Metro Express (Mauritius)
   HOME

TheInfoList



OR:

The Metro Express is a light rail public transport system in
Mauritius Mauritius ( ; french: Maurice, link=no ; mfe, label= Mauritian Creole, Moris ), officially the Republic of Mauritius, is an island nation in the Indian Ocean about off the southeast coast of the African continent, east of Madagascar. It ...
. The route, when completed, will run between the
Port Louis District Port Louis (french: Port-Louis) is a district of Mauritius, located in the north west of the island, it is the smallest district and has the highest population density. The district is wholly covered by Port Louis, the capital of the country. Port ...
and
Plaines Wilhems District Plaines Wilhems () is a district of Mauritius. It is the most populous district, with its population estimated at 366,506 as the end of 2018. The district is mainly urban; it consists of four towns, the village of Midlands and part of two other ...
. A branch, running between Rose Hill and
Réduit A reduit is a fortified structure such as a citadel or a keep into which the defending troops can retreat when the outer defences are breached. The term is also used to describe an area of a country, which, through a ring of heavy fortifications o ...
, will be built as well.


History

Mauritius had been without a railway system following the closure of Mauritius Government Railways in the 1950s. The last passenger train ran on 31 March 1956 between
Port Louis Port Louis (french: Port-Louis; mfe, label= Mauritian Creole, Polwi or , ) is the capital city of Mauritius. It is mainly located in the Port Louis District, with a small western part in the Black River District. Port Louis is the country's e ...
and
Curepipe Curepipe () also known as ''La Ville-Lumière'' (The City of Light), is a town in Mauritius, located in the Plaines Wilhems District, the eastern part also lies in the Moka District. The town is administered by the Municipal Council of Curepipe ...
. Due to increased car usage and chronic road congestion, plans for a light railway system have been proposed for many years. The idea of introducing Light Rail Transit was first floated in the 1970s and started being developed in the 1980s as a way to solve increasing road congestion. The idea only started gaining traction in 1995, when the concept of light rail was formulated. The main argument against it was based on the cost of the system construction. The investment was made in the development of road infrastructure instead, like building new roads and adding new lanes to existing motorways. Busways were considered but weren't implemented. In 2010, during a visit to Singapore, the
Prime Minister of Mauritius The prime minister of Mauritius (french: link=no, Premier Ministre de Maurice) is the head of government of Mauritius. He presides over the Cabinet of Ministers, which advises the president of the country and is collectively responsible to the ...
Navin Ramgoolam Navinchandra Ramgoolam, GCSK, FRCP (born 14 July 1947) is a Mauritian politician who was former Prime Minister of Mauritius from 2005 to 2014 and leader of the Labour Party (Mauritius). He was Leader of the Opposition from 1991 to 1995. He ser ...
signed an intergovernmental agreement, under which the Singapore Cooperative Enterprise, would assist Mauritius in preparing a request for a proposal document to be launched to potential developers. A delegation from the SMRT was in Mauritius in March 2011 to study the possibilities of introducing the LRT system. In September 2012 the
Government of Mauritius The Government of Mauritius () is the main authority of the executive power in the Republic of Mauritius. The head of the Government is the Prime Minister of Mauritius, who manages the main agenda of the Government and direct the ministers. The ...
signed a contract with the Singapore Cooperative Enterprise, valued at around Rs 180 million ($6 million as of September 2012), for the determination of a feasible alignment of the light rail line, development of reference design and consideration of potential future line extension. In December 2016, Sir Anerood Jugnauth GCSK, KCMG, QC, PC gave the green light for the implementation of the Metro Express Project because of mitigating the rising cost of traffic congestion. On 31 July 2017 in Ebene the Government of Mauritius signed a contract for the creation of a light rail transit system. The project is led by the Indian company
Larsen & Toubro Larsen & Toubro Ltd, commonly known as L&T, is an Indian multinational conglomerate company, with business interests in engineering, construction, manufacturing, technology, information technology and financial services, headquartered in Mumba ...
, after winning a tender from the Government of Mauritius for Rs 18.8 billion ( 3,375
crores A crore (; abbreviated cr) denotes ten million (10,000,000 or 107 in scientific notation) and is equal to 100 lakh in the Indian numbering system. It is written as 1,00,00,000 with the local 2,2,3 style of digit group separators (one lakh is eq ...
(₹33.75 billion); $557 million as of September 2017), of which Rs 9.9bn ($293M as of September 2017) is being provided by a grant from the
Government of India The Government of India (ISO: ; often abbreviated as GoI), known as the Union Government or Central Government but often simply as the Centre, is the national government of the Republic of India, a federal democracy located in South Asia, ...
. A launching ceremony by the Prime Minister of Mauritius,
Pravind Jugnauth Pravind Kumar Jugnauth (born 25 December 1961) is a Mauritian politician serving as the prime minister of Mauritius since January 2017. Jugnauth has been the leader of the Militant Socialist Movement (MSM) party since April 2003. He has held a n ...
was held on 10 March 2017 at Caudan Old Train Depot. On 28 September 2017 groundbreaking and laying foundation ceremonies were held. The Project, 26 km long, is being implemented in multiple phases as below: Phase 1:Port Louis Victoria to Rose Hill Central (Commercial Operation started on 10th January 2019), Phase 2a: Port Louis Victoria to Quatre Bornes Central (Operation started in June 2021), Phase 2b: Port Louis Victoria to Curepipe Central (Operation started in October 2022). The first phase of the project was inaugurated on the 3rd of October 2019 by the Prime Minister of Mauritius, Honourable Pravind Jugnauth and the Prime Minister of India, Honourable
Narendra Modi Narendra Damodardas Modi (; born 17 September 1950) is an Indian politician serving as the 14th and current Prime Minister of India since 2014. Modi was the Chief Minister of Gujarat from 2001 to 2014 and is the Member of Parliament fro ...
. Various partners are involved in the Project: The Singapore Cooperation Enterprise (SCE) was engaged to produce the reference design and they currently act as a consultant on the delivery of the Project. The Engineering-Procurement-Construction (EPC) contract was awarded to Larsen & Toubro (L&T), India in 2017, which is the main contractor on this project. RITES Ltd, a Government of India engineering consultancy company, currently acts in a supervisory role to ensure the quality and timely delivery of the Project. The help of SMRT Corporation, Singapore has been retained to help MEL prepare for Operational Readiness for both Phase 1 and Phase 2. The Light Rail Vehicles (LRVs) for this Project are from Construcciones y Auxiliar de Ferrocarriles (CAF), Spain. CAF furnished 18 LRV URBOS 100 3rd Generation. On 17 December 2019 Metro Express Ltd, the company running the system, announced that operations will start on 22 December 2019 at 11 am. For the initial period of 15 days, the passengers were carried free of charge on presentation of a free ticket, valid in a given direction and for a given time. The promotional period ended on 10 January 2020. On 30 March 2021 first trial run took place on the 3-km line extension from Rose Hill Central to Quatre Bornes Central, built as Phase 2A. On 25 May 2021, the Ministry of Land Transport and Light Rail, Honourable Alan Ganoo announced in parliament the extension of Phase 3 Ebene and Reduit which will allow 15,000 additional passengers to use the Light Rail Vehicles. The works will cost Rs 4.5 billion and the extension will be 3.4 kilometers long which will be financed by India.


