, image = , image_caption = The main dam after first filling , image_alt = , location_map_caption = , coordinates = , country =
Ethiopia Ethiopia, , om, Itiyoophiyaa, so, Itoobiya, ti, ኢትዮጵያ, Ítiyop'iya, aa, Itiyoppiya officially the Federal Democratic Republic of Ethiopia, is a landlocked country in the Horn of Africa. It shares borders with Eritrea to the ...
, location = Guba,
Benishangul-Gumuz Region Benishangul-Gumuz ( am, ቤንሻንጉል ጉሙዝ, Benšangul Gumuz) is a regional state in northwestern Ethiopia to the border of Sudan. It was previously known as Region 6. The region's capital is Assosa. Following the adoption of the 1 ...
, purpose = Power , status = UC , construction_began = 2 April 2011 , opening = 21 July 2020 , cost = US$5 billion , owner =
Ethiopian Electric Power Ethiopian Electric Power () is an Ethiopian electrical power industry and state-owned electric producer. It is engaged in development, investment, construction, operation, and management of power plants, power generation and power transmissi ...
, dam_type = Gravity, roller-compacted concrete , dam_crosses =
Blue Nile River The Blue Nile (; ) is a river originating at Lake Tana in Ethiopia. It travels for approximately through Ethiopia and Sudan. Along with the White Nile, it is one of the two major tributaries of the Nile and supplies about 85.6% of the water ...
, dam_height_foundation = , dam_height_thalweg = , dam_length = , dam_elevation_crest = , dam_width_crest = , dam_width_base = , dam_volume = , spillway_count = 1 gated, 2 ungated , spillway_type = 6 sector gates for the gated spillway , spillway_capacity = for the gated spillway , res_name = Millennium Reservoir , res_capacity_total = , res_capacity_active = , res_capacity_inactive = , res_catchment = , res_surface = , res_max_length = , res_max_width = , res_max_depth = , res_elevation = , res_tidal_range = , plant_operator =
Ethiopian Electric Power Ethiopian Electric Power () is an Ethiopian electrical power industry and state-owned electric producer. It is engaged in development, investment, construction, operation, and management of power plants, power generation and power transmissi ...
, plant_commission = 2022–? , plant_decommission = , plant_type = C , plant_hydraulic_head = , plant_turbines = , plant_capacity = , plant_capacity_factor = , plant_annual_gen = 15,76  GWh (est., planned) , website = , extra = , location_map = Ethiopia , location_map_size = , dam_height = The Grand Ethiopian Renaissance Dam (GERD or TaIHiGe; am, ታላቁ የኢትዮጵያ ሕዳሴ ግድብ, translit=Tālāqu ye-Ītyōppyā Hidāsē Gidib , ti, ግድብ ሕዳሰ ኢትዮጵያ, ), formerly known as the Millennium Dam and sometimes referred to as Hidase Dam ( am, ሕዳሴ ግድብ, translit=Hidāsē Gidib, ), is a gravity dam on the
Blue Nile River The Blue Nile (; ) is a river originating at Lake Tana in Ethiopia. It travels for approximately through Ethiopia and Sudan. Along with the White Nile, it is one of the two major tributaries of the Nile and supplies about 85.6% of the water ...
in Ethiopia under construction since 2011. The dam is in the
Benishangul-Gumuz Region Benishangul-Gumuz ( am, ቤንሻንጉል ጉሙዝ, Benšangul Gumuz) is a regional state in northwestern Ethiopia to the border of Sudan. It was previously known as Region 6. The region's capital is Assosa. Following the adoption of the 1 ...
of Ethiopia, about east of the border with Sudan. The primary purpose of the dam is electricity production to relieve Ethiopia's acute energy shortage and for electricity export to neighbouring countries. With a planned installed capacity of 5.15
gigawatts The watt (symbol: W) is the unit of power or radiant flux in the International System of Units (SI), equal to 1 joule per second or 1 kg⋅m2⋅s−3. It is used to quantify the rate of energy transfer. The watt is named after James Wat ...
, the dam will be the largest
hydroelectric power plant Hydroelectricity, or hydroelectric power, is electricity generated from hydropower (water power). Hydropower supplies one sixth of the world's electricity, almost 4500 TWh in 2020, which is more than all other renewable sources combined an ...
in Africa when completed, as well as among the 20 largest in the world. First phase of filling the reservoir began in July 2020 and in August 2020 water level increased to 540 meters (40 meters higher than the bottom of the river which is at 500 meters above sea level). The second phase of filling was completed on 19 July 2021, water level increased to around 575 meters. The third filling was completed on 12 August 2022 to a level of , higher than the prior year completed second fill. Actual water level (November 2022) is at around 605 meters and was measuerd at Sentinel images. It will take between 4 and 7 years to fill with water, depending on hydrologic conditions during the filling period. On 20 February 2022, the dam produced electricity for the first time, delivering it to the grid at a rate of 375 MW. A second 375 MW turbine was commissioned in August 2022.


