Space Launch System
   HOME

TheInfoList



OR:

The Space Launch System (SLS) is an American super heavy-lift
expendable launch vehicle An expendable launch system (or expendable launch vehicle/ELV) is a launch vehicle that can be launched only once, after which its components are either destroyed during reentry or discarded in space. ELVs typically consist of several rocket st ...
developed by
NASA The National Aeronautics and Space Administration (NASA ) is an independent agencies of the United States government, independent agency of the US federal government responsible for the civil List of government space agencies, space program ...
. As of 2022, SLS has the highest payload capacity of any rocket in operational service, as well as the greatest liftoff thrust of any rocket in operation. As the primary launch vehicle of the Artemis moon landing program, SLS is designed to launch the crewed Orion spacecraft on a trans-lunar trajectory. The first uncrewed launch, Artemis 1, took place on 16 November 2022. Development of SLS began in 2011, as a replacement for the retired
Space Shuttle The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program ...
as well as the cancelled Ares I and Ares V launch vehicles. As a Shuttle-derived vehicle, the Space Launch System reuses hardware from the Space Shuttle program, including the
solid rocket boosters A solid rocket booster (SRB) is a large solid propellant motor used to provide thrust in spacecraft launches from initial launch through the first ascent. Many launch vehicles, including the Atlas V, SLS and space shuttle, have used SRBs to giv ...
and RS-25 first stage engines. An original flight date of late 2016 was delayed by nearly 6 years. The SLS program has attracted criticism for such delays, high cost, and non-competitive use of Space Shuttle components and contractors. All Space Launch System flights are launched from
LC-39B Launch Complex 39B (LC-39B) is the second of Launch Complex 39's three launch pads, located at NASA's Kennedy Space Center in Merritt Island, Florida. The pad, along with Launch Complex 39A, was first designed for the Saturn V launch vehicle, ...
at the
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 1968 ...
in Florida. The first three SLS flights use the ''Block 1'' configuration, comprising extended Space Shuttle boosters developed for Ares I and the ICPS upper stage. An improved ''Block 1B'' configuration, with the EUS upper stage, is planned to debut on the fourth flight; a further improved ''Block 2'' configuration featuring new solid rocket boosters is planned to debut on the ninth flight. After the first four flights, NASA plans to transfer production and launch operations of SLS to Deep Space Transport LLC, a joint venture between Boeing and Northrop Grumman.


Description

The SLS is a Space Shuttle-derived launch vehicle. The first stage of the rocket is powered by one central core stage and two outboard solid rocket boosters. All SLS Blocks share a common core stage design, while they differ in their upper stages and boosters.


Core stage

Together with the solid rocket boosters, the core stage is responsible for propelling the upper stage and payload out of the atmosphere to near orbital velocity. It contains the liquid hydrogen and liquid oxygen tanks for the ascent phase, the forward and aft solid rocket booster attach points, avionics, and the Main Propulsion System (MPS), an assembly of the four
RS-25 The Aerojet Rocketdyne RS-25, also known as the Space Shuttle Main Engine (SSME), is a liquid-fuel cryogenic rocket engine that was used on NASA's Space Shuttle and is currently used on the Space Launch System (SLS). Designed and manufactu ...
engines, associated plumbing and
hydraulic Hydraulics (from Greek: Υδραυλική) is a technology and applied science using engineering, chemistry, and other sciences involving the mechanical properties and use of liquids. At a very basic level, hydraulics is the liquid counte ...
gimbal actuators, and equipment for
autogenous pressurization Autogenous pressurization is the use of self-generated gaseous propellant to pressurize liquid propellant in rockets. Traditional liquid-propellant rockets have been most often pressurized with other gases, such as helium, which necessitates ca ...
of the vehicle's tanks. The core stage provides approximately 25% of the vehicle's thrust at liftoff. The stage measures long by in diameter and is both structurally and visually similar to the
Space Shuttle external tank The Space Shuttle external tank (ET) was the component of the Space Shuttle launch vehicle that contained the liquid hydrogen fuel and liquid oxygen oxidizer. During lift-off and ascent it supplied the fuel and oxidizer under pressure to the ...
. The first four flights will each use and expend four of the remaining sixteen RS-25D engines previously flown on Space Shuttle missions.
Aerojet Rocketdyne Aerojet Rocketdyne is an American manufacturer of rocket, hypersonic, and electric propulsive systems for space, defense, civil and commercial applications. Headquartered in Sacramento, California, the company is owned by Aerojet Rocketdyne Hold ...
refits these engines with modernized engine controllers, higher throttle limits, as well as insulation for the high temperatures the engine section will experience due to their position adjacent to the solid rocket boosters. Later flights will switch to a RS-25 variant optimized for expended use, the RS-25E, which will lower per-engine costs by over 30%. The thrust of each RS-25D engine has been increased from , as on the Space Shuttle, to on the sixteen modernized engines. The RS-25E will further increase per-engine thrust to .


