North Carolina Highway 74
   HOME

TheInfoList



OR:

The Winston-Salem Northern Beltway is an under construction freeway loop around the
North Carolinian North Carolina () is a state in the Southeastern region of the United States. The state is the 28th largest and 9th-most populous of the United States. It is bordered by Virginia to the north, the Atlantic Ocean to the east, Georgia and So ...
city of
Winston-Salem Winston-Salem is a city and the county seat of Forsyth County, North Carolina, United States. In the 2020 census, the population was 249,545, making it the second-largest municipality in the Piedmont Triad region, the 5th most populous city in N ...
. The western section has been designated as North Carolina Highway 452 (NC 452), which will later become Interstate 274 (I-274) when completed, and the eastern section of the beltway will be designated as North Carolina Highway 74 (NC 74), which will later become part of
I-74 } Interstate 74 (I-74) is an Interstate Highway in the Midwestern and Southeastern United States. Its western end is at an interchange with I-80 in Davenport, Iowa (Quad Cities); the eastern end of its Midwest segment is at an interchange ...
when completed. The beltway would make Winston-Salem the seventh city in North Carolina to have a full or partial Interstate loop; the other six are
Asheville Asheville ( ) is a city in, and the county seat of, Buncombe County, North Carolina. Located at the confluence of the French Broad and Swannanoa rivers, it is the largest city in Western North Carolina, and the state's 11th-most populous cit ...
( I-240),
Charlotte Charlotte ( ) is the List of municipalities in North Carolina, most populous city in the U.S. state of North Carolina. Located in the Piedmont (United States), Piedmont region, it is the county seat of Mecklenburg County, North Carolina, Meckl ...
( I-485 and I-277),
Raleigh Raleigh (; ) is the capital city of the state of North Carolina and the seat of Wake County in the United States. It is the second-most populous city in North Carolina, after Charlotte. Raleigh is the tenth-most populous city in the Southeas ...
( I-440 and I-540), Wilmington ( I-140),
Greensboro Greensboro (; formerly Greensborough) is a city in and the county seat of Guilford County, North Carolina, United States. It is the third-most populous city in North Carolina after Charlotte and Raleigh, the 69th-most populous city in the Un ...
( I-840), and Fayetteville (
I-295 Interstate 295 is the designation for several Interstate Highways in the United States: *Interstate 295 (Delaware–Pennsylvania), a bypass of Philadelphia, Pennsylvania *Interstate 295 (Florida), a beltway around central Jacksonville *Interstate 29 ...
).


Route description

When completed as planned, the beltway will be approximately in length,Interstate 74 - Segment 4
/ref> beginning in the east at
I-74 } Interstate 74 (I-74) is an Interstate Highway in the Midwestern and Southeastern United States. Its western end is at an interchange with I-80 in Davenport, Iowa (Quad Cities); the eastern end of its Midwest segment is at an interchange ...
/ NC 192 and ending in the west at U.S. Highway 158 (US 158). It would be entirely within Forsyth County and would cross
I-40 Interstate 40 (I-40) is a major east–west Interstate Highway running through the south-central portion of the United States. At a length of , it is the third-longest Interstate Highway in the country, after I-90 and I-80. From west to ea ...
and US 421 twice. The beltway would serve as a freeway connector for the
suburb A suburb (more broadly suburban area) is an area within a metropolitan area, which may include commercial and mixed-use, that is primarily a residential area. A suburb can exist either as part of a larger city/urban area or as a separate ...
an communities of Walkertown, Stanleyville, Rural Hall, Tobaccoville, Pfafftown, Lewisville, and Clemmons and would serve as a possible bypass for US 158 and US 52. The TIP Project Number is R-2247 for the western segment and U-2579 for the under construction eastern segment. As of November 2022, the completed portion is signed as NC 74, and bears the mile markers based on I-74's putative mileage when it will be completed. Starting at the current western terminus at mile marker 42 (NC 66), the route travels southeast, with interchanges at NC 8/Germanton Road (Exit 43), Baux Mountain Road (Exit 45), US 311/New Walkertown Road (Exit 49), and US 158 (Reidsville Road). The road turns gently to a more southerly route, and reaches its current terminus at US 421/Salem Parkway. As of November, 2022 work is underway to extend the route in both directions, reaching west to US 52 at the northwestern end by late 2023/early 2024 and south to meet the current I-40 and I-74 by 2025/2026.


