Tampere Tram
   HOME

TheInfoList



OR:

The Tampere light rail ( fi, Tampereen raitiotie), branded as Tampere Tram ( fi, Tampereen Ratikka), is a public transport system in Tampere, Finland. In November 2016, the Tampere city council approved plans to construct a 330-million-euro light rail system on the route from the
city centre A city centre is the commercial, cultural and often the historical, political, and geographic heart of a city. The term "city centre" is primarily used in British English, and closely equivalent terms exist in other languages, such as "" in Fren ...
to Hervanta and to the Tampere University Hospital. Traffic on the first two lines of the route (lines 1 and 3) began on 9 August 2021. An extension from the city centre to
Lentävänniemi Lentävänniemi () is a district in the western part of Tampere on the shores of Lake Näsijärvi in Pirkanmaa, Finland. It belongs to the northwestern part of the city and borders the Niemi and Niemenranta borders on the southwest. There are jo ...
is also under construction. It is aimed to be finished in 2024. Along the route to Lentävänniemi, an artificial island called ''Näsisaari'' ("Näsi Island") near the shore of Lake Näsijärvi is also under construction, and it is planned to be mainly serve the structure of light rail. There is also an extension under construction from Pyynikintori to
Santalahti Santalahti is a district in the western part of Tampere, Finland. It borders Lake Näsijärvi in the north, the Särkänniemi district in the east, Ylä-Pispala and Ala-Pispala in the south and Lielahti in the west. The town plan of Santalahti w ...
, which is scheduled to open in 2023. Unlike Turku, another Finnish city that is planning a new light rail system (see
Turku light rail The Turku tramway network was the first—and until the 2021 opening of Tampere Light Rail, second to last—tram system to be operated in Finland. It was operated as horse tramway from 1890 until 1892, and as an electrified tramway from 1908 unt ...
), Tampere had not had a previously existing tram or light rail system. The construction of a tram system in Tampere was seriously studied between the years 1907 and 1929, but left unrealised due to the high price of constructing such a system. Tampere is the fourth city in Finland to have a tram system but one of only two to still have trams in service, as Turku discontinued tram service in 1972 and Vyborg (already part of the Soviet Union at the time) did so in 1957.


Traffic

After negotiations, the VR Group was chosen as the operator of the Tampere light rail in 2019. The agreement includes traffic operations and traffic direction. The company ''Tampereen Raitiotie Oy'' (TRO), owned by the city of Tampere, is responsible for the vehicle stock and infrastructure. The traffic is commissioned by the Tampere Regional Transport Authority. Commercial test traffic started on 10 May 2021 and traffic proper started on 9 August 2021.


Lines

At the start of operations, the Tampere light rail operates two lines, 1 and 3. The numbering of the lines is in accordance with the rest of the public transport in Tampere, so that line numbers between trams and buses do not collide. Line 3 replaces the old bus lines 3 and 4 and travels from
Pyynikki Pyynikki ( sv, Pynike) is a district and a nature reserve in Tampere, Finland. It is located in the Pyynikinharju ridge, between the city center and the western district of Pispala. Pyynikinharju is the highest esker in the world, rising 85 meter ...
via Sammonaukio,
Hakametsä Hakametsä is a smaller district of Tampere, Finland, located about four kilometers from its city center. The neighboring parts of Hakametsä are Huikas, Ristinarkku, Messukylä, Vuohenoja, Kalevanrinne, Kaleva, Kissanmaa and Uusikylä. Hakam ...
and Hervanta to
Hervantajärvi Hervantajärvi is a lake in Pirkanmaa, Finland, located in the between of Tampere's Hervantajärvi district and Lempäälä's Sääksjärvi district, which belongs to the Moisionjoki catchment area of the Vanajavesi–Pyhäjärvi area in the Koke ...
. Line 1, formed from the middle part of the old bus line 1, starts from Sorin aukio and travels along line 3 from
Koskipuisto Koskipuisto (Finnish for "rapids park") is a park in Kyttälä, Tampere, Finland, to the east of the Tammerkoski rapids. On the opposite shore of the rapids is the Kirjastonpuisto park - which is sometimes considered part of Koskipuisto.Donner ...
to Sammonaukio, where it branches off via the Tampere University Hospital to
Kauppi Kauppi is a Finnish surname. Notable people with the surname include: * Emil Kauppi (1865–1930), Finnish composer *Kalle Kauppi (1892–1961), Finnish legal scholar and politician * Waino Kauppi (1898-1932), musician *Raili Kauppi (1920–1995), ...
. Both lines have several exchange stops where it is possible to switch lines on the same platform. The travel time from Pyynikki to Hervantajärvi is about 29 minutes. The time between trams is 3 to 4 minutes on the common route and 7.5 minutes elsewhere.Tampereen raitiotie
Raitiotieallianssi. Accessed on 20 October 2019.


