Human Landing System
   HOME

TheInfoList



OR:

The Artemis program is a robotic and human Moon exploration program led by the
United States The United States of America (U.S.A. or USA), commonly known as the United States (U.S. or US) or America, is a country primarily located in North America. It consists of 50 states, a federal district, five major unincorporated territori ...
' National Aeronautics and Space Administration (NASA) along with three partner agencies: European Space Agency (ESA), Japan Aerospace Exploration Agency (JAXA), and Canadian Space Agency (CSA). The Artemis program intends to reestablish a human presence on the Moon for the first time since the Apollo 17 mission in 1972. The major components of the program are the
Space Launch System The Space Launch System (SLS) is an American super heavy-lift expendable launch vehicle developed by NASA. As of 2022, SLS has the highest payload capacity of any rocket in operational service, as well as the greatest liftoff thrust of any r ...
(SLS),
Orion spacecraft Orion (officially Orion Multi-Purpose Crew Vehicle or Orion MPCV) is a partially reusable crewed spacecraft used in NASA's Artemis program. The spacecraft consists of a Crew Module (CM) space capsule designed by Lockheed Martin and the Euro ...
,
Lunar Gateway The Lunar Gateway, or simply Gateway, is the first planned extraterrestrial space station in lunar orbit intended to serve as a solar-powered communication hub, science laboratory, and short-term habitation module for government-agency astr ...
space station and the commercial Human Landing Systems. The program's long-term goal is to establish a permanent base camp on the Moon and facilitate human missions to Mars. The Artemis program is a collaboration of government space agencies and
private spaceflight Private spaceflight is spaceflight or the development of spaceflight technology that is conducted and paid for by an entity other than a government agency. In the early decades of the Space Age, the government space agencies of the Soviet Un ...
companies, bound together by the
Artemis Accords The Artemis Accords are a series of non-binding multilateral agreements between the United States government and other world governments participating in the Artemis Program, an American-led effort to return humans to the Moon by 2025, with the u ...
and supporting contracts. As of July 2022, twenty-one countries have signed the accords, including traditional U.S. space partners (such as the European Space Agency as well as agencies from Canada, Japan, and the United Kingdom) and emerging space powers such as Brazil, South Korea, and the United Arab Emirates. The Artemis program was formally established in 2017 during the
Trump administration Donald Trump's tenure as the 45th president of the United States began with his inauguration on January 20, 2017, and ended on January 20, 2021. Trump, a Republican from New York City, took office following his Electoral College victory ...
; however, many of its components such as the Orion spacecraft were developed during the previous
Constellation program The Constellation program (abbreviated CxP) was a crewed spaceflight program developed by NASA, the space agency of the United States, from 2005 to 2009. The major goals of the program were "completion of the International Space Station" and a " ...
(2005–2010) during the Bush administration, and after its cancellation during the Obama administration. Orion's first launch, and the first use of the Space Launch System, was originally set in 2016, but was rescheduled and launched on 16 November 2022 as the Artemis 1 mission, with robots and mannequins aboard. According to plan, the crewed Artemis 2 launch will take place in 2024, the
Artemis 3 Artemis 3 (officially Artemis III) is planned as the first crewed Moon landing mission of the Artemis program and the first crewed flight of the Starship HLS lander. Scheduled for launch in 2025, Artemis 3 is planned to be the second crewed Art ...
crewed lunar landing in 2025, the
Artemis 4 Artemis 4 (officially Artemis IV) is the fourth planned mission of NASA's Artemis program. The mission will launch four astronauts on a Space Launch System rocket and an Orion to the Lunar Gateway and the second lunar landing of the Artemis pr ...
docking with the Lunar Gateway in 2027, and future yearly landings on the Moon thereafter. However, some observers note that the program's cost and timeline are likely to be overrun and delayed due to, according to internal and external review, NASA's inadequate management of contractors.


Overview

The Artemis program is organized around a series of
Space Launch System The Space Launch System (SLS) is an American super heavy-lift expendable launch vehicle developed by NASA. As of 2022, SLS has the highest payload capacity of any rocket in operational service, as well as the greatest liftoff thrust of any r ...
(SLS) missions. These space missions will increase in complexity and are scheduled to occur at intervals of a year or more. NASA and its partners have planned Artemis 1 through Artemis 5 missions; later Artemis missions have also been proposed. Each SLS mission centers on the launch of an SLS launch vehicle carrying an
Orion spacecraft Orion (officially Orion Multi-Purpose Crew Vehicle or Orion MPCV) is a partially reusable crewed spacecraft used in NASA's Artemis program. The spacecraft consists of a Crew Module (CM) space capsule designed by Lockheed Martin and the Euro ...
. Missions after Artemis 2 will depend on support missions launched by other organizations and spacecraft for support functions.


SLS missions

Artemis 1 (2022) is an uncrewed test of the SLS and Orion, and is the first test flight for both craft. The goal of the Artemis 1 mission is to place Orion into a lunar orbit, and then return it to Earth. The SLS uses the ICPS second stage, which will perform the trans-lunar injection burn to send Orion to lunar space. Orion will brake into a retrograde distant polar lunar orbit and remain for about six days before boosting back toward Earth. The Orion capsule will separate from its service module, re-enter the atmosphere for
aerobraking Aerobraking is a spaceflight maneuver that reduces the high point of an elliptical orbit ( apoapsis) by flying the vehicle through the atmosphere at the low point of the orbit ( periapsis). The resulting drag slows the spacecraft. Aerobraking ...
, and splash down under parachutes. Artemis 2 (2024) will be the first crewed test flight of SLS and the Orion spacecraft. The four crew members will perform extensive testing in Earth orbit, and Orion will then be boosted into a
free-return trajectory In orbital mechanics, a free-return trajectory is a trajectory of a spacecraft traveling away from a primary body (for example, the Earth) where gravity due to a secondary body (for example, the Moon) causes the spacecraft to return to the primar ...
around the Moon, which will return Orion back to Earth for re-entry and splashdown. Launch is scheduled no earlier than May 2024.
Artemis 3 Artemis 3 (officially Artemis III) is planned as the first crewed Moon landing mission of the Artemis program and the first crewed flight of the Starship HLS lander. Scheduled for launch in 2025, Artemis 3 is planned to be the second crewed Art ...
(2025) will be a crewed lunar landing. The mission depends on a support mission to place a Human Landing System (HLS) in place in a
near-rectilinear halo orbit A near-rectilinear halo orbit (NRHO) is a halo orbit with slightly curved – or nearly straight – sides between close passes with an orbiting body. The 2022 CAPSTONE mission is the first such orbit in cislunar space, and this Moon-centric o ...
(NRHO) of the Moon prior to the launch of SLS/Orion. After HLS reaches NRHO, SLS/Orion will send the Orion spacecraft with a crew of four, which is intended to include the first woman and the first person of color to land on the Moon, to rendezvous and dock with HLS. Two astronauts will transfer to HLS, which will descend to the lunar surface and spend about 6.5 days on the surface. The astronauts will perform at least two EVAs on the surface before the HLS ascends to return them to a rendezvous with Orion. Orion will return the four astronauts to Earth. Launch is scheduled no earlier than 2025.
Artemis 4 Artemis 4 (officially Artemis IV) is the fourth planned mission of NASA's Artemis program. The mission will launch four astronauts on a Space Launch System rocket and an Orion to the Lunar Gateway and the second lunar landing of the Artemis pr ...
(2027) is a crewed mission to the
Lunar Gateway The Lunar Gateway, or simply Gateway, is the first planned extraterrestrial space station in lunar orbit intended to serve as a solar-powered communication hub, science laboratory, and short-term habitation module for government-agency astr ...
station in NRHO, using an SLS Block 1B. A prior support mission will deliver the first two gateway modules to NRHO. The extra power of the Block 1B will allow SLS/Orion to deliver the I-HAB gateway module for connection to the Gateway. Launch is scheduled no earlier than 2027.
Artemis 5 Artemis 5 (officially Artemis V) is the fifth planned mission and third crewed landing of NASA's Artemis Program. The mission will launch four astronauts on a Space Launch System rocket and an Orion to the south pole of the Moon. In additio ...
through Artemis 8 and beyond are proposed to land astronauts on the lunar surface, where they will take advantage of increasing amounts of infrastructure that are to be landed by support missions. These will include habitats, rovers, scientific instruments, and resource extraction equipment.


Support missions

Support missions include robotic landers, delivery of Gateway modules, Gateway logistics, delivery of the HLS, and delivery of elements of the Moon base. Most of these missions are executed under NASA contracts to commercial providers. Under the
Commercial Lunar Payload Services Commercial Lunar Payload Services (CLPS) is a NASA program to contract transportation services able to send small robotic landers and rovers to the Moon's south polar region mostly with the goals of scouting for lunar resources, testing in sit ...
(CLPS) program, several robotic landers will deliver scientific instruments and robotic rovers to the lunar surface after Artemis 1. Additional CLPS missions are planned throughout the Artemis program to deliver payloads to the Moon base. These include habitat modules and rovers in support of crewed missions. The Human Landing System (HLS) is a spacecraft that can convey crew members from NRHO to the lunar surface, support them on the surface, and return them to NRHO. Each crewed landing needs one HLS, although some or all of the spacecraft may be reusable. Each HLS must be launched from Earth and delivered to NRHO in one or more launches. The initial commercial contract was awarded to SpaceX for two Starship HLS missions, one uncrewed and one crewed as part of Artemis 3. These two missions each require one HLS launch and multiple fueling launches, all on
SpaceX Starship Starship is a fully reusable, super heavy-lift launch vehicle under development by SpaceX, an American aerospace company. With more than twice the thrust of the Saturn V, it is designed to be the most powerful launch vehicle ever built and the ...
launchers. , NASA has also exercised an option under the initial contract to commission an upgraded Starship HLS design and third demonstration lunar mission under new sustainability rules it is drafting. It intends to pursue another HLS design from outside SpaceX in parallel, for redundancy and competition. The first two Gateway modules (PPE and HALO) will be delivered to NRHO in a single launch using a
Falcon Heavy Falcon Heavy is a partially reusable heavy-lift launch vehicle that is produced by SpaceX, an American aerospace manufacturer. The rocket consists of two strap-on boosters made from Falcon 9 first stages, a center core also made from a Falc ...
launcher. Originally planned to be available prior to Artemis 3, as of 2021 it is planned for availability before Artemis 4. The Gateway will be resupplied and supported by launches of Dragon XL spacecraft launched by Falcon Heavy. Each Dragon XL will remain attached to Gateway for up to six months. the Dragon XLs will not return to Earth, but will be disposed of, probably by deliberate crashes on the lunar surface.