Boosters

Blocks 1 and 1B of the SLS will use two five-segment solid rocket boosters. These solid rocket boosters use casing segments that were flown on Shuttle missions as parts of the four-segment
Space Shuttle Solid Rocket Booster The Space Shuttle Solid Rocket Booster (SRB) was the first solid-propellant rocket to be used for primary propulsion on a vehicle used for human spaceflight. A pair of these provided 85% of the Space Shuttle's thrust at liftoff and for the first ...
s. They possess an additional center segment, new avionics, and lighter insulation, but lack a parachute recovery system, as they will not be recovered after launch. The propellants for the solid rocket boosters are aluminum powder, which is very reactive, and ammonium perchlorate, a powerful oxidizer. They are held together by a binder,
polybutadiene acrylonitrile Polybutadiene acrylonitrile (PBAN) copolymer, also noted as polybutadiene— acrylic acid—acrylonitrile terpolymer is a copolymer compound used most frequently as a rocket propellant fuel mixed with ammonium perchlorate oxidizer. It ...
(PBAN). The mixture has the consistency of a rubber eraser and is packed into each segment. The five-segment solid rocket boosters provide approximately 25% more total impulse than the Shuttle Solid Rocket Boosters, but will not be recovered after use. The stock of SLS Block 1 to 1B boosters is limited by the number of casings left over from the Shuttle program, which allows for eight flights of the SLS. On 2 March 2019, the Booster Obsolescence and Life Extension program was announced. This program will develop new solid rocket boosters, to be built by Northrop Grumman Space Systems, for further SLS flights, marking the beginning of Block 2. These boosters will be derived from the composite-casing solid rocket boosters then in development for the canceled
OmegA Omega (; capital: Ω, lowercase: ω; Ancient Greek ὦ, later ὦ μέγα, Modern Greek ωμέγα) is the twenty-fourth and final letter in the Greek alphabet. In the Greek numeric system/ isopsephy ( gematria), it has a value of 800. The ...
launch vehicle, and are projected to increase Block 2's payload to to LEO and at least to trans-lunar injection. , the BOLE program is under development, with first firing expected in 2024.


Upper stages

The
Interim Cryogenic Propulsion Stage The Space Launch System (SLS) is an American super heavy-lift expendable launch vehicle developed by NASA. As of 2022, SLS has the highest payload capacity of any rocket in operational service, as well as the greatest liftoff thrust of any r ...
(ICPS) flew on Artemis 1, and is planned for Artemis 2 and 3 as the upper stage of SLS Block 1. It is a stretched and human-rated
Delta IV Delta IV is a group of five expendable launch systems in the Delta rocket family introduced in the early 2000s. Originally designed by Boeing's Defense, Space and Security division for the Evolved Expendable Launch Vehicle (EELV) program, t ...
Delta Cryogenic Second Stage The Delta Cryogenic Second Stage (DCSS) is a family of cryogenic rocket stages used on the Delta III and Delta IV rockets, and on the Space Launch System Block 1. The stage consists of a cylindrical liquid hydrogen (LH2) tank structurally sep ...
powered by a single RL10 engine. The first ICPS will use the RL10B-2 variant, while the second and third ICPS will use the RL10C-2 variant. Block 1 is intended to be capable of lifting to
low Earth orbit A low Earth orbit (LEO) is an orbit around Earth with a period of 128 minutes or less (making at least 11.25 orbits per day) and an eccentricity less than 0.25. Most of the artificial objects in outer space are in LEO, with an altitude never mor ...
(LEO) in this configuration, including the weight of the ICPS as part of the payload. At the time of SLS core stage separation, Artemis 1 will be travelling on an initial suborbital trajectory. This trajectory will ensure safe disposal of the core stage. ICPS will then perform orbital insertion and a subsequent translunar injection burn to send Orion towards the Moon. The ICPS will be human-rated for the crewed Artemis 2 and 3 flights. The Exploration Upper Stage (EUS) is planned to fly on
Artemis 4 Artemis 4 (officially Artemis IV) is the fourth planned mission of NASA's Artemis program. The mission will launch four astronauts on a Space Launch System rocket and an Orion to the Lunar Gateway and the second lunar landing of the Artemis pr ...
. The EUS will complete the SLS ascent phase and then re-ignite to send its payload to destinations beyond LEO. It is expected to be used by Block 1B and Block 2. The EUS shares the core stage diameter of 8.4 meters, and will be powered by four RL10C-3 engines. It will eventually be upgraded to use four improved RL10C-X engines. ,
Boeing The Boeing Company () is an American multinational corporation that designs, manufactures, and sells airplanes, rotorcraft, rockets, satellites, telecommunications equipment, and missiles worldwide. The company also provides leasing and p ...
is developing a new composite-based fuel tank for the EUS that would increase Block 1B's overall payload mass capacity to TLI by 30 percent. The improved upper stage was originally named the Dual Use Upper Stage (DUUS, pronounced "duce") but was later renamed the Exploration Upper Stage (EUS).