Rolling stock

After a bidding contest, the Kajaani-based company Å koda Transtech was chosen as the provider of the vehicle stock in October 2016. A competing provider complained to the market court about this decision, where the complaint was rejected in October 2017. After this Transtech and the city of Tampere signed an agreement about delivery of the tram vehicles ( Artic X34). The design of the trams was finalized in 2018. In the first stage 19 vehicles were delivered and 5 to 6 more vehicles were delivered in the second stage. The agreement includes an option for an additional 46 vehicles (after the first 19 vehicles), to provide for further expansion of the light rail. The first vehicles were test driven in 2020. The order for the first and second stages includes 26 vehicles in total. The price per vehicle is 3.2 to 3.8 million euro and the price for the entire order is about 97.5 million euro. The model of the Tampere tram is ForCity Smart Artic X34 and they are 37.3 metres long, low-floored and drivable in both directions. The agreement about the vehicles includes an option to lengthen the vehicles to 47 metres. The industrial design company Idis Design was chosen as the designer of the vehicles in January 2018. The main solutions for the vehicles were designed in early 2018 after which the design was improved by constructing a life-size model tram vehicle to describe the details of the design. The first raw model tram was completed in March 2018 and the finalised model was presented to the citizens of Tampere in February 2019. Transtech started construction of the vehicles in
Otanmäki Otanmäki is a village to the south-west of Kajaani, Finland. Otanmäki is located in Vuolijoki within the bounds of the City of Kajaani municipality. The railway rolling stock manufacturer Škoda Transtech, Škoda Transtech Oy has a factory in ...
in Kajaani in October 2018; the first vehicle was completed and delivered to Tampere in May 2020. Already in February 2020 Transtech had provided a
TW 6000 The TW 6000 is a type of articulated light rail vehicle used on the Hanover Stadtbahn system, manufactured by Duewag, Linke-Hofmann-Busch, AEG, Kiepe and Siemens. The vehicle can serve both high platforms and street-level stops; it has cabs at ...
tram from 1981 to Tampere as a test vehicle. The vehicles have space for 264 passengers, of which 104 are seating places. The top traffic speed is 70 kilometres per hour; the average speed is 19 to 22 kilometres per hour. Movement between the platform and the tram is level and accessible. The final design and colouring of the trams were announced in October 2018, with brick red chosen as the main colour of the trams.


History


1907–1929: tram system planning

The first official plans for a tram system in Tampere were made in 1907, when a committee was formed to study the construction of the tram system. The study, completed in 1909, found the construction of a tram system relatively expensive, but during the first years of the next decade, it seemed that Tampere would get a tram system. Eventually, the plans were shelved due to World War I. Around the same time, plans for tram systems were also made in other Finnish cities: Turku tram was opened in 1908,
Vyborg tram Vyborg, in Finland until 1940, and since then in Russia, had an electric tramway network from 1912 to 1957. See also * History of rail transport in Finland * History of rail transport in Russia * List of town tramway systems in Europe * Trams ...
in 1912, while Lahti (1907–17) and Riihimäki (1922) also made serious studies into the matter, though their systems, too, were left unbuilt. After the war, subsequent plans for a tram system in Tampere were made as late as 1929, but these, again, were not realised.


