Carlingford Line
   HOME

TheInfoList



OR:

The Carlingford railway line was a railway line in Sydney, Australia. It was opened from Clyde railway station, Sydney, Clyde to Camellia railway station, Subiaco (later renamed Camellia) in January 1885, then by means of the construction of a bridge across the Parramatta River, to Carlingford railway station, Carlingford in April 1896. It closed on 5 January 2020 with much of the line to be converted to light rail as part of the Parramatta Light Rail network, while a short section of the line was retained for use by Sydney Trains.


Line description

The Carlingford line branched off the Main Suburban railway line, Western line at Clyde railway station, Sydney, Clyde heading north and crossing Parramatta Road via a level crossing, before passing under the M4 Western Motorway to Rosehill railway station, Rosehill station. It was a double track line to this point. Immediately south of Rosehill, the two tracks joined, before dividing into two bi-directional tracks, the Sandown railway line, Sandown line and the Carlingford line. Rosehill railway station, Rosehill station had two platforms; one four-car long platform on the Carlingford line and one platform which was approximately sixteen-cars long on the Sandown line track which was used for special events at Rosehill Gardens Racecourse. Originally these operated as conventional platforms; the shorter platform being served by northbound services and the longer one by southbound services with the double track merging into a single track to the north of the station. However, on race days, the shorter platform would be served by services in both directions to allow for the section immediately north of the station on the southbound track to stable race day trains. In June 1992, the junction was moved to south of Rosehill station with the shorter platform served by Calingford line services in both directions and the longer platform only by race day trains and Sandown line services. The line then headed in a north-easterly direction over the Parramatta River to Carlingford railway station, Carlingford. The stations from Camellia railway station, Camellia to Carlingford consisted of a single platform of a sufficient length to accommodate four-carriage trains. There were no crossing loops or any further sections of double track on the line, and thus no capacity for trains to pass each other. There were no signals past Rosehill, meaning the entire section of line was one Signalling block system, block, meaning only one train could be in this section at any time. Trains entering or exiting this block were detected using an axle counter. The section between Rosehill and Clyde was controlled using conventional track circuits and Australian railway signalling#Double light colour light, signals.


Stations


Sidings

A number of industrial and car storage sidings have been built on the line."NSW Track and Signalling Diagrams", Australian Railway Historical Society (NSW Division) Starting from the Clyde end: *Prestressed Concrete Siding: located between Clyde station and the Parramatta Road crossing. Served the railways prestressed concrete manufacturing plant which no longer operates. Currently used to stable an automated track recording vehicle. The junction is on the branch down line with the points facing north (down). * Clyde Refinery, Shell Refinery Siding: located between A'Beckett Creek and Rosehill station. The siding and junctions points have been removed. Junction was on the branch up line with the points facing south (up). *Rheem Siding and Loop: located at Rydalmere railway station, Rydalmere station. Served the Rheem Manufacturing Company, Rheem factory. The siding consisted of a short loop line with junctions north and south of the original Rydalmere station and a siding branch into the factory itself at the southern end of the yard. The loop, factory branch and all junctions have been removed. The new Rydalmere station is now situated on the opposite side of the branch line from the original station and occupies the site of the former loop. *Electricity Commission of New South Wales, Electricity Commission Siding: located at the southern end of Carlingford station. The siding was built to move large electrical transformers into the Carlingford Electrical sub-station, one of the major substations distributing electric power to Sydney. The siding and junction points have been removed. The junction was on the run-around loop with the points facing north. *Carlingford Produce Siding and Loop: a locomotive run-around loop alongside Carlingford station and a siding serving the Carlingford Produce store. The produce store siding joined the run-around loop at the southern end of the station with the points facing south. The loop and siding, together with all their junctions, have been removed. *Carlingford Car Storage Sidings: a two track siding north of Carlingford station connected to both the branch line and the locomotive run-around loop. The sidings and junctions have been removed.


History

The line was opened in two sections: Clyde to Camellia was opened on 17 November 1888, and Camellia to Carlingford (then known as Pennant Hills) was opened on 20 April 1896. Telopea station was added in 1925. Originally the line was privately owned by two companies: the line from Clyde to Rosehill was owned by John Bennett and the line from Rosehill to Carlingford was owned by the Rosehill Railway Company. The lines were taken over by their bank in 1896, with the Government of New South Wales, Government purchasing the line in 1898 and recommencing services on 1 August 1900. The line was duplicated to just south of Camellia station on 19 June 1902.Railways and Tramways of the Parramatta Hills District ''Australian Railway History, Australian Railway Historical Society Bulletin'' issue 210 April 1955 pages 50-54, 57-62The Carlingford-Clyde Branch Line ''Australian Railway Historical Society Bulletin'' issue 446 December 1974 pages 266-283 The line from Clyde to Rosehill was electrified on 12 December 1936. The electrification was extended to Carlingford on 9 August 1959. Passenger services to Sandown ceased on 19 December 1991. In 1996, the original iron lattice bridge over the Parramatta River was replaced. The new bridge only has one track, although it was built to allow a second track to be laid in the future. It sits on the refurbished piers of the original bridge. In early 2007, the pedestrian Level crossing, crossings at Telopea railway station, Telopea and Dundas railway station, Sydney, Dundas stations were rebuilt. The new automatic crossings provide audible and visual warnings of an approaching train and a short time later close the metal gates. Over the week of 20 to 26 October 2007, the section of track from Telopea to Carlingford was completely replaced, utilising concrete Railroad tie, sleepers instead of timber ones. The section from Telopea to Rosehill was similarly upgraded over the fortnight of 22 June to 3 July 2009. The railway remains on timber sleepers from Rosehill to Clyde. The line was colour-coded orange in CityRail promotional material until 1991 when it was coded yellow (along with the Western Line). From 2000 it has been colour-coded dark blue. Until June 2010, the line carried oil trains to and from the Clyde Refinery on the Sandown railway line, Sandown line. In October 2016, Sandown line traffic was officially suspended. A Stop Block was placed on the Sydney side of Access Road level crossing.


