The Uganda Electricity Generation Company Limited (UEGCL) is a
parastatal
A state-owned enterprise (SOE) is a government entity which is established or nationalised by the ''national government'' or ''provincial government'' by an executive order or an act of legislation in order to earn profit for the government ...
company whose primary purpose is to generate electric power for use in Uganda and for sale to neighboring countries. As of December 2017, UEGCL's generation capacity was 380 megawatts, with that capacity planned to increase to over 1,300 megawatts, by 2023.
Location
The headquarters of UEGCL are on Block C, Victoria Office Park, Plot 6-9 Okot Close,
Bukoto
Bukoto is a township within the city of Kampala, Uganda's capital and largest metropolitan area.
Location
Bukoto is bordered by Kisaasi to the north, Kigoowa to the north-east, Ntinda to the east, Naguru, Uganda, Naguru to the south-east, Kolol ...
, in
Kampala
Kampala (, ) is the capital and largest city of Uganda. The city proper has a population of 1,680,000 and is divided into the five political divisions of Kampala Central Division, Kawempe Division, Makindye Division, Nakawa Division, and Ruba ...
, Uganda's capital and largest city. Its coordinates are 0°19'35.0"N, 32°34'38.0"E (Latitude:0.326389; Longitude:32.577222). The company maintains a second office at 18-20 Faraday Road, Amberly Estate, in
Jinja, a city located approximately , by road, east of Kampala.
History
UEGCL was incorporated by the
Uganda Ministry of Finance, Planning and Economic Development in 2001,
following the break-up of the ''Uganda Electricity Board''.
Operations
UEGCL is responsible for the operation, maintenance, and improvement of the power stations owned by the Ugandan government.
In 2002, UEGCL executed a 20-year operational, management, and maintenance concession to
Eskom Uganda Limited, a subsidiary of South African energy company
Eskom
Eskom Hld SOC Ltd or Eskom is a South African electricity public utility. It was established in 1923 as the Electricity Supply Commission (ESCOM) and was also known by its Afrikaans name Elektrisiteitsvoorsieningskommissie (EVKOM). Eskom repre ...
, to cover the two power stations UEGCL owned at the time:
Kiira Power Station
Kiira Hydroelectric Power Station, is a hydroelectric power station in Uganda, with an installed capacity of .
Location
The power station is located at Kimaka, a northern suburb of Jinja, in Jinja District, in the Eastern Region of Uganda, a ...
and
Nalubaale Power Station
Nalubaale Power Station, formerly known as Owen Falls Dam, is a hydroelectric power station across the White Nile near its source at Lake Victoria in Uganda. ''Nalubaale'' is the Luganda name for Lake Victoria.
Location
The dam sits across the N ...
. Eskom sells the electricity it generates to the
Uganda Electricity Transmission Company Limited (UETCL) as the authorized single buyer. UETCL resells the power to
Umeme
Umeme Limited is the largest energy distributor in Uganda, distributing about 97 percent of all electricity used in the country. The shares of the stock of the company are listed on the Uganda Securities Exchange (USE) and are cross listed o ...
, the energy distributor, which then sells it to the public.
As of 30 June 2020, UEGCL controlled 563 megawatts of the national installed generation capacity of 1,252 megawatts, accounting for about 45 percent. It is expected that when the 600 megawatts Karuma Power Station comes on board in the first half of 2021, UEGCL will control an estimated 1,163 MW out of 1,852 MW, accounting for about 62 percent at that time.
Planned initial public offering
In January 2015, the UEGCL chairman announced plans to list shares of company stock on the
Uganda Securities Exchange
The Uganda Securities Exchange (USE) is the principal stock exchange of Uganda. It was founded in June 1997. The USE is operated under the jurisdiction of Uganda's Capital Markets Authority, which in turn reports to the Bank of Uganda, Uganda's ...
in an
initial public offering
An initial public offering (IPO) or stock launch is a public offering in which shares of a company are sold to institutional investors and usually also to retail (individual) investors. An IPO is typically underwritten by one or more investme ...
within the following two years. The funds raised would be used to develop more electricity generation stations, thus adding to national electricity output. At that time, UEGCL owned 380 megawatts of generating capacity, with a goal to increase to 563 megawatts in 2018 and 1,213 megawatts in 2020.
Power stations
Operational stations
*
Nalubaale Hydroelectric Power Station
Nalubaale Power Station, formerly known as Owen Falls Dam, is a hydroelectric power station across the White Nile near its source at Lake Victoria in Uganda. ''Nalubaale'' is the Luganda name for Lake Victoria.
Location
The dam sits across the N ...
: 180 megawatts
*
Kiira Hydroelectric Power Station
Kiira Hydroelectric Power Station, is a hydroelectric power station in Uganda, with an installed capacity of .