Background

The name that the
Blue Nile The Blue Nile (; ) is a river originating at Lake Tana in Ethiopia. It travels for approximately through Ethiopia and Sudan. Along with the White Nile, it is one of the two major tributaries of the Nile and supplies about 85.6% of the water to ...
river takes in Ethiopia ("Abay") is derived from the Ge'ez word for 'great' to imply its being 'the river of rivers'. The word Abay still exists in Ethiopian major languages to refer to anything or anyone considered to be superior. The eventual site for the Grand Ethiopian Renaissance Dam was identified by the
United States Bureau of Reclamation The Bureau of Reclamation, and formerly the United States Reclamation Service, is a federal agency under the U.S. Department of the Interior, which oversees water resource management, specifically as it applies to the oversight and opera ...
in the course of the Blue Nile survey, which was conducted between 1956 and 1964 during the reign of Emperor
Haile Selassie Haile Selassie I ( gez, ቀዳማዊ ኀይለ ሥላሴ, Qädamawi Häylä Səllasé, ; born Tafari Makonnen; 23 July 189227 August 1975) was Emperor of Ethiopia from 1930 to 1974. He rose to power as Regent Plenipotentiary of Ethiopia (' ...
. Due to the coup d'état of 1974 and following 17-year-long
Ethiopian Civil War The Ethiopian Civil War was a civil war in Ethiopia and present-day Eritrea, fought between the Ethiopian military junta known as the Derg and Ethiopian-Eritrean anti-government rebels from 12 September 1974 to 28 May 1991. The Derg overthrew ...
, however, the project failed to progress. The Ethiopian Government surveyed the site in October 2009 and August 2010. In November 2010, a design for the dam was submitted by James Kelston. On 31 March 2011, a day after the project was made public, a US$4.8 billion contract was awarded without competitive bidding to Italian company
Salini Impregilo Webuild SpA (formerly Salini Impregilo SpA) () is an Italian industrial group specialised in the construction and civil engineering business headquartered in Milan. The company was formally founded in 2014 as the result of the merger by incorporat ...
, and the dam's foundation stone was laid on 2 April 2011 by the Prime Minister
Meles Zenawi Meles Zenawi Asres (Tigrinya and ; , born Legesse Zenawi Asres; 9 May 1955 – 20 August 2012) was an Ethiopian soldier and politician who served as President of Ethiopia from 1991 to 1995 and then Prime Minister of Ethiopia from 1995 until his ...
. A rock-crushing plant was constructed, along with a small air strip for fast transportation. The expectation was for the first two power-generation turbines to become operational after 44 months of construction, or early 2015. Egypt, located over downstream of the site, opposes the dam, which it believes will reduce the amount of water available from the Nile. Zenawi argued, based on an unnamed study, that the dam would not reduce water availability downstream and would also regulate water for irrigation. In May 2011, it was announced that Ethiopia would share blueprints for the dam with Egypt so that the downstream impact could be examined. The dam was originally called "Project X", and after its contract was announced it was called the Millennium Dam. On 15 April 2011, the Council of Ministers renamed it Grand Ethiopian Renaissance Dam. Ethiopia has a potential for about 45 GW of hydropower. The dam is being funded by
government bond A government bond or sovereign bond is a form of bond issued by a government to support public spending. It generally includes a commitment to pay periodic interest, called coupon payments'','' and to repay the face value on the maturity dat ...
s and private donations. It was slated for completion in July 2017. The potential impacts of the dam have been the source of severe regional controversy. The Government of Egypt, a country which depends on the Nile for about 97% of its irrigation and drinking water, has demanded that Ethiopia cease construction on the dam as a precondition to negotiations, has sought regional support for its position, and some political leaders have discussed methods to sabotage it. Egypt has planned a diplomatic initiative to undermine support for the dam in the region as well as in other countries supporting the project such as China and Italy. However, other nations in the
Nile Basin Initiative The Nile Basin Initiative (NBI) is a partnership among the Nile riparian states that “seeks to develop the river in a cooperative manner, share substantial socioeconomic benefits, and promote regional peace and security”. The NBI began with a di ...
have expressed support for the dam, including Sudan, the only other nation downstream of the Blue Nile, although Sudan's position towards the dam has varied over time. In 2014, Sudan accused Egypt of inflaming the situation. Ethiopia denies that the dam will have a negative impact on downstream water flows and contends that the dam will, in fact, increase water flows to Egypt by reducing evaporation on Lake Nasser. Ethiopia has accused Egypt of being unreasonable; In October 2019, Egypt stated that talks with Sudan and Ethiopia over the operation of a $4 billion hydropower dam that Ethiopia is building on the Nile have reached a deadlock. Beginning in November 2019, U.S. Secretary of the Treasury Steven T. Mnuchin began facilitating negotiations between the three countries.


Cost and financing

The Grand Ethiopian Renaissance Dam (GERD) is estimated to cost close to 5 billion US dollars, about 7% of the 2016 Ethiopian gross national product. The lack of international financing for projects on the Blue Nile River has persistently been attributed to Egypt's campaign to keep control on the Nile water share. Ethiopia has been forced to finance the GERD with crowd funding through internal fund raising in the form of selling bonds and persuading employees to contribute a portion of their incomes. Contributions are made in the newly official website confirmed by the verified account of the Office of the
Prime Minister of Ethiopia The Prime Minister of Ethiopia is the head of government and Chief Executive of Ethiopia. Ethiopia is a parliamentary republic with a Prime Minister as head of the government and the Commander-in-Chief of the Ethiopian Armed Forces. The Pri ...
Of the total cost, 1 billion US dollars for turbines and electrical equipment were funded by the
Exim Bank of China The Export–Import Bank of China (Chexim - China Exim Bank) () is one of two institutional banks in China chartered to implement the state policies in industry, foreign trade, economy, and foreign aid to other developing countries, and provi ...
.


Design

The design changed several times between 2011 and 2019. This affected both the electrical parameters and the storage parameters. Originally, in 2011, the hydropower plant was to receive 15 generating units with 350 MW
nameplate capacity Nameplate capacity, also known as the rated capacity, nominal capacity, installed capacity, or maximum effect, is the intended full-load sustained output of a facility such as a power station,
each, resulting in a total installed capacity of 5,250 MW with an expected power generation of 15,128 GWh per year. Its planned generation capacity was later increased to 6,000 MW, through 16 generating units with 375 MW nominal capacity each. The expected power generation was estimated at 15,692 GWh per year. In 2017, the design was again changed to add another 450 MW for a total of 6,450 MW, with a planned power generation of 16,153 GWh per year. That was achieved by upgrading 14 of the 16 generating units from 375 MW to 400 MW without changing the nominal capacity. According to a senior Ethiopian official, on 17 October 2019, the power generation capacity of the GERD is now 5,150 MW, with 13 turbines (2x 375 MW and 11x 400 MW) down from 16 turbines. Not only the electrical power parameters changed over time, but also the storage parameters. Originally, in 2011, the dam was planned to be tall with a volume of 10.1 million m³. The reservoir was planned to have a volume of and a surface area of at full supply level. The rock-filled
saddle dam A dam is a barrier that stops or restricts the flow of surface water or underground streams. Reservoirs created by dams not only suppress floods but also provide water for activities such as irrigation, human consumption, industrial use, ...
beside the main dam was planned to have a height of meters, a length of and a volume of 15 million m³. In 2013, an Independent Panel of Experts (IPoE) assessed the dam and its technological parameters. At that time, the reservoir sizes were changed already. The size of the reservoir at full supply level went up to , an increase of . The storage volume at full supply level had increased to , an increase of . These numbers did not change after 2013. The storage volume of is representing nearly entire annual flow of Nile. After the IPoE made its recommendations, in 2013, the dam parameters were changed to account for higher flow volumes in case of extreme floods: a main dam height of , an increase of , with a length of (no change) and a dam volume of , an increase of . The outlet parameters did not change, only the crest of the main dam was raised. The rock saddle dam went up to a height of , an increase of , with a length of , an increase of . The volume of the rock saddle dam increased to , an increase of . The design parameters as of August 2017 are as follows, given the changes as outlined above:


Two dams

The zero level of the main dam, the ground level, will be at a height of about above sea level, corresponding roughly to the level of the river bed of the Blue Nile. Counting from the ground level, the main gravity dam will be tall, long and composed of roller-compacted concrete. The crest of the dam will be at a height of above sea level. The outlets of the two powerhouses are below the ground level, the total height of the dam will, therefore, be slightly higher than that of the given height of the dam. In some publications, the main contractor constructing the dam puts forward a number of for the dam height, which might account for the additional depth of the dam below ground level, which would mean of excavations from the basement before filling the reservoir. The structural volume of the dam will be . The main dam will be from the border with Sudan. Supporting the main dam and reservoir will be a curved and long and high rock-fill
saddle dam A dam is a barrier that stops or restricts the flow of surface water or underground streams. Reservoirs created by dams not only suppress floods but also provide water for activities such as irrigation, human consumption, industrial use, ...
. The ground level of the saddle dam is at an elevation of about above sea level. The surface of the saddle dam has a bituminous finish, to keep the interior of the dam dry. The saddle dam will be just away from the border with Sudan, it is much closer to the border than the main dam. The reservoir behind both dams will have a storage capacity of and a surface area of when at full supply level of above sea leve

The full supply level is therefore above the ground level of the main dam. Hydropower generation can happen between reservoir levels of , the so-called ''minimum operating level'', and , the ''full supply level''. The ''live storage volume'', usable for power generation between both levels is then . The first of the height of the dam will be a dead height for the reservoir, leading to a ''dead storage volume'' of the reservoir of .


