BAP Victoria
   HOME

TheInfoList



OR:

BAP Victoria was an ironclad
monitor Monitor or monitor may refer to: Places * Monitor, Alberta * Monitor, Indiana, town in the United States * Monitor, Kentucky * Monitor, Oregon, unincorporated community in the United States * Monitor, Washington * Monitor, Logan County, West ...
built for the Peruvian Navy in the mid-1860s. The ship participated in the
Battle of Callao The Battle of Callao (, as it is known in South America) occurred on May 2, 1866, between a Spanish Empire, Spanish fleet under the command of Admiral Casto Méndez Núñez and the fortified battery emplacements of the Peruvian port city of Cal ...
in 1866 during the
Chincha Islands War The Chincha Islands War, also known as Spanish–South American War ( es, Guerra hispano-sudamericana), was a series of coastal and naval battles between Spain and its former colonies of Peru, Chile, Ecuador, and Bolivia from 1865 to 1879. The ...
of 1864–66 and was not damaged. Her ultimate fate is unknown.


Description

''Victoria'' was long, had a beam of and a
draft Draft, The Draft, or Draught may refer to: Watercraft dimensions * Draft (hull), the distance from waterline to keel of a vessel * Draft (sail), degree of curvature in a sail * Air draft, distance from waterline to the highest point on a vesse ...
of . The ship displaced . She was powered by a steam engine taken from a locomotive and was thus very slow. The ship was armed with a single
smoothbore A smoothbore weapon is one that has a barrel without rifling. Smoothbores range from handheld firearms to powerful tank guns and large artillery mortars. History Early firearms had smoothly bored barrels that fired projectiles without signi ...
64-pounder gun. ''Victoria'' was protected by of armorGreene & Massignani, p. 265 and had a
freeboard In sailing and boating, a vessel's freeboard is the distance from the waterline to the upper deck level, measured at the lowest point of sheer where water can enter the boat or ship. In commercial vessels, the latter criterion measured relativ ...
of .


Construction and career

Designed by the brothers José Tomás and Manuel José Ramos, construction of ''Victoria'' began on 30 July 1864, when she was "commissioned" in the Peruvian Navy, at the Maestranza Naval de Bellavista shipyard in Callao, Peru. She was completed in early 1866. Little is known of the ship's activities during the Battle of Callao on 2 May 1866, but she was struck by a single Spanish 68-pounder shell that failed to penetrate her armor. Nothing is known about any subsequent activities or her fate.Pixley & Walker, p. 248


References


Bibliography

* * * {{DEFAULTSORT:Victoria Monitors of the Peruvian Navy