Location
The power station is located at Kimaka, a northern suburb of Jinja, in Jinja District, in the Eastern Region of Uganda, ...
: 200 megawatts
*
Isimba Hydroelectric Power Station
Isimba Hydroelectric Power Station is a hydroelectric power station commissioned on 21 March 2019 in Uganda. Construction of this dam began in April 2015 and was completed in January 2019. Commercial operations began on 21 March 2019.
Locati ...
: 183 megawatts
*
Namanve Thermal Power Station
Namanve Power Station is a 50 MW heavy fuel oil-fired thermal power plant in Uganda. Sometimes the power station is referred to as Kiwanga Power Station.
Location
The power plant is located in a locality known as Kiwanga, in Namanve in Mu ...
: 50 megawatts
Power stations in development
*
Karuma Power Station
The Karuma Hydroelectric Power Station is a 600 MW hydroelectric power project under construction in Uganda. When completed, it will be the largest power-generating installation in the country.
Location
The power station is located on the ...
: 600 megawatts
*
Ayago Power Station
Ayago Hydroelectric Power Station, also Ayago Power Station, is a planned 840 megawatt hydroelectric power project to be constructed in Uganda. If it is built, Ayago would be the largest power station in Uganda, based on generating capacity.
L ...
: 840 megawatts
*
Nyagak III Power Station
Nyagak III Power Station is a mini hydroelectric power project, under construction in Uganda, the third-largest economy in the East African Community.
Location
The power station is located across the Nyagak River in Nyapea Sub County, Okoro ...
: 6.6 megawatts
*
Muzizi Power Station
The Muzizi Power Station is a proposed hydroelectric power project in Uganda. The project, which has been planned for several years, has received a funding commitment from KfW and the French Development Agency.
Location
The power station i ...
: 48 megawatts
Governance
UEGCL is governed by a seven-person
board of directors whose chairman is
Proscovia Margaret Njuki. Other UEGCL board members include (a) Zachary Baguma Atwooki, (b) Ms. Hope Bizimana, (c) Paul Patrick Mwanja, (d) Nixon Kamukama and (e) Mark Martin Obia.
The
chief executive officer
A chief executive officer (CEO), also known as a central executive officer (CEO), chief administrator officer (CAO) or just chief executive (CE), is one of a number of corporate executives charged with the management of an organization especial ...
is
Harrison E. Mutikanga.
In August 2017, UEGCL received the ISO 9001: 2015 certification, becoming the first Ugandan government agency to receive this certification.
Corporate social responsibility
In December 2021, UEGCL launched a
corporate social responsibility (CSR) project to extend grid electricity to over 40 villages in both
Kayunga District
Kayunga District is a district in Central Uganda. It is named after its chief town, Kayunga.
Geography
Kayunga District is bordered by Amolatar District to the north, Buyende District to the northeast, Kamuli District to the east, Jinja Distri ...
and
Kamuli District
Kamuli District is a district in the Eastern Region of Uganda. The town of Kamuli is the site of the district headquarters.
Location
Kamuli District is bordered by Buyende District to the north, Luuka District to the east, Jinja District t ...
, as mitigation for "the increased pressure on local infrastructure, social services, and livelihoods arising from the construction of the.."
Isimba Hydroelectric Power Station
Isimba Hydroelectric Power Station is a hydroelectric power station commissioned on 21 March 2019 in Uganda. Construction of this dam began in April 2015 and was completed in January 2019. Commercial operations began on 21 March 2019.
Locati ...
. The project is expected to last 24 months in Kayunga District and 36 months in Kamuli District. It will cost USh11 billion (approx. US$3.1 million).
See also
*
List of power stations in Uganda
This article lists all power stations in Uganda. As of April 2019, national generation capacity was 1,177 megawatts of electricity. By January 2021, Uganda's generating capacity had increased to 1,268.9 megawatts.
Hydroelectric Completed
U ...
*
Electricity Regulatory Authority
The Electricity Regulatory Authority (ERA) is a government agency that regulates, licenses, and supervises the generation, transmission, distribution, sale, export, and importation of electrical energy in Uganda.
Location
The offices of the ERA ...
*
Energy in Uganda
Burning of renewable resources provides approximately 90 percent of the energy in Uganda, though the government is attempting to become energy self-sufficient. While much of the hydroelectric potential of the country is untapped, the government d ...
References
External links
UEGCL Homepage
{{coord, 00, 19, 35, N, 32, 34, 38, E, display=title
Energy companies of Uganda
Electric power infrastructure in Uganda
Electric power companies of Uganda
Government-owned companies of Uganda
Energy companies established in 2001
2001 establishments in Uganda