The Eurotunnel Calais Terminal (also known as the
Charles Dickens Charles John Huffam Dickens (; 7 February 1812 – 9 June 1870) was an English writer and social critic. He created some of the world's best-known fictional characters and is regarded by many as the greatest novelist of the Victorian e ...
Terminal or Coquelles Terminal) is a railway terminal built for the transport of road-going vehicles on specially constructed trains through the Channel Tunnel. The terminal is one of two, with the
Eurotunnel Folkestone Terminal The Eurotunnel Folkestone Terminal (also known as the Victor Hugo Terminal) is a railway terminal built for the transport of road-going vehicles on specially constructed trains through the Channel Tunnel. The terminal is one of two, with the Euro ...
located at Cheriton, near Folkestone.


History

As part of the Channel Tunnel project, the plan for services included the use of dedicated shuttle trains that would carry both passenger and freight vehicles between Britain and France, which would compete with the cross-channel ferries. In order to accommodate these services, it was planned to build a brand new vehicle terminal on each side of the tunnel that would allow cars and lorries to be loaded quickly onto the trains. The site chosen for the French terminal was
Coquelles Coquelles (; vls, Kalkwelle, lang) is a commune in the Pas-de-Calais department near Calais in northern France. The town comprises a shopping centre, hotels and farm in Vieille Coquelles (old Coquelles), part of the L'Européenne autoroute ...
, near Calais, not far from the French tunnel portal. The site chosen was a large greenfield area of more than 1700
acres The acre is a unit of land area used in the imperial and US customary systems. It is traditionally defined as the area of one chain by one furlong (66 by 660 feet), which is exactly equal to 10 square chains, of a square mile, 4,840 square ...
, which provided significantly more space than the British terminal. However, a large proportion of the area chosen for construction was marshland, with anything from 3 to 10 metres of
peat Peat (), also known as turf (), is an accumulation of partially decayed vegetation or organic matter. It is unique to natural areas called peatlands, bogs, mires, moors, or muskegs. The peatland ecosystem covers and is the most efficient ...
on top of the solid ground. As a consequence, 12,000,000 m³ of material had to be removed to provide solid foundations, before work could begin on building the actual facility. The main parts of the passenger terminal to be built were the platforms and overbridges that connect it to the A16, and thence to the rest of the autoroute network. The tunnel was officially opened on 6 May 1994, with services between Cheriton and Coquelles beginning in July the same year, when the first freight shuttles started running. Passenger services then started in December 1994. As a result of the Sangatte Protocol signed between France and the UK in 1991, juxtaposed controls have been established. Travellers going from Coquelles to Cheriton clear French exit checks as well as UK entry immigration and customs checks before boarding the train in Coquelles, rather than on arrival in Cheriton.


Infrastructure

The terminal consists of ten
island platform An island platform (also center platform, centre platform) is a station layout arrangement where a single platform is positioned between two tracks within a railway station, tram stop or transitway interchange. Island platforms are popular on ...
s, with four overbridges connecting each platform to the autoroute. The overbridges are located at approximately equidistant points along the length of the platforms so that vehicles have to drive for as little distance as possible along the platforms themselves; vehicles unloaded from the front to the middle of the train would use the furthest bridge, while those unloaded from the centre to the rear would use the next bridge in, and vice versa for those vehicles embarking. The bridges at the western end of the platforms are intended for embarking vehicles, while those at the eastern end are for those disembarking. The island platforms are separated by single track, allowing vehicles to access the train from both sides. The terminal is located at the end of a loop connected to the route from the tunnel; trains exiting the tunnel travel anti-clockwise around this loop and then pull into the terminal, meaning the locomotive that pulled the train will remain at the front for the next service through the tunnel. The terminal at Cheriton also has a loop arrangement, but instead trains travel clockwise; this is intended to ensure equal wear on the
flange A flange is a protruded ridge, lip or rim, either external or internal, that serves to increase strength (as the flange of an iron beam such as an I-beam or a T-beam); for easy attachment/transfer of contact force with another object (as the f ...
of the wheels. The terminal has a larger loading gauge than the rest of the French network owing to the oversized trailers used to carry the road going vehicles. As a consequence, all maintenance of the rolling stock is undertaken within the small, self-contained Channel Tunnel rail network, with the major work carried out at the large maintenance facility at Coquelles.