Construction

Phase 1 linked
Port Louis Port Louis (french: Port-Louis; mfe, label= Mauritian Creole, Polwi or , ) is the capital city of Mauritius. It is mainly located in the Port Louis District, with a small western part in the Black River District. Port Louis is the country's e ...
to Rose Hill and Commercial Service started on 10 January 2020. It was originally planned that Phase 2 would extend the line from Rose Hill to
Curepipe Curepipe () also known as ''La Ville-Lumière'' (The City of Light), is a town in Mauritius, located in the Plaines Wilhems District, the eastern part also lies in the Moka District. The town is administered by the Municipal Council of Curepipe ...
in September 2021. An intermediate phase, known as Phase 2A consisting of Belle Rose Station and Quatre Bornes Central Station, was opened on 20 June 2021. The target to complete the rest of the line (Phase 2B) was pushed back to the end of 2022, given the COVID-19 Pandemic and lockdowns in the Country. As of early July 2021, 61% of the work has been completed for Phase 2B and 85% for the whole line. The scope of the project involves the construction. It also includes the installation of advanced signalling systems across the network to ensure integration with road traffic. Phase 3 will bring major economic development to the country. The multimodal station already integrates several modes of transport and its connection with Phase 3 will generate job creation and will certainly contribute to an increase in economic growth and standard of living.


