The North–South Motorway is a partially complete
motorway A controlled-access highway is a type of highway that has been designed for high-speed vehicular traffic, with all traffic flow—ingress and egress—regulated. Common English terms are freeway, motorway and expressway. Other similar terms i ...
traversing the inner western suburbs of
Adelaide Adelaide ( ) is the capital city of South Australia, the state's largest city and the fifth-most populous city in Australia. "Adelaide" may refer to either Greater Adelaide (including the Adelaide Hills) or the Adelaide city centre. The dem ...
from Waterloo Corner in the north to Bedford Park in the south. Progressively constructed in stages since 2010, once complete it will replace the adjacent
South Road South Road and its southern section as Main South Road outside of Adelaide is a major north–south conduit connecting Adelaide and the Fleurieu Peninsula, in South Australia. It is one of Adelaide's most important arterial and bypass roads. As ...
as Adelaide's main north–south roadway and form the central section of the North–South Corridor, being flanked north and south by the
Northern Expressway Northern Expressway, also known as the Fatchen Northern Expressway, is a 21 kilometre long controlled-access highway in Adelaide, South Australia. Since March 2020, the North–South Motorway continues west of Port Wakefield Highway and interse ...
and Southern Expressway, respectively. It is designated part of route M2. By March 2021, approximately of the motorway had been completed, with the remaining under investigation. The full project is planned for completion in 2030.


Background

In 2010, the Australian Government, through the Nation Building Program project, committed $500 million and the
South Australia South Australia (commonly abbreviated as SA) is a state in the southern central part of Australia. It covers some of the most arid parts of the country. With a total land area of , it is the fourth-largest of Australia's states and territories ...
n Government committed $432 million to the North–South Corridor over five years. This funding allocation recognised that
South Road South Road and its southern section as Main South Road outside of Adelaide is a major north–south conduit connecting Adelaide and the Fleurieu Peninsula, in South Australia. It is one of Adelaide's most important arterial and bypass roads. As ...
is the only continuous link between the northern and southern suburbs as well as the spine connecting
Adelaide Adelaide ( ) is the capital city of South Australia, the state's largest city and the fifth-most populous city in Australia. "Adelaide" may refer to either Greater Adelaide (including the Adelaide Hills) or the Adelaide city centre. The dem ...
's major inter-modal transport hubs –
Adelaide Airport Adelaide Airport , also known as Adelaide International Airport, is the principal airport of Adelaide, South Australia and the List of the busiest airports in Australia, fifth-busiest airport in Australia, servicing 8.5 million passenger ...
, Islington Rail Terminal,
Port Adelaide Port Adelaide is a port-side region of Adelaide, approximately northwest of the Adelaide CBD. It is also the namesake of the City of Port Adelaide Enfield council, a suburb, a federal and state electoral division and is the main port for the ...
and Outer Harbor. In May 2015, a government strategy paper envisioned the entire non-stop north–south road corridor would be completed by 2025, including "an upgraded South Road". It stated the planned "non-stop motorway" would "cater for the unimpeded flow of longer distance northbound and southbound trips" and would not include "at-grade traffic signals, intersections, junctions or property accesses which cause vehicles to slow down or stop".


Sections

The motorway is divided into sections for the purposes of construction. As of March 2021, four sections are complete and one is under investigation. From north to south the sections are:


