The unit commitment problem (UC) in electrical power production is a large family of
mathematical optimization Mathematical optimization (alternatively spelled ''optimisation'') or mathematical programming is the selection of a best element, with regard to some criterion, from some set of available alternatives. It is generally divided into two subfi ...
problems where the production of a set of electrical generators is coordinated in order to achieve some common target, usually either matching the energy demand at minimum cost or maximizing revenue from electricity production. This is necessary because it is difficult to store electrical energy on a scale comparable with normal consumption; hence, each (substantial) variation in the consumption must be matched by a corresponding variation of the production. Coordinating generation units is a difficult task for a number of reasons: * the number of units can be large (hundreds or thousands); * there are several types of units, with significantly different energy production costs and constraints about how power can be produced; * generation is distributed across a vast geographical area (e.g., a country), and therefore the response of the
electrical grid An electrical grid is an interconnected network for electricity delivery from producers to consumers. Electrical grids vary in size and can cover whole countries or continents. It consists of:Kaplan, S. M. (2009). Smart Grid. Electrical Power ...
, itself a highly complex system, has to be taken into account: even if the production levels of all units are known, checking whether the load can be sustained and what the losses are requires highly complex power flow computations. Because the relevant details of the electrical system vary greatly worldwide, there are many variants of the UC problem, which are often very difficult to solve. This is also because, since some units require quite a long time (many hours) to start up or shut down, the decisions need be taken well in advance (usually, the day before), which implies that these problems have to be solved within tight time limits (several minutes to a few hours). UC is therefore one of the fundamental problems in power system management and simulation. It has been studied for many years,C.J. Baldwin, K.M. Dale, R.F. Dittrich. ''A study of the economic shutdown of generating units in daily dispatch''. Transactions of the American Institute of Electrical Engineers Power Apparatus and Systems, Part III, 78(4):1272–1282, 1959.J.F. Bard. ''Short-term scheduling of thermal-electric generators using Lagrangian relaxation''. Operations Research 1338 36(5):765–766, 1988. and still is one of the most significant energy optimization problems. Recent surveys on the subjectN.P. Padhy. ''Unit commitment – a bibliographical survey'', IEEE Transactions On Power Systems 19(2):1196–1205, 2004.M. Tahanan, W. van Ackooij, A. Frangioni, F. Lacalandra. ''Large-scale Unit Commitment under uncertainty'', 4OR 13(2), 115–171, 2015.
/ref> count many hundreds of scientific articles devoted to the problem. Furthermore, several commercial products comprise specific modules for solving UC, such as MAONMaon Model Handbook
/ref> and PLEXOS,PLEXOS® Integrated Energy Model
/ref> or are even entirely devoted to its solution.Power optimization
/ref>


