The Ilısu Dam () is a
concrete-face rock-fill dam A dam is a barrier that stops or restricts the flow of surface water or underground streams. Reservoirs created by dams not only suppress floods but also provide water for activities such as irrigation, human consumption, industrial use, ...
on the
Tigris The Tigris () is the easternmost of the two great rivers that define Mesopotamia, the other being the Euphrates. The river flows south from the mountains of the Armenian Highlands through the Syrian and Arabian Deserts, and empties into the ...
near the village of Ilısu and along the border of
Mardin Mardin ( ku, Mêrdîn; ar, ماردين; syr, ܡܪܕܝܢ, Merdīn; hy, Մարդին) is a city in southeastern Turkey. The capital of Mardin Province, it is known for the Artuqid architecture of its old city, and for its strategic location on ...
and
Şırnak Province Şırnak Province ( tr, Şırnak ili, ku, Parêzgeha Şirnexê) is a province of Turkey in the Southeastern Anatolia Region. Şırnak Province was created in 1990, with areas that were formerly part of the Siirt and Mardin Provinces. It borders b ...
s in
Turkey Turkey ( tr, Türkiye ), officially the Republic of Türkiye ( tr, Türkiye Cumhuriyeti, links=no ), is a list of transcontinental countries, transcontinental country located mainly on the Anatolia, Anatolian Peninsula in Western Asia, with ...
. It is one of the 22
dam A dam is a barrier that stops or restricts the flow of surface water or underground streams. Reservoirs created by dams not only suppress floods but also provide water for activities such as irrigation, human consumption, industrial use, a ...
s of the
Southeastern Anatolia Project The Southeastern Anatolia Project ( tr, Güneydoğu Anadolu Projesi, GAP) is a multi-sector integrated regional development project based on the concept of sustainable development for the 9 million people (2005) living in the Southeastern Anatoli ...
and its purpose is
hydroelectric Hydroelectricity, or hydroelectric power, is electricity generated from hydropower (water power). Hydropower supplies one sixth of the world's electricity, almost 4500 TWh in 2020, which is more than all other renewable sources combined and ...
power production, flood control and water storage. When operational, the dam will support a 1,200 MW power station and will form a 10.4 billion m3 reservoir. Construction of the dam began in 2006 and was originally expected to be completed by 2016. As part of the project, the much smaller Cizre Dam is to be constructed downstream for irrigation and power. The dam has drawn international controversy, because it will flood portions of ancient
Hasankeyf Hasankeyf ( ar, حصن كيفا, translit=Ḥiṣn Kayfa‘, ku, Heskîf, hy, Հասանքեյֆ, translit=, el, Κιφας, translit=Kifas, lat, Cepha, syr, ܚܣܢܐ ܕܟܐܦܐ, Ḥesno d-Kifo) is a town and district located along the Ti ...
and necessitate the relocation of people living in the region. Because of this, the dam lost international funding in 2008. Most historical structures in Hasankeyf were moved to the new Hasankeyf prior to the filling of the dam. The dam began to fill its reservoir in late July 2019. Due to rainfall, the dam has achieved water levels up to 100m above the river bed and stored 5 billion cubic meters of water. The water level had reached an elevation of 498.2m on 1 April 2020. DSI has started testing 2 turbines for energy production after completing the spillway testing. The dam reservoir has attained a water volume of 7.6 billion cubic meters. Water storage crest level was 513m on 19 April 2020. It would need 12m rise to achieve the maximum storage level. The first of six generators was commissioned on 19 May 2020, while its power plant is scheduled to reach full capacity by the end of 2020. Three hydro-turbines have been commissioned since 19 June 2020 and the remaining three are being tested. So far the dam has contributed 51M$ energy towards economy.


