The ''Malta''-class aircraft carrier was a British large
aircraft carrier An aircraft carrier is a warship that serves as a seagoing airbase, equipped with a full-length flight deck and facilities for carrying, arming, deploying, and recovering aircraft. Typically, it is the capital ship of a fleet, as it allows a ...
design of
World War II World War II or the Second World War, often abbreviated as WWII or WW2, was a world war that lasted from 1939 to 1945. It involved the vast majority of the world's countries—including all of the great powers—forming two opposin ...
. Four ships were ordered in 1943 for the
Royal Navy The Royal Navy (RN) is the United Kingdom's naval warfare force. Although warships were used by English and Scottish kings from the early medieval period, the first major maritime engagements were fought in the Hundred Years' War against F ...
, but changing tactical concepts, based on American experience in the
Pacific War The Pacific War, sometimes called the Asia–Pacific War, was the theater of World War II that was fought in Asia, the Pacific Ocean, the Indian Ocean, and Oceania. It was geographically the largest theater of the war, including the vast ...
, caused repeated changes to the design, which was not completed before the end of the war. All four ships were cancelled in 1945 before they were
laid down Laying the keel or laying down is the formal recognition of the start of a ship's construction. It is often marked with a ceremony attended by dignitaries from the shipbuilding company and the ultimate owners of the ship. Keel laying is one o ...
.


Background

In July 1942 the Royal Navy formed the Future Building Committee, chaired by the Deputy First Sea Lord, to examine the fleet's requirements for the rest of the war. Tasked with anticipating the Navy's readiness and requirements for January 1944, the committee realised that a major expansion of naval aviation was required, which meant that more aircraft carriers would be needed. Many factors combined to drive up the size of these new carriers, notably the increasing size and speed of aircraft and the desire to increase the numbers of aircraft aboard
fleet carrier A fleet carrier is an aircraft carrier designed to operate with the main fleet of a nation's navy. The term was developed during World War II, to distinguish it from the escort carrier and other less capable types. In addition to many medium-siz ...
s. Another important consideration was the change in carrier tactics from the earlier doctrine of more attacks with smaller numbers of aircraft to the use of large, single
airstrike An airstrike, air strike or air raid is an offensive operation carried out by aircraft. Air strikes are delivered from aircraft such as blimps, balloons, fighters, heavy bombers, ground attack aircraft, attack helicopters and drones. The offic ...
s. Sir Stanley V. Goodall,
Director of Naval Construction The Director of Naval Construction (DNC) also known as the Department of the Director of Naval Construction and Directorate of Naval Construction and originally known as the Chief Constructor of the Navy was a senior principal civil officer resp ...
(DNC), proposed a variety of designs, both open and closed
hangar A hangar is a building or structure designed to hold aircraft or spacecraft. Hangars are built of metal, wood, or concrete. The word ''hangar'' comes from Middle French ''hanghart'' ("enclosure near a house"), of Germanic origin, from Frankish ...
. On 8 October 1943, the
Board of Admiralty The Board of Admiralty (1628–1964) was established in 1628 when Charles I put the office of Lord High Admiral into commission. As that position was not always occupied, the purpose was to enable management of the day-to-day operational requi ...
selected a closed-hangar design with an
armoured flight deck An armoured flight deck is an aircraft carrier flight deck that incorporates substantial armour in its design. Comparison is often made between the carrier designs of the Royal Navy (RN) and the United States Navy (USN). The two navies followed ...
and five
propeller shaft A drive shaft, driveshaft, driving shaft, tailshaft (Australian English), propeller shaft (prop shaft), or Cardan shaft (after Girolamo Cardano) is a component for transmitting mechanical power and torque and rotation, usually used to connect ...
s. Reports of American operations in the Pacific convinced the Board to reconsider hangar design; American experience had shown that the ability to fly off all of a carrier's aircraft in a single airstrike was vital. That required a well-ventilated, open-hangar design, which would reduce the time required to launch the aircraft by allowing them to begin the typical 15-minute engine warm-up while still in the hangar. On 15 May 1944, the Board reversed itself and ordered the DNC to produce an open-hangar design with deck-edge lifts. An unarmoured flight deck was agreed upon in June by the
Controller of the Navy The post of Controller of the Navy (abbreviated as CofN) was originally created in 1859 when the Surveyor of the Navy's title changed to Controller of the Navy. In 1869 the controller's office was abolished and its duties were assumed by that of ...
and the
Fifth Sea Lord The Fifth Sea Lord was formerly one of the Naval Lords and members of the Board of Admiralty that controlled the Royal Navy. The post's incumbent had responsibility for naval aviation. History In 1805, for the first time, specific functions wer ...
. The new design, long at the
waterline The waterline is the line where the hull of a ship meets the surface of the water. Specifically, it is also the name of a special marking, also known as an international load line, Plimsoll line and water line (positioned amidships), that indi ...
and known as Design X, was submitted to the Board on 10 August, although it was not approved. In October, concerns arose over the size of Design X in that it might have problems manoeuvring in constricted harbours, and the DNC was asked for two smaller designs: X1, shorter, and Y, shorter. Design Y was too short for efficient operations with the larger aircraft the committee anticipated, and the
First Sea Lord The First Sea Lord and Chief of the Naval Staff (1SL/CNS) is the military head of the Royal Navy and Naval Service of the United Kingdom. The First Sea Lord is usually the highest ranking and most senior admiral to serve in the British Armed ...
selected X1. It was submitted to the Board on 12 April 1945 and fully worked out in anticipation of approval that never came. The Board minutes for 31 August noted that further consideration of the design had been postponed.


