connection The Wairarapa Connection is a New Zealand interurban commuter rail service along the Wairarapa Line between Masterton, the largest town in the Wairarapa, and Wellington. It is operated by Wellington suburban operator Transdev (with KiwiRai ...
services per day to Masterton (2 per day at weekends) The Great Journeys of New Zealand (KiwiRail) operates one long-distance service from Wellington up the North Island Main Trunk, the
Northern Explorer The ''Northern Explorer'' is a long-distance passenger train operated by The Great Journeys of New Zealand division of KiwiRail between Auckland and Wellington in the North Island of New Zealand, along the North Island Main Trunk (NIMT). Thre ...
to Auckland Strand. The service ran three times per week until December 2021, and is due to resume in September 2022. The Capital Connection service operates to
Palmerston North Palmerston North (; mi, Te Papa-i-Oea, known colloquially as Palmy) is a city in the North Island of New Zealand and the seat of the Manawatū-Whanganui region. Located in the eastern Manawatu Plains, the city is near the north bank of the ...
once daily on weekdays.


Bus

The bus terminal, formerly Lambton Interchange, is served by most Wellington bus routes and is connected to the station by a subway under Featherston St. It is served by the following bus routes: 1, 3, 7, 12, 12e, 14, 17, 22, 23, 24, 25, 26, 27, 29, 30x, 31x, 32x, 35, 36, 39, 52, 56, 57, 58, 60e, 83 and 84. A small roadway opposite Platform 9 is also served by train replacement buses,
Interislander Interislander is a road and rail ferry service across New Zealand's Cook Strait, between Wellington in the North Island and Picton in the South Island. It is owned and operated by state-owned rail operator KiwiRail. Three roll-on roll-off (R ...
shuttle buses, and
InterCity InterCity (commonly abbreviated ''IC'' on timetables and tickets) is the classification applied to certain long-distance passenger train services in Europe. Such trains (in contrast to regional, local, or commuter trains) generally call at m ...
and Newmans long-distance coaches.


See also

*
Rail transport in New Zealand Rail transport in New Zealand is an integral part of New Zealand's transport network, with a nationwide network of of track linking most major cities in the North and South Islands, connected by inter-island rail and road ferries. Rail trans ...
*
Public transport in the Wellington Region The Wellington Region has a well developed public transport system, the most used in New Zealand. It consists of electric and diesel buses, commuter trains, ferries and a funicular (the Wellington Cable Car). It also included trams until 1964 ...


References


Citations


Bibliography

* *


Further reading

*


External links


Train and bus timetables from Metlink

View Beek Interactive Guide
* * {{Northern Explorer train stops Buildings and structures in Wellington City NZHPT Category I listings in the Wellington Region Rail transport in Wellington Railway stations in New Zealand Railway stations opened in 1937 George Troup buildings 1930s architecture in New Zealand