Three spillways

The dams will have three
spillway A spillway is a structure used to provide the controlled release of water downstream from a dam or levee, typically into the riverbed of the dammed river itself. In the United Kingdom, they may be known as overflow channels. Spillways ensure th ...
s. All using approximately 18,000 cubic meters of concrete. These spillways together are designed for a flood of up to , an event not considered to happen at all, as this discharge volume is the so-called 'Probable Maximum Flood'. All waters from the three spillways are designed to discharge into the Blue Nile before the river enters Sudanese territory. The main and gated spillway is located to the left of the main dam and will be controlled by six
floodgates Floodgates, also called stop gates, are adjustable gates used to control water flow in flood barriers, reservoir, river, stream, or levee systems. They may be designed to set spillway crest heights in dams, to adjust flow rates in sluices and ...
and have a design discharge of in total. The spillway will be wide at the outflow gates. The base level of the spillway will be at , well below the full supply level. An ungated spillway, the auxiliary spillway, sits at the center of the main dam with an open width of about . This spillway has a base-level at , which is exactly the full supply level of the reservoir. The dam crest is higher to the left and to the right of the spillway. This ungated spillway is only expected to be used, if the reservoir is both full and the flow exceeds , a flow value, that is expected to be exceeded once every ten years. A third spillway, an emergency spillway, is located to the right of the curved saddle dam, with a base level at . This emergency spillway has an open space of about along its rim. This third spillway will carry water only if the conditions for a flood of more than around are given, corresponding to a flood to occur only once every 10,000 years.


Power generation and distribution

Flanking either side of the auxiliary ungated spillway at the center of the dam will be two power houses, that will be equipped with 2 x 375 MW Francis turbine-generators and 11 x 400 MW turbines. The total installed capacity with all turbine-generators will be 5,150 MW. The average annual flow of the Blue Nile being available for power generation is expected to be , which gives rise to an annual expectation for power generation of 16,153 GWh, corresponding to a plant load factor (or
capacity factor The net capacity factor is the unitless ratio of actual electrical energy output over a given period of time to the theoretical maximum electrical energy output over that period. The theoretical maximum energy output of a given installation is def ...
) of 28.6%. The Francis turbines inside the power houses are installed in a vertical manner, raising above the ground level. For the foreseen operation between the minimum operating level and the full supply level, the water head available to the turbines will be high. A switching station will be located close to the main dam, where the generated power will be delivered to the national grid. Four 500 kV main
power transmission line Electric power transmission is the bulk movement of electrical energy from a generating site, such as a power plant, to an electrical substation. The interconnected lines that facilitate this movement form a ''transmission network''. This is d ...
s were completed in August 2017, all going to
Holeta Holeta ( Oromo: ''Holataa'') is a town in the special zone of Oromia Region, Ethiopia. It has a latitude and longitude of and an altitude of 2391 meters above sea level. History Holeta came into existence with the construction of the Addis ...
and then with several 400 kV lines to the metropolitan area of
Addis Ababa Addis Ababa (; am, አዲስ አበባ, , new flower ; also known as , lit. "natural spring" in Oromo), is the capital and largest city of Ethiopia. It is also served as major administrative center of the Oromia Region. In the 2007 census, t ...
. Two 400 kV lines run from the dam to the
Beles Hydroelectric Power Plant The Beles Hydroelectric Power Plant, sometimes referred to as Beles II or Tana Beles, is a run-of-the-river hydroelectric power plant in Ethiopia near Lake Tana. The power plant receives water from the lake through the Tana-Beles interbasin trans ...
. Also planned are 500 kV
high-voltage direct current A high-voltage direct current (HVDC) electric power transmission system (also called a power superhighway or an electrical superhighway) uses direct current (DC) for electric power transmission, in contrast with the more common alternating curre ...
lines.


Early power generation

Two non-upgraded turbine-generators with 375 MW were first to go into operation with 750 MW delivered to the national power grid, while the first turbine was commissioned in February 2022 and the second one in August 2022. The two units sit within the 10 unit powerhouse to the right side of the dam at the auxiliary spillway. They are fed by two special intakes within the dam structure that are located at a height of above sea level. That power generation started at a water level of , below the minimum operating level of the other 11 turbine-generators. At that level, the reservoir has been filled with roughly of water, which corresponds to roughly 11% of the annual inflow of . During the rainy season, this is expected to happen within days to weeks. The first stage filling of the reservoir for early generation was completed on 20 July 2020.


Siltation, evaporation

Two "bottom" outlets at above sea level or above the local river bed level are available for delivering water to Sudan and Egypt under special circumstances, in particular for irrigation purposes downstream, if the level of the reservoir falls below the minimum operating level of but also during the initial filling process of the reservoir. The space below the "bottom" outlets is the primary buffer space for
alluvium Alluvium (from Latin ''alluvius'', from ''alluere'' 'to wash against') is loose clay, silt, sand, or gravel that has been deposited by running water in a stream bed, on a floodplain, in an alluvial fan or beach, or in similar settings. ...
through
siltation Siltation, is water pollution caused by particulate Terrestrial ecoregion, terrestrial Clastic rock, clastic material, with a particle size dominated by silt or clay. It refers both to the increased concentration of suspended sediments and to the ...
and
sedimentation Sedimentation is the deposition of sediments. It takes place when particles in suspension settle out of the fluid in which they are entrained and come to rest against a barrier. This is due to their motion through the fluid in response to the ...
. For the Roseires Reservoir just downstream from the GERD site, the average siltation and sedimentation volume (without GERD in place) amounts to around per year. Due to the large size of the GERD reservoir, the siltation and sedimentation volume is expected to be much higher in this case, per annum. The GERD reservoir will foreseeably take away the siltation threat from the Roseires reservoir almost entirely. The base of the GERD dam is at around above sea level. Water flowing out of the dam will be released into the Blue Nile again which will flow for only around , before joining the Roseires reservoir, which – if at full supply level – will be at above sea level. There is only a elevation difference between both projects. The two reservoirs and accompanying hydropower projects could – if coordinated properly across the border between Ethiopia and Sudan – become a cascaded system for more efficient hydropower generation and better irrigation (in Sudan in particular). Water from the column of the water storage of the GERD reservoir could be diverted through tunnels to facilitate new irrigation schemes in Sudan close to the border with
South Sudan South Sudan (; din, Paguot Thudän), officially the Republic of South Sudan ( din, Paankɔc Cuëny Thudän), is a landlocked country in East Africa. It is bordered by Ethiopia, Sudan, Central African Republic, Democratic Republic of the ...
. In Ethiopia itself, no irrigation schemes are planned due to the proximity of the dam to the downstream border with Sudan. Evaporation of water from the reservoir is expected to be at 3% of the annual inflow volume of , which corresponds to an average volume lost through evaporation of around annually. This was considered negligible by the IPoE. For comparison, Lake Nasser in Egypt loses between annually through evaporation.