Design

The Ilısu Dam will be a high and wide rock-fill embankment dam with a structural volume of . It will be wide at its crest and wide at its base. The dam will have an overflow
spillway A spillway is a structure used to provide the controlled release of water downstream from a dam or levee, typically into the riverbed of the dammed river itself. In the United Kingdom, they may be known as overflow channels. Spillways ensure tha ...
on its right bank which will be controlled by eight
radial gate The Tainter gate is a type of radial arm floodgate used in dams and canal locks to control water flow. It is named for Wisconsin structural engineer Jeremiah Burnham Tainter. A side view of a Tainter gate resembles a slice of pie with the c ...
s which will pour into four chutes before the water reaches a plunge pool. Its power station will be above ground and will contain 6 x 200 MW
Francis turbine The Francis turbine is a type of water turbine. It is an inward-flow reaction turbine that combines radial and axial flow concepts. Francis turbines are the most common water turbine in use today, and can achieve over 95% efficiency. The proces ...
-generators with an expected annual generation of 3,833 GWh and gross
hydraulic head Hydraulic head or piezometric head is a specific measurement of liquid pressure above a vertical datum., 410 pages. See pp. 43–44., 650 pages. See p. 22. It is usually measured as a liquid surface elevation, expressed in units of length, ...
of . The dam's reservoir will have a capacity of , of which will be active (or live, useful) storage and will be inactive (dead) storage. At a normal elevation of above sea level, the reservoir surface area will cover .


Background

Beginning in 1954 the Turkish government surveyed of the Tigris river downstream of Diyarbakır with the aim of identifying suitable locations for a hydroelectric power plant at an elevation below . Turkey's Electric Power Resources Survey and Development Administration (EIE) included 10 potential sites in its 1971 Tigris River Pre-Investigation Report. By 1975, the EIE had completed a technical and economic evaluation of the sites. Ilısu was selected as the preferred site for geological reasons. A feasibility study and final design by international consultants (1980–82) resulted in a recommendation to construct both the Ilısu Dam and the Cizre Dam downstream. There was little movement on the project for more than 15 years until the dam was added to the State Hydraulic Works' formal construction program in 1997 or 1998. On 5 August 2006, the foundation stone for the dam was laid and initial construction began.


Funding issues

To avoid inflation and other economic repercussions, the
Turkish Government The Government of Turkey ( tr, Türkiye Cumhuriyeti Hükûmeti) is the national government of Turkey. It is governed as a unitary state under a presidential representative democracy and a constitutional republic within a pluriform multi-party ...
has often sought outside assistance to fund the Ilısu Dam Project. However, pressure from environmental and human rights groups have often halted this process. In 2000, the
British Government ga, Rialtas a Shoilse gd, Riaghaltas a Mhòrachd , image = HM Government logo.svg , image_size = 220px , image2 = Royal Coat of Arms of the United Kingdom (HM Government).svg , image_size2 = 180px , caption = Royal Arms , date_es ...
declined $236 million in funding for the Ilısu Dam. Before the 2006 ground-breaking ceremony, German, Swiss and Austrian export credit agencies had agreed to fund $610 million of the project. In December 2008, the European firms suspended funds for the dam and gave Turkey a 180-day period to comply with over 150 international standards. In June 2009, after failing to meet the standards, the European firms officially cut the funding for the Ilısu Dam Project. Shortly after the announcement of the funding loss, Turkey's Environment Minister
Veysel Eroğlu Veysel Eroğlu (born 18 August 1948) is a Member of Parliament for Afyonkarahisar of the ruling Justice and Development Party and a former Minister of Forestry and Water of Turkey. Early life Eroğlu was born on 18 August 1948 in the Şuhu ...
said, "Let me tell you this, these power plants will be built. No one can stop it. This is the decision of the state and the government." Turkey's Prime Minister
Recep Tayyip Erdoğan Recep Tayyip Erdoğan (born 26 February 1954) is a Turkish politician serving as the List of presidents of Turkey, 12th and current president of Turkey since 2014. He previously served as prime minister of Turkey from 2003 to 2014 and as Lis ...
is also committed to the Ilısu Dam Project as well and claims Turkey will use internal or other international funding. Turkey stated that construction would start again in July 2009. In February 2010, it was announced that loans had been granted and the project would continue. On 15 July 2010,
Andritz Hydro Andritz AG is an international technology group, offering plants, equipment, systems and services for various industries. The group's headquarters are in Graz, Austria. The group gets its name from the district of Andritz in which it is located ...
lifted a temporary suspension on supplying parts to the project and announced it would provide the six 200 MW Francis turbines for the power plant.


