Admiral Sergei Gorshkov Class Frigate
   HOME

TheInfoList



OR:

The ''Admiral Gorshkov'' class, Russian designation Project 22350 for the original and upgraded version armed with 16 and 32 VLS cells respectively, is the newest class of
frigate A frigate () is a type of warship. In different eras, the roles and capabilities of ships classified as frigates have varied somewhat. The name frigate in the 17th to early 18th centuries was given to any full-rigged ship built for speed and ...
s being built by the Severnaya Verf in Saint Petersburg for the Russian Navy with a cost of $250 million. The Project 22350 was designed by the
Severnoye Design Bureau The Severnoe Design Bureau (russian: Северное Проектно-Конструкторское Бюро, ''Severnoe Proyektno-Konstruktorsoye Byuro''), founded in 1946, is a Russian ship designing company. It is based in Saint Petersburg wi ...
and incorporates use of
stealth technology Stealth technology, also termed low observable technology (LO technology), is a sub-discipline of military tactics and passive and active electronic countermeasures, which covers a range of methods used to make personnel, aircraft, ships, subm ...
. As of August 2020, ten vessels have been ordered for delivery by 2027. The lead ship of the class, , was commissioned on 28 July 2018.


History

The design of the ship, developed by ''Severnoye PKB'' (Northern Design Bureau) FSUE in St. Petersburg, was approved by Naval Command in July 2003. The plan is to fully replace the older and in four Russian fleets. The lead ship, or its full name – ''Admiral of the Fleet of the Soviet Union Gorshkov'', was laid down on 1 February 2006 in Severnaya Verf shipyard in St. Petersburg. In late October 2008 the Russian deputy prime minister, Sergei Ivanov, said the timely construction of combat ships is a priority task of for Russia's shipbuilding industry, and announced that the first ship in the class would be ready by 2011. The completion date of the lead ship was initially slated for 2009, but this was later pushed back, as was the commissioning date. On 24 June 2009, during the "МВМС-IMDS 2009" International Naval Expo, the Commander in Chief of the Russian Navy, Admiral Vladimir Vysotsky, announced that the production of a second ''Admiral Gorshkov''-class frigate would begin at Severnaya Verf by the end of the year. In November 2009 the Severnaya Verf shipyard announced that it would start the construction of the second ship of the class on 26 November named . The ship was laid down in a ceremony attended by representatives of the Russian Navy, the St. Petersburg administration, and Admiral Igor Kasatonov - the son of the ship's namesake,
Vladimir Kasatonov Vladimir Afanasyevich Kasatonov (russian: Владимир Афанасьевич Касатонов; 21 July 1910 – 9 June 1989) was a Soviet military leader, fleet admiral, and Hero of the Soviet Union. Kasatonov finished the M.V. Frunz ...
. In December 2014, one engine from ''Admiral Kasatonov'' was transferred to ''Admiral Gorshkov''. The first frigate was floated out of the launch dock on 29 October 2010. The ship was only 40 percent complete and then began to be fitted out. At that point, main mechanical equipment and systems providing safe launching had been installed, including a combined diesel and gas (CODAG) turbine powerplant, gear assemblies, drive shafts and screws, and electric power supply facilities. Further work was be performed at the shipyard's fitting quay. The Russian Navy set a requirement for 20–30 such ships. The Severnaya Verf shipyard has thus far announced having received orders for six units. According to the Russian Navy’s deputy commander for armament Vice Admiral Viktor Bursuk, the Russian Navy needs no less than 15 such frigates in basic and upgraded versions. In August 2012, the shipyard received loans worth RUB 16.23 billion (US$510 million) from the state-owned Sberbank to facilitate the frigate construction project. The first two ships of the class have gas turbines from Zorya-Mashproekt in Ukraine. Following the
2014 Crimean crisis In February and March 2014, Russia invaded and subsequently annexed the Crimean Peninsula from Ukraine. This event took place in the aftermath of the Revolution of Dignity and is part of the wider Russo-Ukrainian War. The Revolution of Dign ...
, Ukrainian industry refused to supply Russia with military technology. As a result, NPO Saturn has been commissioned to design indigenous engines. Initial forecasts expected these new engines to be available in 2017–18, allowing ships to be commissioned from 2020; however, after intervention by the Russian government, the plan was brought forward. In November 2020 it was announced that United Engine Corporation had initiated delivery of the DGTA M55R diesel-gas power plant which would be installed on frigates of the class beginning with ''Admiral Isakov''. The first frigate in the class, ''Admiral Gorshkov'', was commissioned on 28 July 2018. State testing of the Russian shipborne Poliment-Redut range air defence missile system with a phased array radar for the frigates of 22350 series has been completed, Commander-in-Chief of the Russian Navy Admiral Vladimir Korolev announced in February 2019. In February 2019, ''Admiral Gorshkov'' and ''Admiral Kasatonov'' were equipped with a naval version of the new
5P-42 Filin The 5P-42 Filin ( eagle owl), is a Russian electro-optic countermeasure system developed by Roselectronics for the Russian Armed Forces. The system is designed to disrupt enemy's combatants eyesight at night and preventing them from targeting a prot ...
electro-optic countermeasure system. The Filin fires a beam similar to a strobe light that affects enemy's combatants eyesight, making it more difficult for them to aim at night. During testing, volunteers reportedly used rifles and guns to shoot targets that were protected by the system and reported having trouble aiming because they could not see. Additionally, about half of the volunteers said they felt dizzy, nauseated and disoriented. About 20 percent of the volunteers reported experiencing hallucinations. In March 2019, the
Severnoye Design Bureau The Severnoe Design Bureau (russian: Северное Проектно-Конструкторское Бюро, ''Severnoe Proyektno-Konstruktorsoye Byuro''), founded in 1946, is a Russian ship designing company. It is based in Saint Petersburg wi ...
reported it has completed the outline design of the upgraded Project 22350M frigate and began working on the technical documentation for the ship. The Project 22350M frigates are believed to incorporate increased number of VLS cells for combination of 48 or 64 Kalibr, Oniks and Zircon anti-ship cruise missiles while displacing about 7,000 tons. The ships are expected to be laid down in a new boathouse with two slipways at Severnaya Verf which will be completed in 2022. On 23 April 2019, two modified Project 22350 frigates, ''Admiral Amelko'' and ''Admiral Chichagov'', were laid down at Severnaya Verf in Saint Petersburg during a ceremony attended by Russian President Vladimir Putin. It was reported that they were to be fitted with 24 VLS cells for Kalibr, Oniks or Zircon cruise missiles, as opposed to 16 VLS cells installed on the first four frigates of the class. Their delivery to the Russian Navy is scheduled for 2023/24 and 2025, respectively. In 2021 it was reported that the intent was actually to fit 32 3S-14 versatile shipborne VLS cells in ''Admiral Amelko'', ''Admiral Chichagov'' and follow-on ships. This remained to be confirmed. In 2020 it was indicated that three ships would be assigned to the Northern Fleet, three to the Pacific Fleet and two to the Black Sea Fleet. A further contract for two additional frigates of the class was announced at the ''Army-2020'' forum increasing the numbers of projected frigates in the Northern and Pacific Fleets to four vessels each. On 30 December 2020 it was reported that the Admiral Kasatonov frigate successfully completed acceptance trials of the Otvet anti-submarine missile complex. On 30 December 2021, it was reported that the Amur Shipyard is preparing to sign a contract for the construction of six frigates for the Pacific Fleet, likely of the ''Admiral Gorshkov'' class. This would decrease the load on Severnaya Verf, which is currently responsible for the construction of all ''Admiral Gorshkov''-class frigates. However, there has been no official confirmation from either the
Ministry of Defence {{unsourced, date=February 2021 A ministry of defence or defense (see spelling differences), also known as a department of defence or defense, is an often-used name for the part of a government responsible for matters of defence, found in states ...
or Amur Shipyard. On 17 August 2022, the United Shipbuilding Corporation stated that they will soon be ready to submit a design proposal for ''Project 22350M "Super Gorshkov"'' to the Ministry of Defence, with a lead vessel laying already planned but not yet publicly known (as of August 2022). On 15 November 2022, General Director of Severnaya Verf Igor Orlov stated that the shipyard will lay down five additional Admiral Gorshkov-class frigates.


