Digital Park is a complex of seven modern office buildings located in the Bratislava district
Petržalka Petržalka (; german: Engerau / Audorf; hu, Pozsonyligetfalu) is the largest borough of Bratislava, the capital of Slovakia. Situated on the right bank of the river Danube, the area shares a land border with Austria, and is home to around 100,000 ...
on Einsteinova Street near the highway D1 (section Viedenská cesta - Prístavný most) and the shopping center
Aupark :''Aupark was also a former name of Sad Janka Kráľa public park.'' Aupark is a shopping centre (shopping mall and entertainment centre) in the Petržalka borough of Bratislava, Slovakia. It was the second major modern shopping centre built in B ...
on the opposite side. The main building is connected with Aupark by a footbridge over the highway; it connects the two buildings on their second floors.


Project

There was also a high-rise building in the original project but it was changed after the financial group Penta had entered the project. This and other changes made the area less filled and the available space will be used for an artificial lake and a park. The construction of the park proceeded in stages. During the years 2005 and 2006, the main 9-floor building was built, the remaining buildings were constructed in the following years. Gross investment is about 3 billion Slovak crowns (cca
The euro sign () is the currency sign used for the euro, the official currency of the eurozone and unilaterally adopted by Kosovo and Montenegro. The design was presented to the public by the European Commission on 12 December 1996. It consists ...
90 million).


Stage 1

The first building of the complex was passed (as capable) in October 2006. The building has 9 floors and one underground floor. The first floor is intended for shops, restaurants, and other services, while the remaining ones serve as offices. A parking lot and storerooms are located underground. The total area available for rent is 12,400 m². About one half of this is already rented to a foreign company that has a technical support center for the
EMEA EMEA is a shorthand designation meaning Europe, the Middle East and Africa. The acronym is used by institutions and governments, as well as in marketing and business when referring to this region: it is a shorthand way of referencing the two ...
region here.


Stage 2

Digital Park II was built between 2007 and 2009. It consists of four mutually interconnected buildings. It is the largest of all the park's stages with a total rentable area of more than 40,000 m², most of which is intended for offices. The premises are also used as conference rooms. There are hundreds of parking places underground.


Stage 3

The third and final stage of Digital Park was completed in 2012. It is actually an extension to the already built Digital Park II. It offers more than 21,000 m² of rentable area and over 360 parking places underground. As in Stage 2, its premises can also be used as conference rooms. In total, the entire Digital ParkDigital Park 3D panorama
/ref> offers about 74,000 m² of rentable area. It serves as the headquarters to many well-known companies, such as Lenovo, Shell, Bayer, or Penta Investments.


References


External links




Reliance SCADA – visualization and control of the Digital Park project