Construction

The main contractor is the Italian company Webuild (formerly Salini Impregilo), which also served as primary contractor for the Gilgel Gibe II, Gilgel Gibe III and Tana Beles dams. Simegnew Bekele was the project manager of GERD from the start of construction in 2011 up to his death on 26 July 2018. In October same year he was replaced by Kifle Horo. The dam is expected to require 10 million cubic meters of concrete. The government has pledged to use only domestically produced concrete. In March 2012, Salini awarded the Italian firm Tratos Cavi SPA a contract to supply low- and high-voltage cable for the dam. Alstom will provide the eight 375 MW Francis turbines for the project's first phase, at a cost of €250 million. As of April 2013, nearly 32 per cent of the project was complete. Site excavation and some concrete placement was underway. One concrete batch plant has been completed with another under construction. Diversion of the Blue Nile was completed on 28 May 2013 and marked by a ceremony the same day. In October 2019, the work was approximately 70% complete. , the steelworks reached 35% complete, civil works are 87% complete while electro-mechanical works are 17% complete, to attain in total 71% construction complete according to Belachew Kasa, Project Deputy Director. On 26 June 2020, Egypt, Sudan and Ethiopia agreed to delay filling the reservoir for a few weeks. On 21 July 2020, Ethiopian prime minister,
Abiy Ahmed Abiy Ahmed Ali ( om, Abiyi Ahmed Alii; am, አብይ አሕመድ ዐሊ; born 15 August 1976) is an Ethiopian politician who has been the 4th prime minister of the Federal Democratic Republic of Ethiopia since 2 April 2018. He won the 2019 ...
, announced that the first phase of filling the reservoir had been completed. The early filling was attributed to heavy rains. In his statement, Abiy stated that "We have successfully completed the first dam filling without bothering and hurting anyone else. Now the dam is overflowing downstream". The target for the first year filling was 4.9 cubic kilometres, while the dam has capacity to hold 74 cubic kilometres when completed. The first phase of filling the reservoir began in July 2020, to a maximum depth of utilising a temporary sill. Further construction work is necessary before the reservoir can be filled to a level for electricity generation. The second phase of filling of the GERD reservoir was completed on 19 July 2021 with estimates of reaching the level of (a.m.s.l) and retaining no more than at this stage. In February 2021, Ethiopian Minister of Water and Irrigation, Seleshi Bekele, mentioned that the engineering work in constructing the dam reached 91%, while the total construction rate was 78.3%. In May 2021, Minister of Water and Irrigation Seleshi Bekele mentioned that 80% of dam construction was complete.


Controversies


Engineering questions

In 2012, the International Panel of Experts was formed with experts from Egypt, Sudan, Ethiopia and other independent entities to discuss mainly engineering and partially impact related questions. This panel concluded at a number of engineering modifications, that were proposed to Ethiopia and the main contractor constructing the dam. One of the two main engineering questions, dealing with the size of flood events and the constructive response against them, was later addressed by the contractor. The emergency spillway located near the rock saddle dam saw an increase of the rim length from 300 m to 1,200 m to account even for the largest possible flood of the river. The second main recommendation of the panel however found no immediate resolution. This second recommendation dealt with the structural integrity of the dam in context with the underlying rock basement as to avoid the danger of a sliding dam due to an unstable basement. It was argued by the panel, that the original structural investigations considered only a ''generic'' rock mass without taking special conditions like faults and sliding planes in the rock basement (
gneiss Gneiss ( ) is a common and widely distributed type of metamorphic rock. It is formed by high-temperature and high-pressure metamorphic processes acting on formations composed of igneous or sedimentary rocks. Gneiss forms at higher temperatures a ...
) into account. The panel noted, that there was indeed an exposed sliding plane in the rock basement, this plane potentially allowing a sliding process downstream. The panel didn't argue that a catastrophic dam failure with a release of dozens of cubic kilometres of water would be possible, probable or even likely, but the panel argued, that the given safety factor to avoid such a catastrophic failure might be non-optimal in the case of the Grand Ethiopian Renaissance Dam. It was later revealed that the underlying basement of the dam was completely different from all expectations and did not fit the geological studies as the needed excavation works exposed the underlying gneiss. The engineering works then had to be adjusted, with digging and excavating deeper than originally planned , which took extra time and capacity and also required more concrete.


Alleged over-sizing

Originally, in 2011, the hydropower plant was to receive 15 generating units with 350 MW
nameplate capacity Nameplate capacity, also known as the rated capacity, nominal capacity, installed capacity, or maximum effect, is the intended full-load sustained output of a facility such as a power station,
each, resulting in a total installed capacity of 5,250 MW with an expected power generation of 15,128 GWh per annum. The
capacity factor The net capacity factor is the unitless ratio of actual electrical energy output over a given period of time to the theoretical maximum electrical energy output over that period. The theoretical maximum energy output of a given installation is def ...
of the planned hydropower plant – the expected electricity production divided by the potential production if the power plant was utilised permanently at full capacity – was only 32.9% compared to 45–60% for other, smaller hydropower plants in Ethiopia. Critics concluded that a smaller dam would have been more cost-effective. Soon after, in 2012, the hydropower plant was upgraded to receive 16 generating units with 375 MW nameplate capacity each, increasing the total installed capacity to 6,000 MW, with the expected power generation going up only slightly to 15,692 GWh per annum. Consequently, the capacity factor shrank to 29.9%. According to Asfaw Beyene, a professor of mechanical engineering at
San Diego State University San Diego State University (SDSU) is a public research university in San Diego, California. Founded in 1897 as San Diego Normal School, it is the third-oldest university and southernmost in the 23-member California State University (CSU) system ...
in California, the dam and its hydropower plant are massively oversized: "GERD’s available power output, based on the average of river flow throughout the year and the dam height, is about 2,000 megawatts, not 6,000. There is little doubt that the system has been designed for a peak flow rate that only happens during the two to three months of the rainy season. Targeting near peak or peak flow rate makes no economic sense." In 2017, the total installed capacity was moved to 6,450 MW, without changing the number and nameplate capacity of the generating units (which then remained at 6,000 MW in total). This was thought to arrive from enhancements made to the generators. The expected power generation per annum went up to 16,153 GWh, the capacity factor shrank again and reached 28.6%. This time nobody publicly voiced concern. Such optimisation of the Francis turbines used at the dam site is indeed possible and is usually done by the provider of the turbines taking into account site-specific conditions. Considering the critics voiced about the alleged over-sizing of the possible power output, now of 6,450 MW. Ethiopia is relying heavily on hydropower, but the country is often affected by droughts (see e.g.
2011 East Africa drought Occurring between July 2011 and mid-2012, a severe drought affected the entire East African region. > Said to be "the worst in 60 years", the drought caused a severe food crisis across Somalia, Djibouti, Ethiopia and Kenya that threatened the li ...
). The water reservoirs used for power generation in Ethiopia have a limited size. For example, the Gilgel Gibe I reservoir, that feeds both the Gilgel Gibe I powerplant and the Gilgel Gibe II Power Station, has a capacity of 0.7 km3. In times of drought, there is no water left to generate electrical power. This heavily affected Ethiopia in the drought years 2015/16 and it was only the Gilgel Gibe III powerplant, that in 2016 just started to run in trial service on a 14 km3 well-filled reservoir, that saved the economy of Ethiopia. The GERD reservoir, once it has been filled, has a total water volume of 74 km3, 3 times the volume of Ethiopia's largest lake, Lake Tana. Filling it takes 5–15 years and even by using all generating units at maximum capacity will not drain it within a few months. The installed power of 6.450 MW in combination with the size of the reservoir will help to manage the side effects of the next severe drought, when other hydropower plants have to stop their operations.


