HOME

TheInfoList



OR:

The North Wales Mineral Railway was formed to carry coal and ironstone from the mineral-bearing area around
Wrexham Wrexham ( ; cy, Wrecsam; ) is a city and the administrative centre of Wrexham County Borough in Wales. It is located between the Welsh mountains and the lower Dee Valley, near the border with Cheshire in England. Historically in the count ...
to the River Dee wharves. It was extended to run from Shrewsbury and formed part of a main line trunk route, under the title The Shrewsbury and Chester Railway. It opened in 1846 from Chester to Ruabon, and in 1848 from Ruabon to Shrewsbury. It later merged with the Great Western Railway. Much of its main line ran through rural areas, but the important mineral area west of Wrexham, and also near Ruabon, led to considerable development of mineral business. A dense network of branches to access pits and ironworks built up, although the hilly terrain made railway construction difficult. At the end of the nineteenth century passenger services were put on for the mining communities. The main line business developed too, enabling the GWR to access the
Mersey The River Mersey () is in North West England. Its name derives from Old English and means "boundary river", possibly referring to its having been a border between the ancient kingdoms of Mercia and Northumbria. For centuries it has formed part ...
, from London and from South Wales, and a heavy long-distance mineral flow built up. That traffic dwindled steeply in the 1930s; the main line suffered from the handicap of reaching the west bank of the Mersey, and later it was reduced to the status of a secondary route. The original main line remains open.


The North Wales Coalfield

The North Wales Coalfield runs from near
Talacre Talacre is a village in Flintshire on the north coast of Wales in the community of Llanasa and the electoral ward of Ffynnongroyw, and is the northernmost mainland settlement in Wales. The village itself has a population of 347 as of the 2011 cen ...
at the mouth of the River Dee through Wrexham to Oswestry. The coal and associated iron industries became particularly active from the early eighteenth century, but poor transport links to markets suppressed the potential of the trade.Peter E Baughan, ''A Regional History of the Railways of Great Britain: volume 11: North and Mid Wales'', David St John Thomas Publisher, Nairn, 1991, , page 36 The
Chester and Holyhead Railway The Chester and Holyhead Railway was an early railway company conceived to improve transmission of Government dispatches between London and Ireland, as well as ordinary railway objectives. Its construction was hugely expensive, chiefly due to ...
was being promoted from 1836, and more actively from 1840, and the idea of a railway feeder to that line arose. This was promoted locally, titled the North Wales Mineral Railway. At first it was to include branches to coal pits and iron works, but these were dropped due to local opposition. It obtained the Royal Assent to its Act of Incorporation on 6 August 1844. It was to run from Wrexham to a wharf at
Saltney Saltney is a cross-border town, split between Flintshire, Wales and Cheshire, England. The town is intersected by the England–Wales border, with its larger part being a community of Wales in the historic county of Clwyd. The town forms par ...
, and a connection at the latter place to the Chester and Holyhead Railway, which was authorised in the same session. In the following Parliamentary session, on 21 July 1845 it was authorised to extend south from Wrexham to Ruabon. To get better access to the pits, it was to include a branch from a junction at Wheatsheaf, a little north of Wrexham, to Brymbo and
Minera Minera ( cy, Mwynglawdd; ) is a village and community in Wrexham County Borough, Wales. It adjoins the village of Coedpoeth. The community, which in addition to Minera village includes a number of smaller hamlets such as Gwynfryn and New Brigh ...
.E T MacDermot, ''History of the Great Western Railway: volume I, 1833 to 1863'', published by the Great Western Railway, 1927, part 1, pages 341 to 347Baughan, page 37 Further powers were taken the following year, on 27 July 1846, for short stubs to access collieries at Ffrwd, Brynmally, Brymbo and Vron. The line from Wheatsheaf to Minera was open in July 1847 and the local branches were ready and open in November 1847.


Shrewsbury, Oswestry and Chester Railway

The forecast for the main line disrupted when the Chester and Holyhead Railway proposed its own line south. This arose out of disagreements with the
Grand Junction Railway The Grand Junction Railway (GJR) was an early railway company in the United Kingdom, which existed between 1833 and 1846 when it was amalgamated with other railways to form the London and North Western Railway. The line built by the company w ...
, on which the CHR would depend for access to London. The CHR developed proposals for a line from Chester to Shrewsbury (to be called the Cheshire and Shropshire Junction Railway). Such a railway would hugely reduce the income of the North Wales Mineral Railway, so the NWMR promoted its own route from Ruabon to Shrewsbury, named the Shrewsbury, Oswestry and Chester Junction Railway. In Parliament it was this line that was authorised, on 30 June 1845, unopposed in Parliament, and the CHR scheme was turned down.


