The Mratinje Dam ( cnr, Брана Мратиње, Brana Mratinje) is a
concrete Concrete is a composite material composed of fine and coarse aggregate bonded together with a fluid cement (cement paste) that hardens (cures) over time. Concrete is the second-most-used substance in the world after water, and is the most wid ...
arch dam An arch dam is a concrete dam that is curved upstream in plan. The arch dam is designed so that the force of the water against it, known as hydrostatic pressure, presses against the arch, causing the arch to straighten slightly and strengthe ...
in the canyon of the
Piva River The Piva (Serbian Cyrillic: Пива, ) is the river in Montenegro and Bosnia and Herzegovina. The river runs through Montenegro for the most of its course length, and in its last three kilometres represents the border between the two countries. ...
in
Montenegro ) , image_map = Europe-Montenegro.svg , map_caption = , image_map2 = , capital = Podgorica , coordinates = , largest_city = capital , official_languages = M ...
. The dam was completed in 1975 with designs by Energoprojekt. Its construction resulted in the flooding of the Piva canyon and the creation of
Lake Piva Lake Piva ( cg, Пивско језеро, Pivsko јezero) is a reservoir in Montenegro. It is located in the northwest part of the country, in Plužine Municipality. The surface of the lake is 12.5 km², the length is 45 km, and the ma ...
, which, with its 12.5 km², is the second largest lake in Montenegro. The dam is high, one of the highest in
Europe Europe is a large peninsula conventionally considered a continent in its own right because of its great physical size and the weight of its history and traditions. Europe is also considered a subcontinent of Eurasia and it is located entirel ...
. The dam is long and thick at the crest, while it is long and thick at the base. The foundations go as deep as into the ground. of concrete and 5,000 tonnes of steel were built into the dam. The
hydroelectric power station Hydroelectricity, or hydroelectric power, is electricity generated from hydropower (water power). Hydropower supplies one sixth of the world's electricity, almost 4500 TWh in 2020, which is more than all other renewable sources combined an ...
at Mratinje is capable of producing 860 gigawatt-hours per annum. It has three turbines and generators, each with a generation capacity of 120 MW. The location of the 16th century Piva Monastery was flooded by the lake, so while the dam was built, the monastery was broken into pieces and moved to a higher ground, 3.5 km away. It was reconstructed in the original way.


References

Hydroelectric power stations in Montenegro Dams in Montenegro Dams completed in 1975 Arch dams {{Montenegro-geo-stub