HOME

TheInfoList



OR:

A flood opening or flood vent (also styled floodvent) is an orifice in an enclosed structure intended to allow the free passage of water between the interior and exterior.


United States

In the
United States The United States of America (U.S.A. or USA), commonly known as the United States (U.S. or US) or America, is a country primarily located in North America. It consists of 50 states, a federal district, five major unincorporated territorie ...
, flood openings are used to provide for the automatic equalization of
hydrostatic pressure Fluid statics or hydrostatics is the branch of fluid mechanics that studies the condition of the equilibrium of a floating body and submerged body "fluids at hydrostatic equilibrium and the pressure in a fluid, or exerted by a fluid, on an imme ...
on either side of a wall.
Building codes A building code (also building control or building regulations) is a set of rules that specify the standards for constructed objects such as buildings and non-building structures. Buildings must conform to the code to obtain planning permiss ...
usually require the installation of flood openings in the walls of structures located in A-type flood zones recognized by the
Federal Emergency Management Agency The Federal Emergency Management Agency (FEMA) is an agency of the United States Department of Homeland Security (DHS), initially created under President Jimmy Carter by Presidential Reorganization Plan No. 3 of 1978 and implemented by two Exec ...
. Various agencies in the United States define necessary characteristics for flood openings. The NFIP Regulations and Building Codes require that any residential building constructed in Flood Zone Type A have the lowest floor, including basements, elevated to or above the Base Flood Elevation (BFE). Enclosed areas are permitted under elevated buildings provided that they meet certain use restrictions and construction requirements such as the installation of flood vents to allow for the automatic entry and exit of flood waters. The wet floodproofing technique is required for residential buildings.


Engineered vs. non-engineered openings

Most regulatory authorities in the United States that offer requirements for flood openings define two major classes of opening:FEMA: Building Code Resources
/ref> engineered, and non-engineered. The requirements for non-engineered openings are typically stricter, defining necessary characteristics for aspects ranging from overall size of each opening, to allowable screening or other coverage options, to number and placement of openings. Engineered openings ignore many of the requirements, depending on the particular regulatory authority. To qualify as an engineered opening, testing and/or certification by a qualified agency (varying from regulator to regulator, and indicated below where appropriate) is required.


American Society of Civil Engineers definition

The
American Society of Civil Engineers American(s) may refer to: * American, something of, from, or related to the United States of America, commonly known as the "United States" or "America" ** Americans, citizens and nationals of the United States of America ** American ancestry, pe ...
(ASCE) requirements apply to any structure that is not dry flood-proofed and which is in the mapped flood zone. It calls for openings in
load-bearing A load-bearing wall or bearing wall is a wall that is an active structural element of a building, which holds the weight of the elements above it, by conducting its weight to a foundation structure below it. Load-bearing walls are one of the ea ...
foundation walls located below the mapped flood elevation. Where non-engineered openings are used, each opening must be at least three inches in diameter, and have no screen or other cover that interferes with the transition of water between interior and exterior. The total net open area of all flood openings in the structure must be equal to or greater than one square inch, per square foot of footprint of the enclosed area—though no fewer than two openings, total, which must be located on different walls. Openings must be placed such that the bottom of each opening is no more than one
foot The foot ( : feet) is an anatomical structure found in many vertebrates. It is the terminal portion of a limb which bears weight and allows locomotion. In many animals with feet, the foot is a separate organ at the terminal part of the leg made ...
above the adjacent ground level.Highlights of ASCE 24-05 Flood Resistant Design and Construction
/ref> In lieu of these requirements, engineered openings must conform to a performance standard: during a flood with a rate of rise/fall of five feet per hour, the difference between interior and exterior flood water levels in an enclosure using the engineered openings must not be greater than one foot.


International Building Code (IBC)

The
International Building Code The International Building Code (IBC) is a model building code developed by the International Code Council (ICC). It has been adopted for use as a base code standard by most jurisdictions in the United States. The IBC addresses both health and saf ...
refers to the American Society of Civil Engineer requirements for both non-engineered and engineered flood openings.


International Residential Code (IRC)

The International Residential Code requirements vary mildly from revision to revision, but require that entry and exit of floodwater be provided for in accordance with the requirements of the ASCE.2003 International Residential Code, International Code Council, 20032006 International Residential Code, International Code Council, 20062009 International Residential Code, International Code Council, 2009 These requirements apply for both non-engineered and engineered flood openings.