History


Early history

The Artemis program incorporates several major components of previously canceled
NASA The National Aeronautics and Space Administration (NASA ) is an independent agencies of the United States government, independent agency of the US federal government responsible for the civil List of government space agencies, space program ...
programs and missions, including the
Constellation program The Constellation program (abbreviated CxP) was a crewed spaceflight program developed by NASA, the space agency of the United States, from 2005 to 2009. The major goals of the program were "completion of the International Space Station" and a " ...
and the
Asteroid Redirect Mission The Asteroid Redirect Mission (ARM), also known as the Asteroid Retrieval and Utilization (ARU) mission and the Asteroid Initiative, was a space mission proposed by NASA in 2013; the mission was later cancelled. The Asteroid Retrieval Robotic ...
. Originally legislated by the
NASA Authorization Act of 2005 The NASA Authorization Act of 2005 is an act of the United States Congress that requires NASA to carry out a balanced set of programs in human spaceflight, in aeronautics research and development and in scientific research. It was signed by the t ...
, Constellation included the development of
Ares I Ares I was the crew launch vehicle that was being developed by NASA as part of the Constellation program. The name "Ares" refers to the Greek deity Ares, who is identified with the Roman god Mars. Ares I was originally known as the "Crew Launc ...
, Ares V, and the Orion Crew Exploration Vehicle. The program ran from the early 2000s until 2010. In May 2009, President
Barack Obama Barack Hussein Obama II ( ; born August 4, 1961) is an American politician who served as the 44th president of the United States from 2009 to 2017. A member of the Democratic Party, Obama was the first African-American president of the ...
established the Augustine Committee to take into account several objectives including support for the
International Space Station The International Space Station (ISS) is the largest modular space station currently in low Earth orbit. It is a multinational collaborative project involving five participating space agencies: NASA (United States), Roscosmos (Russia), JAXA ( ...
, development of missions beyond
low Earth orbit A low Earth orbit (LEO) is an orbit around Earth with a period of 128 minutes or less (making at least 11.25 orbits per day) and an eccentricity less than 0.25. Most of the artificial objects in outer space are in LEO, with an altitude never mor ...
(including the Moon, Mars, and
near-Earth object A near-Earth object (NEO) is any small Solar System body whose orbit brings it into proximity with Earth. By convention, a Solar System body is a NEO if its closest approach to the Sun (perihelion) is less than 1.3 astronomical units (AU). ...
s), and utilization of the commercial space industry within defined budget limits. The committee concluded that the Constellation program was massively underfunded and that a 2020 Moon landing was impossible. Constellation was subsequently put on hold. On 15 April 2010, President Obama spoke at the Kennedy Space Center, announcing the administration's plans for NASA and cancelling the non-Orion elements of Constellation on the premise that the program had become nonviable. He instead proposed US$6 billion in additional funding and called for development of a new heavy lift rocket program to be ready for construction by 2015 with crewed missions to Mars orbit by the mid-2030s. On 11 October 2010, President Obama signed into law the
NASA Authorization Act of 2010 The NASA Authorization Act of 2010 is a U.S. law authorizing NASA appropriations for fiscal years 2011, 2012, 2013 with the same top-line budget values as requested by US President Barack Obama. It resulted from the Augustine Commission's review o ...
, which included requirements for the immediate development of the
Space Launch System The Space Launch System (SLS) is an American super heavy-lift expendable launch vehicle developed by NASA. As of 2022, SLS has the highest payload capacity of any rocket in operational service, as well as the greatest liftoff thrust of any r ...
as a follow-on launch vehicle to the
Space Shuttle The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program ...
, and continued development of a
Crew Exploration Vehicle The Crew Exploration Vehicle (CEV) was a component of the U.S. NASA Vision for Space Exploration plan. A competition was held to design a spacecraft that could carry humans to the destinations envisioned by the plan. The winning design was th ...
to be capable of supporting missions beyond low Earth orbit starting in 2016, while making use of the workforce, assets, and capabilities of the Space Shuttle program,
Constellation program The Constellation program (abbreviated CxP) was a crewed spaceflight program developed by NASA, the space agency of the United States, from 2005 to 2009. The major goals of the program were "completion of the International Space Station" and a " ...
, and other NASA programs. The law also invested in space technologies and robotics capabilities tied to the overall space exploration framework, ensured continued support for
Commercial Orbital Transportation Services Commercial Orbital Transportation Services (COTS) was a NASA program to coordinate the development of vehicles for the delivery of crew and cargo to the International Space Station by private companies. The program was announced on January 18, 200 ...
,
Commercial Resupply Services Commercial Resupply Services (CRS) are a series of flights awarded by NASA for the delivery of cargo and supplies to the International Space Station (ISS) on commercially operated spacecraft. The first CRS contracts were signed in 2008 and awarde ...
, and expanded the
Commercial Crew Development Development of the Commercial Crew Program began in the second round of the Commercial Crew Development (CCDev) program, which was rescoped from a technology development program for human spaceflight to a competitive development program that woul ...
program. On 30 June 2017, President
Donald Trump Donald John Trump (born June 14, 1946) is an American politician, media personality, and businessman who served as the 45th president of the United States from 2017 to 2021. Trump graduated from the Wharton School of the University of P ...
signed an executive order to re-establish the
National Space Council The National Space Council is a body within the Executive Office of the President of the United States created in 1989 during the George H. W. Bush administration, disbanded in 1993, and reestablished in June 2017 by the Donald Trump administrat ...
, chaired by Vice-President Mike Pence. The Trump administration's first budget request kept Obama-era human spaceflight programs in place: Commercial Resupply Services, Commercial Crew Development, the Space Launch System, and the Orion spacecraft for deep space missions, while reducing Earth science research and calling for the elimination of NASA's education office.


Redefinition and naming as Artemis

On 11 December 2017,
President Trump Donald John Trump (born June 14, 1946) is an American politician, media personality, and businessman who served as the 45th president of the United States from 2017 to 2021. Trump graduated from the Wharton School of the University of Pe ...
signed Space Policy Directive 1, a change in national space policy that provides for a U.S.-led, integrated program with private sector partners for a human return to the Moon, followed by missions to Mars and beyond. The policy calls for the NASA administrator to "lead an innovative and sustainable program of exploration with
commercial Commercial may refer to: * a dose of advertising conveyed through media (such as - for example - radio or television) ** Radio advertisement ** Television advertisement * (adjective for:) commerce, a system of voluntary exchange of products and s ...
and international partners to enable human expansion across the
Solar System The Solar System Capitalization of the name varies. The International Astronomical Union, the authoritative body regarding astronomical nomenclature, specifies capitalizing the names of all individual astronomical objects but uses mixed "Solar ...
and to bring back to Earth new knowledge and opportunities". The effort intends to more effectively organize government, private industry, and international efforts toward returning humans to the Moon, and laying the foundation of eventual human
exploration of Mars The planet Mars has been explored remotely by spacecraft. Probes sent from Earth, beginning in the late 20th century, have yielded a large increase in knowledge about the Martian system, focused primarily on understanding its geology and habi ...
. Space Policy Directive 1 authorized the lunar-focused campaign. The campaign (later named Artemis) draws upon legacy US spacecraft programs including the Orion space capsule, the
Lunar Gateway The Lunar Gateway, or simply Gateway, is the first planned extraterrestrial space station in lunar orbit intended to serve as a solar-powered communication hub, science laboratory, and short-term habitation module for government-agency astr ...
space station,
Commercial Lunar Payload Services Commercial Lunar Payload Services (CLPS) is a NASA program to contract transportation services able to send small robotic landers and rovers to the Moon's south polar region mostly with the goals of scouting for lunar resources, testing in sit ...
, and also creates entirely new programs such as the Human Landing System. The in-development
Space Launch System The Space Launch System (SLS) is an American super heavy-lift expendable launch vehicle developed by NASA. As of 2022, SLS has the highest payload capacity of any rocket in operational service, as well as the greatest liftoff thrust of any r ...
is expected to serve as the primary launch vehicle for Orion, while commercial launch vehicles will launch various other elements of the program. On 26 March 2019, Vice President Mike Pence announced that NASA's Moon landing goal would be accelerated by four years with a planned landing in 2024. On 14 May 2019, NASA Administrator
Jim Bridenstine James Frederick Bridenstine (born June 15, 1975) is an American military officer and politician who served as the 13th administrator of the National Aeronautics and Space Administration (NASA). Bridenstine was the United States representative f ...
announced that the new program would be named
Artemis In ancient Greek mythology and religion, Artemis (; grc-gre, Ἄρτεμις) is the goddess of the hunt, the wilderness, wild animals, nature, vegetation, childbirth, care of children, and chastity. She was heavily identified wit ...
, after the goddess of the Moon in
Greek mythology A major branch of classical mythology, Greek mythology is the body of myths originally told by the ancient Greeks, and a genre of Ancient Greek folklore. These stories concern the origin and nature of the world, the lives and activities ...
who is the twin sister of
Apollo Apollo, grc, Ἀπόλλωνος, Apóllōnos, label=genitive , ; , grc-dor, Ἀπέλλων, Apéllōn, ; grc, Ἀπείλων, Apeílōn, label= Arcadocypriot Greek, ; grc-aeo, Ἄπλουν, Áploun, la, Apollō, la, Apollinis, label ...
. Despite the immediate new goals, Mars missions by the 2030s were still intended . In mid-2019, NASA requested US$1.6 billion in additional funding for Artemis for fiscal year 2020, while the Senate Appropriations Committee requested from NASA a five-year budget profile which is needed for evaluation and approval by
Congress A congress is a formal meeting of the representatives of different countries, constituent states, organizations, trade unions, political parties, or other groups. The term originated in Late Middle English to denote an encounter (meeting of ...
. In February 2020, the
White House The White House is the official residence and workplace of the president of the United States. It is located at 1600 Pennsylvania Avenue NW in Washington, D.C., and has been the residence of every U.S. president since John Adams in ...
requested a funding increase of 12% to cover the Artemis program as part of its fiscal year 2021 budget. The total budget would have been US$25.2 billion per year with US$3.7 billion dedicated towards a Human Landing System. NASA Chief Financial Officer Jeff DeWit said he thought the agency has "a very good shot" to get this budget through Congress despite Democratic concerns around the program. However, in July 2020 the
House Appropriations Committee The United States House Committee on Appropriations is a committee of the United States House of Representatives that is responsible for passing appropriation bills along with its Senate counterpart. The bills passed by the Appropriations Commi ...
rejected the White House's requested funding increase. The bill proposed in the House dedicated only US$700 million towards the Human Landing System, 81% (US$3 billion) short of the requested amount. In April 2020, NASA awarded funding to Blue Origin, Dynetics, and SpaceX for competing 10-month-long preliminary design studies for the HLS. Throughout February 2021, Acting Administrator of NASA Steve Jurczyk reiterated those budget concerns when asked about the project's schedule, clarifying that "The 2024 lunar landing goal may no longer be a realistic target ... On 4 February 2021, the
Biden Administration Joe Biden's tenure as the 46th president of the United States began with his inauguration on January 20, 2021. Biden, a Democrat from Delaware who previously served as vice president under Barack Obama, took office following his victory ...
endorsed the Artemis program. More specifically, White House Press Secretary
Jen Psaki Jennifer Rene Psaki (; born c. 1978) is an American television political analyst who currently works for MSNBC. Previously, she was a political advisor who served under both the Obama and Biden administrations. Immediately prior to working for ...
expressed the Biden administration's "support orthis effort and endeavor". On 16 April 2021, NASA contracted SpaceX to develop, manufacture, and fly two lunar landing flights with the Starship HLS lunar lander. Blue Origin and Dynetics protested the award to the
GAO Gao , or Gawgaw/Kawkaw, is a city in Mali and the capital of the Gao Region. The city is located on the River Niger, east-southeast of Timbuktu on the left bank at the junction with the Tilemsi valley. For much of its history Gao was an impor ...
on 26 April. After the GAO rejected the protests, Blue Origin sued NASA over the award, and NASA agreed to stop work on the contract until 1 November 2021 as the lawsuit proceeded. The judge dismissed the suit on 4 November 2021 and NASA resumed work with SpaceX. On 25 September 2021, NASA released its first digital, interactive graphic novel in celebration of National Comic Book Day. "First Woman: NASA's Promise for Humanity" is the fictional story of Callie Rodriguez, the first woman to explore the Moon. In addition to the initial SpaceX contract, NASA awarded two rounds of separate contracts in May 2019 and September 2021, on aspects of the HLS to encourage alternative designs, separately from the initial HLS development effort. It announced in March 2022 that it was developing new sustainability rules and pursuing both a Starship HLS upgrade (an option under the initial SpaceX contract) and new competing alternative designs. These came after criticism from members of Congress over lack of redundancy and competition, and led NASA to ask for additional support.


