Inverness and Aviemore Direct Railway
   HOME

TheInfoList



OR:

The Inverness and Aviemore Direct Railway was a section of railway built by the
Highland Railway The Highland Railway (HR) was one of the smaller British railways before the Railways Act 1921, operating north of Perth railway station in Scotland and serving the farthest north of Britain. Based in Inverness, the company was formed by merger ...
to provide a shorter and more direct route between Inverness and
Aviemore Aviemore (; gd, An Aghaidh Mhòr ) is a town and tourist resort, situated within the Cairngorms National Park in the Highlands of Scotland. It is in the Badenoch and Strathspey committee area, within the Highland council area. The town is po ...
, carrying its main line traffic to
Perth Perth is the capital and largest city of the Australian state of Western Australia. It is the fourth most populous city in Australia and Oceania, with a population of 2.1 million (80% of the state) living in Greater Perth in 2020. Perth i ...
and the south. The line was constructed as a tactical measure to fend off incursions into the area by rival companies. It opened in 1898. The earlier route from
Forres Forres (; gd, Farrais) is a town and former royal burgh in the north of Scotland on the Moray coast, approximately northeast of Inverness and west of Elgin. Forres has been a winner of the Scotland in Bloom award on several occasions. There a ...
via Dava was retained, and for many years the Highland Railway and its successors operated both routes in parallel, but in 1965 the Dava route was closed. The Inverness and Aviemore Line continues in operation at the present day, forming part of the
Highland Main Line The Highland Main Line is a railway line in Scotland. It is long and runs through the Scottish Highlands linking a series of small towns and villages with Perth at one end and Inverness at the other. Today, services between Inverness and Edi ...
between Inverness and Perth.