Elements of unit commitment problems

There are many different UC problems, as the electrical system is structured and governed differently across the world. Common elements are: * A ''time horizon'' along which the decisions have to be made, sampled at a finite number of ''time instants''. This is usually one or two days, up to a week, where instants are usually hours or half-hours; less frequently, 15 or 5 minutes. Hence, time instants are typically between 24 and around 2000. * A set of ''generating units'' with the corresponding energy production cost and/or emission curves, and (complex) technical constraints. * A representation of the significant part of the ''
grid network Elex Media Komputindo is a publishing company in Indonesia which publishes books, comics, magazines, novels and other print media. Established on January 15, 1985, Elex Media Komputindo is a subsidiary of Kompas Gramedia Group. Elex is headquart ...
''. * A (forecasted) ''
load profile In electrical engineering, a load profile is a graph of the variation in the electrical load versus time. A load profile will vary according to customer type (typical examples include residential, commercial and industrial), temperature and holi ...
'' to be satisfied, i.e., the net amount of energy to be delivered to each node of the grid network at each time instant. * Possibly, a set of ''reliability constraints''M. Shahidehpour, H. Yamin, and Z. Li. ''Market Operations in Electric Power Systems: Forecasting, Scheduling, and Risk Management'', Wiley-IEEE Press, 2002. ensuring that demand will be satisfied even if some unforeseen events occur. * Possibly, ''financial and/or regulatory conditions''C. Harris. ''Electricity markets: Pricing, structures and Economics'', volume 565 of The Wiley Finance Series. John Wiley and Sons, 2011. (energy revenues, market operation constraints, financial instruments, ...). The decisions that have to be taken usually comprise: * ''commitment decisions'': whether a unit is producing energy at any time instant; * ''production decisions'': how much energy a unit is producing at any time instant; * ''network decisions'': how much energy is flowing (and in which direction) on each branch of the transmission and/or distribution grid at any given time instant. While the above features are usually present, there are many combinations and many different cases. Among these we mention: * whether the units and the grid are all handled by a Monopolistic Operator (MO),A.J. Conejo and F.J. Prieto. ''Mathematical programming and electricity markets'', TOP 9(1):1–53, 2001. or a separate Transmission System Operator (TSO) manages the grid providing fair and not discriminatory access to Generating Companies (GenCos) that compete to satisfy the production on the (or, most often, several interconnected) energy market(s); * the different kinds of energy production units, such as thermal/nuclear ones, hydro-electric ones, and renewable sources (wind, solar, ...); * which units can be ''modulated'', i.e., their produced energy can be decided by the operator (albeit subject to the technical constraints of the unit), as opposed to it being entirely dictated by external factors such as weather conditions; * the level of detail at which the working of the
electrical grid An electrical grid is an interconnected network for electricity delivery from producers to consumers. Electrical grids vary in size and can cover whole countries or continents. It consists of:Kaplan, S. M. (2009). Smart Grid. Electrical Power ...
must be considered, ranging from basically ignoring it to considering the possibility of dynamically opening (interrupting) a line in order to optimally change the energy routing on the grid.


Management objectives

The objectives of UC depend on the aims of the actor for which it is solved. For a MO, this is basically to ''minimize energy production costs'' while satisfying the demand; reliability and emissions are usually treated as constraints. In a free-market regime, the aim is rather to ''maximize energy production profits'', i.e., the difference between revenues (due to selling energy) and costs (due to producing it). If the GenCo is a ''price maker'', i.e., it has sufficient size to influence market prices, it may in principle perform ''strategic bidding''A.K. David, F. Wen. ''Strategic bidding in competitive electricity markets: a literature survey'' In Proceedings IEEE PES Summer Meeting 4, 2168–2173, 2001. in order to improve its profits. This means bidding its production at high cost so as to raise market prices, losing market share but retaining some because, essentially, there is not enough generation capacity. For some regions this may be due to the fact that there is not enough grid network capacity to import energy from nearby regions with available generation capacity.T. Peng and K. Tomsovic. ''Congestion influence on bidding strategies in an electricity market'', IEEE Transactions on Power Systems 18(3):1054–1061, August 2003. While the electrical markets are highly regulated in order to, among other things, rule out such behavior, large producers can still benefit from simultaneously optimizing the bids of all their units to take into account their combined effect on market prices.A.J. Conejo, J. Contreras, J.M. Arroyo, S. de la Torre. ''Optimal response of an oligopolistic generating company to a competitive pool-based electric power market'', IEEE Transactions on Power Systems 17(2):424–430, 2002. On the contrary, ''price takers'' can simply optimize each generator independently, as, not having a significant impact on prices, the corresponding decisions are not correlated.J.M. Arroyo, A.J. Conejo. ''Optimal response of a thermal unit to an electricity spot market'', IEEE Transactions on Power Systems 15(3):1098–1104, 2000.