Launch

Artemis 1 was originally scheduled for late 2021, but the launch date was pushed back to 29 August 2022. Engine sensor problems caused a delay on that date; the next launch window was September 3. A fuel supply line leak in a quick disconnect arm on a ground tail service mast caused a further delay to a period between 23 September and 4 October. While the leak was partially repaired to a satisfactory condition, weather delays due to Hurricane Ian forced NASA managers to begin preparing for the stack's rollback to the
Vehicle Assembly Building The Vehicle Assembly Building (originally the Vertical Assembly Building), or VAB, is a large building at NASA's Kennedy Space Center (KSC), designed to assemble large pre-manufactured space vehicle components, such as the massive Saturn V and th ...
and call off the September–early October launch window. In October 2022, NASA launch managers decided on a new launch date of 14 November, with backup options for 16 November and 19 November. In early November, NASA launch managers ruled out the 14 November option and made preparations to secure the SLS at the pad for
Tropical Storm Nicole The name Nicole has been used for four tropical cyclones and one subtropical cyclone in the Atlantic Ocean: * Hurricane Nicole (1998) – Category 1 hurricane that never approached land * Subtropical Storm Nicole (2004) – formed near Bermuda ...
, after which launch was planned for 16 November. On 16 November 2022, at 01:47:44 EST (06:47:44 UTC), Artemis 1 successfully launched from the
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 1968 ...
. The Artemis I flight test was completed at 9:40 a.m. PST 11 December 2022, when the Orion spacecraft splashed down in the Pacific Ocean, west of Baja California, after a record-breaking mission, which saw Artemis travel more than 1.4 million miles on a path around the Moon before returning safely to Earth. The splashdown occurred 50 years to the day since NASA's Apollo 17 moon landing; the last astronaut mission to touch down on the lunar surface.


Supporting programs

Implementation of the Artemis program will require additional programs, projects, and commercial launchers to support the construction of the Gateway, launch resupply missions to the station, and deploy numerous robotic spacecraft and instruments to the lunar surface. Several precursor robotic missions are being coordinated through the
Commercial Lunar Payload Services Commercial Lunar Payload Services (CLPS) is a NASA program to contract transportation services able to send small robotic landers and rovers to the Moon's south polar region mostly with the goals of scouting for lunar resources, testing in sit ...
(CLPS) program, which is dedicated to scouting and characterization of
lunar resources The Moon bears substantial natural resources which could be exploited in the future. Potential lunar resources may encompass processable materials such as volatiles and minerals, along with geologic structures such as lava tubes that together, ...
as well as testing principles for
in-situ resource utilization In space exploration, in situ resource utilization (ISRU) is the practice of collection, processing, storing and use of materials found or manufactured on other astronomical objects (the Moon, Mars, asteroids, etc.) that replace materials th ...
.


Commercial Lunar Payload Services

In March 2018,
NASA The National Aeronautics and Space Administration (NASA ) is an independent agencies of the United States government, independent agency of the US federal government responsible for the civil List of government space agencies, space program ...
established the
Commercial Lunar Payload Services Commercial Lunar Payload Services (CLPS) is a NASA program to contract transportation services able to send small robotic landers and rovers to the Moon's south polar region mostly with the goals of scouting for lunar resources, testing in sit ...
(CLPS) program with the aim of sending small robotic landers and rovers mostly to the lunar south pole region as a precursor to and in support of crewed missions. The main goals include scouting of
lunar resources The Moon bears substantial natural resources which could be exploited in the future. Potential lunar resources may encompass processable materials such as volatiles and minerals, along with geologic structures such as lava tubes that together, ...
,
in situ resource utilization In space exploration, in situ resource utilization (ISRU) is the practice of collection, processing, storing and use of materials found or manufactured on other astronomical objects (the Moon, Mars, asteroids, etc.) that replace materials that ...
(ISRU) feasibility testing, and lunar science. NASA is awarding commercial providers
indefinite delivery/indefinite quantity In U.S. Federal government contracting, IDIQ is an abbreviation of the term indefinite delivery/indefinite quantity. This is a type of contract that provides for an indefinite quantity of supplies or services during a fixed period of time. The legal ...
contracts to develop and fly lunar landers with scientific payloads. The first phase considered proposals capable of delivering at least of payload by the end of 2021. Proposals for mid-sized landers capable of delivering between and of cargo were planned to also be considered for launch beyond 2021. In November 2018, NASA announced the first nine companies that were qualified to bid on the CLPS transportation service contracts (see list below). On 31 May 2019, three of those were awarded lander contracts: Astrobotic Technology,
Intuitive Machines Intuitive Machines, LLC is a private American company headquartered in Houston, Texas. It was founded in 2013 by Stephen Altemus, Kam Ghaffarian, Tim Crain. Intuitive Machines is completing its lunar program which will provide lunar surface access ...
, and OrbitBeyond. On 29 July 2019, NASA announced that it had granted OrbitBeyond's request to be released from obligations under the contract citing "internal corporate challenges". The first twelve payloads and experiments from NASA centers were announced on 21 February 2019. On 1 July 2019, NASA announced the selection of twelve additional payloads, provided by universities and industry. Seven of these are scientific investigations while five are technology demonstrations. The Lunar Surface Instrument and Technology Payloads (LSITP) program was soliciting payloads in 2019 that do not require significant additional development. They will include technology demonstrators to advance lunar science or the commercial development of the Moon. In November 2019, NASA added five contractors to the group of companies who are eligible to bid to send large payloads to the surface of the moon under the CLPS program: Blue Origin,
Ceres Robotics Ceres Robotics Inc. is a private, commercial company dedicated to the development and manufacturing of robotic lunar landers and rovers. In November 2019, Ceres Robotics was granted the right to bid on contracts by NASA's Commercial Lunar Payl ...
,
Sierra Nevada Corporation Sierra Nevada Corporation (SNC) is an American, privately held aerospace and national security contractor specializing in aircraft modification and integration, space components and systems, and related technology products for cybersecurity and ...
, SpaceX, and
Tyvak Nano-Satellite Systems Tyvak Nano-Satellite Systems was an American company designing and building satellites. It started as a designer, builder and provider of nanosatellite and CubeSat space vehicle products and services for government and commercial customers. Ty ...
. In April 2020, NASA selected
Masten Space Systems Masten Space Systems was an aerospace manufacturer startup company in Mojave, California (formerly in Santa Clara, California) that was developing a line of vertical takeoff, vertical landing (VTVL) rockets, initially for uncrewed research sub- ...
for a follow-on CLPS delivery of cargo to the Moon in 2022. On 23 June 2021, Masten Space Systems announced it was delayed until November 2023. Dave Masten, the founder and chief technology officer, blamed the delay on the COVID pandemic and industry-wide supply chain issues. In February 2021, NASA selected
Firefly Aerospace Firefly Aerospace is an American private aerospace firm based in Austin, Texas, that develops launch vehicles for commercial launches to orbit. The company completed its $75 million Series A investment round in May 2021, which was led by DADA ...
for a CLPS launch to
Mare Crisium Mare Crisium (Latin ''crisium'', the "Sea of Crises") is a lunar mare located in the Moon's Crisium basin, just northeast of Mare Tranquillitatis. The basin is of the Pre-Imbrian period, 4.55 to 3.85 billion years ago. Characteristics Mare Cri ...
in mid-2023.