To the South from Inverness

Interests in Inverness had long wanted a railway connection to Central Scotland and the south. The
Inverness and Aberdeen Junction Railway The Inverness and Aberdeen Junction Railway (I&AJR) was a railway company in Scotland, created to connect other railways and complete the route between Inverness and Aberdeen. The Inverness and Nairn Railway had opened to the public on 7 Novemb ...
provided a route to
Keith Keith may refer to: People and fictional characters * Keith (given name), includes a list of people and fictional characters * Keith (surname) * Keith (singer), American singer James Keefer (born 1949) * Baron Keith, a line of Scottish barons ...
where the
Great North of Scotland Railway The Great North of Scotland Railway (GNSR) was one of the two smallest of the five major Scottish railway companies prior to the 1923 Grouping, operating in the north-east of the country. Formed in 1845, it carried its first passengers the fro ...
connected to
Aberdeen Aberdeen (; sco, Aiberdeen ; gd, Obar Dheathain ; la, Aberdonia) is a city in North East Scotland, and is the third most populous city in the country. Aberdeen is one of Scotland's 32 local government council areas (as Aberdeen City), and ...
. This route became available in 1858. The co-operation of the Great North of Scotland Railway was less than perfect; and this, coupled with the circuitous route, and connectional difficulties at Aberdeen, made the arrangement very unsatisfactory to people in Inverness. John Thomas and David Turnock, ''A Regional History of the Railways of Great Britain: Volume 15, North of Scotland'', David and Charles, Newton Abbot, 1989, ISBN 0 946537 03 8, page 166 The Inverness people proposed a more direct route to the south, and this was authorised as the
Inverness and Perth Junction Railway The Inverness and Perth Junction Railway (I&PJR) was a railway company that built a line providing a more direct route between Inverness and the south for passengers and goods. Up to the time of its opening, the only route was a circuitous way th ...
. It was routed southwards from Forres so as to provide a convenient connection for all the communities on the Inverness and Aberdeen Junction Railway: a route direct to Inverness would make the I&AJR a branch line, it was felt. Neil T Sinclair, ''The Highland Main Line'', Atlantic Publishers, Penryn, 1998, ISBN 0 906899 96 6, pages 22 and 23 The I&PJR ran over wild and remote terrain as far as
Aviemore Aviemore (; gd, An Aghaidh Mhòr ) is a town and tourist resort, situated within the Cairngorms National Park in the Highlands of Scotland. It is in the Badenoch and Strathspey committee area, within the Highland council area. The town is po ...
, and then on to
Dunkeld Dunkeld (, sco, Dunkell, from gd, Dùn Chailleann, "fort of the Caledonians") is a town in Perth and Kinross, Scotland. The location of a historic cathedral, it lies on the north bank of the River Tay, opposite Birnam. Dunkeld lies close to t ...
. From there trains used the
Perth and Dunkeld Railway The Perth and Dunkeld Railway was a Scottish railway company. It was built from a junction with the Scottish Midland Junction Railway at Stanley, north of Perth, to a terminus at Birnam, on the south bank of the River Tay opposite Dunkeld. It ...
to Stanley Junction, and from there the
Scottish North Eastern Railway The Scottish North Eastern Railway was a railway company in Scotland operating a main line from Perth to Aberdeen, with branches to Kirriemuir, Brechin and Montrose. It was created when the Aberdeen Railway amalgamated with the Scottish Midland ...
to Perth. This was a considerable improvement over the Aberdeen route, although operation of the line over the mountainous route was difficult. The traffic from east of Forres proved to be lighter than anticipated, and at the same time traffic from Inverness and from the
Inverness and Ross-shire Railway The Inverness and Ross-shire Railway was a Scottish railway company formed in 1860 to build a line from Inverness to Invergordon. It opened in 1862 as far as Dingwall and in 1863 to Invergordon. It was extended to a Bonar Bridge station in 186 ...
became increasingly dominant. The deviation to Forres before turning south was now a serious liability. In addition it was clear that the Great North of Scotland Railway was planning its own independent line between Elgin and Inverness; at the same time the
West Highland Railway The West Highland Railway was a railway company that constructed a railway line from Craigendoran (on the River Clyde west of Glasgow, Scotland) to Fort William and Mallaig. The line was built through remote and difficult terrain in two stages ...
was known to be considering a line along the
Great Glen The Great Glen ( gd, An Gleann Mòr ), also known as Glen Albyn (from the Gaelic "Glen of Scotland" ) or Glen More (from the Gaelic ), is a glen in Scotland running for from Inverness on the edge of Moray Firth, in an approximately straight ...
connecting from Fort William to Inverness. The Highland Railway was alarmed at both of these competitive encroachments into what it considered to be its own territory. It anticipated that Parliament would look favourably on them, if it could be shown that the Highland Railway was not taking adequate steps to improve its own line and its service to passengers and goods customers.Sinclair, page 44


A more direct route

The solution was a new line of 34 miles running directly south from Inverness, rejoining the existing Perth line at Aviemore. This became the Inverness and Aviemore Direct Railway, informally known as the Carr Bridge line, or later the Carrbridge line. Its authorising Act of Parliament was passed on 28 July 1884. Vallance et al, page 175 David Ross, ''The Highland Railway'', Tempus Publishing Limited, Stroud, 2005, ISBN 0 7524 3479 9, page 104 The commercial impact of the new line was hardly positive for the Highland Railway. Acworth set out the issue in 1890:
No amount of genius can extract much sustenance for railways… from the barren hills of Perthshire or Inverness. The Highland must always mainly depend for a dividend upon its through traffic. And its through traffic it is forced to carry over a single line route so tortuous that, though the total distance from Wick to Perth, as the crow flies, is only 125 miles, the railway is 305 miles in length. A year or two back, in order to keep out the Great North, it took powers for the construction of a new direct line from Aviemore to Inverness, cutting off the great elbow round by Forres and Nairn and so saving no less than 24 miles of distance. Having got its powers, it did nothing towards making the line. But when the Great North announced their intention to apply for powers to Inverness, the Highland dared not wait longer.
It could never face a Parliamentary Committee and maintain that the existing facilities to Inverness were sufficient, when it had taken no steps to supply the additional accommodation whose necessity it had itself asserted only a few years before…
The construction of the new road will mean to he Highland Railway in the first place, a capital expenditure of some hundreds of thousands of pounds; secondly the cost of working some thirty additional miles; thirdly no additional traffic whatever; and lastly, the reduction of the passenger fares by as many pence as the new road will he shorter in miles than the old.W M Acworth, ''The Railways of Scotland: Their Present Position, with a Glance at their Past and a Forecast of Their Future'', John Murray, London, 1890, pages 74 and 75