Block variants

File:Block 1 70t Crew Expanded View.jpg, Block 1 configuration File:Sls block 1b poster-expanded.jpg, Block 1B configuration File:Block 2 130t Cargo Expanded View.jpg, Block 2 configuration


Development


Funding

During the joint Senate-NASA presentation in September 2011, it was stated that the SLS program had a projected development cost of US$18 billion through 2017, with $10 billion for the SLS rocket, $6 billion for the Orion spacecraft, and $2 billion for upgrades to the launch pad and other facilities at
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 1968 ...
. These costs and schedules were considered optimistic in an independent 2011 cost assessment report by
Booz Allen Hamilton Booz Allen Hamilton Holding Corporation (informally Booz Allen) is the parent of Booz Allen Hamilton Inc., an American management and information technology consulting firm, headquartered in McLean, Virginia, in Greater Washington, D.C., with 8 ...
for NASA. An internal 2011 NASA document estimated the cost of the program through 2025 to total at least $41 billion for four launches (1 uncrewed, 3 crewed), with the version ready no earlier than 2030. The Human Exploration Framework Team estimated unit costs for 'Block 0' at $1.6 billion and Block 1 at $1.86 billion in 2010. However, since these estimates were made the Block 0 SLS vehicle was dropped in late 2011, and the design was not completed. In September 2012, an SLS deputy project manager stated that $500 million is a reasonable target average cost per flight for the SLS program. In 2013, the Space Review estimated the cost per launch at $5 billion, depending on the rate of launches. NASA announced in 2013 that the European Space Agency will build the Orion service module. In August 2014, as the SLS program passed its Key Decision Point C review and was deemed ready to enter full development, costs from February 2014 until its planned launch in September 2018 were estimated at $7.021 billion. Ground systems modifications and construction would require an additional $1.8 billion over the same time. In October 2018, NASA's Inspector General reported that the
Boeing The Boeing Company () is an American multinational corporation that designs, manufactures, and sells airplanes, rotorcraft, rockets, satellites, telecommunications equipment, and missiles worldwide. The company also provides leasing and p ...
core stage contract had made up 40% of the $11.9 billion spent on the SLS as of August 2018. By 2021, development of the core stage was expected to have cost $8.9 billion, twice the initially planned amount. In December 2018, NASA estimated that yearly budgets for the SLS will range from $2.1 to $2.3 billion between 2019 and 2023. In March 2019, the Trump administration released its fiscal year 2020 budget request for NASA, which notably proposed dropped funding for Block 1B and Block 2 variants of SLS. Congressional action ultimately included the funding in the passed budget. Several launches previously planned for the SLS Block 1B are expected to fly on commercial launcher vehicles such as
Falcon Heavy Falcon Heavy is a partially reusable heavy-lift launch vehicle that is produced by SpaceX, an American aerospace manufacturer. The rocket consists of two strap-on boosters made from Falcon 9 first stages, a center core also made from a Falc ...
, New Glenn, and
Vulcan Vulcan may refer to: Mythology * Vulcan (mythology), the god of fire, volcanoes, metalworking, and the forge in Roman mythology Arts, entertainment and media Film and television * Vulcan (''Star Trek''), name of a fictional race and their home p ...
. Quote: "Supports launch of the Power and Propulsion Element on a commercial launch vehicle as the first component of the LOP–Gateway, (page 14) However, the request for a budget increase of $1.6 billion towards SLS, Orion, and crewed landers along with the launch manifest seem to indicate support of the development of Block 1B, debuting Artemis 4. An uncrewed Block 1B is planned to launch the Lunar Surface Asset in 2028, the first lunar outpost of the Artemis program.


Budget

For fiscal years 2011 through 2022, the SLS program had expended funding totaling $23.809 billion in nominal dollars. This is equivalent to $27.491 billion in 2022 dollars using the NASA New Start Inflation Indices.''
NASA FY22 Inflation Tables - to be utilized in FY23
(Excel). NASA. Retrieved 31 October 2022''. This article incorporates text from this source, which is in the
public domain The public domain (PD) consists of all the creative work to which no exclusive intellectual property rights apply. Those rights may have expired, been forfeited, expressly waived, or may be inapplicable. Because those rights have expired, ...
''.''
On top of this, the costs to assemble, integrate, prepare and launch the SLS and its payloads are funded separately under
Exploration Ground Systems NASA's Exploration Ground Systems (EGS) Program is one of three programs based at NASA's Kennedy Space Center in Florida. EGS was established to develop and operate the systems and facilities necessary to process and launch rockets and spacecraft d ...
, currently at about $600 million per year, and anticipated to stay there through at least the first four launches of SLS. Payloads that launch on SLS, such as the Orion crew capsule, are similarly accounted separately from SLS. Predecessor programs contributed development to SLS, such as the Ares V Cargo Launch Vehicle, funded from 2008 to 2010 a total of $70 million, and the Ares I Crew Launch Vehicle, funded from 2006 to 2010 a total of $4.8 billion in development, including the 5-segment Solid Rocket Boosters that will be used on the SLS. Included in the above SLS cost table is the Interim Cryogenic Propulsion Stage (ICPS), a $412 million contract. Also included in the above SLS cost table are the costs of developing the Exploration Upper Stage:


Launch costs

Estimates of the per launch costs for the SLS have varied widely, partly due to uncertainty over how much the program will expend during development and testing before the operational launches begin, and partly due to various agencies using differing cost measures; but also based on differing purposes for which the cost estimates were developed. For example, a marginal cost per one additional launch ignores the development and annual recurring fixed costs, whereas a
total cost In economics, total cost (TC) is the minimum dollar cost of producing some quantity of output. This is the total economic cost of production and is made up of variable cost, which varies according to the quantity of a good produced and includes ...
per launch includes recurring costs but excludes development. There are no official NASA estimates for how much the SLS will cost per launch, nor for the SLS program annual recurring costs once operational. Cost per launch is not a straightforward figure to estimate as it depends heavily on how many launches occur per year. For example, similarly, the
Space Shuttle The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program ...
was estimated, in 2012 dollars, to cost $576 million per launch had it been able to achieve 7 launches per year, while the marginal cost of adding a single additional launch in a given year was estimated to be less than half of that, at just $252 million of marginal cost. However, at the rate that it flew, the final cost was $1.64 billion per Space Shuttle launch, including development. NASA associate administrator William H. Gerstenmaier said in 2017 that there would be no official per flight cost estimates of any variety provided by NASA for the SLS. Other bodies, such as the Government Accountability Office (GAO), the
NASA Office of Inspector General The NASA Office of Inspector General (NASA OIG or OIG) is the inspector general office in the National Aeronautics and Space Administration, the space agency of the United States. The OIG's stated mission is to "prevent and detect crime, fraud, wa ...
, the
Senate Appropriations Committee The United States Senate Committee on Appropriations is a standing committee of the United States Senate. It has jurisdiction over all discretionary spending legislation in the Senate. The Senate Appropriations Committee is the largest committ ...
, and the White House Office of Management and Budget have put out cost per launch figures, however. Several internal NASA programs and project concept study reports have released proposed budgets that include future SLS launches. For example, a concept study report for a space telescope stated it was advised by NASA HQ in 2019 to budget $500 million for an SLS launch in 2035. Another study in 2019 also proposing a space telescope assumed a budget for their launch of $650 million in current-day dollars, or $925 million for when the launch would occur, also in the "mid-2030s". Section 9-11 9.4.1 Basis of estimate, page 281
Europa Clipper Europa Clipper (previously known as Europa Multiple Flyby Mission) is an interplanetary mission in development by NASA comprising an orbiter. Planned for launch in October 2024, the spacecraft is being developed to study the Galilean moon Eur ...
is a NASA scientific mission that was initially required by Congress to launch on SLS. Oversight bodies both internal and external to NASA disagreed with this requirement. First, NASA's Inspector General office published a report in May 2019 that stated Europa Clipper would need to give up $876 million for the "marginal cost" of its SLS launch. An addendum to the letter published in August 2019 increased the estimate and stated that switching to a commercial rocket would save over $1 billion. Ultimately, Europa Clipper was rebooked to launch on a
Falcon Heavy Falcon Heavy is a partially reusable heavy-lift launch vehicle that is produced by SpaceX, an American aerospace manufacturer. The rocket consists of two strap-on boosters made from Falcon 9 first stages, a center core also made from a Falc ...
for a contract price of $178 million — saving $2 billion in launch costs compared to SLS. The move was done not only for cost reasons but also due to unacceptably high vibration loads on SLS, and concerns over the availability of spare SLS vehicles from the Artemis program. A JCL (Joint Cost and Schedule Confidence Level) analysis cited in that letter put the cost savings at $700 million, with the SLS at $1.05 billion per launch and the commercial alternative at $350 million. Finally, a letter from the White House Office of Management and Budget (OMB) to the Senate Appropriations Committee in October 2019 revealed that SLS's total cost to the taxpayer was estimated at "over $2 billion" per launch after development is complete; said development has cost $23 billion in 2021 dollars. The letter suggested Congress remove this requirement, agreeing the NASA Inspector General, adding that using a commercial launch vehicle for Europa Clipper instead of the SLS would save $1.5 billion overall. NASA did not deny this $2 billion cost of launch and an agency spokesperson stated it "is working to bring down the cost of a single SLS launch in a given year as the agency continues negotiations with Boeing on the long-term production contract and efforts to finalize contracts and costs for other elements of the rocket". This OMB figure is dependent on the rate of construction, so building more SLS rockets faster could decrease the per-unit cost. For example,
Exploration Ground Systems NASA's Exploration Ground Systems (EGS) Program is one of three programs based at NASA's Kennedy Space Center in Florida. EGS was established to develop and operate the systems and facilities necessary to process and launch rockets and spacecraft d ...
– whose only role is to support, assemble, integrate, and launch SLS – has separately budgeted fixed costs of $600 million per year on facilities, spread across however many rockets launch that year. Then, in December 2019, NASA Administrator Jim Bridenstine shared informally that he disagrees with the $2 billion figure since the marginal cost of an SLS launch should decrease after the first few, and is expected to end up around $800 million to $900 million, although contract negotiations were only just beginning for those later cores. In November 2021 a new
NASA Office of Inspector General The NASA Office of Inspector General (NASA OIG or OIG) is the inspector general office in the National Aeronautics and Space Administration, the space agency of the United States. The OIG's stated mission is to "prevent and detect crime, fraud, wa ...
audit was released, which estimated that, at least for the first four launches of SLS, the per-launch production and operating costs would be $2.2 billion for SLS, plus $568 million for
Exploration Ground Systems NASA's Exploration Ground Systems (EGS) Program is one of three programs based at NASA's Kennedy Space Center in Florida. EGS was established to develop and operate the systems and facilities necessary to process and launch rockets and spacecraft d ...
. Additionally, since the first four missions are under the Artemis program, the payload would cost $1 billion for Orion and $300 million for the
ESA , owners = , headquarters = Paris, Île-de-France, France , coordinates = , spaceport = Guiana Space Centre , seal = File:ESA emblem seal.png , seal_size = 130px , image = Views in the Main Control Room (120 ...
service module.