VIPER

The
VIPER The Viperidae (vipers) are a family of snakes found in most parts of the world, except for Antarctica, Australia, Hawaii, Madagascar, and various other isolated islands. They are venomous and have long (relative to non-vipers), hinged fangs tha ...
(Volatiles Investigating Polar Exploration Rover) is a
lunar rover A lunar rover or Moon rover is a space exploration vehicle designed to move across the surface of the Moon. The Apollo Program's Lunar Roving Vehicle was driven on the Moon by members of three American crews, Apollo 15, 16, and 17. Other rov ...
by NASA planned to be delivered to the surface of the Moon in November 2024. The rover will be tasked with prospecting for
lunar resources The Moon bears substantial natural resources which could be exploited in the future. Potential lunar resources may encompass processable materials such as volatiles and minerals, along with geologic structures such as lava tubes that together, ...
in permanently shadowed areas in the
lunar south pole The lunar south pole is the southernmost point on the Moon, at 90°S. It is of special interest to scientists because of the occurrence of water ice in permanently shadowed areas around it. The lunar south pole region features craters that ar ...
region, especially by mapping the distribution and concentration of
water ice Water ice could refer to: * Ice formed by water (as opposed to other substances) *The alternate term for various similar frozen fruit-flavoured desserts: ** Italian ice primarily in Philadelphia and the Delaware Valley **Sorbet Sorbet (), also ...
. The mission builds on a previous NASA rover concept called Resource Prospector, which was cancelled in 2018. The VIPER rover is part of the Lunar Discovery and Exploration Program managed by the
Science Mission Directorate The Science Mission Directorate (SMD) of the National Aeronautics and Space Administration (NASA) engages the United States’ science community, sponsors scientific research, and develops and deploys satellites and probes in collaboration with NA ...
at NASA Headquarters, and it is meant to support the crewed Artemis program. NASA's
Ames Research Center The Ames Research Center (ARC), also known as NASA Ames, is a major NASA research center at Moffett Federal Airfield in California's Silicon Valley. It was founded in 1939 as the second National Advisory Committee for Aeronautics (NACA) labo ...
is managing the rover project. The hardware for the rover is being designed by the Johnson Space Center, while the instruments are provided by
Ames Research Center The Ames Research Center (ARC), also known as NASA Ames, is a major NASA research center at Moffett Federal Airfield in California's Silicon Valley. It was founded in 1939 as the second National Advisory Committee for Aeronautics (NACA) labo ...
,
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 1968 ...
, and Honeybee Robotics. , the estimated cost of the mission is US$433.5 million. The VIPER rover will operate near the
lunar south pole The lunar south pole is the southernmost point on the Moon, at 90°S. It is of special interest to scientists because of the occurrence of water ice in permanently shadowed areas around it. The lunar south pole region features craters that ar ...
at Nobile Crater. VIPER is planned to travel several kilometers, collecting data on different kinds of soil environments affected by light and temperature — those in complete darkness, occasional light, and in constant sunlight. Once it enters a permanently shadowed location, it will operate on battery power alone and will not be able to recharge them until it drives to a sunlit area. Its total operation time will be approximately 100 Earth days. Both the launcher and the lander to be used will be competitively provided through the
Commercial Lunar Payload Services Commercial Lunar Payload Services (CLPS) is a NASA program to contract transportation services able to send small robotic landers and rovers to the Moon's south polar region mostly with the goals of scouting for lunar resources, testing in sit ...
(CLPS) contractors, with Astrobotic delivering the Griffin lander and SpaceX providing the
Falcon Heavy Falcon Heavy is a partially reusable heavy-lift launch vehicle that is produced by SpaceX, an American aerospace manufacturer. The rocket consists of two strap-on boosters made from Falcon 9 first stages, a center core also made from a Falc ...
launch vehicle.


International contractors


Artemis Accords

On 5 May 2020,
Reuters Reuters ( ) is a news agency owned by Thomson Reuters Corporation. It employs around 2,500 journalists and 600 photojournalists in about 200 locations worldwide. Reuters is one of the largest news agencies in the world. The agency was esta ...
reported that the
Trump administration Donald Trump's tenure as the 45th president of the United States began with his inauguration on January 20, 2017, and ended on January 20, 2021. Trump, a Republican from New York City, took office following his Electoral College victory ...
was drafting a new international agreement outlining the laws for mining on the Moon. NASA Administrator Jim Bridenstine officially announced the Artemis Accords on 15 May 2020. It consists of a series of
bilateral agreement Bilateralism is the conduct of political, economic, or cultural relations between two sovereign states. It is in contrast to unilateralism or multilateralism, which is activity by a single state or jointly by multiple states, respectively. When ...
s between the governments of participating nations in the Artemis program "grounded in the Outer Space Treaty of 1967". The Artemis Accords have been criticized by some American researchers as "a concerted, strategic effort to redirect international space cooperation in favor of short-term U.S. commercial interests". The Accords were signed by the
United States The United States of America (U.S.A. or USA), commonly known as the United States (U.S. or US) or America, is a country primarily located in North America. It consists of 50 states, a federal district, five major unincorporated territori ...
, Australia,
Canada Canada is a country in North America. Its ten provinces and three territories extend from the Atlantic Ocean to the Pacific Ocean and northward into the Arctic Ocean, covering over , making it the world's second-largest country by tot ...
, Japan,
Luxembourg Luxembourg ( ; lb, Lëtzebuerg ; french: link=no, Luxembourg; german: link=no, Luxemburg), officially the Grand Duchy of Luxembourg, ; french: link=no, Grand-Duché de Luxembourg ; german: link=no, Großherzogtum Luxemburg is a small lan ...
,
Italy Italy ( it, Italia ), officially the Italian Republic, ) or the Republic of Italy, is a country in Southern Europe. It is located in the middle of the Mediterranean Sea, and its territory largely coincides with the homonymous geographical ...
, the
United Kingdom The United Kingdom of Great Britain and Northern Ireland, commonly known as the United Kingdom (UK) or Britain, is a country in Europe, off the north-western coast of the European mainland, continental mainland. It comprises England, Scotlan ...
, and the
United Arab Emirates The United Arab Emirates (UAE; ar, اَلْإِمَارَات الْعَرَبِيَة الْمُتَحِدَة ), or simply the Emirates ( ar, الِْإمَارَات ), is a country in Western Asia ( The Middle East). It is located at t ...
on 13 October 2020, and later signed by
Ukraine Ukraine ( uk, Україна, Ukraïna, ) is a country in Eastern Europe. It is the second-largest European country after Russia, which it borders to the east and northeast. Ukraine covers approximately . Prior to the ongoing Russian inv ...
. In May 2021,
South Korea South Korea, officially the Republic of Korea (ROK), is a country in East Asia, constituting the southern part of the Korean Peninsula and sharing a land border with North Korea. Its western border is formed by the Yellow Sea, while its eas ...
joined as the 10th signatory state of the Artemis Accords, with
New Zealand New Zealand ( mi, Aotearoa ) is an island country in the southwestern Pacific Ocean. It consists of two main landmasses—the North Island () and the South Island ()—and over 700 smaller islands. It is the sixth-largest island count ...
following later the same month.
Brazil Brazil ( pt, Brasil; ), officially the Federative Republic of Brazil (Portuguese: ), is the largest country in both South America and Latin America. At and with over 217 million people, Brazil is the world's fifth-largest country by area ...
became the 12th signatory country in June 2021.
Poland Poland, officially the Republic of Poland, is a country in Central Europe. It is divided into 16 administrative provinces called voivodeships, covering an area of . Poland has a population of over 38 million and is the fifth-most populou ...
became the 13th signatory country in October 2021.
Mexico Mexico (Spanish: México), officially the United Mexican States, is a country in the southern portion of North America. It is bordered to the north by the United States; to the south and west by the Pacific Ocean; to the southeast by Guatema ...
signed in December 2021.
Israel Israel (; he, יִשְׂרָאֵל, ; ar, إِسْرَائِيل, ), officially the State of Israel ( he, מְדִינַת יִשְׂרָאֵל, label=none, translit=Medīnat Yīsrāʾēl; ), is a country in Western Asia. It is situated ...
signed in January 2022,
Romania Romania ( ; ro, România ) is a country located at the crossroads of Central, Eastern, and Southeastern Europe. It borders Bulgaria to the south, Ukraine to the north, Hungary to the west, Serbia to the southwest, Moldova to the east, and ...
and
Singapore Singapore (), officially the Republic of Singapore, is a sovereign island country and city-state in maritime Southeast Asia. It lies about one degree of latitude () north of the equator, off the southern tip of the Malay Peninsula, bor ...
in March 2022, Colombia signed in May 2022,
France France (), officially the French Republic ( ), is a country primarily located in Western Europe. It also comprises of overseas regions and territories in the Americas and the Atlantic, Pacific and Indian Oceans. Its metropolitan area ...
signed in June 2022, followed by
Saudi Arabia Saudi Arabia, officially the Kingdom of Saudi Arabia (KSA), is a country in Western Asia. It covers the bulk of the Arabian Peninsula, and has a land area of about , making it the fifth-largest country in Asia, the second-largest in the A ...
in July 2022.


Exploration Ground Systems (EGS)

The Exploration Ground Systems (EGS) Program is one of three NASA programs based at NASA's
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 1968 ...
in Florida. EGS was established to develop and operate the systems and facilities necessary to process and launch rockets and spacecraft during assembly, transport, and launch. EGS is preparing the infrastructure to support NASA's
Space Launch System The Space Launch System (SLS) is an American super heavy-lift expendable launch vehicle developed by NASA. As of 2022, SLS has the highest payload capacity of any rocket in operational service, as well as the greatest liftoff thrust of any r ...
(SLS) rocket and its payloads, such as the
Orion spacecraft Orion (officially Orion Multi-Purpose Crew Vehicle or Orion MPCV) is a partially reusable crewed spacecraft used in NASA's Artemis program. The spacecraft consists of a Crew Module (CM) space capsule designed by Lockheed Martin and the Euro ...
for Artemis 1.


Gateway Logistics Services

The
Lunar Gateway The Lunar Gateway, or simply Gateway, is the first planned extraterrestrial space station in lunar orbit intended to serve as a solar-powered communication hub, science laboratory, and short-term habitation module for government-agency astr ...
is a station set to be constructed in lunar orbit, and the Gateway Logistics Services program will provide cargo and other supplies to the station, even when crews are not present. , only SpaceX's supply vehicle, known as Dragon XL, is planned to supply the Gateway. Dragon XL is a version of the
Dragon spacecraft American private space transportation company SpaceX has developed and produced several spacecraft named Dragon. The first family member, now referred to as Dragon 1, flew 23 cargo missions to the ISS between 2010 and 2020 before being retired ...
, to be launched by the
Falcon Heavy Falcon Heavy is a partially reusable heavy-lift launch vehicle that is produced by SpaceX, an American aerospace manufacturer. The rocket consists of two strap-on boosters made from Falcon 9 first stages, a center core also made from a Falc ...
. Unlike
Dragon 2 Dragon 2 is a class of partially reusable spacecraft developed and manufactured by American aerospace manufacturer SpaceX, primarily for flights to the International Space Station (ISS). SpaceX has also launched private missions such as Ins ...
and its predecessor, it is intended to be an expendable spacecraft.