Security around dam

In recent years due to the threat of a possible airstrike on the dam, the
Ethiopian government The government of Ethiopia () is the federal government of Ethiopia. It is structured in a framework of a federal parliamentary republic, whereby the prime minister is the head of government. Executive power is exercised by the government. T ...
has sought and bought several air defence systems some from Russia, including the
Pantsir-S1 The Pantsir (russian: Панцирь, translation="Carapace") missile system is a family of self-propelled, medium-range surface-to-air missile and anti-aircraft artillery systems. Starting with the Pantsir-S1 (russian: Панцирь-С1, NATO r ...
air defence system, and also Israeli air defences, including the SPYDER-MR medium-range air defence system which was installed in the dam. Egypt has sought to block a sale between Israel and Ethiopia but has failed due to the installations of the air defences on the dam. Israel was seen denying the request of Egypt by not answering their request.


Benefits

A major benefit of the dam will be
hydropower Hydropower (from el, ὕδωρ, "water"), also known as water power, is the use of falling or fast-running water to produce electricity or to power machines. This is achieved by converting the gravitational potential or kinetic energy of a w ...
production. All the energy generated by GERD will be going into the national grid of Ethiopia to fully support the development of the whole country, both in rural and urban areas. The role of GERD will be to act as a stabilising backbone of the Ethiopian national grid. There will be exports, but only if there is a total surplus of energy generated in Ethiopia. This is mainly expected to happen during rainy seasons, when there is plenty of water for hydropower generation. The eventual surplus electricity of GERD which does not fit the demand inside Ethiopia, is then to be sold and exported to neighbouring countries including Sudan and possibly Egypt, but also
Djibouti Djibouti, ar, جيبوتي ', french: link=no, Djibouti, so, Jabuuti officially the Republic of Djibouti, is a country in the Horn of Africa, bordered by Somalia to the south, Ethiopia to the southwest, Eritrea in the north, and the Red ...
. Exporting the electricity from the dam would require the construction of massive transmission lines to major consumption centers such as Sudan's capital
Khartoum Khartoum or Khartum ( ; ar, الخرطوم, Al-Khurṭūm, din, Kaartuɔ̈m) is the capital of Sudan. With a population of 5,274,321, its metropolitan area is the largest in Sudan. It is located at the confluence of the White Nile, flowing n ...
, located more than 400 km away from the dam. These export sales would come on top of electricity that is expected to be sold from other large hydropower plants. Powerplants that have been readied or are under construction in Ethiopia, such as Gilgel Gibe III or Koysha, whose exports (if given surplus energy) will mainly be going to
Kenya ) , national_anthem = " Ee Mungu Nguvu Yetu"() , image_map = , map_caption = , image_map2 = , capital = Nairobi , coordinates = , largest_city = Nairobi ...
through a 500 kV HVDC line. The volume of the reservoir will be two to three times that of Lake Tana. Up to 7,000 tonnes of fish are expected to be harvested annually. The reservoir may become a
tourist destination A tourist attraction is a place of interest that tourists visit, typically for its inherent or an exhibited natural or cultural value, historical significance, natural or built beauty, offering leisure and amusement. Types Places of natural ...
. Sudan expects a reduce in floods thanks to the dam, but this has not been observed in reality yet.


Environmental and social impacts

The NGO
International Rivers International Rivers is a non-profit, non-governmental, environmental, and human rights organization. Founded in 1985 by social and environmental activists, International Rivers works with policy and financial analysts, scientists, journalists, ...
has commissioned a local researcher to make a field visit because so little
environmental impact Environmental issues are effects of human activity on the biophysical environment, most often of which are harmful effects that cause environmental degradation. Environmental protection is the practice of protecting the natural environment on t ...
information is publicly available. Public consultation about dams in Ethiopia is affected by the
political climate The political climate is the aggregate mood and opinions of a political society at a particular time. It is generally used to describe when the state of mood and opinion is changing or unstable. The phrase has origins from both ancient Greece and ...
in the country. International Rivers reports that "conversations with civil society groups in Ethiopia indicate that questioning the government's energy sector plans is highly risky, and there are legitimate concerns of government persecution. Because of this political climate, no groups are actively pursuing the issues surrounding hydro-power dams, nor publicly raising concerns about the risks in this situation, extremely limited and inadequate public consultation has been organised" during the implementation of major dams. In June 2011, Ethiopian journalist Reeyot Alemu was imprisoned after she raised questions about the proposed Grand Millennium Dam. Staff of International Rivers have received death threats. Former prime minister
Meles Zenawi Meles Zenawi Asres (Tigrinya and ; , born Legesse Zenawi Asres; 9 May 1955 – 20 August 2012) was an Ethiopian soldier and politician who served as President of Ethiopia from 1991 to 1995 and then Prime Minister of Ethiopia from 1995 until his ...
called opponents of the project "hydropower extremists" and "bordering on the criminal" at a conference of the
International Hydropower Association The International Hydropower Association (IHA) is a non-profit, international organisation and membership association representing the global hydropower sector. IHA has members in more than 80 countries, including over 100 corporate and affiliat ...
(IHA) in
Addis Ababa Addis Ababa (; am, አዲስ አበባ, , new flower ; also known as , lit. "natural spring" in Oromo), is the capital and largest city of Ethiopia. It is also served as major administrative center of the Oromia Region. In the 2007 census, t ...
in April 2011. At the conference, the Ethiopian state power utility was embraced as a "Sustainability Partner" by the IHA.