FEMA

While the
Federal Emergency Management Agency The Federal Emergency Management Agency (FEMA) is an agency of the United States Department of Homeland Security (DHS), initially created under President Jimmy Carter by Presidential Reorganization Plan No. 3 of 1978 and implemented by two Exec ...
does not have
de jure In law and government, ''de jure'' ( ; , "by law") describes practices that are legally recognized, regardless of whether the practice exists in reality. In contrast, ("in fact") describes situations that exist in reality, even if not legally ...
authority over the building code, it maintains crucial influence over flood opening standards through its administration of the
National Flood Insurance Program The National Flood Insurance Program (NFIP) is a program created by the Congress of the United States in 1968 through the National Flood Insurance Act of 1968 (P.L. 90-448). The NFIP has two purposes: to share the risk of flood losses through floo ...
(NFIP). By controlling the standards for nearly all
flood insurance Flood insurance is the specific insurance coverage issued against property loss from flooding. To determine risk factors for specific properties, insurers will often refer to topographical maps that denote lowlands, floodplains and other areas tha ...
in the United States, the NFIP exerts exceptional
de facto ''De facto'' ( ; , "in fact") describes practices that exist in reality, whether or not they are officially recognized by laws or other formal norms. It is commonly used to refer to what happens in practice, in contrast with ''de jure'' ("by la ...
authority over many aspects of floodplain construction. The FEMA (and, thus, NFIP) requirements for non-engineered openings are similar to requirements from the American Society of Civil Engineers. Unlike the ASCE, FEMA requires the placement of openings such that the bottom of each opening is no more than one foot above the higher of the adjacent ground level, or the interior foundation slab height.FEMA Technical Bulletin 1-08: Openings in Foundation Walls and Walls of Enclosures
/ref> For engineered openings, FEMA offers two subclassifications: individual certification openings, and openings with International Code Council Evaluation Service (ICC-ES) Evaluation Reports. Individual certification openings are offered for use when, " r architectural or other reasons, building designers or owners may prefer to use unique or individually designed openings or devices". In such cases, an
architect An architect is a person who plans, designs and oversees the construction of buildings. To practice architecture means to provide services in connection with the design of buildings and the space within the site surrounding the buildings that h ...
or
engineer Engineers, as practitioners of engineering, are professionals who invent, design, analyze, build and test machines, complex systems, structures, gadgets and materials to fulfill functional objectives and requirements while considering the l ...
may provide certification including the professional's signature and applied
seal Seal may refer to any of the following: Common uses * Pinniped, a diverse group of semi-aquatic marine mammals, many of which are commonly called seals, particularly: ** Earless seal, or "true seal" ** Fur seal * Seal (emblem), a device to impr ...
. The certification must include a "statement certifying that the openings are designed to automatically equalize hydrostatic flood loads on exterior walls by allowing the automatic entry and exit of
floodwater A flood is an overflow of water ( or rarely other fluids) that submerges land that is usually dry. In the sense of "flowing water", the word may also be applied to the inflow of the tide. Floods are an area of study of the discipline hydrolog ...
s in accordance with the...design requirements"; " scription of the range of flood characteristics tested or computed for which the certification is valid, such as rates of rise and fall of floodwaters"; and " scription of the installation requirements and limitations that, if not followed, will void the certification". The nature of the "live seal" requirement means that each structure containing an individual certification opening must have a separate certification, even if the opening is identical to that used in another structure. The alternative subclassification is an opening that carries certification through the ICC-ES. According to FEMA, "Evaluation Reports are issued only after the ICC-ES performs technical evaluations of documentation submitted by a manufacturer, including technical design reports, certifications, and testing that demonstrate code compliance and performance." The report must include a statement concerning the purpose of the opening tested; a description of the characteristics tested; and a description of installation requirements. FEMA allows a copy of the report to be used as a blanket certification of any project including an ICC-ES certified opening, in contrast to the requirements of an individual certification opening.


AC364-1006-R1

AC364-1006-R1 documents the ICC-ES's testing standards for flood openings, including specifications for a dual-chambered testing tank. While the requirements for the opening itself are based on ASCE 24, the substance of the test adds new layers of performance expectation. Under these requirements, the opening must activate before water level is one foot above the bottom of the opening, under conditions of 50 and 300 gallons per minute flooding, at a minimum of five foot per hour rate of rise. Additionally, water levels on the testing tank's "interior" and "exterior" portions must at no point differ more than one foot. To gauge performance against waterborne
debris Debris (, ) is rubble, wreckage, ruins, litter and discarded garbage/refuse/trash, scattered remains of something destroyed, or, as in geology, large rock fragments left by a melting glacier, etc. Depending on context, ''debris'' can refer to ...
, leaves and grass clippings are added to both chambers of the tank.AC364-1006-R1
/ref>


See also

*
Culvert A culvert is a structure that channels water past an obstacle or to a subterranean waterway. Typically embedded so as to be surrounded by soil, a culvert may be made from a pipe, reinforced concrete or other material. In the United Kingdom ...


References

{{reflist Building engineering Construction Architectural elements Safety codes Legal codes Hydrology Flood control