Launch vehicles

As of the early mission concepts outlined by NASA in May 2020 and refined by the HLS contract award in July 2021, launch vehicles planned to be used will include the NASA
Space Launch System The Space Launch System (SLS) is an American super heavy-lift expendable launch vehicle developed by NASA. As of 2022, SLS has the highest payload capacity of any rocket in operational service, as well as the greatest liftoff thrust of any r ...
for Orion,
SpaceX Starship Starship is a fully reusable, super heavy-lift launch vehicle under development by SpaceX, an American aerospace company. With more than twice the thrust of the Saturn V, it is designed to be the most powerful launch vehicle ever built and the ...
for the HLS, and
Falcon Heavy Falcon Heavy is a partially reusable heavy-lift launch vehicle that is produced by SpaceX, an American aerospace manufacturer. The rocket consists of two strap-on boosters made from Falcon 9 first stages, a center core also made from a Falc ...
for Gateway components, as well as launch vehicles that are contracted for the various CLPS cargo providers. The European
Ariane 6 Ariane 6 is a European expendable launch system currently under development since the early 2010s by ArianeGroup on behalf of the European Space Agency (ESA). It is intended to replace the Ariane 5, as part of the Ariane launch vehicle famil ...
was also proposed to be part of the program in July 2019. The
Power and Propulsion Element The Power and Propulsion Element (PPE), previously known as the Asteroid Redirect Vehicle propulsion system, is a planned solar electric ion propulsion module being developed by Maxar Technologies for NASA. It is one of the major components of ...
(PPE) module and the
Habitation and Logistics Outpost The Habitation and Logistics Outpost (HALO),
and
Falcon Heavy Falcon Heavy is a partially reusable heavy-lift launch vehicle that is produced by SpaceX, an American aerospace manufacturer. The rocket consists of two strap-on boosters made from Falcon 9 first stages, a center core also made from a Falc ...
to launch a crewed Orion mission given SLS delays. Given the complexity of conversion to a different vehicle, the agency ultimately decided to use only the SLS to launch astronauts.


Space Launch System

The
Space Launch System The Space Launch System (SLS) is an American super heavy-lift expendable launch vehicle developed by NASA. As of 2022, SLS has the highest payload capacity of any rocket in operational service, as well as the greatest liftoff thrust of any r ...
(SLS) is a United States super heavy-lift
expendable launch vehicle An expendable launch system (or expendable launch vehicle/ELV) is a launch vehicle that can be launched only once, after which its components are either destroyed during reentry or discarded in space. ELVs typically consist of several rocket st ...
, which has been under development since its announcement in 2011. The SLS is the main launch vehicle of the Artemis lunar program, . NASA is required by the
U.S. Congress The United States Congress is the legislature of the federal government of the United States. It is bicameral, composed of a lower body, the House of Representatives, and an upper body, the Senate. It meets in the U.S. Capitol in Washin ...
to utilize SLS Block 1, which will be powerful enough to lift a payload of to
low Earth orbit A low Earth orbit (LEO) is an orbit around Earth with a period of 128 minutes or less (making at least 11.25 orbits per day) and an eccentricity less than 0.25. Most of the artificial objects in outer space are in LEO, with an altitude never mor ...
(LEO), and will launch Artemis 1, 2, and 3. Starting in 2027, Block 1B is intended to debut the
Exploration Upper Stage The Exploration Upper Stage (EUS) is being developed as a large second stage for Block 1B and Block 2 of the Space Launch System (SLS), succeeding Block 1's Interim Cryogenic Propulsion Stage. It will be powered by four RL10C-3 engines burning ...
(EUS) and launch the notional Artemis 4-7. Starting in 2029, Block 2 is planned to replace the initial Shuttle-derived boosters with advanced boosters and would have a LEO capability of more than , again as required by Congress. Block 2 is intended to enable crewed launches to
Mars Mars is the fourth planet from the Sun and the second-smallest planet in the Solar System, only being larger than Mercury. In the English language, Mars is named for the Roman god of war. Mars is a terrestrial planet with a thin at ...
. The SLS will launch the
Orion spacecraft Orion (officially Orion Multi-Purpose Crew Vehicle or Orion MPCV) is a partially reusable crewed spacecraft used in NASA's Artemis program. The spacecraft consists of a Crew Module (CM) space capsule designed by Lockheed Martin and the Euro ...
and use the ground operations capabilities and launch facilities at NASA's
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 1968 ...
in
Florida Florida is a state located in the Southeastern region of the United States. Florida is bordered to the west by the Gulf of Mexico, to the northwest by Alabama, to the north by Georgia, to the east by the Bahamas and Atlantic Ocean, and to ...
. In March 2019, the
Trump Administration Donald Trump's tenure as the 45th president of the United States began with his inauguration on January 20, 2017, and ended on January 20, 2021. Trump, a Republican from New York City, took office following his Electoral College victory ...
released its Fiscal Year 2020 Budget Request for NASA. This budget did not initially include any money for the Block 1B and Block 2 variants of SLS, but later a request for a budget increase of $1.6 billion towards SLS, Orion, and crewed landers was made. Block 1B is currently intended to debut on Artemis 4 and will be used mainly for co-manifested crew transfers and logistics rather than constructing the Gateway as initially planned. An uncrewed Block 1B was planned to launch the Lunar Surface Asset in 2028, the first lunar outpost of the Artemis program, but now that launch has been moved to a commercial launcher. Block 2 development will most likely start in the late 2020s after NASA is regularly visiting the lunar surface and shifts focus towards Mars. In October 2019, NASA authorized
Boeing The Boeing Company () is an American multinational corporation that designs, manufactures, and sells airplanes, rotorcraft, rockets, satellites, telecommunications equipment, and missiles worldwide. The company also provides leasing and p ...
to purchase materials in bulk for more SLS rockets ahead of the announcement of a new contract. The contract was expected to support up to ten core stages and eight
Exploration Upper Stage The Exploration Upper Stage (EUS) is being developed as a large second stage for Block 1B and Block 2 of the Space Launch System (SLS), succeeding Block 1's Interim Cryogenic Propulsion Stage. It will be powered by four RL10C-3 engines burning ...
s for the SLS 1B to transfer heavy payloads of up to 40 metric tons on a lunar trajectory.


SpaceX Starship

The SpaceX Starship system is a fully-resuable super heavy-lift launch system under development. It consists of a booster named Super Heavy and a second stage named Starship. Starship is both a second stage and a spacecraft. The system is planned to launch crew or cargo Starship to a parking low Earth orbit where to meet up an additional Super Heavy tanker (also reusable) launch for refueling necessary to the Gateway or other lunar orbits. It is also qualified to be bid for CLPS launches.


Falcon Heavy

The SpaceX Falcon Heavy is a partially reusable heavy-lift launcher. It will be used to launch the first two Gateway modules into NRHO. It will also be used to launch the Dragon XL spacecraft on supply missions to Gateway, and it is qualified to be bid for other launches under the CLPS program. It was selected under CLPS to launch the VIPER mission.


CLPS launchers

Under the CLPS program, qualified CLPS vendors can use any launcher that meets their mission requirements.


Spacecraft


Orion

Orion is a class of partially reusable spacecraft to be used in the Artemis program. The spacecraft consists of a Crew Module (CM)
space capsule A space capsule is an often-crewed spacecraft that uses a blunt-body reentry capsule to reenter the Earth's atmosphere without wings. Capsules are distinguished from other satellites primarily by the ability to survive reentry and return a payl ...
designed by Lockheed Martin and the
European Service Module The European Service Module (ESM) is the service module component of the Orion spacecraft, serving as its primary power and propulsion component until it is discarded at the end of each mission. In January 2013, NASA announced that the European ...
(ESM) manufactured by Airbus Defence and Space. Capable of supporting a crew of six beyond
low Earth orbit A low Earth orbit (LEO) is an orbit around Earth with a period of 128 minutes or less (making at least 11.25 orbits per day) and an eccentricity less than 0.25. Most of the artificial objects in outer space are in LEO, with an altitude never mor ...
, Orion is equipped with solar panels, an automated docking system, and glass cockpit interfaces modeled after those used in the
Boeing 787 Dreamliner The Boeing 787 Dreamliner is an American wide-body jet airliner developed and manufactured by Boeing Commercial Airplanes. After dropping its unconventional Sonic Cruiser project, Boeing announced the conventional 7E7 on January 29, 2003, ...
. It has a single
AJ10 The AJ10 is a hypergolic rocket engine manufactured by Aerojet Rocketdyne (previously Aerojet). It has been used to propel the upper stages of several launch vehicles, including the Delta II and Titan III. Variants were and are used as the servi ...
engine for primary propulsion, and others including
reaction control system A reaction control system (RCS) is a spacecraft system that uses thrusters to provide attitude control and translation. Alternatively, reaction wheels are used for attitude control. Use of diverted engine thrust to provide stable attitude cont ...
engines. Although designed to be compatible with other
launch vehicle A launch vehicle or carrier rocket is a rocket designed to carry a payload ( spacecraft or satellites) from the Earth's surface to outer space. Most launch vehicles operate from a launch pads, supported by a launch control center and ...
s, Orion is primarily intended to launch atop a
Space Launch System The Space Launch System (SLS) is an American super heavy-lift expendable launch vehicle developed by NASA. As of 2022, SLS has the highest payload capacity of any rocket in operational service, as well as the greatest liftoff thrust of any r ...
(SLS) rocket, with a tower
launch escape system A launch escape system (LES) or launch abort system (LAS) is a crew-safety system connected to a space capsule that can be used to quickly separate the capsule from its launch vehicle in case of an emergency requiring the abort of the launch, suc ...
. Orion was originally conceived by Lockheed Martin as a proposal for the
Crew Exploration Vehicle The Crew Exploration Vehicle (CEV) was a component of the U.S. NASA Vision for Space Exploration plan. A competition was held to design a spacecraft that could carry humans to the destinations envisioned by the plan. The winning design was th ...
(CEV) to be used in NASA's
Constellation program The Constellation program (abbreviated CxP) was a crewed spaceflight program developed by NASA, the space agency of the United States, from 2005 to 2009. The major goals of the program were "completion of the International Space Station" and a " ...
. Lockheed Martin's proposal defeated a competing proposal by
Northrop Grumman Northrop Grumman Corporation is an American multinational aerospace and defense technology company. With 90,000 employees and an annual revenue in excess of $30 billion, it is one of the world's largest weapons manufacturers and military techn ...
, and was selected by NASA in 2006 to be the CEV. Originally designed with a service module featuring a new "Orion Main Engine" and a pair of circular solar panels, the spacecraft was to be launched atop the
Ares I Ares I was the crew launch vehicle that was being developed by NASA as part of the Constellation program. The name "Ares" refers to the Greek deity Ares, who is identified with the Roman god Mars. Ares I was originally known as the "Crew Launc ...
rocket. Following the cancellation of the Constellation program in 2010, Orion was heavily redesigned for use in NASA's Journey to Mars initiative; later named Moon to Mars. The SLS replaced the
Ares I Ares I was the crew launch vehicle that was being developed by NASA as part of the Constellation program. The name "Ares" refers to the Greek deity Ares, who is identified with the Roman god Mars. Ares I was originally known as the "Crew Launc ...
as Orion's primary launch vehicle, and the service module was replaced with a design based on the European Space Agency's
Automated Transfer Vehicle The Automated Transfer Vehicle, originally Ariane Transfer Vehicle or ATV, was an expendable cargo spacecraft developed by the European Space Agency (ESA), used for space cargo transport in 2008–2015. The ATV design was launched to orbit fiv ...
. A development version of Orion's CM was launched in 2014 during
Exploration Flight Test-1 Exploration Flight Test-1 or EFT-1 (previously known as Orion Flight Test 1 or OFT-1) was the first test flight of the crew module portion of the Orion (spacecraft), Orion Multi-Purpose Crew Vehicle. Without a crew, it was launched on December&nb ...
, while at least four test articles were produced. By 2022, three flight-worthy Orion crew modules have been built, with an additional one ordered, for use in the Artemis program; the first of these was due to be launched on November 30th 2020, however Artemis 1 did not launch until November 16th 2022. It was reported that
NASA The National Aeronautics and Space Administration (NASA ) is an independent agencies of the United States government, independent agency of the US federal government responsible for the civil List of government space agencies, space program ...
and Lockheed Martin had found a failure with a component in one of the Orion spacecraft's power data units but
NASA The National Aeronautics and Space Administration (NASA ) is an independent agencies of the United States government, independent agency of the US federal government responsible for the civil List of government space agencies, space program ...
later clarified that it did not expect the issue to affect the Artemis 1 launch date.