Shrewsbury and Chester Railway formed

The NWMR and the SO&CR were allies, and their strength was in the end-to-end route. It made sense to combine formally, and on 27 July 1846 the Shrewsbury and Chester Railway was created by Act of Parliament. On the same day the Royal Assent was given to SO&CJR proposals for a branch from Leaton to Wem, and from
Gobowen Gobowen is a village in Shropshire, England, about 3 miles north of Oswestry. The population according to the 2011 census was 3,270. History The village was previously called ''Bryn-y-Castell'' ("Hill of the Castle" in English) after the House ...
via Oswestry to Crickheath (four miles south of Oswestry, to join a proposed Shropshire Union Railway branch there). The plans for the SO&CR had been prepared hastily, and included an independent station at Shrewsbury. Negotiations with the promoters of other lines resulted in agreement for a joint station near the centre. The extension to this station was authorised in the amalgamation act; the joint station there was to be used also by the Shropshire Union Railway, the
Shrewsbury and Hereford Railway The Shrewsbury and Hereford Railway was an English railway company that built a standard gauge line between those places. It opened its main line in 1853. Its natural ally seemed to be the Great Western Railway. With other lines it formed a rout ...
, the
Shrewsbury and Birmingham Railway The Shrewsbury and Birmingham Railway was authorised in 1846. It agreed to joint construction with others of the costly Wolverhampton to Birmingham section, the so-called Stour Valley Line. This work was dominated by the hostile London and North ...
.Baughan, pages 37 to 40 The former NWMR main line from Ruabon (actually
Rhosymedre Rhosymedre () is a village within the community of Cefn, in Wrexham County Borough, Wales. The Anglican church, which was consecrated in 1837, is dedicated to St John the Evangelist, and is part of the Diocese of St Asaph. Former vicars inclu ...
, a little to the south) to
Saltney Saltney is a cross-border town, split between Flintshire, Wales and Cheshire, England. The town is intersected by the England–Wales border, with its larger part being a community of Wales in the historic county of Clwyd. The town forms par ...
, 15 miles, opened on 2 or 4 November 1846;Baughan, page 38 the section of the Chester and Holyhead Railway from Saltney into Chester opened on the same day, worked temporarily by the S&CR as the C&HR was not yet operational. There were five passenger trains each way daily. The
Minera Minera ( cy, Mwynglawdd; ) is a village and community in Wrexham County Borough, Wales. It adjoins the village of Coedpoeth. The community, which in addition to Minera village includes a number of smaller hamlets such as Gwynfryn and New Brigh ...
branch, with two rope-worked inclines and two tunnels, opened in July 1847, and two subsidiary branches off that line, to Ffrwd and Brynmally collieries opened in November 1847.Peter E Baughan, The Chester and Holyhead Railway, volume 1, David & Charles, Newton Abbot, 1972, , pages 15 to 22 The SO&CJR main line of 25 miles opened from Ruabon to a temporary terminus at Shrewsbury on 14 or 16 October 1848;Baughan, page 39 the extension to the new joint station was opened on 1 June 1849. This was the first railway to enter Shrewsbury. There were two remarkable viaducts on the section between Ruabon and Shrewsbury, at Cefn over the Dee, and at Chirk over the
River Ceiriog The River Ceiriog ( cy, Afon Ceiriog) is an long river in north east Wales, whose name may derive from a term meaning "favoured one". It is a tributary of the River Dee. It rises at an altitude of around on the south east slopes of Moel Ffern ...
. The Dee viaduct is 510 yards in length, and was the largest in the country at the time of construction.Keith M Beck, ''The Great Western North of Wolverhampton'', Ian Allan Limited, Shepperton, 1986, , page 9 Chester was promised a joint station by Act of 9 July 1847, to be used by S&CR, C&HR and
LNWR The London and North Western Railway (LNWR, L&NWR) was a British railway company between 1846 and 1922. In the late 19th century, the L&NWR was the largest joint stock company in the United Kingdom. In 1923, it became a constituent of the L ...
trains; it opened on 1 August 1848. The Wem branch authorised in 1846 was never built, and the Crickheath branch was cut back to Oswestry from Gobowen; it opened on 23 December 1848.


