Line 10 is a tram line which forms part of
Metrovalencia Metrovalencia is an urban rail system serving a large part of the metropolitan area of Valencia. The network is a modern amalgamation of former FEVE narrow gauge electric operated suburban railways. It is a large suburban network that crosses ...
in the city of
Valencia, Spain Valencia ( va, València) is the capital of the autonomous community of Valencia and the third-most populated municipality in Spain, with 791,413 inhabitants. It is also the capital of the province of the same name. The wider urban area also ...
. It opened on 17 May 2022. From 2007 until 2014, the line was designated as ''line 2''. However, in November 2014, this designation was given to a branch of the existing
Line 1 Line 1 or 1 line may refer to: Public transport Africa * Line 1 (Algiers Metro), Algeria * Cairo Metro Line 1, Egypt Asia China * Line 1 (Beijing Subway) * Line 1 (Changchun Rail Transit) * Line 1 (Changsha Metro) * Line 1 (Changzhou Metro) * L ...
, effective from April 2015. The line was then referred to as 'T2' until 1 March 2018 when it was decided to name it Line 10, to avoid confusion with existing metro lines. The first sections of the line had been built by 2007, with the part north of the city centre used by Line 6. A lack of available funds as a result of the Spanish economic crisis led to work being halted on the remaining sections. In June 2017, work resumed, with funding from the European Union and regional government used to complete the southern half of the line. Construction of the central part of the line has been indefinitely halted.


Route

The route originally planned included a section between Xàtiva and Tavernes Blanques which has been suspended indefinitely. The suspended section was to pass through the district of Orriols, following the current Line 6 as far as Alfauir station, entering the north-south tunnel at Pont de Fusta. Underground stops were planned in Valencia's old town at the Serrano Towers (under the old riverbed), Carme and the central market (Mercat station) before reaching the current main train station at Xàtiva. The completed route begins at the future central station. It continues underground along Avenida del Regne de València, turning right into Luís de Santángel and Amado Granell with an underground station at Germans Maristes, reaching the surface again near the crossroads of Amado Granell/Avenida de la Plata. From there it runs on the surface to the
City of Arts and Sciences The City of Arts and Sciences ( vl, Ciutat de les Arts i les Ciències ; es, Ciudad de las Artes y las Ciencias ) is a cultural and architectural complex in the city of Valencia, Spain. It is the most important modern tourist destination in the ...
, and the Natzaret neighbourhood.


History

Construction began in January 2007 and the first sections of the line north of the city centre were completed later that year and put into use as part of Line 6 on 28 September 2007. The remaining sections were intended to be completed by 2010. However, work was eventually halted as funding ran out. In an interview in December 2011, Isabel Bonig, the regional minister responsible, stated that completion would be impossible without external help, for example from the central government. The cost of completing the remaining sections was estimated at 160 million euros. As of May 2012, 5.2 kilometres of the southern route had been completed between Natzaret and Calle Alicante, near the main train station. This included a 2.3 km underground section. However, a half kilometre of overground track in this section had not yet been completed, including the Germans Maristes station. Between Calle Alicante and the Serranos Towers, only the Mercat station had been completed in the old town. In May 2012, accidents suffered by pedestrians on the metro bridge over the railway line near the district of Natzaret and flooding of the tunnel already completed on Avenida Regne de València forced the Council of infrastructure to ask for tenders for the maintenance, inspection and cleaning of the sections already completed. The cost of this for six months is estimated to be 264,359 euros plus
VAT A value-added tax (VAT), known in some countries as a goods and services tax (GST), is a type of tax that is assessed incrementally. It is levied on the price of a product or service at each stage of production, distribution, or sale to the en ...
. In November 2012, Bonig admitted that it was doubtful that Line 2 would be completed in 2013 as the required funds were not yet available. In January 2014, she said that completion of the line was a financial impossibility before the Valencian regional elections scheduled to be held by May 2015. In July 2015, it was estimated that 190 million euros would be required to complete the line. The cost of maintaining the sections already built was 400,000 euros per year. As of October 2015, spending on the line totalled 195 million euro. 51 million had been spent on the Mercat station with the rest on the tram line between the proposed Natzaret station and Calle Alicante. In that month, the regional government began removing the rails which had been installed on the surface to avoid traffic accidents. To complete the Natzaret to Calle Alicante section, 100 million euro was needed as of August 2015. On 11 June 2017, Valencian regional president
Ximo Puig Joaquín Francisco Puig Ferrer, known as Ximo Puig (; born 4 January 1959), is a Spanish politician who has served as leader of the Socialist Party of the Valencian Country (PSPV-PSOE), the Valencian regional branch of the PSOE, since March 2012 ...
announced that work on the southern half of the line between Natzaret and Xàtiva would resume. The regional government will provide €30 million of funding, with another €20 million of funds coming from the European Union. Only one station on the northern half of the line, Mercat Central, was completed at a cost of 27 million euros, but remains a
ghost station A ghost station is a disused train station through which revenue-service passenger trains (especially rapid transit trains) pass but at which they do not stop. The term is also sometimes used for any unused underground station or any unused s ...
. In March 2021, the director of Valencian railways said that the sections north of Alacant station had been abandoned and that a decision would be taken on how to use the Mercat Central station. This left Line 10 unconnected with the rest of the network. To improve accessibility, the regional government announced that a foot tunnel would be built between Xàtiva and Alacant stations, predicted to open in early 2024.