Construction

As part of early and ongoing construction, of roads are subject to raising and repairing work. A long temporary bridge was constructed upstream of the dam site which is supported by 30 sections of steel pipe. Additionally, a permanent steel-girder bridge with concrete supports was constructed just downstream of the dam. Construction of new Ilısu and Koçtepe villages were underway as well as the relocation of major portions of Hasankeyf. Excavations for the main body of the dam began in May 2011 and the first loads of fill were laid in January 2012. Diversion of the Tigris River began during a ceremony on 29 August 2012. As of April 2014, the project is 60% complete while the resettlement of Hasankeyf is 73% complete. All works are expected to be completed in 2015. In 2014, the dam, as well as others in southeast Turkey such as the Silvan Dam, became a prime target of
Kurdistan Workers' Party The Kurdistan Workers' Party or PKK is a Kurdish militant political organization and armed guerrilla movement, which historically operated throughout Kurdistan, but is now primarily based in the mountainous Kurdish-majority regions of south ...
(PKK) militants after peace talks collapsed with the government. Attacks on the dam, supporting structures and workers are part of the PKK's efforts to stop construction. Construction of the dam was suspended temporarily late in the year. On 3 February 2015, a convoy of supplies for the dam was attacked, injuring three. Several days later a worker was killed in his home by suspected PKK militants. The construction reached 96% in June 2017. In February 2018, construction on the dam was completed. On 1 June 2018, the reservoir was to begin impoundment but was delayed until November then 2019 following another detail due to water shortages in Iraq. Impoundment began in late July 2019. As of November 2019, the hydroelectric power generation would start in February 2020. Due to rainfalls dam has achieved the water elevation level of 498.2m as of 1 April 2020. Ilisu Dam has attained water level of 513m on 19 April 2020, and it is less than 12m from the maximum conservation level of 525m, according to
CNN Türk CNN Türk is a Turkish pay television news channel, launched on 11 October 1999 as the localised variant of American channel CNN. It broadcasts exclusively for Turkey and it is owned by Warner Bros. Discovery and Demirören Group. Its headquarte ...
citing the
State Hydraulic Works The State Hydraulic Works ( tr, Devlet Su İşleri) is a state agency, under the Ministry of Environment and Forestry of Turkey, responsible for the utilization of all the country's water resources. The institution's four major functions are ene ...
(DSI) by an AA correspondent.


Controversy

Completion of the Ilısu Dam caused the flooding of the majority of the ancient city of
Hasankeyf Hasankeyf ( ar, حصن كيفا, translit=Ḥiṣn Kayfa‘, ku, Heskîf, hy, Հասանքեյֆ, translit=, el, Κιφας, translit=Kifas, lat, Cepha, syr, ܚܣܢܐ ܕܟܐܦܐ, Ḥesno d-Kifo) is a town and district located along the Ti ...
, whose history stretches back over 10,000 years. About 199 settlements (villages and hamlets) will be fully or partially affected by flooding as well. This figure excludes vacant settlements, which will also be inundated. Three decades of conflict between the Turkish government and the PKK has resulted in the depopulation of many hamlets in the area, and so now their original inhabitants will never be able to return home either, in addition to the others who still live in the region. In 2006, the Turkish government estimated that 61,620 people would be "physically or economically displaced". Using 1990 census data, it had previously estimated that 55,127 people would be affected; updating these calculations using 2000 survey data produced a figure of 71,186. The official Turkish government line was expressed by then-Prime Minister
Recep Tayyip Erdoğan Recep Tayyip Erdoğan (born 26 February 1954) is a Turkish politician serving as the List of presidents of Turkey, 12th and current president of Turkey since 2014. He previously served as prime minister of Turkey from 2003 to 2014 and as Lis ...
at the ground-breaking ceremony in 2006: "The step that we are taking today demonstrates that the south-east is no longer neglected. This dam will bring big gains to the local people." The government says the project will generate 10,000 jobs, spur agricultural production through irrigation and boost tourism, although others argue that the tourism industry will be ruined due to the loss of Hasankeyf and that the local people will be forced to move to cities because the amount of money they were given to buy new homes in the region is insufficient.