Design

The ''Admiral Gorshkov'' class is the successor to the and frigates. Unlike their Soviet-era predecessors, the new ships are designed for multiple roles. They are to be capable to execute long-range strikes, conduct anti-submarine warfare and to carry out escort missions.


Ships


Variants

* Project 22350 – the original version that has been commissioned. * Project 22350 upgraded – with 32 UKSK VLS cells (for cruise missiles) instead of 16. * Project 22356 – export version of Project 22350, first unveiled during the international exhibition Euronaval-2010. * Project 22350M – first unveiled in 2014, the ship is dubbed "Super Gorshkov" for its enlarged hull with an increased displacement of 8,000 tons, pyramidal mast and 64 VLS cells for Kalibr, Oniks and Zircon anti-ship cruise missiles, being developed for the Russian Navy. In 2020, it was reported that design work was to be finished in 2022 after which a lead vessel of the upgraded class was projected to be laid down. A year later, the deputy CEO for military shipbuilding of the United Shipbuilding Corporation (USC), Vladimir Korolyov, was reported to have told the TASS news agency that design of the ship would in fact be completed in 2023 with the first ship expected to be laid down in 2024. He said that 12 vessels were planned and that they were to carry up to 64 Kalibr, Onyx and Tsirkon cruise missiles along with the Poliment-Redut air defense missile system, with up to 100 missiles. The ships would also be equipped for anti-submarine warfare.


See also

*
List of ships of the Soviet Navy This is a list of ships and classes of the Soviet Navy. Corvettes In the Soviet Navy these were classified as small anti-submarine ships (MPK) or small missile ships (MRK). * (projects 122A, 122bis) * (project 204) * (project 1124 ''Al'bat ...
* List of ships of Russia by project number *


References


External links


Admiral Gorshkov-class frigates
@ Naval-technology.com

@ Globalsecurity.com

@ flot.com

{{Soviet and Russian ships after 1945 Frigates of the Russian Navy Frigate classes Stealth ships