Line 8, Shenzhen Metro
   HOME

TheInfoList



OR:

Line 8 of the Shenzhen Metro (also known as the Yantian line) is an East-West line from Liantang to . It opened on 28 October 2020. Line 8 has a length of and a total of 7 stations. Line 8 is the first line to serve Yantian District. Line 8 merges into Line 2 at Liantang station, with trains on Line 8 continuing service to Chiwan station.


Timeline


Service routes

* —


Stations


Phase 2 & Phase 3

* Phase 2 and Phase 3 both under construction. Phase 2 from Yantian Road to Xiaomeisha, opening in 2023. Phase 3 from Xiaomeisha to Xichong, opening in 2025.


Rolling Stock


Notes


References

{{Shenzhen Metro, line8=yes Shenzhen Metro lines Transport infrastructure under construction in China