Gateway

NASA's Gateway is an in-development mini-space station in lunar orbit intended to serve as a solar-powered communication hub, science laboratory, short-term habitation module, and holding area for rovers and other robots. While the project is led by NASA, the Gateway is meant to be developed, serviced, and utilized in collaboration with commercial and international partners: Canada ( Canadian Space Agency) (CSA), Europe ( European Space Agency) (ESA), and Japan ( JAXA). The
Power and Propulsion Element The Power and Propulsion Element (PPE), previously known as the Asteroid Redirect Vehicle propulsion system, is a planned solar electric ion propulsion module being developed by Maxar Technologies for NASA. It is one of the major components of ...
(PPE) started development at the
Jet Propulsion Laboratory The Jet Propulsion Laboratory (JPL) is a federally funded research and development center and NASA field center in the City of La Cañada Flintridge, California, United States. Founded in the 1930s by Caltech researchers, JPL is owned by NASA an ...
during the now canceled
Asteroid Redirect Mission The Asteroid Redirect Mission (ARM), also known as the Asteroid Retrieval and Utilization (ARU) mission and the Asteroid Initiative, was a space mission proposed by NASA in 2013; the mission was later cancelled. The Asteroid Retrieval Robotic ...
(ARM). The original concept was a robotic, high performance solar electric spacecraft that would retrieve a multi-ton boulder from an asteroid and bring it to lunar orbit for study. When ARM was canceled, the solar electric propulsion was repurposed for the Gateway. The PPE will allow access to the entire lunar surface and act as a
space tug ''Space Tug'' is a young adult science fiction novel by author Murray Leinster. It was published in 1953 by Shasta Publishers in an edition of 5,000 copies. It is the second novel in the author's Joe Kenmore series. Groff Conklin gave it a mixed ...
for visiting craft. It will also serve as the command and communications center of the Gateway. The PPE is intended to have a mass of 8-9 tonnes and the capability to generate 50 kW of solar electric power for its
ion thruster An ion thruster, ion drive, or ion engine is a form of electric propulsion used for spacecraft propulsion. It creates thrust by accelerating ions using electricity. An ion thruster ionizes a neutral gas by extracting some electrons out of ...
s, which can be supplemented by chemical propulsion. The Habitation and Logistics Outpost (HALO), also called the Minimal Habitation Module (MHM) and formerly known as the Utilization Module, will be built by Northrop Grumman Innovation Systems (NGIS). A single Falcon Heavy equipped with an extended fairing will launch the PPE together with the HALO in November 2024. The HALO is based on a Cygnus Cargo resupply module to the outside of which radial docking ports, body mounted radiators (BMRs), batteries and communications antennae will be added. The HALO will be a scaled-down habitation module, yet, it will feature a functional pressurized volume providing sufficient command, control, and data handling capabilities, energy storage and power distribution, thermal control, communications and tracking capabilities, two axial and up to two radial docking ports, stowage volume, environmental control and life support systems to augment the Orion spacecraft and support a crew of four for at least 30 days. In March 2020, Doug Loverro, NASA's associate administrator for human exploration and operations at that time, removed the Gateway construction from the 2024 critical path to clear up funding for the HLS. He stated that the PPE could face delays and that moving it back to 2026 would allow for a more refined vehicle. It is also worth noting that the international partners on the Gateway would not have their modules ready until 2026. It was made a requirement that all Human Landing System proposals would be capable of free flight without the Gateway. On 30 April 2020, a key to NASA's vision for a "sustainable" crew presence on or near the Moon, the Gateway station, was announced to be optional, rather than required, in mission planning. NASA officials originally hoped the Gateway would be in position near the Moon in time for the Artemis 3 mission in 2024, allowing elements of the lunar lander to be assembled, or aggregated, at the Gateway before the arrival of astronauts on an Orion crew capsule.
Jim Bridenstine James Frederick Bridenstine (born June 15, 1975) is an American military officer and politician who served as the 13th administrator of the National Aeronautics and Space Administration (NASA). Bridenstine was the United States representative f ...
told Spaceflight Now, the Artemis 3 mission will no longer go through the Gateway, but NASA is not backing away from the program. In late October 2020, NASA and European Space Agency (ESA) finalized their agreement to collaborate in the Gateway program. ESA will provide a habitat module in partnership with JAXA (I-HAB) and a refueling module ( ESPRIT). In return Europe will have three flight opportunities to launch crew aboard the Orion crew capsule, which they will provide the service module for.


Dragon XL

On 27 March 2020, SpaceX revealed the Dragon XL resupply spacecraft designed to carry pressurized and unpressurized cargo, experiments, and other supplies to NASA's planned Gateway under a NASA Gateway Logistics Services (GLS) contract. The equipment delivered by Dragon XL missions could include sample collection materials, spacesuits, and other items astronauts may need on the Gateway and the surface of the Moon, according to NASA. It will launch on SpaceX's
Falcon Heavy Falcon Heavy is a partially reusable heavy-lift launch vehicle that is produced by SpaceX, an American aerospace manufacturer. The rocket consists of two strap-on boosters made from Falcon 9 first stages, a center core also made from a Falc ...
launch vehicle from pad
LC-39A Launch Complex 39A (LC-39A) is the first of Launch Complex 39's three launch pads, located at NASA's Kennedy Space Center in Merritt Island, Florida. The pad, along with Launch Complex 39B, were first designed for the Saturn V launch vehicle. T ...
at the
Kennedy Space Center The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center), located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 1968 ...
in
Florida Florida is a state located in the Southeastern region of the United States. Florida is bordered to the west by the Gulf of Mexico, to the northwest by Alabama, to the north by Georgia, to the east by the Bahamas and Atlantic Ocean, and to ...
. The Dragon XL is planned to stay at the Gateway for six to 12 months at a time when research payloads inside and outside the cargo vessel could be operated remotely, even when crews are not present. Its payload capacity is expected to be more than to lunar orbit. Unlike previous Dragon variants, the spacecraft will not be reusable and will instead be built solely for transporting cargo. It will act as the United States' logistics vehicle.


Human Landing System

The Human Landing System (HLS) is a critical component of the Artemis mission. This system transports crew from lunar orbit (the Gateway or an Orion spacecraft) to the lunar surface, acts as a lunar habitat, and then transports the crew back to lunar orbit.


Development history

NASA elected to have the HLS designed and developed by commercial vendors. NASA called for proposals, and five vendors responded. In April 2020, NASA awarded three competing design contracts, and in April 2021, NASA selected the Starship HLS to proceed to development and production. Separately from the design and development program for the first two HLS spacecraft, NASA has multiple smaller contracts to study elements of alternative HLS designs. Eleven contracts were awarded in May 2019 and five were awarded in September 2021.


Starship HLS

The Starship Human Landing System (Starship HLS) was the winner selected by NASA for potential use for long-duration crewed lunar landings as part of NASA's Artemis program. Starship HLS is a variant of SpaceX's Starship spacecraft optimized to operate on and around the Moon. In contrast to the Starship spacecraft from which it derives, Starship HLS will never re-enter an atmosphere, so it does not have a heat shield or
flight control surface Aircraft flight control surfaces are aerodynamic devices allowing a pilot to adjust and control the aircraft's flight attitude. Development of an effective set of flight control surfaces was a critical advance in the development of aircraft. Ea ...
s. In contrast to other proposed HLS designs that used multiple stages, the entire spacecraft will land on the Moon and will then launch from the Moon. Like other Starship variants, Starship HLS has
Raptor Raptor or RAPTOR may refer to: Animals The word "raptor" refers to several groups of bird-like dinosaurs which primarily capture and subdue/kill prey with their talons. * Raptor (bird) or bird of prey, a bird that primarily hunts and feeds on ...
engines mounted at the tail as its primary propulsion system. However, when it is within "tens of meters" of the lunar surface during descent and ascent, it will use high-thrust meth/ox RCS thrusters located mid-body instead of the Raptors to avoid raising dust via
plume impingement In hydrodynamics, a plume or a column is a vertical body of one fluid moving through another. Several effects control the motion of the fluid, including momentum (inertia), diffusion and buoyancy (density differences). Pure ''jets'' and pure ''p ...
. A solar array located on the nose below the docking port provides electrical power. Elon Musk stated that Starship HLS would be able to deliver "potentially up to 200 tons" to the lunar surface. Starship HLS would be launched to Earth orbit using the SpaceX Super Heavy booster, and would use a series of tanker spacecraft to refuel the Starship HLS vehicle in Earth orbit for lunar transit and lunar landing operations. Starship HLS would then boost itself to lunar orbit for rendezvous with Orion. In the mission concept, a NASA Orion spacecraft would carry a NASA crew to the lander, where they would depart and descend to the surface of the Moon. After lunar surface operations, Starship HLS would lift off from the lunar surface acting as a single-stage-to-orbit (SSTO) vehicle and return the crew to Orion.


