Kolkata Metro Line 4
   HOME

TheInfoList



OR:

The Kolkata Metro Line 4 or the Yellow Line, also known as the Noapara - Barasat Line of the
Kolkata Metro The Kolkata Metro is a rapid transit system serving the city of Kolkata in West Bengal, India. , it has two operational lines, a line from Dakshineswar to Kavi Subhash and a line from Salt Lake Sector V to Sealdah, for a total of . Four o ...
in India is a long metro route from Noapara to
Barasat Barasat () is a city and a municipality of North 24 Parganas district in the Indian state of West Bengal. It is the headquarters of Barasat Sadar subdivision. It is a part of the area covered by Kolkata Metropolitan Development Authority (KMDA) ...
in
North 24 Parganas North 24 Parganas (abv. 24 PGS (N)) or sometimes North Twenty Four Parganas is a district in southern West Bengal, of eastern India. North 24 Parganas extends in the tropical zone from latitude 22° 11′ 6″ north to 23° 15′ 2″ north and f ...
, which is under construction. It is being built by RVNL. It will run mostly underground viaducts. It will run elevated until Jessore Road Station and then it goes underground towards Barasat metro station. It will have an interchange station at the NSCBI Airport with
Kolkata Metro Line 6 Kolkata Metro Line 6 or the Orange Line of the Kolkata Metro is an under-construction rapid transit line that will connect New Garia with Netaji Subhas Chandra Bose International Airport via two satellite towns Salt Lake and New Town. The line ...
.


Stations

The stations of this corridor are:


Progress of Dum Dum Cantonment metro station

An amount of Rs 227 crore contract to build this station along with a mostly at-grade 2.16 km section from the Bagjola Canal to the existing ramp of the Airport Circular Railway track was awarded to Senbo Engineering Limited all the way back in June 2011. Since then, the station’s civil structure has been built, but work for the at-grade track section could not be started due to land acquisition issues along the line’s proposed alignment. But the rehabilitation work has completed, and the work is going smoothly. Recently girders were placed over Eastern Railway tracks.


Project Development

The project will be completed in three phases. The first phase of work from Noapara to Biman Bandar is under progress. In the second phase work from Biman Bandar to New Barrackpore will be done and in the last phase from New Barrackpore to Barasat work will be done. But the development work from New Barackpore to Barasat got struck for the last eight years since it was sanctioned because of encroachments and the
Airport Authority of India The Airports Authority of India, or AAI, is a public sector enterprise under the ownership of the Ministry of Civil Aviation, Government of India. It is responsible for creating, upgrading, maintaining, and managing civil aviation infrastruct ...
objected the elevated stretches from New Barrackpore to Barasat. Later, after objections from AAI, a decision was taken to convert this into an underground stretch. On 29 June 2019 sanction for material modification for underground construction at an additional cost of was sent to Railway Board by Metro. For this underground tunneling AAI has agreed to shift their fuel tanks, buildings and cables and the project is expected to be started from 2020. Construction of an underground integrated station for Line 6 and Line 4 has begun at NSCBI Airport land just 150 metre away from the terminal building. The development of New Barrackpore to Barasat was supposed to go elevated to cut down the expenses, but the stretch was in doubt due to huge encroachment problem. But in February 2021, Prime Minister
Narendra Modi Narendra Damodardas Modi (; born 17 September 1950) is an Indian politician serving as the 14th and current Prime Minister of India since 2014. Modi was the Chief Minister of Gujarat from 2001 to 2014 and is the Member of Parliament from ...
gave his nod to construct this stretch underground, giving respite to thousands of families who were supposed to be evicted for the development of the elevated stretch. Line 4 has been divided into three phases now. * Phase 1: Noapara - Biman Bandar (under construction) * Phase 2: Biman Bandar - New Barrackpore (construction to begin soon, tender floated by RVNL to carry out construction work) * Phase 3: New Barrackpore - Barasat (construction to begin soon)


See also

*
List of Kolkata metro stations The Kolkata Metro is a Mass Rapid Transit Urban Railway network in Kolkata, India. It was the first underground railway to be built in India, with the first operations commencing in October, 1984 and the full stretch that was initially planned ...
* Kolkata Metro Rolling Stock *
List of rapid transit systems These lists of rapid transit systems are sorted by the type of system: * List of tram and light rail transit systems * List of town tramway systems * Medium-capacity rail transport system * List of premetro systems * List of metro systems * List of ...
*
Trams in Kolkata The tram system in the city of Kolkata, West Bengal, India, operated by West Bengal Transport Corporation (WBTC) after Calcutta Tramways Company (CTC) was dissolved, is the oldest existing tram network operating in India, and oldest operating ...
* Kolkata Lightrail *
Kolkata Monorail Kolkata Monorail was a rail-based transit project planned for the city of Kolkata, West Bengal, India. This was the first proposed monorail in the country. History 2004 & 2008 The initial plan regarding the monorail was floated in 2004. In ...
*
Kolkata Suburban Railway The Kolkata Suburban Railway is a suburban rail system serving the Kolkata metropolitan area and its surroundings in India. It is the largest suburban railway network in the country with the highest number of stations. It is also the 7th larg ...


References

{{Rapid transit in India Kolkata Metro lines Kolkata Metro 750 V DC railway electrification