Butibori Power Project
   HOME

TheInfoList



OR:

Butibori Power Project is a coal-based thermal power plant located at Butibori near
Nagpur Nagpur (pronunciation: aːɡpuːɾ is the third largest city and the winter capital of the Indian state of Maharashtra. It is the 13th largest city in India by population and according to an Oxford's Economics report, Nagpur is projected to ...
in the Indian state of Maharashtra. The power plant is operated by the
Reliance Power Reliance Power Limited (R-Power), formerly Reliance Energy Generation Limited (REGL) is a part of the Reliance Anil Dhirubhai Ambani Group. It was established to develop, construct, operate and maintain power projects in the Indian and internat ...
. The Engineering, procurement and construction contract is given to
Reliance Infrastructure Reliance Infrastructure Limited (R-Infra), formerly Reliance Energy Limited (REL) and Bombay Suburban Electric Supply (BSES), is an Indian private sector enterprise involved in power generation, infrastructure, construction and defence. It is p ...
and Shanghai Electric Corporation of
People's Republic of China China, officially the People's Republic of China (PRC), is a country in East Asia. It is the world's most populous country, with a population exceeding 1.4 billion, slightly ahead of India. China spans the equivalent of five time zones and ...
is supplying the boiler, turbine and generator (BTG) for the power plant. Along with Power generation units, there are two reservoirs of water, one of which has intake from the
MIDC Maharashtra Industrial Development Corporation (MIDC) is a project of the government of Maharashtra state in India and is the leading corporation of Maharashtra. It provides businesses with infrastructure such as land (open plot or built-up spa ...
area and the other from the nearby Wadgaon dam. The premises of the power plant also include a Coal Handling Plant (CHP), an Ash Handling Plant (AHP) and a
Water Treatment Water treatment is any process that improves the quality of water to make it appropriate for a specific end-use. The end use may be drinking, industrial water supply, irrigation, river flow maintenance, water recreation or many other uses, inc ...
Plant. The basis for generation of electricity in this plant is the reheat
Rankine cycle The Rankine cycle is an idealized thermodynamic cycle describing the process by which certain heat engines, such as steam turbines or reciprocating steam engines, allow mechanical work to be extracted from a fluid as it moves between a heat sourc ...
.


Working Process

The plant has two 72 m high tangentially fired, water tube boilers. The boilers have a capacity of 1024 m3/hr each, with the output steam being supplied at 167 bar and 540 °C. The boilers are heated by coal. The coal is initially about 300 mm in size. It is crushed to 20 mm and then put into a coal mill, which pulverizes it into extremely fine powder of around 70 microns. The powdered coal is then supplied to the top of the boilers via tubes and primary air (PA) fans, where it is burnt to generate heat and convert the water in the boilers to steam. The steam generated in the boilers is then supplied to the turbine, which is coupled to a generator. The steam is supplied via 2 out of 3 boiler feed pumps. Two pumps are always active, while one pump is on standby. The
turbine A turbine ( or ) (from the Greek , ''tyrbē'', or Latin ''turbo'', meaning vortex) is a rotary mechanical device that extracts energy from a fluid flow and converts it into useful work. The work produced by a turbine can be used for generating ...
s run at a constant speed of 3000 rpm, so as to provide a steady output of 50 Hz. The turbines are divided into 3 parts : High Pressure (HP) turbine, Intermediate Pressure (IP) turbine and a Low Pressure (LP) turbine. The steam is supplied to the HP, which sends it back for reheating. This reheated steam then goes to the IP and the LP, which in turn run the generator to produce electricity. The steam let out from the turbine goes to a condenser, which converts the steam into water to be reused in the boiler. The burning of coal releases
ash Ash or ashes are the solid remnants of fires. Specifically, ''ash'' refers to all non-aqueous, non- gaseous residues that remain after something burns. In analytical chemistry, to analyse the mineral and metal content of chemical samples, ash ...
and flue gases. The flue gases are released out into the surroundings, 220 m above the ground level via two chimneys. Post combustion, the mixture of flue gases and ash passes over an
Electrostatic Precipitator An electrostatic precipitator (ESP) is a filterless device that removes fine particles, like dust and smoke, from a flowing gas using the force of an induced electrostatic charge minimally impeding the flow of gases through the unit. In con ...
(ESP). This attracts the ash particles, which are usually positively or negatively charged, to its surface and lets the uncharged flue gases through to the chimneys. This ESP has 8 stages, to even out the accumulation of ash and prevent overloading. The ash is collected in a storage via a hopper. This ash is then carried away to the AHP until it is shipped if the need arises. Before the water is supplied into the boilers, it is treated in the water treatment plant, which removes all dissolved minerals in the water, disinfects it and removes dissolved air and silica. The
turbidity Turbidity is the cloudiness or haziness of a fluid caused by large numbers of individual particles that are generally invisible to the naked eye, similar to smoke in air. The measurement of turbidity is a key test of water quality. Fluids ...
of water is also reduced to less than 1 NTU. Chemicals used in the Water treatment plant are Lime Dolomite, Poly electrolyte, Chlorine gas, SMBS ( Sodium metabisulphate) and an antiscalant.


Capacity

It has an installed capacity of 600 MW. Although the plant has a capacity of 660 MW, it supplies only about 540 MW to the grid. 30% of the power generated is used to run the plant itself.


Status updates

Vidarbha Industries Power Limited (VIPL), a subsidiary of
Reliance Power Limited Reliance Power Limited (R-Power), formerly Reliance Energy Generation Limited (REGL) is a part of the Reliance Anil Dhirubhai Ambani Group. It was established to develop, construct, operate and maintain power projects in the Indian and internat ...
, has made 141 out of its 170 staffers at the 600 MW Butibori power plant tender their resignation. The plant was closed since January 2019 and the staffers were doing only maintenance and preservation work. The remaining 29 staffers will continue this work. Station director Rajendra Kale said the plant had closed down due to regulatory issues after Adani Power took over Reliance’s power distribution business in Mumbai. “We initially closed one 300 MW unit and then had to close the second one too,” he added.


References

{{coord missing, Maharashtra Coal-fired power stations in Maharashtra Nagpur district Year of establishment missing