Westermost Rough Wind Farm is an offshore
wind farm A wind farm or wind park, also called a wind power station or wind power plant, is a group of wind turbines in the same location used Wind power, to produce electricity. Wind farms vary in size from a small number of turbines to several hundre ...
north east of
Withernsea Withernsea is a seaside resort and civil parish in Holderness, East Riding of Yorkshire, England. Its white inland lighthouse, rising around above Hull Road, now houses a museum to 1950s actress Kay Kendall, who was born in the town. The Pr ...
off the
Holderness Holderness is an area of the East Riding of Yorkshire, on the north-east coast of England. An area of rich agricultural land, Holderness was marshland until it was drained in the Middle Ages. Topographically, Holderness has more in common wit ...
coast, in the
North Sea The North Sea lies between Great Britain, Norway, Denmark, Germany, the Netherlands and Belgium. An epeiric sea on the European continental shelf, it connects to the Atlantic Ocean through the English Channel in the south and the Norwegian S ...
,
England England is a country that is part of the United Kingdom. It shares land borders with Wales to its west and Scotland to its north. The Irish Sea lies northwest and the Celtic Sea to the southwest. It is separated from continental Europe b ...
. The farm covers an area of approximately with a generation capacity of approximately 210 MW. It became operational in May 2015.


History

The Westermost Wind farm site was originally awarded to Total in 2003 during the initial Round 2 wind farm tendering process; Total later withdrew and the concession was returned to the
Crown Estate The Crown Estate is a collection of lands and holdings in the United Kingdom belonging to the British monarch as a corporation sole, making it "the sovereign's public estate", which is neither government property nor part of the monarch's priva ...
in 2006. In 2007
DONG Energy Dong or DONG may refer to: Places * Dong Lake, or East Lake, a lake in China * Dong, Arunachal Pradesh, a village in India * Dong (administrative division) (동 or 洞), a neighborhood division in Korea Persons *Queen Dong (1623–1681), princes ...
was awarded a lease from
The Crown Estate The Crown Estate is a collection of lands and holdings in the United Kingdom belonging to the British monarch as a corporation sole, making it "the sovereign's public estate", which is neither government property nor part of the monarch's priva ...
to develop a wind farm at Westermost Rough. The company ''Westermost Rough Ltd'' was established 2007;Westernmost Rough Limited, incorporated 1 May 2007, company number 0623914. Source:
Companies House Companies House is the executive agency of the company registrars of the United Kingdom, falling under the remit of the Department for Business, Energy and Industrial Strategy. All forms of companies (as permitted by the Companies Act) are i ...
database
a subsidiary of DONG Energy. A planning application was submitted in November 2009, and consent was given by the
Department of Energy and Climate Change The Department of Energy and Climate Change (DECC) was a department of the Government of the United Kingdom created on 3 October 2008, by Prime Minister Gordon Brown to take over some of the functions related to energy of the Department for Busin ...
in 2011 for a development of up to 80 turbines of up to 245 MW power with a limit of turbine tip height, and rotor diameter, as well as associated onshore and offshore substations, cabling and other infrastructure. Initial expectations were for an earliest in service date of 2014, in January 2013 construction of the wind farm was confirmed, with construction scheduled to start in 2014 with the farm operational by 2015. DONG Energy sold a 50% stake in the wind farm in equal parts to the
Green Investment Bank Green Investment Group Limited (GIG) is a specialist in green infrastructure principal investment, project delivery and the management of portfolio assets, and related services. The business was launched initially by the UK government in 2012 a ...
and to
Marubeni Corporation (, OSE: 8002, NSE: 8002) is a ''sōgō shōsha'' (general trading company) headquartered in Nihonbashi, Chuo, Tokyo, Japan. It is one of the largest ''sogo shosha'' and has leading market shares in cereal and paper pulp trading as well as a st ...
for a total of £240 million; as part of the sale the two buyers committed to investing £500 million in the construction of the wind farm; the two companies, through the joint company ''WMR JV Investco Limited'' secured £370 million from lenders in August 2014 to fund the capital cost of the project.