Impact on downstream countries

After the completion of the dam's construction in early spring 2018, the
Iraq Iraq,; ku, عێراق, translit=Êraq officially the Republic of Iraq, '; ku, کۆماری عێراق, translit=Komarî Êraq is a country in Western Asia. It is bordered by Turkey to Iraq–Turkey border, the north, Iran to Iran–Iraq ...
i government approached the Turkish authorities to postpone filling of the proposed Ilısu reservoir until the end of June in the same year, due to the fact that the
Tigris The Tigris () is the easternmost of the two great rivers that define Mesopotamia, the other being the Euphrates. The river flows south from the mountains of the Armenian Highlands through the Syrian and Arabian Deserts, and empties into the ...
river has its highest levels during spring time. However, water shortages were witnessed in the
Mosul dam Mosul Dam ( ar, سد الموصل), formerly known as Saddam Dam (), is the largest dam in Iraq. It is located on the Tigris river in the western governorate of Nineveh, upstream of the city of Mosul. The dam serves to generate hydroelectricity ...
, where water in the reservoir had more than 3 billion cubic meters compared with its levels of more than 8 billion cubic meters in the same period of the previous year. Moreover, the southern governorates of Iraq had the lowest portions of the river in years, in which the total Tigris water share in Iraq fell from 21 billion cubic metres to only 9.7 billion cubic metres instead. Such impacts which might lead to the drainage of the
Mesopotamian Marshes The Mesopotamian Marshes, also known as the Iraqi Marshes, are a wetland area located in Southern Iraq and in southwestern Iran. The marshes are primarily located on the floodplains of the Euphrates and Tigris rivers bound by the cities of Basra, ...
and destruction of its ecology system, were part of the reasons to the emergence of a new wave of Iraqi protests, along with several other issues, especially in
Basra Governorate Basra Governorate ( ar, محافظة البصرة ), also called Basra Province, is a Governorates of Iraq, governorate in southern Iraq, bordering Kuwait to the south and Iran to the east. The capital is the city of Basra, located in the Basrah ...
. In addition, water shortages, lack of rainfall and depleted soils led nearly to a halt in farming rice, corn, sesame, sunflower seeds and cotton; and a decrease in the area planted for wheat and barley by half for the 2018–19 season.


See also

* Ilısu Dam Campaign *
List of power stations in Turkey The most important power stations in Turkey are listed here. Turkey generates about 300 TWh of electricity per year. High Carbon Emissions Coal All operational coal-fired power stations over 50MW are listed below. Five plants were shut down ...
*
Southeastern Anatolia Project The Southeastern Anatolia Project ( tr, Güneydoğu Anadolu Projesi, GAP) is a multi-sector integrated regional development project based on the concept of sustainable development for the 9 million people (2005) living in the Southeastern Anatoli ...


References


Sources

* * * * *


External links


Environmental Impact Assessment Report
(English)
GAP
(Republic Of Turkey Ministry Of Development Southeastern Anatolia Project Regional Development Administratio
English

International Ilisu Dam Campaign


on
PBS The Public Broadcasting Service (PBS) is an American public broadcasting, public broadcaster and Non-commercial activity, non-commercial, Terrestrial television, free-to-air television network based in Arlington, Virginia. PBS is a publicly fu ...

Nature Association (Doga Dernegi) page on Ilisu/Hasankeyf
{{DEFAULTSORT:Ilisu Dam Dams in Mardin Province Hydroelectric power stations in Turkey Southeastern Anatolia Project Dams in Şırnak Province Concrete-face rock-fill dams Dams on the Tigris River Dam controversies Dams completed in 2020