Types of production units

In the context of UC, generating units are usually classified as: * Thermal units, which include
nuclear Nuclear may refer to: Physics Relating to the nucleus of the atom: *Nuclear engineering *Nuclear physics *Nuclear power *Nuclear reactor *Nuclear weapon *Nuclear medicine *Radiation therapy *Nuclear warfare Mathematics *Nuclear space *Nuclear ...
ones, that burn some sort of fuel to produce electricity. They are subject to numerous complex technical constraints, among which we mention ''minimum up/down time'', ''ramp up/down rate'', ''modulation/stability'' (a unit cannot change its production level too many timesJ. Batut and A. Renaud. ''Daily scheduling with transmission constraints: A new class of algorithms'', IEEE Transactions on Power Systems 7(3):982–989, 1992.), and ''start-up/shut-down ramp rate'' (when starting/stopping, a unit must follow a specific power curve which may depend on how long the plant has been offline/onlineG. Morales-España, J.M. Latorre, A. Ramos. ''Tight and Compact MILP Formulation of Start-Up and Shut-Down Ramping in Unit Commitment'', IEEE Transactions on Power Systems 28(2), 1288–1296, 2013.). Therefore, optimizing even a single unit is in principle already a complex problem which requires specific techniques.A. Frangioni, C. Gentile. ''Solving Nonlinear Single-Unit Commitment Problems with Ramping Constraints'', Operations Research 54(4), 767–775, 2006. * Hydro units, that generate energy by harvesting water potential energy, are often organized into systems of connected reservoirs called ''hydro valleys''. Because water released by an upstream reservoir reaches the downstream one (after some time), and therefore becomes available to generate energy there, decisions on the optimal production must be taken for all units simultaneously, which makes the problem rather difficult even if no (or little) thermal production is involved,E.C. Finardi and E.L. Da Silva. ''Solving the hydro unit commitment problem via dual decomposition and sequential quadratic programming'', IEEE Transactions on Power Systems 21(2):835–844, 2006. even more so if the complete electrical system is considered.F.Y.K. Takigawa, E.L. da Silva, E.C. Finardi, and R.N. Rodrigues. ''Solving the hydrothermal scheduling problem considering network constraints.'', Electric Power Systems Research 88:89–97, 2012. Hydro units may include pumped-storage units, where energy can be spent to pump water uphill. This is the only current technology capable of storing enough (potential) energy to be significant at the typical level of the UC problem. Hydro units are subject to complex technical constraints. The amount of energy generated by turbining some amount of water is not constant, but it depends on the water head which in turn depends on previous decisions. The relationship is nonlinear and nonconvex, making the problem particularly difficult to solve. A. Borghetti, C. D’Ambrosio, A. Lodi, S. Martello. ''A MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir'', IEEE Transactions on Power Systems 23(3):1115–1124, 2008. * Renewable generation units, such as
wind farms Wind is the natural movement of air or other gases relative to a planet's surface. Winds occur on a range of scales, from thunderstorm flows lasting tens of minutes, to local breezes generated by heating of land surfaces and lasting a few h ...
, solar plants, run-of-river hydro units (without a dedicated reservoir, and therefore whose production is dictated by the flowing water), and geothermal units. Most of these cannot be ''modulated'', and several are also ''intermittent'', i.e., their production is difficult to accurately forecast well in advance. In UC, these units do not really correspond to decisions, since they cannot be influenced. Rather, their production is considered fixed and added to that of the other sources. The substantial increase of intermittent renewable generation in recent years has significantly increased uncertainty in the ''net load'' (demand minus production that cannot be modulated), which has challenged the traditional view that the forecasted load in UC is accurate enough.