History

Construction of the western segment of the beltway was to begin in 1999 but was delayed by a lawsuit aimed at the environmental impact statement (EIS). After the legal situation was resolved, the
North Carolina Department of Transportation The North Carolina Department of Transportation (NCDOT) is responsible for building, repairing, and operating highways, bridges, and other modes of transportation, including ferries in the U.S. state of North Carolina. History The North Carolina ...
(NCDOT) then announced construction would begin in 2006; however, in March 2005, the department postponed the start date again until at least 2012 due to budget shortfalls. Funds once allocated to the western segment were then reapportioned to the construction of the eastern segment, which had a planned construction start date in 2011. A second lawsuit, however, delayed the road further. A federal district judge in May 2010 dismissed the cases accusing an updated environmental study of ignoring
global warming In common usage, climate change describes global warming—the ongoing increase in global average temperature—and its effects on Earth's climate system. Climate change in a broader sense also includes previous long-term changes to E ...
and impact on other intersecting roads. However, the high cost of building the entire project pushed the beltway to last place on a list of urban loop projects being built by the state. In March 2011, state officials agreed to rank projects using sections, which might help the eastern section move higher on a list by 2014. On September 7, 2011, North Carolina Governor
Bev Perdue Beverly Eaves Perdue (born Beverly Marlene Moore; January 14, 1947) is an American businesswoman, politician, and member of the Democratic Party (United States), Democratic Party who served as the List of governors of North Carolina, 73rd Govern ...
announced that construction of a part of the eastern leg of the beltway would begin in 2014. The section to be built connects US 158 to I-40 Business (I-40 Bus.; now US 421/ Salem Parkway).
Right-of-way Right of way is the legal right, established by grant from a landowner or long usage (i.e. by prescription), to pass along a specific route through property belonging to another. A similar ''right of access'' also exists on land held by a gov ...
acquisition began in 2012 and cost $34 million (equivalent to $ in ); construction was estimated to cost $156 million. Construction on the segment, Project U-2579B, commenced in December 2014, with an anticipated completion date of November 2018. However, after delays, including an opening date of late 2019, it was finally opened to traffic on September 5, 2020. Since then, funding has been allocated to complete the remaining sections of NC 74 between US 52 and the current
I-74 } Interstate 74 (I-74) is an Interstate Highway in the Midwestern and Southeastern United States. Its western end is at an interchange with I-80 in Davenport, Iowa (Quad Cities); the eastern end of its Midwest segment is at an interchange ...
(formerly cosigned with US 311), starting with the segment between US 311 and US 158, known as Project U-2579C, in October 2017. Construction on this segment began in 2018, was scheduled to open in 2021, and opened to traffic on December 23, 2020. That same year, a contract for the segment between NC 66 and US 311, Projects U-2579D, U-2579E, and U-2579F, was awarded. Construction on this segment begun in April 2019, and it opened to traffic on November 7, 2022. Next, construction on the segments between I-74 and I-40 Bus. (now US 421/Salem Parkway), Projects U-2579AA and U-2579AB, are scheduled to begin in 2020 and will open in 2024. Construction on the interchange with US 52, which began in 2019, is scheduled to be completed in 2022. On January 22, 2022, another contract was awarded. This section runs from the Salem Parkway (formerly known as I-40 Bus.) to I-40, a length of . The last section of the eastern leg (I-40 to the existing I-74) is scheduled to begin in October 2022. Both of these projects apparently had to be postponed due to the cash crunch caused by the
COVID-19 pandemic The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identif ...
. The first phase of the project to be constructed was the northeastern quadrant, starting at US 421 (Salem Parkway) and extending north and west. It was completed in four segments. The first segment, from US 421 to US 158, was completed on September 5, 2020. The second segment, extending the route to US 311, was opened on December 23, 2020. The third segment, to NC 66, was completed on November 7, 2022.


Future

A "Southern Beltway" connecting the eastern and western segments in Forsyth County and northern Davidson County is in the initial planning stages, as its general proposed routing appears on some Winston-Salem Department of Transportation (WSDOT) long-range planning maps. , no preferred alternatives for this southern section have been officially submitted, and NCDOT does not include the Southern Beltway on its vision maps. The WSDOT plans for this final section of the beltway to start construction sometime after 2030. If completed as planned, the Southern Beltway would serve as a connector for the communities of Midway, Wallburg, and
Arcadia Arcadia may refer to: Places Australia * Arcadia, New South Wales, a suburb of Sydney * Arcadia, Queensland * Arcadia, Victoria Greece * Arcadia (region), a region in the central Peloponnese * Arcadia (regional unit), a modern administrative un ...
and would not necessarily be utilized as a bypass for I-40 due to the freeway's southward dip. The southern section would have an approximate length of and would intersect I-285/US 52/ NC 8 near its midway point. Once the northern segments of the loop are completed, I-40 through Winston-Salem would technically complete the beltway loop without the southern section.


Exit list


Interstate 274

Interstate 274 (I-274) is the future designation for the western half of the beltway, currently designated as NC 452. When completed, it will connect US 158, near Clemmons, to Future I-74/ Future I-285/ US 52, in Bethania. I-274 first appeared on NCDOT planning maps in the early 2000s but was later disused for over a decade since. On May 20, 2019, the
American Association of State Highway and Transportation Officials The American Association of State Highway and Transportation Officials (AASHTO) is a standards setting body which publishes specifications, test quality control, protocols, and guidelines that are used in highway design and construction through ...
(AASHTO) approved a request to establish Future I-274. Justification given by NCDOT was that the section would satisfy a great need to alleviate congestion in Winston-Salem and connect the western portion of the urbanized area.


See also

*
Greensboro Urban Loop The Greensboro Urban Loop is a Interstate Highway beltway that surrounds Greensboro, North Carolina Greensboro (; formerly Greensborough) is a city in and the county seat of Guilford County, North Carolina, United States. It is the List of ...


References


External links

*
NCDOT - Winston-Salem Northern Beltway official site
{{Piedmont Triad Freeways in North Carolina Beltways in the United States Proposed state highways in the United States 74-2 Interstate 74 74-2 North Carolina Transportation in Winston-Salem, North Carolina Transportation in Forsyth County, North Carolina