Early plans

The SLS was created by an act of Congress in the "
NASA Authorization Act of 2010 The NASA Authorization Act of 2010 is a U.S. law authorizing NASA appropriations for fiscal years 2011, 2012, 2013 with the same top-line budget values as requested by US President Barack Obama. It resulted from the Augustine Commission's review o ...
", Public Law 111–267, in which NASA was directed to create a system for launching payloads and crew into space that would replace the capabilities lost with the retirement of the
Space Shuttle The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program ...
. The act set out certain goals, such as being able to lift 130 tons or more of payload into low earth orbit, a target date of December 31, 2016 for the system to be fully operational, and a directive to use "to the extent practicable" existing components, hardware, and workforce from the Space Shuttle and from Ares I. On 14 September 2011, NASA announced their plan to meet these requirements: the design for the SLS, with the Orion spacecraft as payload. The SLS has considered several future development routes of potential launch configurations, with the planned evolution of the blocks of the rocket having been modified many times. Many options, all of which just needed to meet the congressionally mandated payload minimums, were considered, including a Block 0 variant with three main engines, a variant with five main engines, a Block 1A variant with upgraded boosters instead of the improved second stage, and a Block 2 with five main engines plus the Earth Departure Stage, with up to three J-2X engines. In the initial announcement of the design of the SLS, NASA also announced an "Advanced Booster Competition", to select which boosters would be used on Block 2 of the SLS. Several companies proposed boosters for this competition, all of which were indicated as viable: Aerojet and Teledyne Brown proposed three booster engines each with dual combustion chambers, Alliant Techsystems proposed a modified solid rocket booster with lighter casing, more energetic propellant, and four segments instead of five, and Pratt & Whitney Rocketdyne and
Dynetics Dynetics is an American applied science and information technology company headquartered in Huntsville, Alabama. Its primary customers are the United States Department of Defense (DoD), the United States Intelligence Community, and National Ae ...
proposed a liquid-fueled booster named
Pyrios Pyrios is an advanced Liquid rocket booster concept proposed in 2012 by Dynetics for use on NASA's Space Launch System heavy-lift launch vehicle. Pyrios was intended to use the RP-1/ LOX F-1B, a modernized version of the F-1A engine built by Aero ...
. However, this competition was planned for a development plan in which Block 1A would be followed by Block 2A, with upgraded boosters. NASA canceled Block 1A and the planned competition in April 2014, in favor of simply remaining with the Ares I's five-segment solid rocket boosters, themselves modified from the
Space Shuttle The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program ...
's solid rocket boosters, until at least the late 2020s. The overly powerful advanced booster would have resulted in unsuitably high acceleration, and would need modifications to
LC-39B Launch Complex 39B (LC-39B) is the second of Launch Complex 39's three launch pads, located at NASA's Kennedy Space Center in Merritt Island, Florida. The pad, along with Launch Complex 39A, was first designed for the Saturn V launch vehicle, ...
, its flame trench, and Mobile Launcher. On 31 July 2013, the SLS passed Preliminary Design Review. The review included not only the rocket and boosters but also ground support and logistical arrangements. On 7 August 2014, the SLS Block 1 passed a milestone known as Key Decision Point C and entered full-scale development, with an estimated launch date of November 2018.


EUS options

In 2013, NASA and Boeing analyzed the performance of several EUS engine options. The analysis was based on a second-stage usable propellant load of 105 metric tons, and compared stages with four RL10 engines, two MARC-60 engines, or one J-2X engine. In 2014, NASA also considered using the European Vinci instead of the RL10, which offered the same specific impulse but with 64% greater thrust, which would allow for the same performance at a lower cost. In 2018, Blue Origin submitted a proposal to replace the Exploration Upper Stage with a cheaper alternative to be designed and fabricated by the company, but it was rejected by NASA in November 2019 on multiple grounds; these included lower performance compared to the existing EUS design, incompatibility of the proposal with the height of the door of the Vehicle Assembly Building being only , and unacceptable acceleration of Orion components such as its solar panels.


SRB tests

From 2009 to 2011, three full-duration static fire tests of five-segment solid rocket boosters were conducted under the Constellation Program, including tests at low and high core temperatures, to validate performance at extreme temperatures. The 5-segment solid rocket booster would be carried over to SLS. Northrop Grumman Innovation Systems has completed full-duration static fire tests of the five-segment solid rocket boosters. Qualification Motor 1 was tested on 10 March 2015. Qualification Motor 2 was successfully tested on 28 June 2016.


Operation


Construction

, three SLS versions are planned: Block 1, Block 1B, and Block 2. Each will use the same Core stage with its four main engines, but Block 1B will feature the Exploration Upper Stage (EUS), and Block 2 will combine the EUS with upgraded boosters. The ICPS for Artemis 1 was delivered by ULA to NASA about July 2017 and was housed at Kennedy Space Centre as of November 2018.


