The Bucharest Ring Motorway (or the Bucharest Belt Motorway, ro, Autostrada Centura București), termed A0, is a
motorway A controlled-access highway is a type of highway that has been designed for high-speed vehicular traffic, with all traffic flow—ingress and egress—regulated. Common English terms are freeway, motorway and expressway. Other similar terms i ...
ring Ring may refer to: * Ring (jewellery), a round band, usually made of metal, worn as ornamental jewelry * To make a sound with a bell, and the sound made by a bell :(hence) to initiate a telephone connection Arts, entertainment and media Film and ...
in construction around the city of
Bucharest Bucharest ( , ; ro, București ) is the capital and largest city of Romania, as well as its cultural, industrial, and financial centre. It is located in the southeast of the country, on the banks of the Dâmbovița River, less than north of ...
, the capital of
Romania Romania ( ; ro, România ) is a country located at the crossroads of Central Europe, Central, Eastern Europe, Eastern, and Southeast Europe, Southeastern Europe. It borders Bulgaria to the south, Ukraine to the north, Hungary to the west, S ...
. It is intended to be the outer ring to the existing Bucharest Ring Road. It is split into two sections: the South Ring Motorway and the North Ring Motorway. It will have a total distance of 100 km and will be a motorway connection between the existing A1, A2 and A3 motorways. Currently, construction contracts are ongoing for the lot 1 and lot 2 of southern half, while for the northern half three tenders were launched.__NOTOC__


Sections


South section

The South Ring Motorway (52 km) was tendered as a
concession Concession may refer to: General * Concession (contract) (sometimes called a concession agreement), a contractual right to carry on a certain kind of business or activity in an area, such as to explore or develop its natural resources or to opera ...
contract in December 2012, that was supposed to be awarded in November 2013. Yet, a new tender was announced in July 2017, that shall be completed between the end of 2017 and the first half of 2018, with an estimated cost of 580 million euros. Construction works should take three years and a half to complete. It will run through the south of Bucharest, along the route of the
Pan-European Corridor IV The Corridor IV is one of the Pan-European transport corridors. It runs between Dresden/Nuremberg in Germany and Thessaloniki (Greece) / Constanța (Romania) / Istanbul (Turkey). The corridor follows the route: Dresden / Nuremberg – Prag ...
. A tender for a segment of 17.5 km (15.5 km of the South section and 2.5 km of the North section), called lot 3, between the
A1 motorway A1, A-1, A01 or A.1. may refer to: Education * A1, the Basic Language Certificate of the Common European Framework of Reference for Languages * Language A1, the former name for "Language A: literature", one of the IB Group 1 subjects * A1, a ...
and the DN6 road was launched in July 2017 and awarded in April 2018, to the joint-venture Spedition UMB–Tehnostrade–Artera Proiect, with one year allowed for the design of the motorway and two and a half years for the construction works. However, the bid was challenged and awarded to a new constructor, the Greek company Aktor, in October 2018. The rest of the South section was tendered on the same date as well, with both of the two bids awarded to the Turkish company Alsim Alarko: the contract for the segment of 16.3 km between the DN6 road and the CFR Line 902 (near
Jilava Jilava is a commune in Ilfov county, Muntenia, Romania, near Bucharest. It is composed of a single village, Jilava. The name derives from a Romanian word of Slavic origin (Bulgarian жилав ''žilav'' (tough), which passed into Romanian as ''j ...
), called lot 2, was signed in March 2019 and is due to be finished in 2022, while the bid for the segment of 16.9 km between the CFR Line 902 and the A2 motorway, called lot 1, was under challenge procedures until July 2019, with the contract being signed one month later.


North section

In June 2019, the 45 km of the Northern half were tendered for auction into three segments.


Openings timeline

*All segments of the South Ring are under construction and planned to be opened in 2023. *Two of the 4 segments of the North Ring have been signed, with the entire North section expected to be finished by 2024.


Periods of works

In May 2019 the northern portion was auctioned following the works to start on June 10, 2019. In August 2019 it was auctioned the motorway connection between the existing A1, there are currently no works on this portion.


See also

* Roads in Romania * Transport in Romania


References


External links


Ministry of Transport – Bucharest By-Pass Motorway
{{coord missing, Bucharest Proposed roads in Romania Motorways in Romania