HERACLES lander

HERACLES Heracles ( ; grc-gre, Ἡρακλῆς, , glory/fame of Hera), born Alcaeus (, ''Alkaios'') or Alcides (, ''Alkeidēs''), was a divine hero in Greek mythology, the son of Zeus and Alcmene, and the foster son of Amphitryon.By his adoptiv ...
(Human-Enhanced Robotic Architecture and Capability for Lunar Exploration and Science) is a planned
ESA , owners = , headquarters = Paris, Île-de-France, France , coordinates = , spaceport = Guiana Space Centre , seal = File:ESA emblem seal.png , seal_size = 130px , image = Views in the Main Control Room (120 ...
- JAXA-
CSA CSA may refer to: Arts and media * Canadian Screen Awards, annual awards given by the Academy of Canadian Cinema & Television * Commission on Superhuman Activities, a fictional American government agency in Marvel Comics * Crime Syndicate of Amer ...
space cargo transport system that will feature a robotic lunar lander called the European Large Logistic Lander (EL3), which can be configured for different operations such as up to of payload, sample-returns, or prospecting resources found on the Moon. ESA approved the project in November 2019. Its first mission is envisioned for launch in the mid to late 2020s aboard an
Ariane 6 Ariane 6 is a European expendable launch system currently under development since the early 2010s by ArianeGroup on behalf of the European Space Agency (ESA). It is intended to replace the Ariane 5, as part of the Ariane launch vehicle famil ...
. The EL3 lander will be launched directly to the Moon and will have a landing mass of approximately . It will be capable of transporting a Canadian robotic rover to explore, prospect potential resources, and load samples up to on the ascent module. The rover would then traverse several kilometers across the Schrödinger basin on the
far side of the Moon The far side of the Moon is the lunar hemisphere that always faces away from Earth, opposite to the near side, because of synchronous rotation in the Moon's orbit. Compared to the near side, the far side's terrain is rugged, with a multitu ...
to explore and collect more samples to load on the next EL3 lander.Landing on the Moon and returning home: Heracles.
ESA. Accessed on 10 December 2019
The ascent module would return each time to the Gateway, where it would be captured by the Canadian robotic arm and samples transferred to an Orion spacecraft for transport to Earth with returning astronauts.Lunar Robotic Mission Heracles Will Scout for Human Landings
Elizabeth Howell, ''Space.com'' 28 June 2019


Astronauts

On 10 January 2020, NASA's 22nd astronaut group, nicknamed the "Turtles", graduated and were assigned to the Artemis program. The group includes two Canadian Space Agency (CSA) astronauts. The group earned their nickname from the prior astronaut group, " The 8-Balls", as is a tradition dating back to " The Mercury Seven" in 1962 which subsequently provided the " Next Nine" with their nickname. They were given this name, for the most part, because of Hurricane Harvey. Some of the astronauts will fly on the Artemis missions to the Moon and may be part of the first crew to fly to Mars.


Artemis team 1

On 9 December 2020,
Vice President A vice president, also director in British English, is an officer in government or business who is below the president (chief executive officer) in rank. It can also refer to executive vice presidents, signifying that the vice president is on ...
Mike Pence announced the first group of 18 astronauts (all American, including 9 male and 9 female from different backgrounds), the 1st Artemis team, who could be selected as astronauts of early missions of the Artemis program: *
Joe Acaba Joseph Michael "Joe" Acabá (born May 17, 1967) is a Puerto Rican educator, hydrogeologist, and NASA astronaut. In May 2004 he became the first person of Puerto Rican heritage to be named as a NASA astronaut candidate, when he was selected as ...
* Kayla Barron * Raja Chari *
Matthew Dominick Matthew Stuart Dominick (born December 7, 1981; Commander (United States), CDR, United States Navy, USN) is a United States Navy, US Navy test pilot and NASA astronaut. He has more than 1,600 hours of flight time in 28 aircraft, 400 carrier-arr ...
* Victor Glover * Warren Hoburg *
Jonny Kim Jonathan Yong Kim (born 5 February 1984), also called Jonny Kim, is an American US Navy lieutenant commander (and former SEAL), physician, and NASA astronaut. Born and raised in California, Kim enlisted in the United States Navy in the early ...
* Christina Koch * Kjell Lindgren *
Nicole Mann Nicole "Duke" Victoria Aunapu Mann (born June 27, 1977) is an American test pilot and NASA astronaut. She is an F/A-18 Hornet pilot, and a graduate of the US Naval Academy, Stanford University and the US Naval Test Pilot School. She has over 2, ...
* Anne McClain * Jessica Meir *
Jasmin Moghbeli Jasmin Moghbeli ( fa, یاسمین مقبلی ; born ) is an American U.S. Marine Corps test pilot and NASA astronaut. She is a graduate of the Massachusetts Institute of Technology, Naval Postgraduate School and Naval Test Pilot School. , she ...
*
Kathleen Rubins Kathleen Hallisey Rubins (born October 14, 1978) is an American microbiologist and NASA astronaut. She became the 60th woman to fly in space when she launched on a Russian Soyuz spacecraft to the International Space Station (ISS) on July 7, 2016 ...
* Frank Rubio * Scott Tingle * Jessica Watkins * Stephanie Wilson Chief Astronaut Reid Wiseman said in August 2022, however, that all 42 active members of the
NASA Astronaut Corps The NASA Astronaut Corps is a unit of the United States National Aeronautics and Space Administration (NASA) that selects, trains, and provides astronauts as crew members for U.S. and international space missions. It is based at Johnson Space Ce ...
, and the ten more training as
NASA Astronaut Group 23 NASA Astronaut Group 23 (nicknamed The Flies) was announced on December 6, 2021, with the class reporting for duty some time in 2022. Twelve astronaut candidates were selected, including seven men and five women. History NASA announced the cre ...
, are eligible for Artemis 2 and later flights.


Planned surface operations


NASA research programs

As of February 2020, a lunar stay during a Phase 1 Artemis mission will be about seven days and will have five
extravehicular activities Extravehicular activity (EVA) is any activity done by an astronaut in outer space outside a spacecraft. In the absence of a breathable Earthlike atmosphere, the astronaut is completely reliant on a space suit for environmental support. EVA inc ...
(EVA). A ''notional'' concept of operations (i.e., a hypothetical but possible plan) would include the following: On Day 1 of the stay, astronauts touchdown on the Moon but do not conduct an EVA. Instead, they prepare for the EVA scheduled for the next day in what is referred to as "The Road to EVA". On Day 2, the astronauts open the hatch on the Human Landing System and embark on EVA 1 which will be six hours long. It will include collecting a contingency sample, conducting public affairs activities, deploying the experiment package, and acquiring samples. The astronauts will stay close to the landing site on this first EVA. EVA 2 begins on day 3. The astronauts characterize and collect samples from permanently shadowed regions. Unlike the previous EVA, the astronauts will go farther from the landing site, up to , and up and down slopes of 20°. Day 4 will not include an EVA but Day 5 will. EVA 3 may include activities such as collecting samples from an ejecta blanket. Day 6 will have the two astronauts deploy a geotechnical instrument alongside an environmental monitoring station for in-situ resource utilization (ISRU). Day 7 will have the final and shortest EVA; this EVA will only last one hour rather than the others' six hours in duration from egress to ingress and mostly comprises preparations for the lunar liftoff, including jettisoning hardware. Once the final EVA is concluded, the astronauts will return into the Human Landing System and the vehicle will launch from the surface and join up with Orion/Gateway.


Artemis Base Camp

Artemis Base Camp is the prospective lunar base that was proposed to be established at the end of the 2020s. It would consist of three main modules: the Foundational Surface Habitat, the Habitable Mobility Platform, and the Lunar Terrain Vehicle. It would support missions of up to two months and be used to study technologies to use on Mars. The idea would be to build upon this initial base site for decades through both Government and commercial programs. Currently
Shackleton Crater Shackleton is an impact crater that lies at the lunar south pole. The peaks along the crater's rim are exposed to almost continual sunlight, while the interior is perpetually in shadow. The low-temperature interior of this crater functions as a ...
is the prime target for this outpost due to its wide variety of lunar geography and water ice. It would fall under the guidelines of the
Outer Space Treaty russian: link=yes, Договор о космосе es, link=yes, Tratado sobre el espacio ultraterrestre , long_name = Treaty on Principles Governing the Activities of States in the Exploration and Use of Outer Space, including the Moo ...
.


Foundational Surface Habitat

Little is known about the surface outpost with most information coming from studies and launch manifests that include its launch. It would be commercially built and possibly commercially launched in 2028 along with the Mobile Habitat. The first habitat is referred to as the Artemis Foundation Habitat formerly the Artemis Surface Asset. Current launch plans show that landing it on the surface would be similar to the HLS. The pressurized habitat would be sent to the Gateway where it would then be attached to a descent stage separately launched from a commercial launcher, it would utilize the same transfer stage used for the HLS. Other designs from 2019 see it being launched from an
SLS Block 1B The Space Launch System (SLS) is an American super heavy-lift expendable launch vehicle developed by NASA. As of 2022, SLS has the highest payload capacity of any rocket in operational service, as well as the greatest liftoff thrust of any ...
as a single unit and landing directly on the surface. It would then be hooked up to a surface power system launched by a CLPS mission and tested by the Artemis 6 crew. The location of the base would be in the south pole region and most likely be a site visited by prior crewed and robotic missions.


Habitable Mobility Platform

The Habitable Mobility Platform would be a large pressurized rover used to transport crews across large distances. NASA has developed multiple pressurized rovers including the Space Exploration Vehicle built for the
Constellation program The Constellation program (abbreviated CxP) was a crewed spaceflight program developed by NASA, the space agency of the United States, from 2005 to 2009. The major goals of the program were "completion of the International Space Station" and a " ...
which was fabricated and tested. In the 2020 flight manifest it was referred to as the Mobile Habitat suggesting it could fill a similar role to the ILREC Lunar Bus. It would be ready for the crew to use on the surface but could also be autonomously controlled from the Gateway or other locations. Mark Kirasich, who is the acting director of NASA's Advanced Exploration Systems, has stated that the current plan is to partner with JAXA and
Toyota is a Japanese multinational automotive manufacturer headquartered in Toyota City, Aichi, Japan. It was founded by Kiichiro Toyoda and incorporated on . Toyota is one of the largest automobile manufacturers in the world, producing about 10 ...
to develop a closed cabin rover to support crews for up to 14 days (currently known as
Lunar Cruiser The Lunar Cruiser is the nickname of a crewed pressurized lunar rover being developed jointly by JAXA and Toyota that astronauts can drive on the Moon. The Lunar Cruiser is being developed as a part of NASA's Artemis program and will enable astrona ...
). "It's very important to our leadership at the moment to involve JAXA in a major surface element", he said. "... The Japanese, and their auto industry, have a very strong interest in rover-type things. So there was an idea to — even though we have done a lot of work — to let the Japanese lead development of a pressurized rover. So right now, that's the direction we're heading in". In regards to the SEV, Senior Lunar Scientist Clive Neal said "Under Constellation NASA had a sophisticated rover put together, It's pretty sad if it's never going to get to the Moon". but also said that he understands the different scopes of the Constellation Program and Artemis program and the focus on international collaboration.