Construction of core stage

In mid-November 2014, construction of the first Core Stage hardware began using a new welding system in the South Vertical Assembly Building at NASA's Michoud Assembly Facility. Between 2015 and 2017, NASA test fired RS-25 engines in preparation for use on SLS. The core stage for the first SLS, built at Michoud Assembly Facility by
Boeing The Boeing Company () is an American multinational corporation that designs, manufactures, and sells airplanes, rotorcraft, rockets, satellites, telecommunications equipment, and missiles worldwide. The company also provides leasing and p ...
, had all four engines attached in November 2019, and it was declared finished by NASA in December 2019. The first core stage left Michoud Assembly Facility for comprehensive testing at Stennis Space Center in January 2020. The static firing test program at Stennis Space Center, known as the Green Run, operated all the core stage systems simultaneously for the first time. Test 7 (of 8), the wet dress rehearsal, was carried out in December 2020 and the fire (test 8) took place on 16 January 2021, but shut down earlier than expected, about 67 seconds in total rather than the desired eight minutes. The reason for the early shutdown was later reported to be because of conservative test commit criteria on the thrust vector control system, specific only for ground testing and not for flight. If this scenario occurred during a flight, the rocket would have continued to fly normally. There was no sign of damage to the core stage or the engines, contrary to initial concerns. The second fire test was completed on 18 March 2021, with all 4 engines igniting, throttling down as expected to simulate in-flight conditions, and gimballing profiles. The core stage was shipped to
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 1968 ...
to be mated with the rest of the rocket for Artemis 1. It left Stennis on April 24 and arrived at Kennedy on April 27. It was refurbished there in preparation for stacking. On 12 June 2021, NASA announced the assembly of the first SLS rocket was completed at the Kennedy Space Center. The assembled SLS was used for the uncrewed Artemis 1 mission in 2022. While the first SLS for Artemis 1 is currently flying to the moon on a test flight in fall 2022, NASA and Boeing are constructing the next three, for Artemis 2,
Artemis 3 Artemis 3 (officially Artemis III) is planned as the first crewed Moon landing mission of the Artemis program and the first crewed flight of the Starship HLS lander. Scheduled for launch in 2025, Artemis 3 is planned to be the second crewed Art ...
, and
Artemis 4 Artemis 4 (officially Artemis IV) is the fourth planned mission of NASA's Artemis program. The mission will launch four astronauts on a Space Launch System rocket and an Orion to the Lunar Gateway and the second lunar landing of the Artemis pr ...
. Boeing stated in July 2021 that while the
COVID-19 pandemic The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identi ...
had affected their suppliers and schedules, such as delaying parts needed for hydraulics, they would still be able to provide the Artemis 2 SLS Core stage per NASA's schedule, with months to spare. The spray-on foam insulation process for Artemis 2 has been automated for most sections of the core stage, saving 12 days in the schedule. The Artemis 2 forward skirt, which is the foremost component of the core stage, was affixed on the liquid oxygen tank in late May 2021. , the complete core stage is set to ship to NASA in March 2023. For Artemis 3, assembly of elements of the thrust structure began at Michoud Assembly Facility in early 2021. The liquid hydrogen tank that is to be used on Artemis 3 was originally planned to be the Artemis 1 tank, but it was set aside as the welds were found to be faulty. Repair techniques were developed, and the tank has reentered production and will be proof tested for strength, for use on Artemis 3.


Construction of EUS for Block 1B

As of July 2021, Boeing is also preparing to begin construction of the Exploration Upper Stage (EUS), which is planned to debut on
Artemis 4 Artemis 4 (officially Artemis IV) is the fourth planned mission of NASA's Artemis program. The mission will launch four astronauts on a Space Launch System rocket and an Orion to the Lunar Gateway and the second lunar landing of the Artemis pr ...
.


Launches

Originally planned for late 2016, the uncrewed first flight of SLS has slipped more than twenty-six times and almost six years. As of earlier that month, the first launch was originally scheduled for 8:30 am EDT, 29 August 2022. It was postponed to 2:17 pm EDT (18:17 UTC), 3 September 2022, after the launch director called a scrub due to a temperature sensor falsely indicating that an RS-25 engine's hydrogen bleed intake was too warm. The 3 September attempt was then scrubbed due to a hydrogen leak in the tail service mast quick disconnect arm, which was fixed; the next launch option was at first a period in late October and then a launch in mid-November, due to unfavorable weather during Hurricane Ian. It launched on November 16. NASA originally limited the amount of time the solid rocket boosters can remain stacked to "about a year" from the time two segments are joined. The first and second segments of the Artemis 1 boosters were joined on 7 January 2021. NASA could choose to extend the time limit based on an engineering review. On 29 September 2021, Northrop Grumman indicated that the limit could be extended to eighteen months for Artemis 1, based on an analysis of the data collected when the boosters were being stacked; an analysis weeks before the actual launch date later extended that to December 2022 for the boosters of Artemis 1, almost two years after stacking. In late 2015, the SLS program was stated to have a 70% confidence level for the first Orion flight that carries crew, the second SLS flight overall, to happen by 2023; , NASA delayed Artemis 2 from 2023 to May 2024.