Phase 2b Port Louis Victoria to Aapravasi Ghat

During a site visit on 1 July 2021, the Minister of Land Transport and Light Rail,
Alan Ganoo Alan Ganoo (born 17 January 1951) is a Mauritian politician who has been elected to serve as member of the Legislative Assembly and National Assembly on 9 occasions.   Early life and education Alan Ganoo was born in Port Louis, his father was ...
announced among others that a new temporary stop, near the Caudan flyover some 300 m down the line from the Port Louis Victoria station, would be built and be in service until the works at
Caudan Caudan (; br, Kaodan) is a commune in the Morbihan department of Brittany in north-western FrancINSEE commune fileThe writer Yvonne Chauffin (1905–1995), laureate of the Prix Breizh in 1970, died in Caudan. Demographics Inhabitants of Cauda ...
are completed. The works in the area will be conducted between July and December 2021. Several works are being undertaken by Larsen and Toubro at their own cost. They form mostly part of the ongoing development of the Metro Express project for Phase 2, with an integration element with various infrastructural facilities. They are the upcoming integration works with Victoria Urban Terminal; maintenance and improvement (enabling works) at the Caudan entrance; Le Pouce Railway Bridge; a temporary light rail platform at Waterfront; and a temporary light rail station near Caudan flyover. These works will collectively enhance the vibrancy, accessibility, and image of the Port Louis Waterfront area. The temporary station has the same facilities as the Port Louis Victoria station and it opened on 10 August 2021. The completion of the section from the Waterfront temporary station to Aapravasi Ghat is subject to ongoing coordination with UNESCO.


Phase 2b Quatre Bornes Central to Curepipe Central

Phase 2b connecting Quatre Bournes Central to Curepipe Central consists of the construction of approximately 11km of track. Despite two lockdowns, the project is on track and ongoing stakeholder engagement activities with various stakeholders are being carried out. The section from Quatre Bornes Central to Phoenix is expected to be completed by June 2022. The completion of the entire section up to Curepipe Central is scheduled for December 2022. The Government (Cabinet) approved an agreement between Ascencia and MEL for the construction of an additional station in Phoenix. The Phoenix Mall Station is expected to be operational by mid-2022. Between 4,000 to 5,000 people will use this station daily. Construction will be carried out by L&T. The Phoenix Mall Station will be integrated with the Phoenix Shopping Mall and will provide direct access to the mall. According to Dr Das Mootanah, Chief Executive Officer of Metro Express Ltd, "The Phoenix Mall Station will be the first station of its kind in Mauritius and will benefit the public as well as MEL and Phoenix Mall. This project will be fully funded by Ascencia for Rs 235 million. It is a true example of a public and private partnership.


Plans

A 3.4-km branch from Rose Hill through Ebène to
Réduit A reduit is a fortified structure such as a citadel or a keep into which the defending troops can retreat when the outer defences are breached. The term is also used to describe an area of a country, which, through a ring of heavy fortifications o ...
is planned. Of the 2 planned stations along the branch, one will serve the Ebène Cybercity and the other (terminus)— the University of Mauritius, Open University of Mauritius and several other educational establishments, research institutes and state departments. Major structural works on the branch will include a 548-m long flyover, between the Rose Hill Central elevated station (installed north of the station), and Ebène (in front of the Ebène State Secondary School), and a 120-m long bridge over Cascade River, located next to a disused railway bridge, which will be preserved; and the presence of a hydroelectric dam nearby will have to be taken into consideration. Its potential ridership was assessed to be 15,000 passengers per day. This leg is planned to be completed by End 2022/Early 2023. On 14 July 2021 the CEO of Metro Express Ltd, Das Mootanah announced that the acquisition of land for the Rose Hill to Ebène branch has already started and the company was engaging in dialogue with stakeholders - Réduit,
Larsen & Toubro Larsen & Toubro Ltd, commonly known as L&T, is an Indian multinational conglomerate company, with business interests in engineering, construction, manufacturing, technology, information technology and financial services, headquartered in Mumba ...
and
RITES Rail India Technical and Economic Service Limited, abbreviated as RITES Ltd, is a wholly owned subsidiary of the Indian Railways, Ministry of Railways, Government of India. It is an engineering consultancy corporation, specializing in the field ...
. The Ebène and Réduit extension lines and the stations were already recommended in a report by the Singapore Cooperation Enterprise, submitted to the Mauritian authorities in 2016.