Moon rover


Lunar light vehicle development

In February 2020, NASA released two requests for information regarding both a crewed and uncrewed unpressurized surface rover. The LTV would be propositioned by a CLPS vehicle before the Artemis 3 mission. It would be used to transport crews around the exploration site. It would serve a similar function as the Apollo Lunar Rover. In July 2020, NASA will move to formally establish a program office for the rover at the Johnson Space Center in Houston.


Space suits

The Artemis program will make use of two types of
space suit A space suit or spacesuit is a garment worn to keep a human alive in the harsh environment of outer space, vacuum and temperature extremes. Space suits are often worn inside spacecraft as a safety precaution in case of loss of cabin pressure, ...
revealed in October 2019: the Exploration Extravehicular Mobility Unit (xEMU), and the Orion Crew Survival System (OCSS). On 10 August 2021, a
NASA Office of Inspector General The NASA Office of Inspector General (NASA OIG or OIG) is the inspector general office in the National Aeronautics and Space Administration, the space agency of the United States. The OIG's stated mission is to "prevent and detect crime, fraud, wa ...
audit reported a conclusion that the spacesuits would not be ready until April 2025 at the earliest, likely delaying the mission from the planned late 2024. In response to the IG report, SpaceX indicated that they could provide the suits.


Commercial spacesuits

NASA published a draft RFP to procure commercially-produced spacesuits in order to meet the 2024 schedule. On 2 June 2022, NASA announced that commercially produced spacesuits would be developed by
Axiom Space Axiom Space, Inc., also known as Axiom, is an American privately funded space infrastructure developer headquartered in Houston, Texas. Founded in 2016 by Michael T. Suffredini and Kam Ghaffarian, the company first flew a spaceflight in 2 ...
and Collins Aerospace.


Artemis flights


Orion testing

A prototype version of the Orion Crew Module was launched on
Exploration Flight Test-1 Exploration Flight Test-1 or EFT-1 (previously known as Orion Flight Test 1 or OFT-1) was the first test flight of the crew module portion of the Orion (spacecraft), Orion Multi-Purpose Crew Vehicle. Without a crew, it was launched on December&nb ...
on 5 December 2014 atop a
Delta IV Heavy The Delta IV Heavy (Delta 9250H) is an expendable heavy-lift launch vehicle, the largest type of the Delta IV family. It is the world's third highest-capacity launch vehicle in operation, behind NASA's Space Launch System and SpaceX's Falcon H ...
rocket. Its
reaction control system A reaction control system (RCS) is a spacecraft system that uses thrusters to provide attitude control and translation. Alternatively, reaction wheels are used for attitude control. Use of diverted engine thrust to provide stable attitude cont ...
and other components were tested during two medium Earth orbits, reaching an apogee of and crossing the Van Allen radiation belts before making a high-energy reentry at . The Ascent Abort-2 test on 2 July 2019 tested the final iteration of the launch abort system on a Orion Boilerplate (spaceflight), boilerplate at maximum aerodynamic load, using a custom Minotaur IV-derived launch vehicle built by Orbital ATK.


Missions

, all crewed Artemis missions will launch on the Space Launch System from Kennedy Space Center Launch Complex 39B. Current plans call for some supporting hardware to be launched on other vehicles and from other launch pads.


Proposed missions

In November 2021, plans to return humans to the Moon in 2024 were cancelled, and the
Artemis 3 Artemis 3 (officially Artemis III) is planned as the first crewed Moon landing mission of the Artemis program and the first crewed flight of the Starship HLS lander. Scheduled for launch in 2025, Artemis 3 is planned to be the second crewed Art ...
mission was delayed until at least 2025. However, , plans remained in place for crewed Artemis 5 through 9 missions to launch yearly between 2027 and 2031, testing
in situ resource utilization In space exploration, in situ resource utilization (ISRU) is the practice of collection, processing, storing and use of materials found or manufactured on other astronomical objects (the Moon, Mars, asteroids, etc.) that replace materials that ...
and Nuclear reactor, nuclear power on the lunar surface with a partially reusable lander. Artemis 7 would deliver in 2029 a crew of four astronauts to a Lunar outpost (NASA), Surface lunar outpost known as the Foundation Habitat along with the Mobile Habitat. The Foundation Habitat would be launched back to back with the Mobile Habitat by an undetermined super heavy launcher and would be used for extended crewed lunar surface missions.. "NASA's "notional" plan for a human return to the Moon by 2024, and an outpost by 2028". Prior to each crewed Artemis mission, various payloads to the Gateway, such as refueling depots and expendable elements of the lunar lander, would be deployed by commercial launch vehicles.. "After Artemis 3, NASA would launch four additional crewed missions to the lunar surface between 2025 and 2028. Meanwhile, the agency would work to expand the Gateway by launching additional components and crew vehicles and laying the foundation for an eventual Moon base". The most updated manifest includes missions suggested in NASA's timelines that have not been designed or funded from Artemis 4-9.


Support missions


Criticism

The Artemis program has received criticisms from several space professionals. Mark Whittington, who is a contributor to ''The Hill (newspaper), The Hill'' and an author of several space exploration studies, stated in an article that the "lunar orbit project doesn't help us get back to the Moon". Aerospace engineer, author, and Mars Society founder Robert Zubrin has voiced his distaste for the Gateway which is part of the Artemis program as of 2020. He presented an alternative approach to a 2024 crewed lunar landing called "Moon Direct", a successor to his proposed Mars Direct. His vision phases out the SLS and Orion, replacing them with the SpaceX launch vehicles and SpaceX Dragon 2. It also proposes using a heavy ferry/lander that would be refueled on the lunar surface via
in situ resource utilization In space exploration, in situ resource utilization (ISRU) is the practice of collection, processing, storing and use of materials found or manufactured on other astronomical objects (the Moon, Mars, asteroids, etc.) that replace materials that ...
and transfer the crew from LEO to the lunar surface. The concept bears a heavy resemblance to NASA's own Space Transportation System proposal from the 1970s. Apollo 11 astronaut Buzz Aldrin disagrees with NASA's current goals and priorities, including their plans for a lunar outpost. He also questioned the benefit of the idea to "send a crew to an intermediate point in space, pick up a lander there and go down". However, Aldrin expressed support for Robert Zubrin's "Moon Direct" concept which involves lunar landers traveling from Earth orbit to the lunar surface and back.


House Authorization Bill of 2020

The leadership of the House Science Committee introduced a bipartisan NASA authorization bill on 24 January 2020 that would significantly alter NASA's current plans to return humans to the Moon and rather would focus on a Deep Space Transport, Mars orbital mission in 2033. Bill H.R. 5666 would change the lunar landing date from 2024 to 2028 and put the program as a whole underneath a larger space exploration plan. The bill became stuck in the House Committee on Science, Space, and Technology, and there were no committee votes or further action for the remainder of 116th United States Congress, the congressional term. Major proposed changes included: * Creation of a new Moon to Mars program office with a goal of Mars landing, landing humans on
Mars Mars is the fourth planet from the Sun and the second-smallest planet in the Solar System, only being larger than Mercury. In the English language, Mars is named for the Roman god of war. Mars is a terrestrial planet with a thin at ...
"in a sustainable manner as soon as practicable" * A 2028 target date for a lunar landing to allow the technology to mature * A NASA developed expendable Human Landing System (HLS), something along the line of the Advanced Exploration Lander or the expendable Altair (spacecraft), Altair design * Launching both the Orion and HLS on SLS 1B rockets rather than splitting them between SLS and a commercial vehicle * The requirement of one uncrewed and one crewed test flight of the HLS before a lunar landing is attempted, something not currently required * Once operational, the system would perform two lunar landings a year rather than one * No base would be set up on the lunar surface rather, the missions would follow the "flag and footsteps" approach of Apollo * Development of the Gateway as a separate program to test Mars transportation technologies and not be required for lunar operations * ISRU technologies would be managed under a program separate from the Moon to Mars campaign and not be required for either mission *
International Space Station The International Space Station (ISS) is the largest modular space station currently in low Earth orbit. It is a multinational collaborative project involving five participating space agencies: NASA (United States), Roscosmos (Russia), JAXA ( ...
funding would be extended to 2030 Many of these changes, such as uncrewed HLS test flights and the development of the Gateway as no longer essential to Artemis, were implemented into the current timeline.


Gallery

File:Artemis Phase 1.jpg, Planned missions of Artemis program File:The-Initial-Phase-Gateway-with-Orion,-an-HLS-and-a-logistics-module-docked.jpg, Phase 1 Gateway with an Orion and HLS docked on Artemis 3 File:Artemis program astronauts lunar craterv2.png, Concept of surface operations File:Artemis I map October 2021.jpg, Artemis 1 planned flight path File:Artemis I SLS in the VAB.jpg, SLS atop the Mobile launcher platform, MLP being carried by the Crawler-transporter, CT out of the Vehicle Assembly Building, VAB


See also

* * Chinese Lunar Exploration Program – Chinese crewed lunar program with international partners e.g. Russia. * * * * First Lunar Outpost – Crewed lunar program proposal from the Space Exploration Initiative, SEI * * *
NASA Astronaut Group 23 NASA Astronaut Group 23 (nicknamed The Flies) was announced on December 6, 2021, with the class reporting for duty some time in 2022. Twelve astronaut candidates were selected, including seven men and five women. History NASA announced the cre ...
*


Notes


References


Sources

* * * * *


External links


Moon to Mars portal
at NASA
Artemis program
at NASA
Monthly report
by the Exploration Systems Development (ESD) {{Portal bar, Astronomy, Stars, Spaceflight, Outer space, Solar System, United States Artemis program, 2010s in the United States 2020s in the United States 2020s in spaceflight Orion (spacecraft) Commercial Lunar Payload Services Exploration of the Moon Human spaceflight programs NASA programs Projects established in 2017