The Merowe Dam, also known as Merowe High Dam, Merowe Multi-Purpose Hydro Project or Hamdab Dam, is a large dam near Merowe Town in northern
Sudan Sudan ( or ; ar, السودان, as-Sūdān, officially the Republic of the Sudan ( ar, جمهورية السودان, link=no, Jumhūriyyat as-Sūdān), is a country in Northeast Africa. It shares borders with the Central African Republic t ...
, about north of the capital Khartoum. Its dimensions make it the largest contemporary hydropower project in Africa. It is situated on the river Nile, close to and inundating the 4th Cataract where the river divides into multiple smaller branches with large islands in between. Merowe is a city about downstream from the construction site at Hamdab. The main purpose for building the dam was the generation of electricity.


Technical details

The dam has a length of about and a crest height of up to . It consists of concrete-faced rockfill dams on each river bank (the right bank dam is the largest part of the project, 4.3 km long and 53m high; the left bank is 1590 metres long and 50 metres high), an -long -high earth-core rockfill dam (the 'main dam') in the left river channel, and a live water section in the right river channel (sluices, spillway and a 300-metre power intake dam with turbine housings). It contains a reservoir of , or about 15% of the Nile's annual flow of ; the intended reservoir level is 300 metres above sea level, with the Nile level downstream of the dam being about 265 metres. The reservoir lake is planned to extend upstream.


Powerhouse

The powerhouse is equipped with ten
Francis turbine The Francis turbine is a type of water turbine. It is an inward-flow reaction turbine that combines radial and axial flow concepts. Francis turbines are the most common water turbine in use today, and can achieve over 95% efficiency. The proces ...
s, each one designed for a nominal discharge rate of 300 cubic metres per second, and each one driving a , synchronous
generator Generator may refer to: * Signal generator, electronic devices that generate repeating or non-repeating electronic signals * Electric generator, a device that converts mechanical energy to electrical energy. * Generator (circuit theory), an eleme ...
. The planners expect an annual electricity yield of , corresponding to an average load of , or 50% of the rated load. To utilize the extra generation capacity, the Sudanese power grid will be upgraded and extended as part of the project, with about of new aerial transmission line across the
Bayudah Desert The Bayuda Desert, located at , is in the eastern region of the Sahara Desert, spanning approximately 100,000 km2 of northeast Sudan north of Omdurman and south of Korti, embraced by the great bend of the Nile in the north, east and south a ...
to Atbara, continuing to
Omdurman Omdurman (standard ar, أم درمان ''Umm Durmān'') is a city in Sudan. It is the most populated city in the country, and thus also in the State of Khartoum. Omdurman lies on the west bank of the River Nile, opposite and northwest of the ...
/Khartoum, as well as about of lines eastwards to Port Sudan and westwards along the Nile, connecting to Merowe, Dabba and Dongola.


