Edinburgh to Glasgow Improvement Programme
   HOME

TheInfoList



OR:

The Edinburgh Glasgow Improvement Programme or EGIP was an initiative funded by
Transport Scotland Transport Scotland ( gd, Còmhdhail Alba) is the national transport agency of Scotland. It was established by the Transport (Scotland) Act 2005, and began operating on 1 January 2006 as an Executive Agency of the Scottish Government. Organisa ...
on behalf of the Scottish Government to increase capacity on the main
railway line Rail terminology is a form of technical terminology. The difference between the American term ''railroad'' and the international term ''railway'' (used by the International Union of Railways and English-speaking countries outside the United Sta ...
between
Edinburgh Edinburgh ( ; gd, Dùn Èideann ) is the capital city of Scotland and one of its 32 council areas. Historically part of the county of Midlothian (interchangeably Edinburghshire before 1921), it is located in Lothian on the southern shore of t ...
and
Glasgow Glasgow ( ; sco, Glesca or ; gd, Glaschu ) is the most populous city in Scotland and the fourth-most populous city in the United Kingdom, as well as being the 27th largest city by population in Europe. In 2020, it had an estimated popul ...
, with new, longer electric trains running by 2017 and scheduled for full completion in 2019. It was expected to cost £742 million and delivered by
Network Rail Network Rail Limited is the owner (via its subsidiary Network Rail Infrastructure Limited, which was known as Railtrack plc before 2002) and infrastructure manager of most of the railway network in Great Britain. Network Rail is an "arm's leng ...
. The programme was initially announced by the Labour-
Liberal Democrat Several political parties from around the world have been called the Liberal Democratic Party or Liberal Democrats. These parties usually follow a liberal democratic ideology. Active parties Former parties See also *Liberal democracy *Lib ...
coalition government in 2006, and was continued, although cut back from the original scheme, by the subsequent Scottish National Party governments. It was officially completed on 4 October 2021 with the completion of the redevelopment of the Glasgow Queen Street station.


Aims

The project aimed to deliver the infrastructure to enable 8 car, electric trains to operate (an increase from the previous 6 car maximum) on Edinburgh - Glasgow services with a fastest journey time of 42 minutes. The additional train carriages were to allow a total increase in capacity of 30%. The project was also designed to deliver electrification of 94 miles of track including diversionary routes through
Cumbernauld Cumbernauld (; gd, Comar nan Allt, meeting of the streams) is a large town in the historic county of Dunbartonshire and council area of North Lanarkshire, Scotland. It is the tenth most-populous locality in Scotland and the most populated t ...
and Falkirk.


Timeline of planned improvements

* December 2013 - Haymarket Station redevelopment opens. * May 2014 - Glasgow - Cumbernauld electrification complete. * May 2015 - Haymarket - Inverkeithing signalling renewals complete. * July 2015 -
Winchburgh Winchburgh is a village in the Subdivisions of Scotland, council area of West Lothian, Scotland. It is located approximately west of the city-centre of Edinburgh, east of Linlithgow and northeast of Broxburn, West Lothian, Broxburn. Prehist ...
Tunnel clearance completed. * April 2016 - 61 Bridges and structures cleared for electrification. * August 2016 -
Glasgow Queen Street , symbol_location = gb , symbol = rail , image = Queen Street railway station (geograph 6687389).jpg , caption = Main entrance in 2020 , borough = Glasgow , country = Scotland , coordinates = , grid_name = Grid reference , grid_positi ...
(High Level) tunnel track and trackbed replacement completion. * October 2016 - Platform extensions at
Linlithgow Linlithgow (; gd, Gleann Iucha, sco, Lithgae) is a town in West Lothian, Scotland. It was historically West Lothian's county town, reflected in the county's historical name of Linlithgowshire. An ancient town, it lies in the Central Belt on a ...
, Croy,
Polmont Polmont ( gd, Poll-Mhonadh) is a village in the Falkirk council area of Central Scotland. It lies towards the east of the town of Falkirk, north of the Union Canal, which runs adjacent to the village. Due to its situation in Central Scotland, ...
and Falkirk High. * December 2016 - Platform extensions at
Edinburgh Waverley Edinburgh Waverley railway station (also known simply as Waverley; gd, Waverley Dhùn Èideann) is the principal railway station serving Edinburgh, Scotland. It is the second busiest station in Scotland, after Glasgow Central. It is the north ...
. * December 2016 - Electrification of the Edinburgh to Glasgow via Falkirk High Line. * December 2016 -
Edinburgh Gateway , symbol_location = gb , symbol = rail , symbol2 = edinburgh , image = Edinburgh Gateway Station, view south from the pedestrian overbridge. Scotland.jpg , caption = Edinburgh Gateway s ...
station opened. * 2017 - Millerhill Depot in Millerhill Marshalling Yard opens. * December 2017 - Delivery of first new Hitachi Class 385 trains. * July 2018 - First Hitachi Class 385 EMUs enter service. * December 2018 - Platform extensions at
Glasgow Queen Street , symbol_location = gb , symbol = rail , image = Queen Street railway station (geograph 6687389).jpg , caption = Main entrance in 2020 , borough = Glasgow , country = Scotland , coordinates = , grid_name = Grid reference , grid_positi ...
. * December 2018 - Electrification of the Cumbernauld - Falkirk line. * 4 October 2021 - The redevelopment of Glasgow Queen Street station was officially completed.