Description

Had the X1 design received final approval, the ''Malta'' class would have been about the same size as the American s at in
length overall __NOTOC__ Length overall (LOA, o/a, o.a. or oa) is the maximum length of a vessel's hull measured parallel to the waterline. This length is important while docking the ship. It is the most commonly used way of expressing the size of a ship, an ...
and at the waterline. The
beam Beam may refer to: Streams of particles or energy *Light beam, or beam of light, a directional projection of light energy **Laser beam *Particle beam, a stream of charged or neutral particles **Charged particle beam, a spatially localized grou ...
would have been at the waterline and they would have had a draught of at
deep load The displacement or displacement tonnage of a ship is its weight. As the term indicates, it is measured indirectly, using Archimedes' principle, by first calculating the volume of water displaced by the ship, then converting that value into wei ...
. The ships would have displaced at
standard load The displacement or displacement tonnage of a ship is its weight. As the term indicates, it is measured indirectly, using Archimedes' principle, by first calculating the volume of water displaced by the ship, then converting that value into wei ...
and at deep load. Their
metacentric height The metacentric height (GM) is a measurement of the initial static stability of a floating body. It is calculated as the distance between the centre of gravity of a ship and its metacentre. A larger metacentric height implies greater initial stab ...
s were estimated to be at standard load and at deep load.Friedman, p. 295 Their complement was expected to consist of 3,520 officers and enlisted men.Chesneau 1995, p. 140 The flight deck had a maximum width of . Because the unarmoured flight deck required an expansion joint about
amidships This glossary of nautical terms is an alphabetical listing of terms and expressions connected with ships, shipping, seamanship and navigation on water (mostly though not necessarily on the sea). Some remain current, while many date from the 17th t ...
, the ''Malta''s'
island An island (or isle) is an isolated piece of habitat that is surrounded by a dramatically different habitat, such as water. Very small islands such as emergent land features on atolls can be called islets, skerries, cays or keys. An island ...
could not be a single structure and was split into two, each section with its own
funnel A funnel is a tube or pipe that is wide at the top and narrow at the bottom, used for guiding liquid or powder into a small opening. Funnels are usually made of stainless steel, aluminium, glass, or plastic. The material used in its construct ...
. This allowed turbulence around the islands to be reduced and provided more space for
radar Radar is a detection system that uses radio waves to determine the distance (''ranging''), angle, and radial velocity of objects relative to the site. It can be used to detect aircraft, ships, spacecraft, guided missiles, motor vehicles, w ...
s and fire-control directors. The carriers would have been fitted with 16
arrestor cable An arresting gear, or arrestor gear, is a mechanical system used to rapidly acceleration, decelerate an aircraft as it landing, lands. Arresting gear on aircraft carriers is an essential component of naval aviation, and it is most commonly used ...
s that were designed to stop landing aircraft up to in weight, at speeds of up to . They would have been backed up by three crash barricades to prevent landing aircraft from crashing into aircraft parked on the ship's bow. Positioned on the forward part of the flight deck, two newly designed hydraulic
aircraft catapult An aircraft catapult is a device used to allow aircraft to take off from a very limited amount of space, such as the deck of a vessel, but can also be installed on land-based runways in rare cases. It is now most commonly used on aircraft carrier ...
s were intended to launch fully laden aircraft at . The ships were designed with four lifts (two on the centreline (, and two on the portside deck edge () to facilitate the rapid movement of aircraft between the flight deck and the hangar. This was long, with a maximum width of , and high to accommodate American aircraft designed for that height. In case of fire the hangar was intended to be divided by four sliding steel doors. Between the hangar spaces and the deck park, the ''Malta'' class would have been capable of accommodating between 80 and 108 aircraft. For these aircraft, the ships would have been provided with of petrol.