Northern Connector

Plans for a motorway connecting South Road and the Northern Expressway surfaced in early 2008 when the Northern Expressway was awaiting construction; the ''Northern Connector'' would be an eight-lane motorway linking the Northern Expressway and
South Road South Road and its southern section as Main South Road outside of Adelaide is a major north–south conduit connecting Adelaide and the Fleurieu Peninsula, in South Australia. It is one of Adelaide's most important arterial and bypass roads. As ...
, with three intermediate interchanges. The project was proposed to also include a major diversion in the main ARTC interstate rail line, which would run down the middle of the new motorway between
Dry Creek, South Australia Dry Creek is a mostly industrial suburb north of Adelaide, containing significant wetlands. A substantial area was devoted to salt crystallisation pans until 2014, with plans to redevelop the site for housing. This housing plan, first put fo ...
and Taylors Road at Waterloo Corner. The federal government also proposed that it could be the state's first
toll road A toll road, also known as a turnpike or tollway, is a public or private road (almost always a controlled-access highway in the present day) for which a fee (or ''toll'') is assessed for passage. It is a form of road pricing typically implemented ...
. On 14 September 2015, the
Premier of South Australia The premier of South Australia is the head of government in the state of South Australia, Australia. The Government of South Australia follows the Westminster system, with a Parliament of South Australia acting as the legislature. The premier is ...
,
Jay Weatherill Jay Wilson Weatherill (born 3 April 1964) is an Australian politician who was the 45th Premier of South Australia, serving from 21 October 2011 until 19 March 2018. Weatherill represented the House of Assembly seat of Cheltenham as a member of ...
and
Prime Minister of Australia The prime minister of Australia is the head of government of the Commonwealth of Australia. The prime minister heads the executive branch of the Australian Government, federal government of Australia and is also accountable to Parliament of A ...
Tony Abbott Anthony John Abbott (; born 4 November 1957) is a former Australian politician who served as the 28th prime minister of Australia from 2013 to 2015. He held office as the leader of the Liberal Party of Australia. Abbott was born in Londo ...
announced that the road component of the project would start construction in early 2016. The federal government would provide towards an expected total cost of . The project was reduced to three lanes each way with two intermediate interchanges; the railway component was also removed, though a corridor has been reserved on the western side of the motorway for future use. The road is not subject to direct tolls, but South Australia will become a testing ground for a "network fee" which involves charging trucks based on road use and impact in place of high registration fees. The first new bridge to open to traffic was the bridge over the new motorway at the Waterloo Corner interchange. This bridge was opened on 26 March 2019 to provide the new access route into St Kilda, replacing several roads that had been cut by the motorway. The last road to be closed in the area was St Kilda Road, three days after the new bridge opened. The next new bridges were the twin bridges over the
Port River Expressway Port River Expressway is a freeway-grade road. The expressway links Port Adelaide and the LeFevre Peninsula across the north-western suburbs of Adelaide to major interstate routes via North-South Motorway. The expressway is only grade-separate ...
at the southern interchange. They replaced the original Craig Gilbert Bridge which was closed and demolished in May 2019. A temporary off ramp from South Road to Salisbury Highway was provided which used the new southbound bridge and the future Port River Expressway to South Road on ramp. In July 2019, the bridge for the end-state off ramp opened to traffic, carrying north->east traffic over the Northern Connector. The bridge over the expressway at Bolivar Road opened for access into the Bolivar Waste Water Treatment Plant about a week before Christmas 2019. The final alignment of the northbound carriageway of Port Wakefield Road at the northern interchange opened at about the same time, over a new bridge that passes over the southbound on-ramp from Port Wakefield Road. The whole road opened to traffic on 7 March 2020.