Design, manufacture and construction

The wind farm is located off the
Holderness Holderness is an area of the East Riding of Yorkshire, on the north-east coast of England. An area of rich agricultural land, Holderness was marshland until it was drained in the Middle Ages. Topographically, Holderness has more in common wit ...
coast, roughly northeast of
Withernsea Withernsea is a seaside resort and civil parish in Holderness, East Riding of Yorkshire, England. Its white inland lighthouse, rising around above Hull Road, now houses a museum to 1950s actress Kay Kendall, who was born in the town. The Pr ...
.Boundaries of the wind farm are at grid locations , , , , and . ( London Gazette, 18 June 2012) The proposed design is for 35 to 80 turbines of between 3 and 7 MW power output, in an area of , with a total installed capacity of up to 245 MW. The offshore substation design was subcontracted to
Ramboll Rambøll Group A/S (also known as just "Ramboll") is a Danish consulting engineering group. History Rambøll was founded in October 1945 as "Rambøll & Hannemann" in Copenhagen. In 1991 the company merged with "B. Højlund Rasmussen A/S" into ...
, with medium voltage turbine to offshore transformer submarine cables supplied by
Nexans Nexans S.A. is a global company in the cable and optical fiber industry headquartered in Paris, France. The group is active in four main business areas: buildings and territories (construction, local infrastructure, smart cities / grids, e-mobil ...
. High voltage 155 kV submarine export cables and 155/275 kV underground cables were contracted to be supplied from
LS Cable & System LS Cable & System (Korean: LS전선, 엘에스전선) is a South Korea-based industrial corporation with global operations and one of the biggest cable manufacturers worldwide. Its products comprise power and telecommunication cables and syste ...
of Korea. The cable landing point is to be near
Tunstall, East Riding of Yorkshire Tunstall is a village in Holderness, in the East Riding of Yorkshire, England, close to the North Sea coast. Geography Tunstall village is located in the civil parish of Roos in Holderness, in the East Riding of Yorkshire, England. It is situ ...
, with a national grid connection made via the buried cables to a new substation at
Salt End Salt End or Saltend is a hamlet in the East Riding of Yorkshire, England, in an area known as Holderness. It is situated on the north bank of the Humber Estuary just outside the Hull eastern boundary on the A1033 road. It forms part of the civi ...
. The project was the first commercial use of gearless 6 MW
Siemens Wind Siemens Gamesa Renewable Energy S.A., formerly Gamesa Corporación Tecnológica S.A. () and Grupo Auxiliar Metalúrgico S.A., is a Spanish-German wind engineering company based in Zamudio, Biscay, Spain. In Spain, the company has two other main ...
turbines; 35 turbines were to be installed, giving a capacity of 210 MW.
Varde Varde is a Danish city in southwestern Jutland and is the primary city in the municipality of Varde, in Region of Southern Denmark. In 2015 municipality changed its motto to "We in nature" to emphasize its rural atmosphere. The town has an old ma ...
, Denmark based Titan Wind Energy was contracted to supply towers, with tower foundations supplied by
Bladt Industries Bladt Industries A/S is an international steel contractor specialising in large-scale and highly complex steel structures. Bladt Industries operate within three key areas of business providing steel solutions for the wind and renewable energy sec ...
of
Aalborg Aalborg (, , ) is Denmark's fourth largest town (behind Copenhagen, Aarhus, and Odense) with a population of 119,862 (1 July 2022) in the town proper and an urban population of 143,598 (1 July 2022). As of 1 July 2022, the Municipality of Aalb ...
, Denmark. The driven monopile foundations are diameter with mass up to 800 t, with 425 t transition pieces. A dual
Doppler radar A Doppler radar is a specialized radar that uses the Doppler effect to produce velocity data about objects at a distance. It does this by bouncing a microwave signal off a desired target and analyzing how the object's motion has altered the f ...
system, (originally developed by the US
National Wind Institute The National Wind Institute (NWI) at Texas Tech University (TTU) was established in December 2012, and is intended to serve as Texas Tech University's intellectual hub for interdisciplinary and transdisciplinary research, commercialization and educ ...
, and supplied by SmartWind Technologies, LLC.) was used to measure high-density wind details over the large wind farm area, with the experiment supported by the
Carbon Trust The Carbon Trust was developed and launched in 1999-2001 as part of the development of the Climate Change Levy (CCL), a tax on business energy use that still operates today. The Carbon Trust was originally funded by around £50m of tax revenue ge ...
organisation. GeoSea was awarded the contract to install foundation piles in April 2013. The first foundation pile was installed in February 2014. In early 2014 residents of
Withernsea Withernsea is a seaside resort and civil parish in Holderness, East Riding of Yorkshire, England. Its white inland lighthouse, rising around above Hull Road, now houses a museum to 1950s actress Kay Kendall, who was born in the town. The Pr ...
and the nearby area reported noise and vibration disturbance during the night time, attributed to piling at the wind farm site; by April 2014 an investigation by the
Marine Management Organisation The Marine Management Organisation (MMO) is an executive non-departmental public body in the United Kingdom established under the Marine and Coastal Access Act 2009, with responsibility for English waters. The MMO exists to make a significant con ...
had found evidence of noise, but the results were not conclusive enough for it to act on. Foundation installation was completed by May 2014, and the offshore substation installed by June 2014. Turbine installation was completed March 2015.


Operations

The wind farm was commissioned and became operational in May 2015. Its
levelised cost The levelized cost of electricity (LCOE), or levelized cost of energy, is a measure of the average net present cost of electricity generation for a generator over its lifetime. It is used for investment planning and to compare different methods ...
has been estimated at £121/MWh. In May 2015,
Ofgem , type = Non-ministerial government department , nativename = , nativename_a = , nativename_r = , logo = Ofgem logo.svg , logo_width = 124px , logo_caption = , seal = , seal_width = , seal_caption = , picture = , picture_widt ...
awarded preferred bidder status to own and operate the electrical transmission assets of the wind farm to Transmission Capital Partners; in early 2016 the sale of the assets (TC Westernmost Rough OFTO Ltd.) to a consortium of Transmission Capital Partners Limited Partnership and International Public Partnerships Limited was completed. In early 2016 CWind was given a 20-year contract to maintain the TC Westernmost Rough OFTO's electrical transmission assets. In 2017, DONG Energy rebranded themselves as Ørsted as the acronym for DONG Energy - Danish Oil & Natural Gas - was seen as inappropriate for a company which had divested its entire oil and gas operations and was building an energy portfolio that was approaching 100% renewable.