Dee Bridge failure

The Shrewsbury and Chester Railway used a section of the Chester and Holyhead Railway to reach Chester itself. On 24 May 1847 a bridge on that railway over the River Dee not far from Chester failed, and six persons were killed. The C&HR arranged for the bridge to be strengthened, and invited the S&CR to resume normal operation, but the S&CR waited for a Board of Trade inspection of the work; S&CR trains resumed operation over the strengthened bridge from 26 July.Baughan, Chester and Holyhead Railway, page 109


Shrewsbury and Birmingham Railway

The
London and Birmingham Railway The London and Birmingham Railway (L&BR) was a railway company in the United Kingdom, in operation from 1833 to 1846, when it became part of the London and North Western Railway (L&NWR). The railway line which the company opened in 1838, betw ...
had encouraged the formation of the Shrewsbury and Chester Railway, but the L&BR itself merged with the
Grand Junction Railway The Grand Junction Railway (GJR) was an early railway company in the United Kingdom, which existed between 1833 and 1846 when it was amalgamated with other railways to form the London and North Western Railway. The line built by the company w ...
, forming the London and North Western Railway in July 1846. Now the LNWR viewed the S&CR as an abstracter of business: with the Shrewsbury and Birmingham Railway it would compete with the LNWR for traffic between the Mersey and London. However the Great Western Railway was building its line to Birmingham, so that an alignment with the GWR would benefit the S&CR; equally the LNWR would oppose any such linkage.E T MacDermot, ''History of the Great Western Railway: volume I, 1833 to 1863'', published by the Great Western Railway, 1927, part 1, pages 348 to 354 The Shrewsbury and Birmingham Railway had been authorised in 1846, though the section south of
Wolverhampton Wolverhampton () is a city, metropolitan borough and administrative centre in the West Midlands, England. The population size has increased by 5.7%, from around 249,500 in 2011 to 263,700 in 2021. People from the city are called "Wulfrunians ...
to Birmingham was omitted, in favour of the
Stour Valley Line The Stour Valley Line is the present-day name given to the railway line between Birmingham and Wolverhampton, in England. It was authorised as the Birmingham, Wolverhampton and Stour Valley Railway in 1836; the title was often shortened to the ...
. A
Birkenhead, Lancashire and Cheshire Junction Railway The Birkenhead Railway was a railway company in North West England. It was incorporated as the Birkenhead, Lancashire and Cheshire Junction Railway (BL&CJR) in 1846 to build a line connecting the port of Birkenhead and the city of Chester with ...
had opened in 1840, between Birkenhead and Chester, and the Shrewsbury railways (S&BR and SCR) allied with it, achieving a through route from Birkenhead to Birmingham. The docks at Birkenhead, with the access to Liverpool, formed a key location at the time.T B Maund, ''The Birkenhead Railway (LMS and GW Joint)'', The Railway Correspondence and Travel Society, Sawtry, 2000, , pages 18 to 21Baughan, pages 40 to 42


Conflict with the LNWR

The LNWR chairman,
Mark Huish Captain Mark Huish (9 March 1808 – 18 January 1867) was an English railway manager. He is best known for his term as General Manager of the London & North Western Railway, a position he held for 12 years, beginning from the Company's formation ...
, was accustomed to aggressive business tactics, and prohibited the sale of tickets to Wolverhampton from Chester station, and had S&CR and BL&CJR publicity defaced, and banned omnibuses put on to by-pass the obstruction. The BL&CJR board was intimidated by the LNWR action and at first submitted to the pressure; but in 1850 its shareholders protested at the loss of business, and co-operation with the S&CR was resumed. (The shareholders had discovered that three times as much traffic was being received from the Shrewsbury line as from the LNWR.Beck, page 19 In January 1851 the S&BR and the S&CR formed a traffic agreement with the GWR. The LNWR retaliated with a series of extremely improper business practices, including the forging of a traffic agreement using a false company seal. The S&CR obtained running powers over the whole of the Birkenhead line, enshrined in Act of Parliament, and the S&BR and the S&CR decided to merge with the GWR. At first this was refused by Parliament; the collaborative grouping continued nevertheless, and become known as “the Associated Companies”.