Construction

Lendlease Lendlease is a globally integrated real estate company that creates and invests in communities, workplaces, retail, and infrastructure projects, headquartered in Barangaroo, New South Wales, Australia. History Founding The company was establ ...
was awarded the contract. The announcement included support for other sectors of the South Australian economy, with a requirement that 7500 tonnes of steel would be sourced from
Arrium Arrium was an Australian mining and materials company, employing nearly 10,000 workers, that went into voluntary administration in 2016 with debts of more than $2 billion. In 2017 it was acquired by British-owned Liberty House Group. Histo ...
, and the work would stimulate
urban renewal Urban renewal (also called urban regeneration in the United Kingdom and urban redevelopment in the United States) is a program of land redevelopment often used to address urban decay in cities. Urban renewal involves the clearing out of blighte ...
and generate employment locally in other sectors. In addition, there is a contractual obligation for at least half of the 480 workers required to be hired from the northern suburbs of Adelaide, where other industries had been reducing or shutting down their workforces (such as
Holden Holden, formerly known as General Motors-Holden, was an Australian subsidiary company of General Motors. It was an Australian automobile manufacturer, importer, and exporter which sold cars under its own marque in Australia. In its last thre ...
), and at least 20% of the workforce has to be either Aboriginal, an
apprentice Apprenticeship is a system for training a new generation of practitioners of a trade or profession with on-the-job training and often some accompanying study (classroom work and reading). Apprenticeships can also enable practitioners to gain a ...
/ trainee, or long-term unemployed. In November 2016, it was announced that the majority of the road surface would be
concrete Concrete is a composite material composed of fine and coarse aggregate bonded together with a fluid cement (cement paste) that hardens (cures) over time. Concrete is the second-most-used substance in the world after water, and is the most wi ...
, rather than
asphalt Asphalt, also known as bitumen (, ), is a sticky, black, highly viscous liquid or semi-solid form of petroleum. It may be found in natural deposits or may be a refined product, and is classed as a pitch. Before the 20th century, the term a ...
as used on most roads in South Australia. This was expected to have a slightly higher up-front cost, but significantly lower maintenance costs over 30 years. Major construction was announced to have started on 6 December 2016, with completion anticipated in December 2019. There were a total of nine bridges required to be constructed. The Southern Interchange required three bridges; The Bolivar and Waterloo Corner Interchanges each required a bridge over the expressway; the northern interchange required a new bridge for the northbound carriageway of Port Wakefield Road to cross the southbound on-ramp; the motorway crosses North Arm Creek, Dry Creek and the
Little Para River The Little Para River is a seasonal creek running across the Adelaide Plains in the Australian state of South Australia, whose catchment fills reservoirs that supply some of the water needs of Adelaide’s northern suburbs. Course and features ...
. The project was divided into six zones. Zone 1 containing the northern interchange was let to
McMahon Services McMahon Services is an Australian civil engineering and construction company. It was established at Dry Creek in Adelaide in 1990. McMahon Services is contracted by governments and private industry for construction and demolition projects in m ...
. Zone 2 contained the Waterloo Corner interchange, and was let to LR&M Constructions. Zone 3 contained the Bolivar interchange and bridge over the Little Para River and was subcontracted to
Catcon Catcon is an Australian construction and civil engineering company based in Adelaide, South Australia. It was rated at #50 in South Australia's "Top 100 companies" in 2015. Catcon is the company responsible for the Bolivar interchange and Little ...
. Zone 4 was the Bolivar intersection with Port Wakefield Road, let to
S.E.M. Group S.E.M. Group is a group of related civil engineering companies based in South Australia. It was established in 1976 by Harry and Janice Wauer as Salisbury Earthmovers Pty. Ltd. S.E.M. Group is responsible for the interface of Bolivar Road and P ...
. Zone 5 crossed Dry Creek and the salt pans. Zone six was the southern interchange. Zones 5 and 6 were both managed directly by Lendlease. The shared use path along the eastern side of the road was constructed by Intract Indigenous Contractors and is named Tapa Martinthi Yala. The raw materials to make the concrete for the road were be supplied by
Adelaide Brighton Cement Adbri, formerly Adelaide Brighton Cement, is an Australian manufacturer of cement, lime and dry blended products. Adbri operates manufacturing and distribution facilities in South Australia, the Northern Territory, and New South Wales. Associat ...
, and mixed on-site. The road was reinforced with steel from Liberty OneSteel and asphalt was supplied by
Boral Boral Limited is Australia's largest building and construction materials supplier, with market-leading positions in quarries, cement, concrete and asphalt. Boral is actively pursuing a decarbonisation strategy through recycling of demolition ma ...
.