Construction delayed

Having received the authorisation, the Highland Railway did nothing to hasten actual construction, no doubt believing that the danger of encroachment had been staved off. In any event, for the Highland Railway this was the most important development of the decade. The cut-off was miles of new line between Aviemore and Inverness. For six years from obtaining the necessary Act on 28 July 1884, the company managed to stave off any real action, although by 1886 agreements about land acquisition were made with proprietors. Altogether four extensions of time to complete the line were granted: two before and two during construction.Ross, pages 103 and 104


Opening

The Carr Bridge line was opened in stages: the first, from Aviemore to Carr Bridge, opened on 8 July 1892 as a branch line operated by a tank engine, and carrying very little traffic. The line from Carr Bridge to Daviot opened on 19 July 1897. The route was completed for through running by the opening between Daviot and Millburn Junction, Inverness, on 1 November 1898.There is ambiguity about the dates; Aviemore to Carr Bridge is given as 8 July 1892 by Vallance (page 42 and page 177), Ross (page 104) and Sinclair (page 47). But Thomas and Turnock give 6 July 1892. Carr Bridge to Daviot is given as 8 July 1892 by Vallance (page 42 and page 177). The date for Carr Bridge to Daviot, 19 July 1897, is supported by Sinclair (page 47) and Quick (page 156, quoting a report in the Inverness Courier on 20 July); Thomas and Turnock (page 317) and Vallance (page 42 and page 177) give 8 July, possibly confusing the date with the Aviemore to Carr Bridge opening; Ross (page 105) gives 16 July; and in a footnote on page 239 Ross adds "Sir Francis Marindin inspected the section for the Board of Trade on 15 and 16 July. Vallance's date of 8 July seems incorrect." But the formality at the time was that the Inspecting Officer would report back to the Board of Trade, who would then issue the permission to open, so that opening on the same day as the actual inspection seems highly unlikely.Thomas and Turnock, page 317Sinclair, page 47Ross, page 105Vallance, pages 42 and 177Quick, page 156 In October 1897 it was decided to install double track on the as-yet unopened section between Inverness and Daviot. The decision involved widening some completed single-track bridges. Sinclair records:
The construction work was the greatest upheaval in the history of East Daltullich here Sinclair lived as a child Not only was an embankment built a hundred yards from the farm, the local Smithy demolished, the public road diverted, and a new approach made to the farm under the railway, but new entrances had to be made to several of the fields. By 1897 the contract appeared finished, but then the HR decided to extend the double line from Culloden Moor to Daviot, and the bridge over the road to the farm had to be rebuilt from its single track formation before a train had run over it. The opening of the line to Inverness was delayed for a further year until the completion of the route’s major work, the Culloden Viaduct over the Nairn, whose construction had bankrupted its first contractor.Sinclair, page 8
This section, from Inverness Millburn Junction to Daviot, and with it the entire route, opened on 1 November 1898.Thomas and Turnock, page 317Ross, page 105Vallance et al, page 175 The new line incorporated the Highland Railway’s second-highest summit: Slochd at 1,315 feet. The Strathnairn Viaduct near Culloden Moor is Scotland’s longest masonry viaduct at 600 yards in length; there are 29 arches.Ross, pages 133 and 134Vallance et al, page 197 Major enlargement of the track facilities was also carried out at Millburn Junction in Inverness. The total cost of the line was almost a million pounds.Sinclair, page 46