Planning and construction

The idea of a Nile dam at the 4th cataract is quite old. The authorities of the Anglo-Egyptian Sudan proposed it several times during the first half of the 20th century. It was supposed to equalize the large annual Nile flow fluctuations, create the possibility of growing cotton and provide flood protection for the lower Nile valley. After Sudan achieved independence in
1956 Events January * January 1 – The Anglo-Egyptian Sudan, Anglo-Egyptian Condominium ends in Sudan. * January 8 – Operation Auca: Five U.S. evangelical Christian Missionary, missionaries, Nate Saint, Roger Youderian, Ed McCully, Jim ...
, Egypt decided to control the flow of Nile water that reached its own territory by building a dam and creating a reservoir —the Aswan Dam and Nasser Lake. The Sudan military government under President Nimeiri revived the plan in 1979, now with the intention of producing hydroelectricity for Sudan's rising demand. The following decade saw international industry and planning offices busy, producing a total of four feasibility studies - Coyne et Bellier, 1979 / Gibb, Merz & McLellan, GB, 1983 / Sweco, SE, 1984 / Monenco Consultants Ltd., CA, 1989]. However, insufficient funding and lack of investor interest effectively stalled the project at the planning stage. This appears to have changed fundamentally since the country started exporting oil in commercial quantities in the years 1999/2000. A greatly improved creditworthiness brought an influx of foreign investment, and the contracts for the construction of what is now known as the Merowe Dam project were signed in 2002 and 2003. The main contractors are:
China International Water&Electric Corp.
China National Water Resources and Hydropower Engineering Corp. (construction of dam, hydromechanical works)
Lahmeyer International
(Germany - planning, project management, civil engineering) *
Alstom Alstom SA is a French multinational rolling stock manufacturer operating worldwide in rail transport markets, active in the fields of passenger transportation, signalling, and locomotives, with products including the AGV, TGV, Eurostar, Avelia ...
(France - generators, turbines) * Harbin Power Engineering Company, Jilin Province Transmission and Substation Project Company (both China - transmission system extension) By the time the contracts were signed, the Merowe Dam had been the largest international project the Chinese industry ever participated in. River diversion and work on the concrete dams began in early 2004. The left river channel was closed on 30 December 2005; the project timeline scheduled the reservoir impounding to start in mid-2006 and the first generating unit to go on-line in mid-2007. The dam was inaugurated on March 3, 2009, at which point the reservoir was full and all the hydro-electric generating capacity on-line.


Financing

The total project cost is reported to be $2.945 billion. This can be subdivided into partial amounts for the construction work on the dam itself (ca. 45%), its technical equipment (ca. 25%) and the necessary upgrade of the power transmission system (ca. 30%). The project receives funding from
China Import Export Bank
- USD 608 million
Arab Fund for Economic and Social Development
– USD 477 million
Saudi Fund for Development
– USD 215 million *Abu Dhabi Fund for Development – USD 210 million
Kuwait Fund for Arab Economic Development
– USD 200 million *Oman Fund for Development - USD 106 million * State of Qatar - USD 15 million *The remaining cost – $ 1.114 billion – is covered by the Sudanese government.


Benefits

The electrification level in Sudan is very low, even by the standards of the region. In 2002, the average Sudanese consumed 58
kWh A kilowatt-hour (unit symbol: kW⋅h or kW h; commonly written as kWh) is a unit of energy: one kilowatt of power for one hour. In terms of SI derived units with special names, it equals 3.6 megajoules (MJ). Kilowatt-hours are a common bil ...
of electricity per year, i.e., about one fifteenth of their Egyptian neighbors to the north, and less than one hundredth of the OECD average. The capital Khartoum and a few large plantations account for more than two thirds of the country's electric power demand, while most of the rural areas are not connected to the national grid. Many villages use the option of connecting small generators to the ubiquitous diesel-powered irrigation pumps. This way of generating electricity is rather inefficient and expensive. The combined grid-connected generating capacity in Sudan was 728 MW in 2002, about 45% hydroelectricity and 55% oil-fired thermal plants. However, the effective capacity has always been a lot lower. The two main facilities, the Sennar (constructed in 1925) and Roseires (1966) dams on the Blue Nile, were originally designed for irrigation purposes rather than
power production Electricity generation is the process of generating electric power from sources of primary energy. For electric utility, utilities in the electric power industry, it is the stage prior to its Electricity delivery, delivery (Electric power transmi ...
. Generating units were added during the 1960s and 1970s when the demand for electric power increased, but their power production is often heavily restricted by irrigation needs. The government in Khartoum has announced plans to raise the country's electrification level from an estimated 30% to about 90% in the mid-term. Large investments into the medium and low voltage
distribution grids Distribution may refer to: Mathematics *Distribution (mathematics), generalized functions used to formulate solutions of partial differential equations *Probability distribution, the probability of a particular value or value range of a varia ...
will be necessary but not sufficient to reach this ambitious goal: First and foremost, the foreseeable increase in power consumption would require the addition of generating capacity. During the 1990s, Sudanese electricity customers have already been plagued by frequent blackouts and brownouts due to insufficient generation. Three new thermal power plants went into operation in the Khartoum area in 2004, increasing the installed capacity to 1315 MW. The Merowe dam with its peak output of 1250 MW will almost double this capacity once it comes online.