2001–2004: TramTrain proposal

The construction of a light rail system for Tampere had been discussed since the 1970s, but the decision-makers of the city were hesitant to make any decisions without collaboration with other cities in Finland to keep down costs. In 2001, the city took the initiative in planning a light rail network when a rail traffic project group was formed to study the construction of such a system by the Finnish Ministry of Traffic & Communication, VR Group and various cities in the Greater Tampere area. The group completed its work in 2004, recommending a tram-train system utilising pre-existing railroad sections, newly built track and a tunnel section under central Tampere to avoid traffic jams. The proposed system was named TamTrain as a pun on Tram-Train. The TamTrain proposal created some criticism as existing urban areas in the region are around major roads, not railroads, and the proposed system would have, in fact, worsened public transport connections in many areas. The tunnel under the center of the city was also found problematic, as constructing such a tunnel would have forced the light rail lines to completely bypass important traffic hubs such as TAYS ( Tampere University Hospital). Additionally, the tunnel section, which would have included only three stops, would have constituted 29% of the total price of the system.


TASE 2025 light rail plan

The intermediary TASE 2025 report published in 2007 recommended the creation of a light rail system running alongside major roads linking central Tampere to the suburbs of
Vuores Vuores () is an area located on the border of Tampere and Lempäälä in the Pirkanmaa region, Finland. Each municipality is building in its own area, but a partial master plan has been drawn up in co-operation. On the Tampere side, construction b ...
and Hervanta in phase 1 (by 2015), Lielahti and
Lentävänniemi Lentävänniemi () is a district in the western part of Tampere on the shores of Lake Näsijärvi in Pirkanmaa, Finland. It belongs to the northwestern part of the city and borders the Niemi and Niemenranta borders on the southwest. There are jo ...
in phase 2 (2015–25), with links to Koilliskeskus, Ojala- Lamminrahka and Pirkkala in phase 3 (after 2025). There are also plans to continue light rail to the town of Ylöjärvi. In addition to the light rail system, the study recommended the creation of a commuter rail line utilising pre-existing railroad lines as well as improvements into pre-existing bus connections in areas not covered by either rail option. According to these recommendations, the initial parts of the light rail system would be opened in 2015. Although technically a light rail system, the system proposed in TASE 2025 is referred to in Finnish as ''katuraitiotie'', "street tramway", as opposed to the term ''pikaraitiotie'', literally "rapid tramway", which is a commonly used word for all kinds of light rail systems in Finnish, but which has been used almost exclusively for TramTrain-esque systems with a tunnel in the city centre in Tampere. The length of the proposed light rail system would be in phase 1, in phase 2 and in phase 3. The total cost of the system would be €298 million. The light rail system is projected to make approximately €10 million of yearly profit, whereas the current all-bus based system generates average losses of €10 million every year. A subsequent intermediary report submitted on 5 March 2009 proposed four different alternatives for the future development of public transport in Tampere, all of which included the realisation of a light rail system. The initial phase in all four alternatives was the same, but the precise routes and lengths of the subsequent extensions were different.


Operations

The light rail began operating in August 2021. In the first year of operations, around 10 million trips were made using the system, accounting for around a quarter of all public transport trips during the period.


Construction

The city of Tampere asked for tenders from consultants with experience in designing light rail/tram systems during the summer of 2010. The deadline for submitting tenders was on 16 August 2010, after which a consultant was chosen. The plan was that the consultant's report should be ready by the end of April 2011, after which the city council will make the decision on whether or not to proceed with the construction of a light rail system. A final decision was made in the city council on 7 November 2016 to start construction and to purchase trams. The tram supplier will be Transtech, a Finnish subsidiary of Å koda Transportation.Transtech to supply Tampere trams
''
Railway Gazette International ''Railway Gazette International'' is a monthly business magazine and news website covering the railway, metro, light rail and tram industries worldwide. Available by annual subscription, the magazine is read in over 140 countries by transport p ...
'' 3 October 2016
The rail gauge is 1435 mm, which makes vehicle purchase easier, because producers generally have developed trams for this gauge. Construction commenced in 2017 and the first phase (city centre to TAYS and Hervanta) was opened in 2021. The cost, including rolling stock, was estimated at €330 million. After construction of the first phase was completed, the Tampere municipal council announced that the final cost of the project was €34 million under the revised budget of €300 million. Keolis, Länsilinjat and VR were shortlisted to operate the tramway, with the contract awarded to VR in April 2019 for a period of 10 years, with an option to extend for a further three years.VR Group to operate Tampere tramway
'' Metro Report International'' 29 April 2019


References


External links


Builders website
(construction information and updates) {{VR Group Tram transport in Finland Transport in Tampere Light rail in Finland Railway lines opened in 2021