Propulsion

The ships would have used four
Parsons Parsons may refer to: Places In the United States: * Parsons, Kansas, a city * Parsons, Missouri, an unincorporated community * Parsons, Tennessee, a city * Parsons, West Virginia, a town * Camp Parsons, a Boy Scout camp in the state of Washingt ...
Hobbs, p. 215 double-reduction geared
steam turbine A steam turbine is a machine that extracts thermal energy from pressurized steam and uses it to do mechanical work on a rotating output shaft. Its modern manifestation was invented by Charles Parsons in 1884. Fabrication of a modern steam turbin ...
s, each driving one shaft, using steam supplied by eight Admiralty 3-drum boilers.Chesneau 1980, p. 21 The boilers were distributed between four boiler compartments, but all four turbines were in a single compartment, well aft.Hobbs, p. 214 The turbines were designed to produce a total of , enough to give them a maximum speed of . The ''Malta'' class was designed to carry a maximum of of
fuel oil Fuel oil is any of various fractions obtained from the distillation of petroleum (crude oil). Such oils include distillates (the lighter fractions) and residues (the heavier fractions). Fuel oils include heavy fuel oil, marine fuel oil (MFO), bun ...
and diesel fuel (for the emergency
generator Generator may refer to: * Signal generator, electronic devices that generate repeating or non-repeating electronic signals * Electric generator, a device that converts mechanical energy to electrical energy. * Generator (circuit theory), an eleme ...
s); this was intended to give the ships a range of at or at .


Armament

The ships' main armament was intended to be sixteen QF 4.5-in (113 mm) Mark VII
dual-purpose gun A dual-purpose gun is a naval artillery mounting designed to engage both surface and air targets. Description Second World War-era capital ships had four classes of artillery: the heavy main battery, intended to engage opposing battleships and ...
s in eight powered RP 41 Mk VII twin-
gun turret A gun turret (or simply turret) is a mounting platform from which weapons can be fired that affords protection, visibility and ability to turn and aim. A modern gun turret is generally a rotatable weapon mount that houses the crew or mechani ...
s, four on each side of the hull. The gun had a maximum range of at an elevation of +45° and a
ceiling A ceiling is an overhead interior surface that covers the upper limits of a room. It is not generally considered a structural element, but a finished surface concealing the underside of the roof structure or the floor of a story above. Ceilings ...
of . The light anti-aircraft (AA) armament would have consisted of 55 40 mm Bofors AA guns in eight sextuple stabilised, powered RP 50 Mk VI mounts and seven single mounts of an unknown type. The
Bofors AB Bofors ( , , ) is a former Swedish arms manufacturer which today is part of the British arms concern BAE Systems. The name has been associated with the iron industry and artillery manufacturing for more than 350 years. History Located in ...
gun had a maximum range of and a ceiling of .


Electronics

An August 1944 study anticipated that the ships would carry four
early warning radar An early-warning radar is any radar system used primarily for the long-range detection of its targets, i.e., allowing defences to be alerted as ''early'' as possible before the intruder reaches its target, giving the air defences the maximum t ...
s, including height-finders, four surface search radars and eight gunnery/fire-control radars. Historian David Hobbs wrote that they would mount Type 960 early warning, Type 982 intercept, Type 983 height-finding and Type 293M target indication radars. In addition a number of gunnery radars would also be needed.


Protection

The thick hangar-deck armour of Design X1 was a reduction from the called for in the original X configuration. The waterline armour belt was also four inches thick, but only covered the central portion of the ship to form the armoured citadel. The belt was closed by transverse bulkheads fore and aft. of armour extended forward and aft of the belt to protect the waterline against splinter damage. The underwater defence system was a layered system of liquid- and air-filled compartments, backed by an inclined holding bulkhead that was four inches thick at the top and tapered to a thickness of at the bottom, and was estimated to resist a explosive charge. An earlier version, however, had been estimated to be able to resist a charge, but failed against a charge in a full-scale test.Brown, p. 54 The
magazine A magazine is a periodical publication, generally published on a regular schedule (often weekly or monthly), containing a variety of content. They are generally financed by advertising, purchase price, prepaid subscriptions, or by a combinatio ...
s for the 4.5-inch guns and the steering gear both lay outside the armoured citadel and had their own armour. The magazines had four-inch roofs and sides, with three-inch ends while the steering gear also had a four-inch roof, but only three-inch sides and ends.


Ordering and cancellation

Well before the design was finalised, four ships were ordered in July 1943. ''Africa'' was originally ordered as an unnamed ''Audacious''-class carrier, but the order was modified to a ''Malta''-class ship on 12 July 1943. ''Malta'', ''New Zealand'' and ''Gibraltar'' were all ordered three days later. ''New Zealand'' was originally ordered from
Cammell Laird Cammell Laird is a British shipbuilding company. It was formed from the merger of Laird Brothers of Birkenhead and Johnson Cammell & Co of Sheffield at the turn of the twentieth century. The company also built railway rolling stock until 1929, ...
, but the contract was transferred to
Harland and Wolff Harland & Wolff is a British shipbuilding company based in Belfast, Northern Ireland. It specialises in ship repair, shipbuilding and offshore construction. Harland & Wolff is famous for having built the majority of the ocean liners for the W ...
on 22 July 1944. The Admiralty ordered
Vickers Vickers was a British engineering company that existed from 1828 until 1999. It was formed in Sheffield as a steel foundry by Edward Vickers and his father-in-law, and soon became famous for casting church bells. The company went public in 18 ...
not to order any more material on 27 April 1944 and given that final drawings were never issued to the builders, it is unlikely that any of them actually did more than preliminary work. None of the ships were ever laid down and all of them were cancelled before the end of 1945.