Human impact


Resettlement and compensation

Before the construction began, an estimated 55,000 to 70,000 people were resident in the area covered by the reservoir lake, mainly belonging to the Manasir,
Hamadab Hamadab is an ancient city of ruins located in Sudan. It appears to have been abandoned 4th century AD. The name is borrowed from the nearby village of al Dumat Hamadab, as the ancient name of the city is initially unknown. The ruins lie about so ...
and Amri tribes. They lived in small farming villages along the banks of the Nile and on the islands in the cataract. The whole region was relatively isolated, without paved roads or other infrastructure, and the communities were largely self-sufficient. Except for beans and
millet Millets () are a highly varied group of small-seeded grasses, widely grown around the world as cereal crops or grains for fodder and human food. Most species generally referred to as millets belong to the tribe Paniceae, but some millets al ...
the farmers grew vegetables, both for their own consumption and for trading at the weekly regional markets. However, their main source of income—and their most valuable possession—were the groves of date palms growing in the fertile silt on the river banks. The inhabitants of the region to be flooded were forcibly displaced along a timeline corresponding to their land's proximity to the dam site: the people of Hamadab to Al-Multaga in 2003, the people of Amri to
Wadi Muqaddam Geography Wadi Muqaddam is a dry water course some 320 km extending from beyond Omdurman north to the great bend of the Nile near Korti. It gives its name to the geological Wadi Milk Formation. Delimiting the Bayuda Desert to the west it stil ...
in 2007, and the Manasir to Al-Mokabrab and Al-Fidah in 2008. At the resettlement sites, farmers received plots of land relative in size to their former possessions, in addition to financial compensation for lost assets—houses and
date palm ''Phoenix dactylifera'', commonly known as date or date palm, is a flowering plant species in the palm family, Arecaceae, cultivated for its edible sweet fruit called dates. The species is widely cultivated across northern Africa, the Middle Eas ...
s. However, a majority preferred to stay near to their old grounds as possible and have thus built at the shores of the new lake. Many families have defied resettlement and live now on the margins of the lake. Farmers have become fishermen, but their income is less than before. Though government officials claim there are improved living conditions at the resettlement areas, with relatively modern buildings and infrastructure, affected people reject the compensation plans. Their main objections are: * The soil at the resettlement areas is sandy, and its quality is extremely poor, compared to the excellent farmland beside the Nile. It would take much effort and a long time—probably decades—until it became fertile enough for growing vegetables and other marketable produce. * The government announced that it would provide free water, sand removal and fertilizer during the first two years after the resettlement. After this period, the farmers would have to pay the full price for these services, none of which had to be paid at the old site. * Compensation for a date palm amounts to about four years' harvest, while a good palm tree can bear fruit for a hundred years. Compensation for vegetable gardens is very low, and only married men will receive compensation for their houses. About 6,000 people were resettled to the Al-Multaqah site in the Nubian desert during 2003 and 2004. Their villages were the closest to the dam construction site near Hamdab.Terminski, Bogumil (2013). "Development-Induced Displacement and Resettlement: Theoretical Frameworks and Current Challenges", Indiana University,available at: http://dlc.dlib.indiana.edu/dlc/handle/10535/8833?show=full According to a survey conducted in early 2005, the poverty rate has increased dramatically because the farmers are not able to produce anything saleable in the local markets.