Merging with the Great Western Railway

The amalgamation with the GWR was again proposed, and it was approved on 1 September 1854; in the process the new (expanded) GWR acquired its first narrow (standard) gauge locomotives.MacDermot, page 390 The Birkenhead company saw what was inevitable and made a traffic agreement with the GWR, and goods traffic from Birkenhead started on 2 February 1856. A passenger service between Birmingham and Birkenhead started on 1 May 1857. In 1859 the LNWR and the GWR agreed to joint operation of the Birkenhead line, and full joint ownership followed on 20 November 1860, ratified by Act of Parliament in 1861. In August 1861 the GWR completed the laying of mixed gauge to Paddington, so that narrow gauge trains could run throughout from Birkenhead, and on 1 October 1861 the first narrow gauge through train ran. For some time the GWR did little to develop long distance passenger traffic; it had the handicap of the long route via
Oxford Oxford () is a city in England. It is the county town and only city of Oxfordshire. In 2020, its population was estimated at 151,584. It is north-west of London, south-east of Birmingham and north-east of Bristol. The city is home to the ...
, and of serving Liverpool from the Birkenhead side of the Mersey. Only from 1880 was a fast through train put on, known as the Northern Zulu. From this time the North and West route had trains from
Cardiff Cardiff (; cy, Caerdydd ) is the capital and largest city of Wales. It forms a principal area, officially known as the City and County of Cardiff ( cy, Dinas a Sir Caerdydd, links=no), and the city is the eleventh-largest in the United Kingd ...
and the West of England.Beck, pages 59 to 61 Goods traffic, more particularly mineral traffic, had long been a much more fruitful business; notwithstanding the existence of the North Wales Coalfield locally, there was a heavy traffic in coal from South Wales to the Wrexham area and Birkenhead for bunkering, and a corresponding southward traffic of iron ore to serve the ironworks of South Wales.Beck, pages 27 and 73Buaghan, pages 41 to 43 Passenger traffic developed from Birkenhead to GWR destinations, many of them outside London, as the LNWR service from Liverpool was superior. From the late 1890s through trains from Liverpool via the
Mersey Railway The Mersey Railway was the first part of the passenger railway connecting the communities of Liverpool, Birkenhead, and now the rest of the Wirral Peninsula in England, which lie on opposite banks of the River Mersey, via the Mersey Railway Tun ...
were begun. In fact the dominant traffic was coal from South Wales to Birkenhead.


Access to Minera improved

The 1847 branch from Wheatsheaf Junction to Minera via Brymbo was difficult to work, having two rope-worked inclines. The Shrewsbury and Chester Railway promoted a new line, the Wrexham and Minera Railway, which obtained the Royal Assent on 17 May 1861. It ran by a more southerly route, from a junction south of Wrexham, at Croes Newydd to Brymbo,It is sometimes asserted that the Wrexham and Minera Railway ran throughout between the points in its name. In fact the western extremity was at Brymbo, where it joined the 1847 Minera branch, which continued in use westward from there. and it opened on 22 May 1862. The Moss Incline, the rope-worked inclined plane immediately east of Moss on the original Minera branch line was closed.Baughan, page 51James I C Boyd, ''The Wrexham, Mold and Connah's Quay Railway'', The Oakwood Press, Headington, 1991, pages 48 and 49


Wrexham, Mold and Connah's Quay Railway

There was dissatisfaction among industrialists over railway connections out of the area. In time the Wrexham, Mold and Connah’s Quay Railway was authorised on 7 August 1862. It was built from Wrexham to join the Buckley Railway, a former horse tramway that had been upgraded, and together the two short lines gave access to a wharf on the River Dee, and to a connection with the Chester and Holyhead Railway. The line opened on 1 January 1866 for mineral traffic, and for passengers after improvements, on 1 May 1866.Boyd, page 95 onwards


LNWR branches

Since 1805 there had been a horse tramway from the canal at Pontcysyllte to Acrefair village, serving Kynaston colliery and iron works on the way, as well as quarries at Cefn. It was called the Ruabon Brook Tramway, owned by the canal company. It was leased to the London and North Western Railway in 1847, and in 1863 the LNWR converted the line to a locomotive railway, adding numerous short connections to pits and brickworks in the locality.James I C Boyd, ''The Wrexham, Mold and Connah's Quay Railway'', The Oakwood Press, 1991, The LNWR had a branch line to Coed Poeth and Tryddyn. The Wrexham and Minera Extension Railway, from Brymbo to Tryddyn, was authorised in 1865, and the powers were transferred to the LNWR and GWR jointly, and opened in 1872.Baughan, pages 56 and 60Rex Christiansen, ''Forgotten Railways: North and Mid Wales'', David St John Thomas, Newton Abbot, 1984, , pages 37, 39 and 41