Previous proposals

As originally announced in 2006, the project would have cost £1 billion and aimed to increase capacity by increasing service frequency to 6tph rather than by lengthening trains. Transport Scotland commissioned Jacobs to examine the project for potential savings and they identified that the a similar capacity increase could be achieved by increasing train length while maintaining a 4tph frequency. This had previously been thought to be impossible due to restrictions at Glasgow Queen Street station. The redevelopment of Buchanan Galleries allowed this option to be developed instead with a major rebuild and the lengthening of platforms at Queen St high level station. This enabled several major schemes to be dropped from the scope of EGIP as they were only required if an increase in train frequency took place: * Construction of turnback sidings at Abbeyhill Junction and . * Remodelling of Greenhill Junction to provide a non-conflicting junction; * Construction of a new chord line at Dalmeny to allow trains from the west to access the Haymarket north lines without obstructing existing services at the junction on approach to the station.. Another proposed scheme the Garngad Chord, near had already been dropped from the scheme. It was intended to allow Glasgow-Cumbernauld services to use the North Clyde Line into Queen Street Low Level, thus freeing up capacity on the High Level station. Instead services started on this route in 2014 with a reversal in Springburn, creating a slightly longer journey time. Electrification to
Stirling Stirling (; sco, Stirlin; gd, Sruighlea ) is a city in central Scotland, northeast of Glasgow and north-west of Edinburgh. The market town, surrounded by rich farmland, grew up connecting the royal citadel, the medieval old town with its me ...
, and was originally reported to have been dropped as part of the changes to EGIP. Electrification is continuing and is expected to be complete by 2018; it has been carried out under the rolling programme of electrification, rather than as part of the EGIP programme.


Criticism

The new proposals were criticised by business and environmental groups. Sustainable transport campaign group Transform Scotland described the cuts as 'a major step backwards' and suggested that the government's concurrent decision to bring forward a £3 billion project to dual the A9 road demonstrated a 'perverse set of priorities'. The fastest journey times between Glasgow and Edinburgh under the scheme will now be 42 minutes compared to the just over half an hour previously promised. One of the most disruptive elements of the project was the complete closure of Glasgow Queen Street High Level for a 20-week period between March and August 2016. This was to allow replacement of the track in the Cowlairs Tunnel and the lowering of the track bed to accommodate the installation of overhead electrification equipment in the tunnel. ScotRail warned that the diversion works created a potential
single point of failure A single point of failure (SPOF) is a part of a system that, if it fails, will stop the entire system from working. SPOFs are undesirable in any system with a goal of high availability or reliability, be it a business practice, software appl ...
which could paralyse Glasgow's rail network in the event of a train failure or other incident.


See also

*
Airdrie–Bathgate rail link The Airdrie–Bathgate rail link is a completed railway project in central Scotland. Instigated as part of a round of transport improvement projects proposed by the then Scottish Executive in 2003, the plan was to open up a fourth direct railw ...
*
Glasgow Airport Rail Link The Glasgow Airport Rail Link (GARL) is a proposed link between Glasgow City Centre and Glasgow Airport. The original plans for an airport rail link were proposed during the 2000s to directly link Glasgow Central station with Glasgow Airport i ...
* History of rail transport in Great Britain 1995 to date


References


External links

* {{Railway lines in Scotland Rail infrastructure in Scotland Electrification Railway lines in Scotland Scottish Government Transport in Edinburgh Transport in Glasgow 2006 establishments in Scotland Transport in Falkirk (council area) Transport in East Dunbartonshire Transport in West Lothian