Nantenbach Curve
   HOME

TheInfoList



OR:

The Nantenbach Curve (
German German(s) may refer to: * Germany (of or related to) **Germania (historical use) * Germans, citizens of Germany, people of German ancestry, or native speakers of the German language ** For citizens of Germany, see also German nationality law **Ger ...
: Nantenbacher Kurve or Verbindungskurve Nantenbach) is the name of a connecting curve between the
Main-Spessart Railway Main-Spessart is a ''Landkreis'' (district) in the northwest of Bavaria, Germany. It is located in Lower Franconia and derives its name from the river Main and the wooded hills of the Spessart. Geography The district is bounded by (from the north ...
and the Hanover–Würzburg high-speed line. Coming from Aschaffenburg the line branches off towards Würzburg, about five kilometres northeast of Lohr, in the cadastral district of Nantenbach, in the community of Neuendorf. From the Main-Spessart line, the railway turns in a wide curve to the southeast to a junction at the Rohrbach operating station on the Hanover–Würzburg line.


Route

The route is 11.3 kilometres long with continuous double track, electrified, equipped with the German train protection system, Linienzugbeeinflussung and running on many engineering structures: the 694.5 metre long
viaduct A viaduct is a specific type of bridge that consists of a series of arches, piers or columns supporting a long elevated railway or road. Typically a viaduct connects two points of roughly equal elevation, allowing direct overpass across a wide v ...
over the Main, followed by the 3,941 m long Schönrain Tunnel (passing under the 5,528m long Muhlberg Tunnel on the Hanover–Würzburg line) and another three tunnels. About 60 percent of the curve (6,449 m) is four tunnels with lengths between 526 and 3941 metres. The track rises 127 m from the Nantenbach junction at 156m above sea level to Rohrbach operating station at 283 meters above sea level on a consistent grade of 1.25%. The minimum curve radius of 2,650 m allows a speed of 200 km/h. 740 m of the line is on bridges. The track is located for its full length in the Main-Spessart nature park. The track is built largely slab track on an asphalt base. The line is used by about 60 freight and passenger trains each day.


History

Planning for the line started in 1975 and planning approval was given in 1988. Construction started in March 1990 and the line was put into operation in June 1994.


References

{{reflist Railway lines in Bavaria High-speed railway lines in Germany Railway lines opened in 1994 1994 establishments in Germany Main-Spessart