Ponkey branch

In 1861 the GWR opened a further branch: from a junction just north of Ruabon station to furnaces at
Ponciau Ponciau is a village within the community of Rhosllanerchrugog, Wrexham County Borough, Wales. It is close to the villages of Legacy, Pentre Bychan and Johnstown and is overlooked by Ruabon Mountain. The village name is also applied to a la ...
(Ponkey) and Aberderfyn, opening on 1 August 1861, and on 27 August 1871 it was extended to Legacy.


Moss Valley branch

The GWR opened a Moss Valley Branch of 3 miles, authorised on 21 July 1873 and opened on 11 May 1881; it ran to Ffrwd Ironworks from a junction with the W&MR main line near its origin.Baughan, pages 55 and 56


Passenger operation on the Brymbo lines

On the GWR line from Brymbo to Minera, passenger trains started operating as far as Coed Poeth on 15 November 1897, and the passenger service was extended to Berwig in 1905. From this time the motor-train system favoured by the GWR was used: a single coach incorporated a small steam engine; the arrangement was economical on lightly used passenger services, and a number of motor halts were opened to take advantage of the system. The Moss Valley branch received a similar passenger service from 1 May 1905, running from Wrexham as far up the valley as Moss Platform.Baughan, page 61 and 62


Branch line extensions at Legacy

The GWR later obtained authorisation to construct a branch line (the “Rhos” branch) from near Wrexham to Legacy, making new connections there with the Ponkey branch and the Plas Madoc branch. This new group of branches opened on 1 October 1901. Railmotors once again enabled a passenger service on local routes where patronage might not be heavy; from 1 May 1905 a passenger service ran on the Pontcysyllte branch, and from 5 June 1905 southwards from Legacy on the Ponkey branch.Christiansen, page 43


Wrexham station improvements

The open cast working to the west of the coalfield declined as the pits became worked out, and increasingly at the end of the nineteenth century the focus was on underground working further east. Wrexham became the centre of railway activity as main branches led there, and the passenger facilities at Wrexham General station were substantially improved in the period 1909 – 1912.Baughan, pages 44 and 45


Passenger train services

In July 1938 there were expresses from London to Birkenhead at 09:10, 11:05, 14:10, 16:05 and 18:10, with some summer Saturday extras. Most of these trains advertised connections for the Isle of Man or Belfast, as well as Liverpool Landing Stage. Travel by the morning train occupied 5 hours and 7 minutes to Liverpool Landing Stage. Most of the expresses stopped at Shrewsbury, Gobowen, Ruabon, Wrexham and Chester, and there were some trains from the south coast conveying through coaches from multiple destinations. The local service was fairly limited; taking Rednal as an example, there were seven weekday down trains calling, and most of the local trains did not run right through from Shrewsbury to Chester.''Bradshaw's 1938 Railway Guide'', David and Charles Reprints, 1969, The general pattern had been similar in 1910, but the journey time was slower (6 hours 40 minutes London to Liverpool) and the last train was earlier, at 16:55.''Bradshaw's April 1910 Railway Guide'', David and Charles, Newton Abbot, 1968, In 1960 there were express trains from London to Birkenhead at about two-hourly intervals, as well as a night train conveying a sleeping car. Most of the trains made connections to and from Oswestry at Gobowen. The local station service was very limited; for example Stanwardine Halt had three calls a day by down trains.British Railway, ''Passenger Services'', that is Public Timetable, Western Region, summer 1960


Service reductions

Retrenchment in
World War I World War I (28 July 1914 11 November 1918), often abbreviated as WWI, was one of the deadliest global conflicts in history. Belligerents included much of Europe, the Russian Empire, the United States, and the Ottoman Empire, with fightin ...
resulted in the railmotor halts closing, as well as severance of the Ponkey to Legacy connection. Wrexham to Rhos passenger trains continued running until 30 December 1930. The line between Pontcysyllte and Pant closed in 1953, and between Pant and Rhos on 14 October 1963. Competition from road services for local transport after World War II resulted in a steep decline in passenger and goods business at intermediate stations, and most of those were closed on 10 September 1962.Baughan, pages 62 and 63 When the electrification of the former LNWR London to Birmingham route was complete in March 1967, through trains from Paddington were discontinued, from 4 March 1967.Baughan, page 45 The Gobowen to Oswestry line passenger service was discontinued on 7 November 1966; it was singled on 2 November 1971 with occasional freight operation, until 28 October 1988.Baughan, page 170 The original main line from Saltney Junction (Chester) to Shrewsbury remains active, with passenger stations open at Wrexham General, Ruabon, Chirk and Gobowen. Trains are about every hour but at irregular times.