Stations and stops


Fares

single adult fare is Rs 30 (82 ¢ as of January 2020) or Rs 20 (55¢ as of January 2020) if the trip does not involve travelling between Coromandel and Barkly. Children below the age of 3 and eligible senior citizens and disabled people are entitled to free fares. Eligible pupils and students are entitled to free travel to and from school on school days (along a pre-determined route). There are concession fares for children aged between 3 and 12, and pupils and students not qualifying for free fares. The entitlements to free and concession fares on the Metro Express are identical to those on buses. , after adding two new stations to the line (Phase 2A), a single adult fare for the longest journeys that start or terminate at one of the newly opened stations is Rs 40; the fares for journeys between the other 7 stations (opened as part of Phase 1) remain unchanged. Single tickets can be purchased using cash or a credit/debit card from ticket machines located at each platform. Regular commuters are encouraged to use the MECard—a contactless, stored-value card that automatically deducts the correct fare by tapping on it before boarding and off after disembarking. The card, loaded with applicable entitlement, needs also to be used by those who are entitled to free fares. The fare paid with the MECard is the same as the cash fare, there are no weekly or monthly passes and there are no through fares for those changing from or to bus services.


Ridership

Upon opening, ridership of the line was on average 17,000 passengers daily, dropping to 10,000 after the COVID-19 pandemic in Mauritius began. Since the opening of the Quatre Bornes extension (Phase 2A), the total number of passengers increased by 65% in the first week and in the second week of July there were 85% more passengers over the last two days, almost double the usual number noted before the launch of Quatre Bornes. Demographic-wise, 26% of travellers have been over the age of 60 and 71% – are between 18 and 60. As of July, Metro Express Ltd welcomed onboard 12,000 passengers daily.


Rolling stock

On 26 July 2017, CAF announced that they had won a tender to provide 18 Urbos 100-3 worth over €100 million. The deal also includes providing the signalling system, automatic vehicle location system (AVLS), transit signal priority system (TSPS), depot equipment and a driving simulator. Each train is bi-directional, consists of seven modules, has five doors (per side), measures 45.411 m (length) by 2.65 m (width) by 3.25 m (height), can reach a maximum speed of 70 km/h, can carry up to 422 passengers (based on 6 pax/m2) and is equipped with, among others, air-conditioning of both the driver's cab and the passenger saloon, security CCTV and an event recorder.


Infrastructure and facilities

The line largely follows the old Mauritius Government Railways' Midland Line alignment. It is fully grade-separated from major roads and at level crossings with secondary roads (with little vehicular traffic) and pedestrian crossings are equipped with transit signal priority traffic lights. The system was designed so that there would be no
on-street running A street running train is a train which runs on a Track (rail transport), track built on public streets. The rails are embedded in the roadway, and the train shares the street with other users, such as pedestrians, cars and cyclists, thus often ...
. Between the end of the Rose Hill flyover and the Barkly station the rails are embedded in concrete, and the space between the rails, as well as between the tracks, is grassed. On the Barkly to Coromandel section, the track is laid on concrete sleepers and ballasted. On the flyover on the approach to Port Louis, the tracks are laid in concrete. The depot at Richelieu covers an area of approx. 1 km2 and features eight external stabling tracks, a maintenance building, a wash facility and a sanding plant. An office building houses the control centre and staff offices. The maintenance building is equipped with retractable overhead supply rails that, when extended, allow LRVs to move under their power and, when retracted and isolated, allowing safe access to the roof-mounted equipment. All stations are fully accessible. The minor stations are of simple construction, featuring side platforms (the Vandermeersch station and Belle Rose station feature a single island platform). The elevated Rose Hill Central station is equipped with escalators and lifts. Each station offers bicycle racks. Three stations, namely, Port Louis Victoria, Rose Hill and Quatre Bornes Central, Vacoas Central and Curepipe Central are located next to bus stations; the Aapravasi Ghat station will be located next to bus stations as well. There is a
park-and-ride A park and ride, also known as incentive parking or a commuter lot, is a parking lot with public transport connections that allows commuters and other people heading to city centres to leave their vehicles and transfer to a bus, rail system (rap ...
facility at Coromandel, and other parking facilities will be built at Phoenix and Vacoas.


Notes


References


External links


Metro Express at ''UrbanRail.net''

Metro Express Project
(announcements and work progress by Larsen & Toubro) {{Urban rail transit in Africa Rail transport in Mauritius Rapid transit in Africa Light rail in Africa Railway lines opened in 2019 2019 establishments in Mauritius