The Katse Dam, a
concrete Concrete is a composite material composed of fine and coarse aggregate bonded together with a fluid cement (cement paste) that hardens (cures) over time. Concrete is the second-most-used substance in the world after water, and is the most wi ...
arch dam An arch dam is a concrete dam that is curved upstream in plan. The arch dam is designed so that the force of the water against it, known as hydrostatic pressure, presses against the arch, causing the arch to straighten slightly and strengthe ...
on the
Malibamat'so River The Malibamat'so River is a river in northern Lesotho. Its origin is near to the South African border, where it drains the eastern slopes of the Maloti Range. It flows southwards past the village of Lejone, and eventually joins the Senqu River ...
in
Lesotho Lesotho ( ), officially the Kingdom of Lesotho, is a country landlocked country, landlocked as an Enclave and exclave, enclave in South Africa. It is situated in the Maloti Mountains and contains the Thabana Ntlenyana, highest mountains in Sou ...
, is Africa's second largest double-curvature arch dam. (The
Tekezé Dam Tekezé Dam is a double-curvature arch dam located between Amhara and Tigray region of Ethiopia. It is situated on the Tekezé River, a tributary of the Nile that flows through one of the deepest canyons in the world. Overview CWGS was contracted ...
, completed in early 2009, is now Africa's largest double curvature dam). The dam is part of the
Lesotho Highlands Water Project The Lesotho Highlands Water Project (LHWP) is an ongoing water supply project with a hydropower component, developed in partnership between the governments of Lesotho and South Africa. It comprises a system of several large dams and tunnels thr ...
, which will eventually include five large dams in remote rural areas. The dam is just below the confluence of the Bokong River, which forms the western arm of the Katse reservoir. The potential of the project was identified by the South African
civil engineer A civil engineer is a person who practices civil engineering – the application of planning, designing, constructing, maintaining, and operating infrastructure while protecting the public and environmental health, as well as improving existing ...
Ninham Shand in 1953 as a possible means to supplement the water supply of South Africa's industrial heartland in the
Witwatersrand The Witwatersrand () (locally the Rand or, less commonly, the Reef) is a , north-facing scarp in South Africa. It consists of a hard, erosion-resistant quartzite metamorphic rock, over which several north-flowing rivers form waterfalls, which ...
. The World Bank arranged a treaty between the governments of South Africa and Lesotho, allowing the project to proceed.


Construction

The dam was built by a consortium of
Bouygues Bouygues S.A. () is a French industrial group headquartered in the 8th arrondissement of Paris, 8th arrondissement of Paris, France. Bouygues is listed on the Euronext, Euronext Paris exchange and is a blue chip (stock market), blue chip in the C ...
,
Concor Concor Holdings (Proprietary) Limited. is a South African construction and mining services company. It is active throughout Southern Africa, involved in mining, civil engineering, building and road projects. Concor returned as an independent br ...
, Group 5,
Hochtief Hochtief AG is a German construction company based in Essen, North Rhine-Westphalia, Germany.Impregilo Webuild SpA (formerly Salini Impregilo SpA) () is an Italian industrial group specialised in the construction and civil engineering business headquartered in Milan. The company was formally founded in 2014 as the result of the merger by incorporat ...
,
Kier Group Kier Group plc is a British construction, services and property group active in building and civil engineering, support services, and the Private Finance Initiative. Founded in 1928 in Stoke-on-Trent it initially specialised in concrete enginee ...
and Sterling International. The dam was completed in 1996 and the
reservoir A reservoir (; from French ''réservoir'' ) is an enlarged lake behind a dam. Such a dam may be either artificial, built to store fresh water or it may be a natural formation. Reservoirs can be created in a number of ways, including contro ...
filled with water by 1997. The total cost of the project was US$8 billion. Katse Airport was constructed southeast of the dam to facilitate access to the project.


Environmental impact

The mass of water gave rise to
induced seismicity Induced seismicity is typically minor earthquakes and tremors that are caused by human activity that alters the stresses and strains on Earth's crust. Most induced seismicity is of a low magnitude. A few sites regularly have larger quakes, such ...
. Farmers who lost land to the project have had trouble re-establishing new livelihoods. There is little arable land in the mountains to replace all that was lost, and efforts to help them with new livelihoods have by no means been as successful as the engineering works. A local group has documented the project's human legacy in the rural communities directly affected by the project, and the environmental and human-rights NPO,
International Rivers International Rivers is a non-profit, non-governmental, environmental, and human rights organization. Founded in 1985 by social and environmental activists, International Rivers works with policy and financial analysts, scientists, journalists, ...
, produced a detailed account of the effects.Pipe Dreams, 2001, Ryan Hoover, International Rivers
As mitigation of the loss of habitat, plant rescue missions were conducted in the area to be flooded, and
Katse Botanical Gardens Katse Botanical Gardens is a centre for Alpine flora in Katse village, Lesotho. The gardens were created as a result of plant rescue missions to mitigate the impact of the Katse Dam, particularly spiral aloes. The collection has a focus on tradi ...
was established to house and propagate the plants rescued.


