HOME

TheInfoList



OR:

The is a
nuclear power plant A nuclear power plant (NPP) is a thermal power station in which the heat source is a nuclear reactor. As is typical of thermal power stations, heat is used to generate steam that drives a steam turbine connected to a electric generator, generato ...
located in the town of Takahama, Ōi District,
Fukui Prefecture is a prefecture of Japan located in the Chūbu region of Honshū. Fukui Prefecture has a population of 778,943 (1 June 2017) and has a geographic area of 4,190 km2 (1,617 sq mi). Fukui Prefecture borders Ishikawa Prefecture to the north, Gi ...
. It is owned and operated by the
Kansai Electric Power Company , also known as , is an electric utility with its operational area of Kansai region, Japan (including the Keihanshin megalopolis). The Kansai region is Japan's second-largest industrial area, and in normal times, its most nuclear-reliant. B ...
. It is on a site with an area of about 1 km2. The four
pressurized water reactor A pressurized water reactor (PWR) is a type of light-water reactor, light-water nuclear reactor. PWRs constitute the large majority of the world's nuclear power plants (with notable exceptions being the UK, Japan and Canada). In a PWR, the primary ...
s give the plant a total gross electric capacity of 3,392 MW and average yearly production of 22,638
GW·h A kilowatt-hour ( unit symbol: kW⋅h or kW h; commonly written as kWh) is a unit of energy: one kilowatt of power for one hour. In terms of SI derived units with special names, it equals 3.6 megajoules (MJ). Kilowatt-hours are a common bi ...
(averaged on 2006–2010 data). From 2012 to 2016 the plant was shut down most of the time, with only reactor 3 briefly in operation, due to technical problems and opposition from local residents. Unit 3 and 4 were eventually restarted in May and June 2017.


Reactors on site


History


Maintenance in 2012

On 17 February 2012, Kansai Electric Power Co. announced that on 21 February 2012 reactor no. 3 would be taken off the grid for a regular checkup and maintenance. After that date, only two commercial nuclear power plants were still operating in Japan: the no. 6 reactor of TEPCO at the Kashiwazaki-Kariwa plant in prefecture Niigata, which was scheduled for checkups on 26 March 2012, and the No. 3 reactor at the Tomari plant in Hokkaido of Hokkaido Electric Power Co.; their regular maintenance was planned in late April 2012. From 5 May until 1 July 2012, Japan had no operating nuclear power plants. On 17 April 2013, a shipment of MOX nuclear fuel to Japan left the port of Cherbourg in northern France, for the first time since the Fukushima disaster, destined for the Takahama nuclear plant. MOX fuel contains around 7% plutonium.


Court decision forbids restart

As of 16 April 2015, the Takahama reactors were ordered to remain offline by a Japanese court, which cited continued safety concerns. The Fukui District Court rejected a "stay" on its original ruling that, despite approval to restart the plants from Japan's governmental
Nuclear Regulation Authority The is an administrative body of the Cabinet of Japan established to ensure nuclear safety in Japan as part of the Ministry of the Environment. Established on September 19, 2012, its first head was Shunichi Tanaka. Background The NRA was forme ...
(an agency formed in 2012,) approval guidelines issued by the agency were "lacking in rationality" and "too loose." The Fukui Court issued a similar injunction against the restart of Oi units 3&4 in May, 2014. Former Tokyo high court judge and current Chou Law School Professor Jun Masuda criticized Fukui Judge Hideaki Higuchi, who headed the court panel, “It seems the judge has already had the idea of demanding absolute safety from the beginning. Judges are not experts on nuclear power plants, so it is imperative that they humbly pay attention to scientific knowledge. I doubt the presiding judge took that into consideration.” Japan News (Yomiuri Shimbun) also criticized the Fukui decision, “We have no choice but to call it an irrational decision,” and, “Such a stance seeking zero risk is unrealistic.” An appeal by Kansai Electric Company was rejected by the same court in May, 2015.


Restarting and shutdowns

Unit 3 was restarted on 29 January 2016 and Unit 4 on 27 February 2016. However, on 29 February 2016, after three days of operation, the unit was shut down one second after it started generating power. The cause was stated to be a "main transformer/generator internal failure". On 9 March 2016, the Otsu district court in
Shiga prefecture is a prefecture of Japan located in the Kansai region of Honshu. Shiga Prefecture has a population of 1,412,916 (1 October 2015) and has a geographic area of . Shiga Prefecture borders Fukui Prefecture to the north, Gifu Prefecture to the nort ...
issued an injunction to halt operation of Unit 3 and Unit 4, citing the concerns of local residents. Unit 3 was therefore shut down on 10 March 2016.


License extensions and latest restarts

On 28 March 2017, the Osaka High Court (one of eight high courts in Japan, each with jurisdiction over one of eight territories), canceled the injunction from the district court. On 20 June 2016, Japan's Nuclear Regulation Authority (NRA), approved a 20-year license extensions for units 1 and 2. The two units are now authorized to operate until 2034 and 2035. It is the first NRA approved 20-year extension beyond the initial 40-year life of a reactor. Additional safety measures will take three years to be completed, giving a 2019 restart year, at the earliest. On May 22, 2017, unit 4 was restarted, followed by unit 3 on June 6, 2017.Japan's Fifth Re-Activated Reactor -- Takahama 3 -- Is Restarted
/ref>


See also

*
List of nuclear power plants in Japan The following is a list of Japanese nuclear power plants. After the Fukushima Daiichi nuclear disaster, all 17 major plants were shut down. As of 2022, only 6 out of 17 major nuclear power plants operate in the country, operated by the Kyushu Ele ...


References


External links


Kansai Electric Power Company website
{{Nuclear power in Japan 1970s establishments in Japan Buildings and structures in Fukui Prefecture Nuclear power stations in Japan Nuclear power stations using pressurized water reactors Takahama, Fukui