Train services

The principal passenger trains were diverted to the Carr Bridge line, and the older route became a secondary main line.Vallance et al, page 42 Ross gives a detailed description of the train services with two main lines to Inverness:
From the opening of the direct line from Aviemore… the traffic planners had to cater for two main lines into Inverness from the south. In the summer of 1909, seven scheduled trains ran each day between Perth and Inverness. The night train from Perth left at 12.50 a.m., with sleeping car from Glasgow, and travelled via Carrbridge, arriving at 5.10 a.m. A connecting train left Aviemore for Forres at 4.00 a.m., arriving also at 5.10 a.m. Nairn passengers went on to Inverness and changed trains there. At 5 a.m. another train left Perth, conveying sleeping cars from London and through carriages from southern railways, running via Carrbridge and arriving at Inverness at 8.35 a.m. This ran only from 1 July to 11 August. Fifteen minutes later the 'normal' night train from London left Perth, and arrived in Inverness at 9.08 a.m. This train was also noted as conveying Sleeping Carriages Euston to Strathpeffer…
A Forres connection left Aviemore at 8.25 a.m., arriving at 9.35 a.m. The Mail left Perth at 6.15 a.m. and reached Aviemore at 8.33 a.m. Here it divided, the direct Inverness portion arriving at 10.10 a.m.,and the Grantown portion arriving in Inverness at 11.15 a.m. A Saturdays-only train left Perth at 9.25 a.m., reaching Inverness at 1.50 p.m.; its Forres connection left Aviemore at 12.45, arriving 1.56 p.m. A train for Inverness via Forres still left Perth at 11.50 a.m., running non-stop to Newtonmore, which it reached at 1.44 p.m.; Forres was reached at 3.25, and Inverness at 4.15. Only ten minutes later, the old Parliamentary left Perth, stopping at all stations (five on request only) and reaching Inverness via Carrbridge at 4:36 p.m…Ross, pages 184 and 185


Later developments

As part of the
Highland Railway The Highland Railway (HR) was one of the smaller British railways before the Railways Act 1921, operating north of Perth railway station in Scotland and serving the farthest north of Britain. Based in Inverness, the company was formed by merger ...
, the line became part of the London, Midland and Scottish Railway in 1923 upon the Grouping of the railways under the Railways Act 1921.David Wragg, ''LMS Handbook: The London Midland & Scottish Railway, 1923 - 1947'', Haynes Publishing, Yeovil, 2010, ISBN 978 1 84425 828 4, page 14 The line became part of British Railways Scottish Region on railway nationalisation in 1948. In the 1960s many local stations nationwide were closed, and here on 3 May 1965 Culloden Moor, Daviot, Moy and Tomatin stations closed. Carrbridge was the sole intermediate station continuing in passenger use.Vallance et al, pages 189 to 192


Locations

* Inverness, Millburn Junction; * Culloden Moor; opened 1 November 1898; closed 3 May 1965; * Daviot; opened 19 July 1897; closed 3 May 1965; * Moy; opened 19 July 1897; closed 3 May 1965; * Tomatin; opened 19 July 1897; closed 3 May 1965; * ''Slochd summit''; 1,315 feet; * Carrbridge; opened 8 July 1892; still open. At first usually spelt Carr Bridge; altered to one word 16 May 1983, although the one-word spelling had been used internally since 1899; * Aviemore; opened 3 August 1863, on original Inverness and Perth Junction Railway; still open.M E Quick, ''Railway Passenger Stations in England, Wales and Scotland: A Chronology'', version 5.03, September 2021, Railway and Canal Historical Society, electronic download, alphabetically arranged


Current operations

The line is open as part of the
Highland Main Line The Highland Main Line is a railway line in Scotland. It is long and runs through the Scottish Highlands linking a series of small towns and villages with Perth at one end and Inverness at the other. Today, services between Inverness and Edi ...
, and passenger trains are operated by ScotRail.


Notes


References

{{Historical Scottish railway companies Highland Railway Railway lines opened in 1898 Standard gauge railways in Scotland 1898 establishments in Scotland