South Road Superway

The ''South Road Superway'' is an elevated motorway in the northern suburbs of the
South Australia South Australia (commonly abbreviated as SA) is a state in the southern central part of Australia. It covers some of the most arid parts of the country. With a total land area of , it is the fourth-largest of Australia's states and territories ...
n capital city of
Adelaide Adelaide ( ) is the capital city of South Australia, the state's largest city and the fifth-most populous city in Australia. "Adelaide" may refer to either Greater Adelaide (including the Adelaide Hills) or the Adelaide city centre. The dem ...
. The 2.8 km elevated roadway rises just north of Taminga Street, Regency Park and goes over Days Road, before access ramps at
Grand Junction Road Grand Junction Road is the longest east–west thoroughfare in the Adelaide metropolitan area, traversing through Adelaide's northern suburbs approximately 8 kilometres north of the Adelaide city centre. Route Travelling from the Port Adelaide ...
, then continues over Cormack Road and the Dry Creek railway line to join the intersection of the Port River Expressway and Salisbury Highway where the motorway continues northwards. In 2009, an announcement was made to build an elevated roadway above South Road from just north of
Regency Road Regency Road (and its eastern section as Muller Road) is a main east-west road forming a continuous connection between the inner northern suburbs of Adelaide, South Australia. Located approximately north of the city centre, Regency Road carries ...
to the end of South Road where it joins to the
Port River Expressway Port River Expressway is a freeway-grade road. The expressway links Port Adelaide and the LeFevre Peninsula across the north-western suburbs of Adelaide to major interstate routes via North-South Motorway. The expressway is only grade-separate ...
and
Salisbury Highway Salisbury Highway (and its northern section as John Rice Avenue) is a 15 kilometre major connecting road in the northern suburbs of the Adelaide metropolitan area. It is designated part of route A9. Route Salisbury Highway starts at the interch ...
. The elevated roadway was constructed at a cost of A$812 million and opened 13 March 2014. At the time, the Superway was the biggest single investment in a road project in South Australia's history. The Superway delivered a 4.8 kilometre section of freeway grade road, including a 2.8 kilometre elevated roadway, from the
Port River Expressway Port River Expressway is a freeway-grade road. The expressway links Port Adelaide and the LeFevre Peninsula across the north-western suburbs of Adelaide to major interstate routes via North-South Motorway. The expressway is only grade-separate ...
to
Regency Road Regency Road (and its eastern section as Muller Road) is a main east-west road forming a continuous connection between the inner northern suburbs of Adelaide, South Australia. Located approximately north of the city centre, Regency Road carries ...
. Along the way, it passes over the
Dry Creek-Port Adelaide railway line Dry or dryness most often refers to: * Lack of rainfall, which may refer to **Arid regions **Drought * Dry or dry area, relating to legal prohibition of selling, serving, or imbibing alcoholic beverages * Dry humor, deadpan * Dryness (medical) * ...
, Cormack Road,
Grand Junction Road Grand Junction Road is the longest east–west thoroughfare in the Adelaide metropolitan area, traversing through Adelaide's northern suburbs approximately 8 kilometres north of the Adelaide city centre. Route Travelling from the Port Adelaide ...
and Days Road, with exits at
Grand Junction Road Grand Junction Road is the longest east–west thoroughfare in the Adelaide metropolitan area, traversing through Adelaide's northern suburbs approximately 8 kilometres north of the Adelaide city centre. Route Travelling from the Port Adelaide ...
and Days Road. South Road was previously designated as part of route A13 when South Australia moved to the alpha-numeric road route system in 1998, with the section between the Salisbury Highway in Wingfield and
Grand Junction Road Grand Junction Road is the longest east–west thoroughfare in the Adelaide metropolitan area, traversing through Adelaide's northern suburbs approximately 8 kilometres north of the Adelaide city centre. Route Travelling from the Port Adelaide ...
in Regency Park designated as part of National Highway A13. When the South Road Superway was opened in 2014, route A13 was replaced entirely by route A2; as the section of South Road designated National Highway A13 was replaced by the South Road Superway, this was replaced by National Highway M2. This was eventually modified to route M2 in 2017, to match designs used across the rest of the state.


Construction

South Australian civil engineering and construction company, Bardavcol, was awarded the early works local roads contract for the South Road Superway, with the design and construction contract awarded to Urban Superway Joint Venture, comprising the
John Holland Group The John Holland Group is an infrastructure, building, rail and transport business operating in Australia and New Zealand. Headquartered in Melbourne, it is a subsidiary of China Communications Construction. History The company was founded in ...
, Macmahon Contractors and Leed Engineering & Construction. Construction of the local connector roads was completed in early 2011, with the completion of construction of Gallipoli Drive. This road replaced
South Road South Road and its southern section as Main South Road outside of Adelaide is a major north–south conduit connecting Adelaide and the Fleurieu Peninsula, in South Australia. It is one of Adelaide's most important arterial and bypass roads. As ...
as the main distributor road in the area during construction. Construction of the superway proper commenced in early 2011. Construction was completed in March 2014. The southbound lanes opened early February 2014, with the left turn entry from Port River Expressway opening on 31 January 2014. The northbound lanes opened on 13 March 2014.