Usage beyond Artemis

Although the SLS is only confirmed for use on the first few
Artemis In ancient Greek mythology and religion, Artemis (; grc-gre, Ἄρτεμις) is the goddess of the hunt, the wilderness, wild animals, nature, vegetation, childbirth, care of children, and chastity. She was heavily identified wit ...
missions, many NASA mission concept studies for robotic missions planned to launch on the SLS, such as: Neptune Odyssey, Europa Lander, Enceladus Orbilander, Persephone, HabEx,
Origins Space Telescope Origins Space Telescope (Origins) is a concept study for a far-infrared survey space telescope mission. LUVOIR, Lynx, and
Interstellar probe An interstellar probe is a space probe that has left—or is expected to leave—the Solar System and enter interstellar space, which is typically defined as the region beyond the heliopause. It also refers to probes capable of reaching other s ...
. These concept studies were prepared for possible recommendation by the National Academy's
Decadal survey A decadal survey is a 10-year plan outlining scientific missions and goals created by the United States National Academies. It is a summary of input from scientists in the United States and beyond. Examples include: * Astronomy and Astrophysics ...
s. The Astronomy and Astrophysics Decadal Survey in 2021 recommended a smaller, merged version of HabEx and LUVOIR preceded by a technology maturation program to reduce cost and schedule risk, although the eventual mission may or may not use SLS. In 2022 the
Planetary Science Decadal Survey The Planetary Science Decadal Survey is a publication of the United States National Research Council produced for NASA and other United States Government Agencies such as the National Science Foundation.National Academy of Sciences, National Acade ...
recommended Enceladus Orbilander as the third highest priority for flagship planetary missions in the 2020s. The Heliophysics Decadal Survey, due to be completed in 2024, is considering the Interstellar Probe mission concept.


Criticism

The SLS has been criticized based on program cost, lack of commercial involvement, and the non-competitive nature of a vehicle legislated to use Space Shuttle components.


Funding

In 2011, Rep.
Tom McClintock Thomas Miller McClintock II (; born July 10, 1956) is an American politician serving as the U.S. representative for since 2009. His district stretches from the Sacramento suburbs to the outer suburbs of Fresno; it includes Yosemite National ...
and other groups called on the Government Accountability Office to investigate possible violations of the Competition in Contracting Act, arguing that Congressional mandates forcing NASA to use Space Shuttle components for the SLS are
de facto ''De facto'' ( ; , "in fact") describes practices that exist in reality, whether or not they are officially recognized by laws or other formal norms. It is commonly used to refer to what happens in practice, in contrast with ''de jure'' ("by la ...
non-competitive, single-source requirements assuring contracts to existing Shuttle suppliers. The Competitive Space Task Force, in September 2011, said that the new government launcher directly violates NASA's charter, the Space Act, and the 1998 Commercial Space Act requirements for NASA to pursue the "fullest possible engagement of commercial providers" and to "seek and encourage, to the maximum extent possible, the fullest commercial use of space". Opponents of the heavy launch vehicle have critically used the name "Senate launch system", a name that was still being used by opponents to criticize the program in 2021, as "the NASA Inspector General said the total cost of the rocket would reach $27 billion through 2025". Lori Garver, a former NASA Deputy Administrator, called for canceling the launch vehicle alongside the
Mars 2020 Mars 2020 is a Mars rover mission forming part of NASA's Mars Exploration Program that includes the rover '' Perseverance'', the small robotic, coaxial helicopter '' Ingenuity'', and associated delivery vehicles. Mars 2020 was launched from ...
rover. Phil Plait shared his criticism of the SLS in light of ongoing budget tradeoffs between the
Commercial Crew Development Development of the Commercial Crew Program began in the second round of the Commercial Crew Development (CCDev) program, which was rescoped from a technology development program for human spaceflight to a competitive development program that woul ...
and SLS budgets, also referring to earlier critiques by Garver. In 2019, the Government Accountability Office found that NASA had awarded Boeing over $200 million for service with ratings of 'good' to 'excellent' despite cost overruns and delays. , the maiden launch of the SLS was expected in 2021. NASA continued to expect that the first orbital launch would be in 2021 as late as May 2021. NASA moved out $889 million of costs relating to SLS boosters, but did not update the SLS budget to match, a March 2020 Inspector General report found. This kept the budget overrun to 15% by FY 2019. At 30%, NASA would have to notify Congress and stop funding unless Congress reapproves and provides additional funding. The Inspector General report found that were it not for this "masking" of cost, the overrun would have been 33% by FY 2019. The GAO separately stated "NASA's current approach for reporting cost growth misrepresents the cost performance of the program". On 1 May 2020, NASA awarded a contract extension to
Aerojet Rocketdyne Aerojet Rocketdyne is an American manufacturer of rocket, hypersonic, and electric propulsive systems for space, defense, civil and commercial applications. Headquartered in Sacramento, California, the company is owned by Aerojet Rocketdyne Hold ...
to manufacture 18 additional RS-25 engines with associated services for $1.79 billion, bringing the total RS-25 contract value to almost $3.5 billion. Eric Berger from '' Ars Technica'' noted that the average cost of each engine under the contract would be $146 million, with each SLS launch consuming $580 million in its four RS-25 engines alone. Berger further commented that for the cost of a ''single'' RS-25 engine, ''six'' RD-180 engines (each more powerful than the RS-25) could be purchased, or nearly an entire
Falcon Heavy Falcon Heavy is a partially reusable heavy-lift launch vehicle that is produced by SpaceX, an American aerospace manufacturer. The rocket consists of two strap-on boosters made from Falcon 9 first stages, a center core also made from a Falc ...
launch with two-thirds of the SLS lift capacity. Former NASA Administrator Charlie Bolden, who oversaw the initial design and development of the SLS, also criticized the program in an interview with
Politico ''Politico'' (stylized in all caps), known originally as ''The Politico'', is an American, German-owned political journalism newspaper company based in Arlington County, Virginia, that covers politics and policy in the United States and intern ...
in September 2020. Bolden said that the "SLS will go away ... because at some point commercial entities are going to catch up." Bolden further stated, "They are really going to build a heavy-lift launch vehicle sort of like SLS that they will be able to fly for a much cheaper price than NASA can do SLS. That's just the way it works."