Electrical grid models

There are three different ways in which the energy grid is represented within a UC: * In the ''single bus approximation'' the grid is ignored: demand is considered to be satisfied whenever total production equals total demand, irrespective of their geographical location. * In the ''DC approximation'' only Kirchhoff's current law is modeled; this corresponds to
reactive power Reactive may refer to: *Generally, capable of having a reaction (disambiguation) *An adjective abbreviation denoting a bowling ball coverstock made of reactive resin *Reactivity (chemistry) *Reactive mind *Reactive programming See also *Reactanc ...
flow being neglected, the voltage angles differences being considered small, and the angle voltage profile being assumed constant; * In the ''full AC model'' the complete Kirchhoff laws are used: this results in highly nonlinear and nonconvex constraints in the model. When the full AC model is used, UC actually incorporates the optimal power flow problem, which is already a nonconvex nonlinear problem. Recently, the traditional "passive" view of the energy grid in UC has been challenged. In a ''fixed'' electrical network currents cannot be routed, their behavior being entirely dictated by nodal power injection: the only way to modify the network load is therefore to change nodal demand or production, for which there is limited scope. However, a somewhat counter-intuitive consequence of Kirchhoff laws is that interrupting a line (maybe even a congested one) causes a global re-routing of electrical energy and may therefore ''improve'' grid performances. This has led to defining the ''Optimal Transmission Switching problem'',E.B. Fisher, R.P. O'Neill, M.C. Ferris. ''Optimal transmission switching'', IEEE Transactions on Power Systems 23(3):1346–1355, 2008. whereby some of the lines of the grid can be dynamically opened and closed across the time horizon. Incorporating this feature in the UC problem makes it difficult to solve even with the DC approximation, even more so with the full AC model.K.W. Hedman, M.C. Ferris, R.P. O’Neill, E.B. Fisher, S.S. Oren. ''Co-optimization of generation unit commitment and transmission switching with ''n'' − 1 reliability'', IEEE Transactions on Power Systems 25(2):1052–1063, 2010.


Uncertainty in unit commitment problems

A troubling consequence of the fact that UC needs be solved well in advance to the actual operations is that the future state of the system is not known exactly, and therefore needs be estimated. This used to be a relatively minor problem when the ''uncertainty'' in the system was only due to variation of users' demand, which on aggregate can be forecasted quite effectively,E.A. Feinberg, D. Genethliou. ''Load Forecasting'', in Applied Mathematics for Restructured Electric Power Systems, J.H. Chow, F.F. Wu, and J. Momoh eds., Springer, 269–285, 2005H. Hahn, S. Meyer-Nieberg, S. Pickl. ''Electric load forecasting methods: Tools for decision making'', European Journal of Operational Research 199(3), 902–907, 2009 and occurrence of lines or generators faults, which can be dealt with by well established rules ( spinning reserve). However, in recent years the production from intermittent renewable production sources has significantly increased. This has, in turn, very significantly increased the impact of uncertainty in the system, so that ignoring it (as traditionally done by taking average point estimates) risks significant cost increases.A. Keyhani, M.N. Marwali, and M. Dai. ''Integration of Green and Renewable Energy in Electric Power Systems'', Wiley, 2010. This had made it necessary to resort to appropriate mathematical modeling techniques to properly take uncertainty into account, such as: *
Robust optimization Robust optimization is a field of mathematical optimization theory that deals with optimization problems in which a certain measure of robustness is sought against uncertainty that can be represented as deterministic variability in the value of the ...
approaches; * Scenario optimization approaches; * Chance-constrained optimization approaches. The combination of the (already, many) traditional forms of UC problems with the several (old and) new forms of uncertainty gives rise to the even larger family of ''Uncertain Unit Commitment'' (UUC) problems, which are currently at the frontier of applied and methodological research.


Integrated Transmission and Distribution Models

One of the major issues with the real-time unit commitment problem is the fact that the electricity demand of the transmission network is usually treated as a "load point" at each
distribution system Distribution may refer to: Mathematics *Distribution (mathematics), generalized functions used to formulate solutions of partial differential equations *Probability distribution, the probability of a particular value or value range of a varia ...
. The reality, however, is that each load point is a complex distribution network with its own sub-loads, generators, and DERs. By simplifying a distribution into load points can lead to extreme operational troubles of the whole power grid. Such problems include high pressure on the power transmission system and reverse power flow from the distribution systems towards the power transmission system. A newly pursued approach for more effectively solving the unit-commitment problem hence is born by Integrated Transmission and Distribution Systems. In such models, the unit commitment problem of the Transmission Systems is usually combined with the Renewable Management Problem of the Distribution Systems by the means of bi-level programming tools.


See also

*
Electricity market In a broad sense, an electricity market is a system that facilitates the exchange of electricity-related goods and services. During more than a century of evolution of the electric power industry, the economics of the electricity markets had u ...


References

{{reflist


External links

*A description of the role of unit commitment problems in the overall context of power system management can be found in the