Nomads

A significant fraction of the Manasir tribe inhabits the desert regions close to the Nile valley. The exact size of this nomadic population is unknown, but it is estimated to be of the same order of magnitude as that of the resident farmers, i.e., tens of thousands. Both groups maintain tight cultural interchanges and trade relations with each other. Only the owners of real estate purportedly are covered under the compensation scheme, although reports are that families have been displaced without compensation or adequate provisions for relocation. Nomadic families will not receive any compensation, even though the resettlement of the farming Manasir will deprive them of their symbiotic partners. The consequences for their ability to sustain their lives in a harsh environment remains to be assessed.


Human rights concerns

UN Special Rapporteur on Adequate Housing
Miloon Kothari Miloon Kothari is a scholar and activist who served from 2000 to 2008 as the United Nations Special Rapporteur on adequate housing with the Human Rights Council. Since 2015, he has been the President of UPR Info. He was convener of the Workin ...
issued a statement August 27,
007 The ''James Bond'' series focuses on a fictional British Secret Service agent created in 1953 by writer Ian Fleming, who featured him in twelve novels and two short-story collections. Since Fleming's death in 1964, eight other authors have ...
calling for a halt to dam construction at Merowe until an independent assessment of the dam's impacts on the more than 60,000 people who stand to be displaced by the dams at Merowe and Kajbar. Kothari stated he has "received reports that the Merowe reservoir’s water levels have already risen, destroying dozens of homes in the area and putting many more at risk." Kothari announced, "The affected people have claimed that they received no warning that water levels would be raised and that no assistance from Government authorities has been forthcoming since their houses were destroyed." According to reports, the Government of Sudan has not honored its promises to those who have been displaced. Kothari noted that, "thousands of people in the same area were relocated in similar circumstances that left many temporarily without food or shelter, and that some of those people remain homeless today." Kothari called upon the Sudanese government to ensure safety and adequate housing to all those affected by the dams and warned the projects "would lead to large-scale forced evictions and further violence."


Archaeology

The fertile Nile valley has been attracting human settlement for thousands of years. The section between the 4th and 5th cataract—a significant portion of which will be inundated by the reservoir lake—has been densely populated through nearly all periods of (pre)history, but very little
archaeological Archaeology or archeology is the scientific study of human activity through the recovery and analysis of material culture. The archaeological record consists of artifacts, architecture, biofacts or ecofacts, sites, and cultural landscap ...
work has ever been conducted in this particular region. Recent surveys have confirmed the richness and diversity of traceable remains, from the
Stone Age The Stone Age was a broad prehistoric period during which stone was widely used to make tools with an edge, a point, or a percussion surface. The period lasted for roughly 3.4 million years, and ended between 4,000 BC and 2,000 BC, with t ...
to the
Islamic period Islam (; ar, ۘالِإسلَام, , ) is an Abrahamic monotheistic religion centred primarily around the Quran, a religious text considered by Muslims to be the direct word of God (or ''Allah'') as it was revealed to Muhammad, the main ...
. Several foreign institutions have been recently or are currently involved in salvage archaeology in the region under the umbrella Merowe Dam Archaeological Salvage Project (MDASP). Among them ar
ACACIA project University of CologneGdańsk Archaeological Museum Expedition (GAME)Polish Academy of Sciences
Humboldt University of Berlin, th
Italian Institute for Africa and the Orient (IsIAO)
th

the
Sudan Archaeological Research Society
the
Hungarian Meroe FoundationUniversity of California at Santa Barbara

Arizona State University
consortium, and th
Oriental Institute Museum of the University of Chicago
Their main problems are the shortness of the remaining time and limited funding. Unlike the large UNESCO campaign conducted in Egypt before the completion of the Aswan High Dam, when more than a thousand archaeological sites could be documented and complete buildings were moved to prevent them from drowning in Lake Nasser's floods, work at the 4th cataract is much more restricted. Since 2006, the archaeologists working for the Merowe Dam Archaeological Salvage Project became accused by environmental and human rights activists as well as the representatives of the affected people of facilitating the political legitimatization of the project. The archaeologists working for the dam project found themselves in an ethical dilemma since they were undertaking salvage excavations while the local people were in opposition to the building of the dam that necessitates both their resettlement and the archaeological campaign. Historian
Runoko Rashidi Runoko Rashidi (16 August 1954 – 2 August 2021) was a historian, essayist, author and public lecturer based in Los Angeles, California, and Paris, France. He is the author of ''Introduction to the Study of African Classical Civilizations]'' (1 ...
issued a statement in solidarity with Sudanese Nubians protesting the dams and called for a halt to their construction.


