Isimba Hydroelectric Power Station is a hydroelectric power station commissioned on 21 March 2019 in
Uganda }), is a landlocked country in East Africa. The country is bordered to the east by Kenya, to the north by South Sudan, to the west by the Democratic Republic of the Congo, to the south-west by Rwanda, and to the south by Tanzania. The sou ...
. Construction of this dam began in April 2015 and was completed in January 2019. Commercial operations began on 21 March 2019.


Location

The power station is located at the village of Isimba on the
Victoria Nile The White Nile ( ar, النيل الأبيض ') is a river in Africa, one of the two main tributaries of the Nile, the other being the Blue Nile. The name comes from the clay sediment carried in the water that changes the water to a pale color. ...
, in
Kamuli District Kamuli District is a district in the Eastern Region of Uganda. The town of Kamuli is the site of the district headquarters. Location Kamuli District is bordered by Buyende District to the north, Luuka District to the east, Jinja District t ...
. This is approximately , by road, north of the
Bujagali Hydroelectric Power Station The Bujagali Power Station is a hydroelectric power station across the Victoria Nile that harnesses the energy of its namesake; the Bujagali Falls, in Uganda. Construction began in 2007 and concluded in 2012. It was officially inaugurated on 8 ...
. The geographical coordinates of Isimba Power Station are: 00°46'18.0"N, 33°02'32.0"E (Latitude:0.771667; Longitude:33.042222).


Overview

The contract for a feasibility study and preparation of tender documents, worth US $3.8 million, was awarded to a consortium consisting of the engineering firms Fichtner (lead) and Norplan. A local Ugandan company, Kagga & Partners, was a sub-consultant to the consortium. Initial planned capacity at Isimba was to be at least . In July 2013, Ugandan media reported that the construction contract had been awarded to the
China International Water & Electric Corporation China International Water & Electric Corporation (abbreviated CWE) is a Chinese construction and engineering consulting company that is a subsidiary of China Three Gorges Corporation (CTE). CWE specializes in the construction of water and hydropow ...
, a
Chinese Chinese can refer to: * Something related to China * Chinese people, people of Chinese nationality, citizenship, and/or ethnicity **''Zhonghua minzu'', the supra-ethnic concept of the Chinese nation ** List of ethnic groups in China, people of ...
government-owned power company. The generation capacity had been increased to 183.2 megawatts. Construction was expected to last 34 months. In January 2018, following the expiry of their 40-month contract, ''Energy Infratech Private Limited'', from
India India, officially the Republic of India (Hindi: ), is a country in South Asia. It is the seventh-largest country by area, the second-most populous country, and the most populous democracy in the world. Bounded by the Indian Ocean on the so ...
, handed over to a new supervising engineering consortium. The consortium comprises ''Artelia EAU & Environment'' from
France France (), officially the French Republic ( ), is a country primarily located in Western Europe. It also comprises of overseas regions and territories in the Americas and the Atlantic, Pacific and Indian Oceans. Its metropolitan area ...
and local company ''KKATT Consult Limited''. Completion is now expected in August 2018. As of April 2018, according to the
Uganda Electricity Generation Company Limited The Uganda Electricity Generation Company Limited (UEGCL) is a parastatal company whose primary purpose is to generate electric power for use in Uganda and for sale to neighboring countries. As of December 2017, UEGCL's generation capacity was 380 ...
, the project was 86 percent complete, with total cost quoted at US$567.7 million. The most recent design includes a bridge on top of the power station that will span the Victoria Nile and provide another crossing across the river. However, the road over the dam was one lane instead of the two lanes in the design, and was deemed unusable. The contractor was instructed by the government of Uganda, to construct a public bridge, downstream of Isimba Dam, at a cost of USh24 billion (US$6.7 million). Work on the public bridge is expected to conclude in December 2020.


Construction costs

The total project cost was originally estimated at US $350 million. In 2008, the
Ugandan government Uganda is a presidential republic in which the President of Uganda is the head of state and the prime minister is the head of government business. There is a multi-party system. Executive power is exercised by the government. Legislative power is ...
secured a loan from the Export-Import Bank of India to fund the construction. In April 2013, Ugandan print media reported that the government of India had extended a credit line worth US $450 million (about UGX:1.1 trillion) for construction of the dam. In July 2013, media reports indicated that the cost of the dam had risen to US $570 million (about UGX:1.4 trillion), funded by a loan from the
Export-Import Bank of China The Export–Import Bank of China (Chexim - China Exim Bank) () is one of two institutional banks in China chartered to implement the state policies in industry, foreign trade, economy, and foreign aid to other developing countries, and pro ...
. In March 2015, the Ugandan Parliament authorized the Ugandan government to borrow US$482.5 million (about UGX:1.4 trillion) from China Exim Bank at 2 percent annual interest repayable over 20 years, with a five-year grace period. Uganda will contribute the remaining US$107 million to the project, for a total cost of US$589.5 million. A new 132 kilovolt transmission line was constructed to evacuate the generated power and integrate it into the national grid at the Bujagali Power Station.


Funding

The table below illustrates the funding sources for the power station alone, without the related power line, road and other infrastructure.


Operations

The power station is operated by the
Uganda Electricity Generation Company Limited The Uganda Electricity Generation Company Limited (UEGCL) is a parastatal company whose primary purpose is to generate electric power for use in Uganda and for sale to neighboring countries. As of December 2017, UEGCL's generation capacity was 380 ...
, a government-owned electricity generating company.


See also

*
List of power stations in Uganda This article lists all power stations in Uganda. As of April 2019, national generation capacity was 1,177 megawatts of electricity. By January 2021, Uganda's generating capacity had increased to 1,268.9 megawatts. Hydroelectric Completed U ...
*
Kayunga–Busaana–Nabuganyi Road Kayunga–Busaana–Nabuganyi Road is a road in the Central Region of Uganda, connecting the town of Kayunga to the town of Nabuganyi, on the western bank of the Victoria Nile, adjacent to the Isimba Hydroelectric Power Station. Location T ...
*
Kayunga District Kayunga District is a district in Central Uganda. It is named after its chief town, Kayunga. Geography Kayunga District is bordered by Amolatar District to the north, Buyende District to the northeast, Kamuli District to the east, Jinja Distri ...


References


External links


Isimba Dam changing the face of Kayunga, Kamuli

Isimba Hydropower Dam Is Second Chinese Power Project In Uganda During 2013

Chinese Firm To Build Uganda's Isimba Hydro-electric Dam


{{Kayunga District Power stations in Uganda Kamuli District Kayunga District Hydroelectric power stations in Uganda 2019 establishments in Uganda Energy infrastructure completed in 2019 Dams completed in 2019