Impact on Ethiopia

Since the
Blue Nile The Blue Nile (; ) is a river originating at Lake Tana in Ethiopia. It travels for approximately through Ethiopia and Sudan. Along with the White Nile, it is one of the two major tributaries of the Nile and supplies about 85.6% of the water to ...
is a highly seasonal river, the dam would reduce flooding downstream of the dam, including on the 15 km stretch within Ethiopia. On the one hand, the reduction of flooding is beneficial since it protects settlements from flood damage. On the other hand, it can be harmful if flood recession agriculture is practised in the river valley downstream of the dam since it deprives fields from being watered. However, the next water regulating dam in Sudan, the
Roseires Dam The Roseires Dam ( ar, خزان الروصيرص) is a dam on the Blue Nile at Ad Damazin, just upstream of the town of Er Roseires, in Sudan. It consists of a concrete buttress dam 1 km wide with a maximum height of 68 m, and an earth dam ...
, sits only a few dozens of kilometres downstream. The dam could also serve as a bridge across the Blue Nile, complementing a bridge that was under construction in 2009 further upstream. An independent assessment estimated that at least 5,110 people will be resettled from the reservoir and downstream area, and the dam is expected to lead to a significant change in the fish ecology. According to an independent researcher who conducted research in the area, 20,000 people are being relocated. According to the same source, "a solid plan (is) in place for the relocated people" and those who have already been resettled "were given more than they expected in compensation". Locals have never seen a dam before and "are not completely sure what a dam actually is", despite community meetings in which affected people were informed about the impacts of the dam on their livelihoods. Except for a few older people, almost all locals interviewed "expressed hope that the project brings something of benefit to them" in terms of education and health services or
electricity supply Mains electricity or utility power, power grid, domestic power, and wall power, or in some parts of Canada as hydro, is a general-purpose alternating-current (AC) electric power supply. It is the form of electrical power that is delivered to h ...
based on the information available to them. At least some of the new communities for those relocated will be downstream of the dam. The area around the reservoir will consist of a 5 km buffer zone for malaria control that will not be available for settlement. In at least some upstream areas erosion control measures will be undertaken in order to reduce siltation of the reservoir.


Impact on Sudan and Egypt

The precise impact of the dam on the downstream countries is not known. Egypt fears a temporary reduction of water availability due to the filling of the reservoir and a permanent reduction because of evaporation from the reservoir. Studies indicate that the primary factors which will govern the impacts during the reservoir filling phase include the initial reservoir elevation of the
Aswan High Dam The Aswan Dam, or more specifically since the 1960s, the Aswan High Dam, is one of the world's largest embankment dams, which was built across the Nile in Aswan, Egypt, between 1960 and 1970. Its significance largely eclipsed the previous Aswan L ...
, the rainfall that occurs during the filling period and the negotiated arrangement between the three countries. These studies also show that only through close and continuous coordination, the risks of negative impacts can be minimised or eliminated. The reservoir volume (74 cubic kilometres) is about 1.5 times the average annual flow (49 cubic kilometres) of the Blue Nile at the
Egypt–Sudan border The Egypt–Sudan border ( ar, الحدود السودانية المصرية) is 1,276 km (793 mi) in length and runs from the tripoint with Libya in the west to the Red Sea in the east. The eastern section of the border is subject to a terr ...
. This loss to downstream countries could be spread over several years if the countries reach an agreement. Depending on the initial storage in the Aswan High Dam and this filling schedule of the GERD, flows into Egypt could be temporarily reduced, which may affect the livelihood of two million farmers during the period of filling the reservoir. Allegedly, it would also "affect Egypt's electricity supply by 25 to 40 percent, while the dam is being built". However, hydropower accounts for less than 12 per cent of total electricity production in Egypt in 2010 (14 out of 121 billion kWh), so that a temporary reduction of 25 per cent in hydropower production translates into an overall temporary reduction in Egyptian electricity production of less than 3 per cent. The Grand Ethiopian Renaissance Dam could also lead to a permanent lowering of the water level in Lake Nasser if floods are stored instead in Ethiopia. This would reduce the current evaporation of more than 10 cubic kilometres per year, but it would also reduce the ability of the Aswan High Dam to produce hydropower to the tune of a 100 MW loss of generating capacity for a 3 m reduction of the water level. However, the increased storage in Ethiopia can provide a greater buffer to shortages in Sudan and Egypt during years of future drought, if the countries can reach a compromise. The dam will retain silt. It will thus increase the useful lifetime of dams in Sudan – such as the
Roseires Dam The Roseires Dam ( ar, خزان الروصيرص) is a dam on the Blue Nile at Ad Damazin, just upstream of the town of Er Roseires, in Sudan. It consists of a concrete buttress dam 1 km wide with a maximum height of 68 m, and an earth dam ...
, the Sennar Dam and the
Merowe Dam The Merowe Dam, also known as Merowe High Dam, Merowe Multi-Purpose Hydro Project or Hamdab Dam, is a large dam near Merowe Town in northern Sudan, about north of the capital Khartoum. Its dimensions make it the largest contemporary hydropower pr ...
– and of the Aswan High Dam in Egypt. The beneficial and harmful effects of flood control would affect the Sudanese portion of the Blue Nile, just as it would affect the Ethiopian part of the Blue Nile valley downstream of the dam. Specifically, the GERD would reduce seasonal flooding of the plains surrounding the reservoir of the Roseires Dam located at Ad-Damazin, just as the Tekeze Dam, by retaining a reservoir in the deep gorges of the northern Ethiopian Highlands, had reduced flooding at Sudan's Khashm el-Girba Dam.
The reservoir, located in the temperate
Ethiopian Highlands The Ethiopian Highlands is a rugged mass of mountains in Ethiopia in Northeast Africa. It forms the largest continuous area of its elevation in the continent, with little of its surface falling below , while the summits reach heights of up to . ...
and up to 140 m deep, will experience considerably less evaporation than downstream reservoirs such as Lake Nasser in Egypt, which loses 12% of its water flow due to evaporation as the water sits in the lake for 10 months. Through the controlled release of water from the reservoir to downstream, this could facilitate an increase of up to 5% in Egypt's water supply, and presumably that of Sudan as well.