Location list: main line and Oswestry branch only


Main line

* ''Chester''; joint station; * ''Saltney Junction''; divergence from Holyhead line; * Saltney; opened 4 November 1846; closed 1 January 1917; reopened 4 July 1932; closed 12 September 1960; * Balderton; opened July 1901; closed 3 March 1952; * Rossett; opened 4 November 1846; closed 26 October 1964; * Gresford; opened 4 November 1846; closed 10 September 1962; * Rhosrobin Halt; opened 1 September 1932; closed 6 October 1947; * ''Wheatsheaf Junction''; divergence to 1847 Minera Branch; * Wrexham; opened 4 November 1846; renamed ''Wrexham General''; still open; * Croes Newydd North Junction; divergence to Minera Branch; * Croes Newydd South Junction; convergence from Minera Branch; * ''Rhos Junction''; divergence of Legacy line; * Rhos; opened 14 October 1848; closed February 1855; * Johnstown and Hafod; opened 1 June 1896; closed 12 September 1960; * Wynnville Halt; opened 1 February 1934; closed 12 September 1960; * ''Gardden Lodge Junction''; convergence of Ponkey Branch; * Ruabon; opened 4 November 1846; still open; * Plas Madoc Junction; divergence of Plas Madoc branch; * Llangollen Line Junction; divergence of Llangollen branch; * Rhosymedre Halt; opened 1 September 1906; closed 2 March 1959; * Rhosymedre; opened 14 October 1848; renamed Cefn 1849; closed 12 November 1960; * ''Fron Branch Junction''; divergence of Fron Branch; * Llangollen Road; opened 14 October 1848; closed 1 July 1862; reopened as Llangollen Road Halt; opened 1 October 1905; renamed Whitehurst Halt 1906; closed 12 September 1960; * Chirk; opened 14 October 1848; still open; * Trehowell Halt; opened 27 July 1935; closed 29 October 1951; * Preesgweene; opened 14 October 1848; closed March 1855; reopened November 1871; renamed Weston Rhyn; 1935; closed 12 September 1960; * Gobowen; divergence of Oswestry line; opened 14 October 1848; still open; * Whittington; opened 14 October 1848; renamed Whittington Low Level 1924; closed 12 September 1960; * Rednal; opened 14 October 1848; renamed Rednal and West Felton 1907; closed 12 September 1960; * Haughton Halt; opened 22 September 1934; closed 12 September 1960; * Stanwardine Halt; opened 27 February 1933; closed 12 September 1960; * Baschurch; opened 14 October 1848; closed 12 September 1960; * Oldwoods Halt; opened 3 July 1933; closed 12 September 1960; * Leaton; opened 14 October 1848; closed 12 September 1960; * Shrewsbury (temporary station); opened 14 October 1848; closed 1 June 1849 on completion of line; * Shrewsbury; opened 1 June 1849; sometimes known as Shrewsbury General; still open.


Oswestry branch

* Gobowen; above; * Park Hall Halt; opened 5 July 1926; closed 7 November 1966; * Oswestry; opened 1 January 1849; closed 9 July 1924, service diverted to Cambrian Railways station.Michael Quick; ''Railway Passenger Stations in England, Scotland and Wales: A Chronology'', Railway and Canal Historical Society, Richmond, 2002R A Cooke, ''Atlas of the Great Western Railway'', Wild Swan Publications Limited, Didcot, 1997, Col M H Cobb, ''The Railways of Great Britain: A Historical Atlas'', Ian Allan, Shepperton, 2003,


See also

*
Shrewsbury–Chester line The Shrewsbury–Chester line ( cy, Llinell Amwythig i Gaer) is a railway line between Chester and Shrewsbury in England, with the line passing through Wrexham County Borough in Wales. Passenger train services are operated by Transport for Wal ...


Notes


References

{{reflist Great Western Railway constituents