Water delivery

Water from the dam first travels through a , diameter
tunnel A tunnel is an underground passageway, dug through surrounding soil, earth or rock, and enclosed except for the entrance and exit, commonly at each end. A pipeline is not a tunnel, though some recent tunnels have used immersed tube cons ...
, exiting at a
hydroelectric Hydroelectricity, or hydroelectric power, is electricity generated from hydropower (water power). Hydropower supplies one sixth of the world's electricity, almost 4500 TWh in 2020, which is more than all other renewable sources combined and ...
station near Muela. The dam's high elevation allows a gravity flow water delivery system to South Africa, in addition to hydroelectric power for Lesotho, and was a prime reason behind the choice of site. Water delivery officially began on 22 January 1998. The dam currently supplies about of water to
South Africa South Africa, officially the Republic of South Africa (RSA), is the southernmost country in Africa. It is bounded to the south by of coastline that stretch along the South Atlantic and Indian Oceans; to the north by the neighbouring countri ...
, which pays Lesotho $35 million per year, plus a variable
royalty Royalty may refer to: * Any individual monarch, such as a king, queen, emperor, empress, etc. * Royal family, the immediate family of a king or queen regnant, and sometimes his or her extended family * Royalty payment for use of such things as int ...
based on calculated water usage benefits. In recent years, water from the scheme has also been discharged into the Mohokare (Caledon) River to provide water to Lesotho's capital
Maseru Maseru is the capital and largest city of Lesotho. It is also the capital of the Maseru District. Located on the Caledon River, Maseru lies directly on the Lesotho–South Africa border. Maseru had a population of 330,760 in the 2016 census. The ...
in times of shortages. The new dams have filled as anticipated and discharge of water from the dams into the downstream rivers continues in a scheme devised to preserve ecological balances. This discharged water flows to the Senqu (Orange) River, and while preserving the ecological ''status quo'', it benefits only those communities along the rivers. Schemes to provide water supplies to displaced Highlands farmers have not been very successful. The dam project has also been a source of widespread corruption, which is not uncommon with large dam projects. The Lesotho courts have taken the unusual step of prosecuting the large companies involved in the scandal in addition to the Lesotho bureaucrat who took the bribes. Thus far, there have been a number of convictions and at least one company debarred by the World Bank for its role in the scandal.


Intake tower water transfer

The
intake tower An intake tower or outlet tower is a vertical tubular structure with one or more openings used for capturing water from reservoirs and conveying it further to a hydroelectric or water-treatment plant. Unlike spillways, intake towers are intended ...
is located approximately north of Katse Dam and has been designed to accommodate which was the maximum transfer originally envisaged for full implementation of the LHWP. The intake tower is in diameter and high to accommodate the large range in reservoir storage elevation as well as to facilitate the draw-off at four distinct lake levels. This will enable the quality of the transferred water to be controlled at all times. Due to the position and design of the intake tower, there is a certain volume of water in the reservoir that cannot be accessed via the transfer tunnels. This dead storage is approximately , with the result that the effective live storage behind Katse Dam is reduced from the total storage capacity of 1,950 million m³ to 1,520 million m³.


Dam features

*Height - (second tallest in Africa) *Crest length - *Design - double arch, concrete *Concrete - *Elevation - above sea level (highest elevation dam in Africa)


See also

*
Lesotho Highlands Water Project The Lesotho Highlands Water Project (LHWP) is an ongoing water supply project with a hydropower component, developed in partnership between the governments of Lesotho and South Africa. It comprises a system of several large dams and tunnels thr ...
*
Mohale Dam Mohale Dam is a concrete faced rock-fill dam in Lesotho. It is the second dam, under Phase 1B of the series of dams of the proposed Lesotho Highlands Water Project (LHWP), which will eventually include five large dams in remote rural areas of L ...


References


External links


International Rivers





Lesotho Highlands Development Authority

Transformation Resource Centre
{{Portalbar, Water, Renewable energy Dams in Lesotho Hydroelectric power stations in Lesotho Dams completed in 1996 Energy infrastructure completed in 1996