Reactions: cooperation and condemnation

Egypt has serious concerns about the project; therefore it requested to be granted inspection allowance on the design and the studies of the dam, in order to allay its fears, but Ethiopia has denied the request unless Egypt relinquishes its veto on water allocation. After a meeting between the Ministers of Water of Egypt, Sudan and Ethiopia in March 2012, Sudan's President Bashir said that he supported the building of the dam. A Nile treaty signed by the upper riparian states in 2010, the Cooperative Framework Agreement, has not been signed by either Egypt or Sudan, as they claim it violates the 1959 treaty, in which Sudan and Egypt give themselves exclusive rights to all of the Nile's waters. The
Nile Basin Initiative The Nile Basin Initiative (NBI) is a partnership among the Nile riparian states that “seeks to develop the river in a cooperative manner, share substantial socioeconomic benefits, and promote regional peace and security”. The NBI began with a di ...
provides a framework for dialogue among all Nile riparian countries. Egypt, Ethiopia and Sudan established an International Panel of Experts to review and assess the study reports of the dam. The panel consists of 10 members; 6 from the three countries and 4 international in the fields of water resources and hydrologic modelling, dam engineering, socioeconomic and environmental. The panel held its fourth meeting in Addis Ababa in November 2012. It reviewed documents about the environmental impact of the dam and visited the dam site. The panel submitted its preliminary report to the respective governments at the end of May 2013. Although the full report has not been made public, and will not be until it is reviewed by the governments, Egypt and Ethiopia both released details. The Ethiopian government stated that, according to the report, "the design of the dam is based on international standards and principles" without naming those standards and principles. It also said that the dam "offers high benefit for all the three countries and would not cause significant harm on both the lower riparian countries". According to Egyptian government, however, the report "recommended changing and amending the dimensions and the size of the dam". As of mid-July 2022 the three-way negotiations were not held for more that a year. On 3 June 2013, while discussing the International Panel of Experts report with President
Mohammad Morsi Mohamed Mohamed Morsi Eissa al-AyyatThe spellings of his first and last names vary. survey of 14 news organizations plus Wikipedia in July 2012 However, on 10 June 2013, he said that "all options are open" because "Egypt's water security cannot be violated at all," clarifying that he was "not calling for war," but that he would not allow Egypt's water supply to be endangered. In January 2014, Egypt left negotiations over the dam, citing Ethiopian intransigence. Ethiopia countered that Egypt had set an immediate halt on construction and an increase of its share to 90% as the preconditions, which were deemed wholly unreasonable. Egypt has since launched a diplomatic offensive to undermine support for the dam, sending its Foreign Minister, Nabil Fahmi to
Tanzania Tanzania (; ), officially the United Republic of Tanzania ( sw, Jamhuri ya Muungano wa Tanzania), is a country in East Africa within the African Great Lakes region. It borders Uganda to the north; Kenya to the northeast; Comoro Islands ...
and the
Democratic Republic of the Congo The Democratic Republic of the Congo (french: République démocratique du Congo (RDC), colloquially "La RDC" ), informally Congo-Kinshasa, DR Congo, the DRC, the DROC, or the Congo, and formerly and also colloquially Zaire, is a country in ...
to garner support. Egyptian media outlets declared the visits productive and that the leaders of those nations had expressed "understanding" and "support" of Egypt's position. Sudanese Foreign Minister
Ali Karti Ali Ahmed Karti ( ar, علي أحمد كرتي; born 27 October 1953) is a Sudanese politician. Karti served as Foreign Minister of Sudan from 2010 to 2015. Karti studied law at the University of Khartoum The University of Khartoum (U of K) ...
criticised Egypt for "inflaming the situation" through its statements on the dam, and that it was considering the interests of both sides. ''
Al-Masry Al-Youm ''Al-Masry Al-Youm'' ( ar, المصري اليوم ', , meaning ''The Egyptian Today'') is an Egyptian privately owned Daily paper, daily newspaper that was first published in June 2004. It is published in Modern Standard Arabic, Arabic as is it ...
'' declared that Sudan had "proclaimed its neutrality". The campaign is intensive and wide-reaching; in March 2014, for the first time, only
Uganda }), is a landlocked country in East Africa. The country is bordered to the east by Kenya, to the north by South Sudan, to the west by the Democratic Republic of the Congo, to the south-west by Rwanda, and to the south by Tanzania. The sou ...
,
Kenya ) , national_anthem = " Ee Mungu Nguvu Yetu"() , image_map = , map_caption = , image_map2 = , capital = Nairobi , coordinates = , largest_city = Nairobi ...
, Sudan and
Tanzania Tanzania (; ), officially the United Republic of Tanzania ( sw, Jamhuri ya Muungano wa Tanzania), is a country in East Africa within the African Great Lakes region. It borders Uganda to the north; Kenya to the northeast; Comoro Islands ...
were invited by Egypt to participate in the
Nile Hockey Tournament The Nile, , Bohairic , lg, Kiira , Nobiin: Áman Dawū is a major north-flowing river in northeastern Africa. It flows into the Mediterranean Sea. The Nile is the longest river in Africa and has historically been considered the longest riv ...
. Foreign Minister Fahmi and Water Resources Minister Muhammad Abdul Muttalib planned visits to Italy and Norway to express their concerns and try to compel them to pull their support for the GERD. In April 2014, Ethiopia's Prime Minister invited Egypt and Sudan to another round of talks over the dam and Nabil Fahmi stated in May 2014 that Egypt was still open to negotiations. Following an August 2014 Tripartite Ministerial-level meeting, the three nations agreed to set up a Tripartite National Committee (TNC) meeting over the dam. The first TNC meeting occurred from 20 to 22 September 2014 in Ethiopia. In October 2019, Ethiopian Prime Minister
Abiy Ahmed Abiy Ahmed Ali ( om, Abiyi Ahmed Alii; am, አብይ አሕመድ ዐሊ; born 15 August 1976) is an Ethiopian politician who has been the 4th prime minister of the Federal Democratic Republic of Ethiopia since 2 April 2018. He won the 2019 ...
warned that "no force can stop Ethiopia from building a dam. If there is need to go to war, we could get millions readied." Beginning in November 2019, U.S. Treasury Secretary Steven Mnuchin facilitated negotiations between the governments of Egypt, Ethiopia and Sudan with respect to the filling and the operation of the dam. Ethiopia proposed filling the reservoir with a release of 35 cubic kilometres of water per year, resulting in the complete filling of the reservoir in five years. Egypt countered that this would be too little, and demanded a larger amount of water to be released each year, asking for 40 cubic kilometres of water to be released and for the reservoir to be filled within seven years. In February 2020, Mnuchin said in a statement: "We appreciate the readiness of the government of Egypt to sign the agreement and its initialing of the agreement to evidence its commitment," adding "consistent with the principles set out in the DOP, and in particular the principles of not causing significant harm to downstream countries, final testing and filling should not take place without an agreement." Ethiopian Foreign Minister Gedu Andargachew said Mnuchin's advice to Ethiopia was "ill-advised". In February 2020, the U.S. Treasury Department stated that "final testing and filling should not take place without an agreement." after Ethiopia skipped US talks with Egypt over the dam dispute. Ethiopians online expressed anger using the hashtag #itismydam over what they claim was the US and the World Bank's siding with Egypt contrary to the co-observer role initially promised. The online campaign coincided with Ethiopia's annual public holiday celebrating the 1896 Ethiopian victory at the