Proposed alternatives

In 2009, the Augustine commission proposed a commercial launcher with lower operating costs and noted that a launcher was the minimum required to support lunar exploration. In 2011–2012, the
Space Access Society The Space Access Society (SAS) is an organization dedicated to increasing the viability and reducing the cost of commercial access to space travel. It was founded by Henry Vanderbilt, who was the president from the organizations' founding in 1992 ...
,
Space Frontier Foundation The Space Frontier Foundation is an American space advocacy nonprofit corporation organized to promote the interests of increased involvement of the private sector, in collaboration with government, in the exploration and development of space. I ...
, and
The Planetary Society The Planetary Society is an American internationally-active non-governmental nonprofit organization. It is involved in research, public outreach, and political space advocacy for engineering projects related to astronomy, planetary science, a ...
called for the cancellation of the project, arguing that the SLS will consume the funds for other projects from the NASA budget. U.S. Representative
Dana Rohrabacher Dana Tyrone Rohrabacher (; born June 21, 1947) is a former American politician who served in the U.S. House of Representatives from 1989 to 2019. A Republican, he represented for the last three terms of his House tenure. Rohrabacher ran for r ...
and others proposed that an orbital
propellant depot An orbital propellant depot is a cache of propellant that is placed in orbit around Earth or another body to allow spacecraft or the transfer stage of the spacecraft to be fueled in space. It is one of the types of space resource depots that ...
should be developed and the
Commercial Crew Development Development of the Commercial Crew Program began in the second round of the Commercial Crew Development (CCDev) program, which was rescoped from a technology development program for human spaceflight to a competitive development program that woul ...
program accelerated instead. A NASA study that was not publicly released and another from the Georgia Institute of Technology showed this option to be possibly cheaper. In 2012, the United Launch Alliance also suggested using existing rockets with on-orbit assembly and propellant depots as needed. The lack of competition in the SLS design was highlighted. In the summer of 2019, a former ULA employee claimed that Boeing, NASA's prime contractor for SLS, viewed orbital refueling technology as a threat to the SLS and blocked further investment in it. In 2011,
Robert Zubrin Robert Zubrin (; born April 9, 1952) is an American aerospace engineer, author, and advocate for human exploration of Mars. He and his colleague at Martin Marietta, David Baker, were the driving force behind Mars Direct, a proposal in a 1990 res ...
, founder of Mars Society and Mars Direct, suggested that a heavy lift vehicle could be developed for $5 billion on fixed-price requests for proposal. In 2010, SpaceX's CEO
Elon Musk Elon Reeve Musk ( ; born June 28, 1971) is a business magnate and investor. He is the founder, CEO and chief engineer of SpaceX; angel investor, CEO and product architect of Tesla, Inc.; owner and CEO of Twitter, Inc.; founder of The ...
claimed that his company could build a launch vehicle in the payload range for $2.5 billion, or $300 million (in 2010 dollars) per launch, not including a potential upper-stage upgrade.


See also

* Austere Human Missions to Mars *
Comparison of orbital launchers families This article compares different orbital launcher families (although many launchers that are significantly different from other members of the same 'family' have their own separate entries). The article is organized into two tables: the first tabl ...
*
Comparison of orbital launch systems This comparison of orbital launch systems lists the attributes of all individual rocket configurations designed to reach orbit. A first list contains rockets that are operational or in development as of 2022; a second list includes all retired roc ...
* DIRECT, proposals prior to SLS * Shuttle-Derived Heavy Lift Launch Vehicle, a 2009 concept launch vehicle * Ares V, a 2000s cargo vehicle design for the Constellation Program *
National Launch System The National Launch System (or New Launch System) was a study authorized in 1991 by President George H. W. Bush to outline alternatives to the Space Shuttle for access to Earth orbit. Shortly thereafter, NASA asked Lockheed Missiles and Space, M ...
, 1990s * Magnum (rocket), a 1990s concept *
Saturn (rocket family) The Saturn family of American rockets was developed by a team of mostly German rocket engineers and scientists led by Wernher von Braun to launch heavy payloads to Earth orbit and beyond. The Saturn family used liquid hydrogen as fuel in the ...
, 1960s * Studied Space Shuttle Variations and Derivatives


Notes


References


External links


Space Launch System and Multi-Purpose Crew Vehicle page on NASA.gov

"Preliminary Report on Multi-Purpose Crew Vehicle and Space Launch System" (PDF), NASA


* ttp://www.beyondearth.com/ Video animations of mission to asteroid, the Moon, and Mars, beyondearth.com
"NASA Continues Journey to Mars Planning", spacepolicyonline.com
{{Authority control NASA space launch vehicles Proposed space launch vehicles NASA programs Artemis program Shuttle-derived space launch vehicles Articles containing video clips Lunar Gateway Rocketry