Regency Road to Pym Street

After construction of the South Road Superway and the Torrens-to-Torrens lowered motorway, this section of road was left with two traffic light intersections (including
Regency Road Regency Road (and its eastern section as Muller Road) is a main east-west road forming a continuous connection between the inner northern suburbs of Adelaide, South Australia. Located approximately north of the city centre, Regency Road carries ...
), a controlled pedestrian crossing, and access to local side streets. It was reported in May 2017 that completion of this section would cost $400 million, with construction to begin at the start of 2019 and be completed by the middle of 2022. This would complete 47 km of freeway from Gawler to the River Torrens. The state government said it was seeking 85% of the cost to be funded by the federal government, which had not committed to the spend. Completion of this section was committed by the state and federal governments on 1 May 2018. The announcement stated that the cost would be but did not state an expected completion date. It will include an overpass of Regency Road and a pedestrian and cycling connection over the freeway near Pym Street. The motorway portion will be three lanes each way with an additional two lanes each way on the surface road to provide access to community and businesses. The contract for design and construction of the motorway segment with three lanes in each direction, plus two lanes each way providing access to the surrounding community and businesses, was awarded on 5 July 2019 to a consortium of
McConnell Dowell McConnell Dowell is a major infrastructure construction company founded in New Zealand in 1961. In 2003 it became a wholly owned subsidiary of Aveng, which is listed on the Johannesburg Stock Exchange in South Africa. History McConnell Dowell was ...
,
Mott MacDonald The Mott MacDonald Group is a consultancy headquartered in the United Kingdom. It employs 16,000 staff in 150 countries. Mott MacDonald is one of the largest employee-owned companies in the world. It was established in 1989 by the merger of M ...
and
Arup Group Arup (officially Arup Group Limited) is a British multinational professional services firm headquartered in London which provides design, engineering, architecture, planning, and advisory services across every aspect of the built environment ...
. All three members have been involved in other major infrastructure projects in South Australia, notably the
Oaklands railway station Oaklands railway station is located on the Seaford railway line in Adelaide, South Australia.Labor Labour or labor may refer to: * Childbirth, the delivery of a baby * Labour (human activity), or work ** Manual labour, physical work ** Wage labour, a socioeconomic relationship between a worker and an employer ** Organized labour and the labour ...
government in partnership with the Federal Labor government announced an upgrade to approximately 4 km of road between
Torrens Road Torrens Road is an arterial road in the northwestern suburbs of Adelaide, Australia. The road is aligned southeast to northwest and is parallel with Port Road for most of its length. Route It commences at the City Ring Route along the edge of N ...
and the
River Torrens The River Torrens , (Karrawirra Parri / Karrawirraparri) is the most significant river of the Adelaide Plains. It was one of the main reasons for the siting of the city of Adelaide, capital of South Australia. It flows from its source in the ...
. The upgrade would feature a new, lowered road under Grange and Port Roads to provide a non-stop route through the area for north–south traffic and reduce delays to east–west travel, a parallel surface road along the length of the lowered road to connect the majority of local roads and arterial roads to South Road and a rail overpass of South Road for the Outer Harbor line. Construction started in 2015, with the project expected to be completed by the end of 2018. The project scope was extended in December 2015 to include an underpass of Torrens Road, at no additional project cost or time. The lowered motorway opened to traffic on 29 September 2018.


River Torrens to Darlington

Before the motorway, traffic congestion in this section is presently mitigated by the Gallipoli Underpass at Anzac Highway and nearby Glenelg Tram Overpass (both completed in 2009), and the Emerson Overpass over Cross Road and
Seaford railway line The Seaford railway line is a suburban commuter line in Adelaide, South Australia. History Before the extension of the line to Noarlunga Centre in 1978, the Willunga line ran from Hallett Cove station on a different route through Reynella, ...
(completed in 1985). These measures are only considered interim solutions and will be upgraded prior to or concurrently with the rest of this section of road. In fact, the increasing frequency of commuter trains has resulted in growing bottlenecks at the Emerson Overpass as queues on the exit ramps to Cross Road can extend into the through lanes on South Road; the rail crossing can be closed for up to 20 minutes in the peak hour. In August 2018, the possibility was raised that this section could be completed by tunnelling under the existing alignment. By 2020 the State Government was pursuing two options to complete this section: an open motorway formed of at-grade, elevated and lowered portions reminiscent of completed sections of the North–South Motorway, with short cut-and-cover tunnels where necessary; and a "hybrid option" with an open motorway between
James Congdon Drive Adelaide has two city ring routes, that loop around the Adelaide city centre and North Adelaide, known as the Inner and Outer Ring Routes. Inner ring route The Inner Ring Route is a collection of major roads signposted as state route R1 (was A2 ...
and Edward Street, Clarence Gardens, flanked by longer bored tunnels at the northern and southern ends. Geotechnical works to investigate both options commenced in August 2020. The 2020 state budget announced the preferred approach which would consist of two stages: Stage 1 would deliver a 4.3 km deep-bored tunnel and a 1 km lowered motorway from Darlington to Anzac Highway; Stage 2 would deliver a 2 km deep-bored tunnel from Sir Donald Bradman Drive to West Thebarton Road, with surface motorway and underpasses making up the remaining portions of Stage 2. The budget estimated the project cost at $8.9 billion. The full project's reference design—finalising the approach from the 2020 stage budget—was released in November 2021; Stages 1 and 2 are expected to start construction in 2023 and 2026 respectively, with the full project planned for completion in 2030.


Exits and interchanges


See also