Battle of Adwa The Battle of Adwa (; ti, ውግእ ዓድዋ; , also spelled ''Adowa'') was the climactic battle of the First Italo-Ethiopian War. The Ethiopian forces defeated the Italian invading force on Sunday 1 March 1896, near the town of Adwa. The de ...
, a decisive victory that successfully thwarted the 1896 Italian colonial campaign.
Ethiopia Ethiopia, , om, Itiyoophiyaa, so, Itoobiya, ti, ኢትዮጵያ, Ítiyop'iya, aa, Itiyoppiya officially the Federal Democratic Republic of Ethiopia, is a landlocked country in the Horn of Africa. It shares borders with Eritrea to the ...
has stated that "it will not be pressured on Nile River". In July 2020, Ethiopian Foreign Minister Gedu Andargachew tweeted: "the river became a lake... the Nile is ours." In the same month, talks between water ministers from three involved countries resumed under African Union supervision. In September 2020, the United States suspended part of its economic assistance to Ethiopia due to the lack of sufficient progress in negotiations with Sudan and Egypt over the construction of the dam. On 24 October 2020, U.S. President
Donald Trump Donald John Trump (born June 14, 1946) is an American politician, media personality, and businessman who served as the 45th president of the United States from 2017 to 2021. Trump graduated from the Wharton School of the University of P ...
stated on a public phone call to Sudan's Prime Minister
Abdalla Hamdok Abdalla Hamdok Al-Kinani (also transliterated ''Abdallah'', ''Hamdouk'', '' AlKinani''; ar, عبدالله حمدوك الكناني; born 1 January 1956) is a Sudanese public administrator who served as the 15th Prime Minister of Sudan from 20 ...
and Israel's Prime Minister
Benjamin Netanyahu Benjamin "Bibi" Netanyahu (; ; born 21 October 1949) is an Israeli politician who served as the ninth prime minister of Israel from 1996 to 1999 and again from 2009 to 2021. He is currently serving as Leader of the Opposition and Chairman of ...
that "it's a very dangerous situation because Egypt is not going to be able to live that way... And I said it and I say it loud and clear - they'll blow up that dam. And they have to do something." Ethiopian Prime Minister
Abiy Ahmed Abiy Ahmed Ali ( om, Abiyi Ahmed Alii; am, አብይ አሕመድ ዐሊ; born 15 August 1976) is an Ethiopian politician who has been the 4th prime minister of the Federal Democratic Republic of Ethiopia since 2 April 2018. He won the 2019 ...
responded that "Ethiopia will not cave in to aggression of any kind" and that threats were "misguided, unproductive and clear violations of international law." In April 2021, Egyptian President
Abdel Fattah el-Sisi Abdel Fattah Saeed Hussein Khalil el-Sisi; (born 19 November 1954) is an Egyptian politician and retired military officer who has served as the sixth and current president of Egypt since 2014. Before retiring as a general in the Egyptian mil ...
warned: "I am telling our brothers in Ethiopia, let’s not reach the point where you touch a drop of Egypt’s water, because all options are open." The dispute between Sudan and Ethiopia over the dam escalated in 2021. An advisor to the Sudanese leader
Abdel Fattah al-Burhan Abdel Fattah Abdelrahman al-Burhan ( ar, عبد الفتاح عبد الرحمن البرهان, Abd al-FattāḥʿAbd al-Raḥmān al-Burhān; born 11 July 1960) is a Sudanese politician and Sudanese Army general who is the ''de facto'' hea ...
spoke of a
water war Water (chemical formula ) is an inorganic, transparent, tasteless, odorless, and nearly colorless chemical substance, which is the main constituent of Earth's hydrosphere and the fluids of all known living organisms (in which it acts as a s ...
"that would be more horrible than one could imagine". On 8 July 2021, the
U.N. Security Council The United Nations Security Council (UNSC) is one of the six principal organs of the United Nations (UN) and is charged with ensuring international peace and security, recommending the admission of new UN members to the General Assembly, and ...
held a session to discuss the dispute over the dam filling. During Joe Biden's July 2022 meeting in the Middle East, he met with
Abdel Fattah el-Sisi Abdel Fattah Saeed Hussein Khalil el-Sisi; (born 19 November 1954) is an Egyptian politician and retired military officer who has served as the sixth and current president of Egypt since 2014. Before retiring as a general in the Egyptian mil ...
and restated American support for Egypt's "water security" and "forging a diplomatic resolution that would achieve the interests of all parties and contribute to a more peaceful and prosperous region." During the summer of 2022, U.S. envoy Mike Hammer visited both
Egypt Egypt ( ar, مصر , ), officially the Arab Republic of Egypt, is a transcontinental country spanning the northeast corner of Africa and southwest corner of Asia via a land bridge formed by the Sinai Peninsula. It is bordered by the Medit ...
and later
Ethiopia Ethiopia, , om, Itiyoophiyaa, so, Itoobiya, ti, ኢትዮጵያ, Ítiyop'iya, aa, Itiyoppiya officially the Federal Democratic Republic of Ethiopia, is a landlocked country in the Horn of Africa. It shares borders with Eritrea to the ...
to build relations and discuss the Ethiopian dam. In August 2022, the
United Arab Emirates The United Arab Emirates (UAE; ar, اَلْإِمَارَات الْعَرَبِيَة الْمُتَحِدَة ), or simply the Emirates ( ar, الِْإمَارَات ), is a country in Western Asia ( The Middle East). It is located at t ...
(which has good relations with both Ethiopia and Egypt) has stated that it wants the three nations to hold meetings once again.


See also

*
Water politics Water politics, sometimes called hydropolitics, is politics affected by the availability of water and water resources, a necessity for all life forms and human development. Arun P. Elhance's definition of hydropolitics is "the systematic study o ...
* Renewable energy in Ethiopia *
Dams and reservoirs in Ethiopia Ethiopia is called the ''water tower'' of Africa due to its combination of mountainous areas with a comparatively large share of water resources in Africa. Only a fraction of this potential has been harnessed so far, 1% at the beginning of the 21st ...
*
List of power stations in Ethiopia This page lists power stations in Ethiopia, both integrated with the national power grid but also isolated ones. Due to the quickly developing demand for electricity in Ethiopia, operational power plants are listed as well as those under constructi ...
*
Water politics in the Nile Basin As a body of water that crosses numerous international political borders, the Nile river is subject to multiple political interactions. Traditionally it is seen as the world's longest river flowing 6,700 kilometers through ten countries in northe ...
*
Foreign relations of Ethiopia The foreign relations of Ethiopia refers to overall diplomatic relationship of Ethiopia. The Ministry of Foreign Affairs oversees foreign relations and diplomatic missions of the country. Ethiopia is one of few early African countries admitted ...
* Jonglei Canal * Genale Dawa III Hydroelectric Power Station


References