Modification proposals

The line's low frequency and low level of patronage led to various inquiries and studies into its future. A major problem was the level crossing over Parramatta Road, which held up traffic when trains travelled across it. Proposals included tunnel links to Clyde or Granville stations, or replacing the line altogether with a more frequent light rail or Bus rapid transit, busway service. The Government of New South Wales, New South Wales Government originally planned for the Carlingford line to be part of Stage 2 of the Epping to Chatswood railway line, Parramatta Rail Link. That plan would have incorporated the majority of the line, with the section between Carlingford and Camellia railway station, Camellia duplicated. Telopea railway station, Telopea, Dundas railway station, Sydney, Dundas, and Rydalmere railway station, Rydalmere stations would also have been duplicated and upgraded to allow eight car trains. Camellia station would have been demolished, and Rosehill station closed and replaced by a new underground station with a preliminary name of 'Rosehill/Camellia'. Carlingford station would also have been replaced by an underground station. Various proposals were put forward, including a three-way underground junction near Carlingford, linking the station to the proposed North West Rail Link, as well as the line to Chatswood railway station, Chatswood. In 2003, the Minister for Transport (New South Wales), Minister for Transport, Michael Costa (politician), Michael Costa announced that only Stage 1 of the line, from Chatswood to Epping railway station, Sydney, Epping, would be built, but the Carlingford line section was indefinitely postponed. Under the Rail Clearways Project, announced in 2004, the line was to have had a crossing loop at Rydalmere, thus allowing an increase in train frequency to half-hourly throughout the day. However, that part of the Clearways Project was cancelled in November 2008. In August 2010, the Government of Australia, Federal Government promised $2.6 billion towards the project, which, along with funding from the New South Wales Government, would have allowed the line to be extended from Epping to Parramatta railway station, Parramatta via the Carlingford line. Work was to commence in 2011, with a projected 2017 finish. Following a change of government at the 2011 New South Wales state election, 2011 state election, the project was shelved. A large amount of land lies behind Carlingford station, for future extensions of the line.


Parramatta Light Rail

In 2013, City of Parramatta, Parramatta City Council published a feasibility study into a Western Sydney Light Rail network. The study proposed the construction of a light rail line from Parramatta to the Macquarie Centre, running parallel to the Carlingford line between Camelia and Dundas. The report noted that while the future of the railway line was a matter for the state government, conversion of the line to light rail would reduce the cost of the light rail's construction significantly.Western Sydney Light Rail Network
Parramatta City Council
In December 2015, the NSW government announced the Camellia to Carlingford section of the line would be converted to light rail, forming a branch of the Parramatta Light Rail network. That would replace the connection to the Sydney Trains network at Clyde with a link to Parramatta and Westmead, New South Wales, Westmead. As a consequence, the Carlingford line north of Parramatta Road was closed on 5 January 2020 to allow conversion works to take place. Much of the remaining section closed permanently. That included Rosehill station, which is not on the light rail route. The short section between Clyde and the Parramatta Road level crossing will remain open to allow access to Sydney Trains' track inspection depot. The Sandown line was formally closed in July 2019. A Buses in Sydney#Route 535, replacement bus service, the route 535, was introduced from Parramatta to Carlingford, and is operated by Hillsbus. The level crossing across Parramatta Road was removed in late January 2020.


Services

In its last years, all services on the line operated as shuttle services from Clyde. A few peak hour services operated to and from Central railway station, Sydney, Central, but these had been withdrawn years before the line closed. With annual patronage of 569,000 for the year 2019, the Carlingford line was Sydney's least-used suburban railway line. The following table shows the patronage of Sydney Trains network for the year ending 30 June 2020.


Remains

Very little of the line remains as of May 2020 as the tracks and overhead wiring were removed in January 2020 with the stations at Rydalmere, Telopea, Camellia and Carlingford demolished from April to May 2020. The only remnants of the railway that will be left and integrated with the light rail are the Parramatta River bridge at Rydalmere and the former Dundas Station building. Carlingford_railway_line,_truncation_at_Parramatta_Road.jpg, Truncation of the line just south of Parramatta Road Carlingford_railway_line,_former_Parramatta_Road_level_crossing.jpg, The site of the former level crossing at Parramatta Road Carlingford_railway_line,_former_alignment.jpg, The former alignment alongside James Ruse Drive Camellia_Railway_Station_site.jpg, The site of the former Camellia Station, construction of Light Rail underway


Rolling stock

Prior to the line being electrified, services were hauled by New South Wales Z13 class locomotive, Z13 and New South Wales Z20 class locomotive, Z20 class locomotives. Some services were operated by CPH railmotors. Electric services were operated by New South Wales Standard suburban carriage stock, Standard suburban carriages and New South Wales Sputnik suburban carriage stock, Sputnik Carriages then Sydney Trains S set, S sets and Sydney Trains C set, C sets in two and later four carriage formations from 1993 to 2019 then finally Sydney Trains K set, K and Sydney Trains M set, M sets from July 2019 to the line's closure. Set M30 held the honour of running the final revenue service for the T6 Carlingford Line.Two Car Suburban Electrics Re-Introduced ''Railway Digest'' December 1976 page 231


References


External links

{{Australian railway bridges, state=autocollapse Closed railway lines in Sydney Railway lines opened in 1896 Railway lines closed in 2020 Standard gauge railways in Australia Sydney Trains 1896 establishments in Australia 2020 disestablishments in Australia City of Parramatta