Political impact


International

Usage rights to the waters of the Nile are fixed in the Hydropolitics in the Nile Basin, Nile Waters Treaty, negotiated by the British in 1959. It allots 82 percent of the water volume to Egypt, while Sudan is granted the rights to the remaining 18 percent. None of the riparian countries further upstream in the Nile basin— Ethiopia, Uganda,
Rwanda Rwanda (; rw, u Rwanda ), officially the Republic of Rwanda, is a landlocked country in the Great Rift Valley of Central Africa, where the African Great Lakes region and Southeast Africa converge. Located a few degrees south of the Equator ...
,
Burundi Burundi (, ), officially the Republic of Burundi ( rn, Repuburika y’Uburundi ; Swahili language, Swahili: ''Jamuhuri ya Burundi''; French language, French: ''République du Burundi'' ), is a landlocked country in the Great Rift Valley at the ...
, Kenya and Tanzania—are entitled to any significant use of the water, be it for irrigation (of particular interest to Ethiopia and Kenya) or hydropower (Rwanda, Burundi, Uganda). As Sudan now pushes forward to make use of its water allotment, those countries have begun to call for a revision of the treaty, arguing that—with the exception of Ethiopia—they had all been under colonial rule at the time the negotiations took place, and had not been represented in their best interest. Moreover, the decision of distribution of water was made without any negotiations with Ethiopia, which had rejected the agreement and is the source of 90% of the water and 96% of transported sediment of the Nile.Daniel Kendie, ''The Five Dimensions of the Eritrean Conflict 1941–2004: Deciphering the Geo-Political Puzzle''. United States of America: Signature Book Printing, Inc., 2005, pp.198.


Domestic

While a peace treaty seems to have stopped the fighting in Southern Sudan after almost 20 years, there is no end in sight yet for the civil war in the western Darfur province. More recently, unrest in Nubia as a direct result of the dams and the forced permanent displacement of Nubians from their homelands threatens to erupt into war. A group calling itself the Nubian Liberation Front is threatening armed resistance in order to thwart the series of dams along the Nile, and particularly at Kajbar.


Environmental impact


Health

The resettlement area is a vast area with an expected 50,000–70,000 inhabitants who would be going through a transitional period for a few years before the get acclimatised and psychologically adapted to their new life. Governing by the two eminent health impact experiences of New Halfa resettlement projects and Aswan Dam in Egypt, strategic health planning ought to start early to foresee what water born diseases and other ecological health problems (such as bilharziasis, malaria) are likely to prevail and to plan how to guard against that.


Evaporation

The creation of the reservoir lake will increase the surface area of the Nile by about 700 km2. Under the climatic conditions at the site, additional evaporation losses of up to 1,500,000,000 m3 per year can be expected. This corresponds to about 8% of the total amount of water allocated to Sudan in the Nile Waters Treaty.


See also

* List of conventional hydroelectric power stations *
List of power stations in Sudan This article lists all power stations in Sudan. Hydroelectric power stations Thermal See also * Eastern Africa Power Pool * List of power stations in Africa * List of largest power stations in the world References {{DEFAULTSORT:List Of ...


References


External links

*
International Rivers' critique of project

Photos of Merowe dam
{{Authority control Dams completed in 2009 Energy infrastructure completed in 2009 Dams in Sudan Hydroelectric power stations in Sudan Dams on the Nile Northern (state)